Browse Arkansas Code titles and sections
30 U.S.C. § 1252 — Initial regulatory procedures
Federal law — U.S. Code and appendices · legal_authorities
Page 273
TITLE 30—MINERAL LANDS AND MINING
§ 1252
1977 [30 U.S.C. 1201 et seq.] to the contrary, the
Secretary of the Interior shall, within one year
after October 24, 1992, publish proposed regula-
tions in the Federal Register, and after oppor-
tunity for public comment publish final regula-
tions, establishing environmental protection
performance and reclamation standards, and
separate permit systems applicable to oper-
ations for the on-site reprocessing of abandoned
coal refuse and operations for the removal of
abandoned coal refuse on lands that would oth-
erwise be eligible for expenditure under section
404 and section 402(g)(4) of the Surface Mining
Control and Reclamation Act of 1977 [30 U.S.C.
1234, 1232(g)(4)].
(2) The standards and permit systems referred
to in paragraph (1) shall distinguish between
those operations which reprocess abandoned
coal refuse on-site, and those operations which
completely remove abandoned coal refuse from a
site for the direct use of such coal refuse, or for
the reprocessing of such coal refuse, at another
location. Such standards and permit systems
shall be premised on the distinct differences be-
tween operations for the on-site reprocessing,
and operations for the removal, of abandoned
coal refuse and other types of surface coal min-
ing operations.
(3) The Secretary of the Interior may devise a
different standard than any of those set forth in
section 515 and section 516 of the Surface Mining
Control and Reclamation Act of 1977 [30 U.S.C.
1265, 1266], and devise a separate permit system,
if he determines, on a standard-by-standard
basis, that a different standard may facilitate
the on-site reprocessing, or the removal, of
abandoned coal refuse in a manner that would
provide the same level of envi
Source: Supplied 2024 U.S. Code historical extraction · 30 U.S.C. § 1252
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 7f20c1ae55b0e1bf36152d2f86aa8cb6e90b6b006eb0b35204551dcbe4d19d6c. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-03b114908ffc378fcbe56e5c
Source file: Laws/federal/codes/united-states-code-2024/title-30/section-1252-initial-regulatory-procedures--428428c317.md
Pages: Not recorded – Not recorded
Passage SHA-256: fd4368e8ca3cf82f639868eed0b0e75f30566250913b016a9b7295b5acea9db2
Source location: USCODE-2024-title30-chap25-subchapV-sec1252.pdf
Stored source content
Page 273
TITLE 30—MINERAL LANDS AND MINING
§ 1252
1977 [30 U.S.C. 1201 et seq.] to the contrary, the
Secretary of the Interior shall, within one year
after October 24, 1992, publish proposed regula-
tions in the Federal Register, and after oppor-
tunity for public comment publish final regula-
tions, establishing environmental protection
performance and reclamation standards, and
separate permit systems applicable to oper-
ations for the on-site reprocessing of abandoned
coal refuse and operations for the removal of
abandoned coal refuse on lands that would oth-
erwise be eligible for expenditure under section
404 and section 402(g)(4) of the Surface Mining
Control and Reclamation Act of 1977 [30 U.S.C.
1234, 1232(g)(4)].
(2) The standards and permit systems referred
to in paragraph (1) shall distinguish between
those operations which reprocess abandoned
coal refuse on-site, and those operations which
completely remove abandoned coal refuse from a
site for the direct use of such coal refuse, or for
the reprocessing of such coal refuse, at another
location. Such standards and permit systems
shall be premised on the distinct differences be-
tween operations for the on-site reprocessing,
and operations for the removal, of abandoned
coal refuse and other types of surface coal min-
ing operations.
(3) The Secretary of the Interior may devise a
different standard than any of those set forth in
section 515 and section 516 of the Surface Mining
Control and Reclamation Act of 1977 [30 U.S.C.
1265, 1266], and devise a separate permit system,
if he determines, on a standard-by-standard
basis, that a different standard may facilitate
the on-site reprocessing, or the removal, of
abandoned coal refuse in a manner that would
provide the same level of environmental protec-
tion as under section 515 and section 516.
(4) Not later than 30 days prior to the publica-
tion of the proposed regulations referred to in
this section, the Secretary shall submit a report
to the Committee on Interior and Insular Affairs
of the United States House of Representatives,
and the Committee on Energy and Natural Re-
sources of the United States Senate containing
a detailed description of any environmental pro-
tection performance and reclamation standards,
and separate permit systems, devised pursuant
to this section.
(Pub. L. 102–486, title XXV, § 2503(e), Oct. 24, 1992,
106 Stat. 3103.)
Editorial Notes
REFERENCES IN TEXT
The Surface Mining Control and Reclamation Act of
1977, referred to in par. (1), is Pub. L. 95–87, Aug. 3, 1977,
91 Stat. 445, which is classified generally to this chap-
ter (§ 1201 et seq.). For complete classification of this
Act to the Code, see Short Title note set out under sec-
tion 1201 of this title and Tables.
CODIFICATION
Section was enacted as part of the Energy Policy Act
of 1992, and not as part of the Surface Mining Control
and Reclamation Act of 1977 which comprises this chap-
ter.
Statutory Notes and Related Subsidiaries
CHANGE OF NAME
Committee on Interior and Insular Affairs of House of
Representatives changed to Committee on Natural Re-
sources of House of Representatives on Jan. 5, 1993, by
House Resolution No. 5, One Hundred Third Congress.
§ 1252. Initial regulatory procedures
(a) State regulation
No person shall open or develop any new or
previously mined or abandoned site for surface
coal mining operations on lands on which such
operations are regulated by a State unless such
person has obtained a permit from the State’s
regulatory authority.
(b) Interim standards
All surface coal mining operations on lands on
which such operations are regulated by a State
which commence operations pursuant to a per-
mit issued on or after six months from August 3,
1977, shall comply, and such permits shall con-
tain terms requiring compliance with, the provi-
sions set out in subsection (c) of this section.
Prior to final disapproval of a State program or
prior to promulgation of a Federal program or a
Federal lands program pursuant to this chapter,
a State may issue such permits.
(c) Full compliance with environmental protec-
tion performance standards
On and after nine months from August 3, 1977,
all surface coal mining operations on lands on
which such operations are regulated by a State
shall comply with the provisions of subsections
(b)(2), (b)(3), (b)(5), (b)(10), (b)(13), (b)(15), (b)(19),
and (d) of section 1265 of this title or, where a
surface coal mining operation will remove an
entire coal seam or seams running through the
upper fraction of a mountain, ridge, or hill by
removing all of the overburden and creating a
level plateau or a gently rolling contour with no
highwalls remaining, such operation shall com-
ply with the requirements of section 1265(c)(4)
and (5) of this title without regard to the re-
quirements of section 1265(b)(3) or (d)(2) and (3)
of this title, with respect to lands from which
overburden and the coal seam being mined have
not been removed: Provided, however, That sur-
face coal mining operations in operation pursu-
ant to a permit issued by a State before August
3, 1977, issued to a person as defined in section
1291(19) of this title in existence prior to May 2,
1977 and operated by a person whose total an-
nual production of coal from surface and under-
ground coal mining operations does not exceed
one hundred thousand tons shall not be subject
to the provisions of this subsection except with
reference to the provision of section 1265(d)(1) of
this title until January 1, 1979.
(d) Permit application
Not later than two months following the ap-
proval of a State program pursuant to section
1253 of this title or the implementation of a Fed-
eral program pursuant to section 1254 of this
title, regardless of litigation contesting that ap-
proval or implementation, all operators of sur-
face coal mines in expectation of operating such
mines after the expiration of eight months from
the approval of a State program or the imple-
mentation of a Federal program, shall file an ap-
plication for a permit with the regulatory au-
thority. Such application shall cover those lands
to be mined after the expiration of eight months
from the approval of a State program or the im-
Page 274
TITLE 30—MINERAL LANDS AND MINING
§ 1253
1 So in original. The period probably should be a semicolon.
2 So in original. The semicolon probably should be a period.
1 So in original.
plementation of a Federal program. The regu-
latory authority shall process such applications
and grant or deny a permit within eight months
after the date of approval of the State program
or the implementation of the Federal program,
unless specially enjoined by a court of com-
petent jurisdiction, but in no case later than
forty-two months from August 3, 1977.
(e) Federal enforcement program
Within six months after August 3, 1977, the
Secretary shall implement a Federal enforce-
ment program which shall remain in effect in
each State as surface coal mining operations are
required to comply with the provisions of this
chapter, until the State program has been ap-
proved pursuant to this chapter or until a Fed-
eral program has been implemented pursuant to
this chapter. The enforcement program shall—
(1) include inspections of surface coal mine
sites which may be made (but at least one in-
spection for every site every six months),
without advance notice to the mine operator
and for the purpose of ascertaining compliance
with the standards of subsections (b) and (c)
above. The Secretary shall order any nec-
essary enforcement action to be implemented
pursuant to the Federal enforcement provision
of this subchapter to correct violations identi-
fied at the inspections;
(2) provide that upon receipt of inspection
reports indicating that any surface coal min-
ing operation has been found in violation of
subsections (b) and (c) above, during not less
than two consecutive State inspections or
upon receipt by the Secretary of information
which would give rise to reasonable belief that
such standards are being violated by any sur-
face coal mining operation, the Secretary
shall order the immediate inspection of such
operation by Federal inspectors and the nec-
essary enforcement actions, if any, to be im-
plemented pursuant to the Federal enforce-
ment provisions of this subchapter. When the
Federal inspection results from information
provided to the Secretary by any person, the
Secretary shall notify such person when the
Federal inspection is proposed to be carried
out and such person shall be allowed to accom-
pany the inspector during the inspection;
(3) provide that the State regulatory agency
file with the Secretary and with a designated
Federal office centrally located in the county
or area in which the inspected surface coal
mine is located copies of inspection reports
made;
(4) provide that moneys authorized by sec-
tion 1302 of this title shall be available to the
Secretary prior to the approval of a State pro-
gram pursuant to this chapter to reimburse
the State for conducting those inspections in
which the standards of this chapter are en-
forced and for the administration of this sec-
tion.1
(5) for purposes of this section, the term
‘‘Federal inspector’’ means personnel of the
Office of Surface Mining Reclamation and En-
forcement and such additional personnel of
the United States Geological Survey, Bureau
of Land Management, or of the Mining En-
forcement and Safety Administration so des-
ignated by the Secretary, or such other per-
sonnel of the Forest Service, Soil Conserva-
tion Service, or the Agricultural Stabilization
and Conservation Service as arranged by ap-
propriate agreement with the Secretary on a
reimbursable or other basis; 2
(f) Interim period
Following the final disapproval of a State pro-
gram, and prior to promulgation of a Federal
program or a Federal lands program pursuant to
this chapter, including judicial review of such a
program, existing surface coal mining oper-
ations may continue surface mining operations
pursuant to the provisions of this section. Dur-
ing such period no new permits shall be issued
by the State whose program has been dis-
approved. Permits which lapse during such pe-
riod may continue in full force and effect until
promulgation of a Federal program or a Federal
lands program.
(Pub. L. 95–87, title V, § 502, Aug. 3, 1977, 91 Stat.
468.)
§ 1253. State programs
(a) Regulation of surface coal mining and rec-
lamation operations; submittal to Secretary;
time limit; demonstration of effectiveness
Each State in which there are or may be con-
ducted surface coal mining operations on non-
Federal lands, and which wishes to assume ex-
clusive jurisdiction over the regulation of sur-
face coal mining and reclamation operations,
except as provided in sections 1271 and 1273 of
this title and subchapter IV of this chapter,
shall submit to the Secretary, by the end of the
eighteenth-month 1 period beginning on August
3, 1977, a State program which demonstrates
that such State has the capability of carrying
out the provisions of this chapter and meeting
its purposes through—
(1) a State law which provides for the regula-
tion of surface coal mining and reclamation
operations in accordance with the require-
ments of this chapter;
(2) a State law which provides sanctions for
violations of State laws, regulations, or condi-
tions of permits concerning surface coal min-
ing and reclamation operations, which sanc-
tions shall meet the minimum requirements of
this chapter, including civil and criminal ac-
tions, forfeiture of bonds, suspensions, revoca-
tions, and withholding of permits, and the
issuance of cease-and-desist orders by the
State regulatory authority or its inspectors;
(3) a State regulatory authority with suffi-
cient administrative and technical personnel,
and sufficient funding to enable the State to
regulate surface coal mining and reclamation
operations in accordance with the require-
ments of this chapter;
(4) a State law which provides for the effec-
tive implementations,1 maintenance, and en-
forcement of a permit system, meeting the re-
quirements of this subchapter for the regula-
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
The Congress finds and declares that—
**(a)** extraction of coal and other minerals from the earth can be accomplished by various methods of mining, including surface mining;
**(b)** coal mining operations presently contribute significantly to the Nation’s energy requirements; surface coal mining constitutes one method of extraction of the resource; the overwhelming percentage of the Nation’s coal reserves can only be extracted by underground mining methods, and it is, therefore, essential to the national interest to insure the existence of an expanding and economically healthy underground coal mining industry;
**(c)** many surface mining operations result in disturbances of surface areas that burden and adversely affect commerce and the public welfare by destroying or diminishing the utility of land for commercial, industrial, residential, recreational, agricultural, and forestry purposes, by causing erosion and landslides, by contributing to floods, by polluting the water, by destroying fish and wildlife habitats, by impairing natural beauty, by damaging the property of citizens, by creating hazards dangerous to life and property by degrading the quality of life in local communities, and by counteracting governmental programs and efforts to conserve soil, water, and other natural resources;
**(d)** the expansion of coal mining to meet the Nation’s energy needs makes even more urgent the establishment of appropriate standards to minimize damage to the environment and to productivity of the soil and to protect the health and safety of the public.11 So in original. The period probably should be a semicolon.
**(e)** surface mining and reclamation technology are now developed so that effective and reasonable regulation of surface coal mining operations by the States a
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1201
Stored review status: release_metadata_unconfirmed. The source passage cites 30 U.S.C. § 1201. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 228
TITLE 30—MINERAL LANDS AND MINING
§ 1201
1 So in original. The period probably should be a semicolon.
Sec.
1298.
Alaskan surface coal mine study.
1299.
Study of reclamation standards for surface
mining of other minerals.
1300.
Indian lands.
1301.
Experimental practices.
1302.
Authorization of appropriations.
1303.
Coordination of regulatory and inspection ac-
tivities.
1304.
Surface owner protection.
1305.
Federal lessee protection.
1306.
Effect on rights of owner of coal in Alaska to
conduct surface mining operations.
1307.
Water rights and replacement.
1308.
Advance appropriations.
1308a.
Use of civil penalty funds to reclaim lands.
1308b.
Transfer of computer hardware, software and
other technical equipment.
1309.
Certification and training of blasters.
1309a.
Subsidence.
1309b.
Research.
SUBCHAPTER VIII—UNIVERSITY COAL RESEARCH
LABORATORIES
1311.
Establishment of university coal research
laboratories.
1312.
Financial assistance.
1313.
Limitation on payments.
1314.
Payments; Federal share of operating ex-
penses.
1315.
Advisory Council on Coal Research.
1316.
Authorization of appropriations.
SUBCHAPTER IX—ENERGY RESOURCE GRADUATE
FELLOWSHIPS
1321.
Fellowship awards.
1322.
Fellowship recipients.
1323.
Distribution of fellowships.
1324.
Stipends and allowances.
1325.
Limitation on fellowships.
1326.
Fellowship conditions.
1327.
Authorization of appropriations.
1328.
Research, development projects, etc., relating
to alternative coal mining technologies.
SUBCHAPTER I—STATEMENT OF FINDINGS
AND POLICY
§ 1201. Congressional findings
The Congress finds and declares that—
(a) extraction of coal and other minerals
from the earth can be accomplished by various
methods of mining, including surfac
Source: Supplied 2024 U.S. Code historical extraction · 30 U.S.C. § 1201
Stored review status: historical_2024_not_currentness_verified. The source passage cites 30 U.S.C. § 1201. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Lands and water eligible for reclamation or drainage abatement expenditures under this subchapter are those which were mined for coal or which were affected by such mining, wastebanks, coal processing, or other coal mining processes, except as provided for under [section 1240a of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1240a&num=0&edition=prelim), and abandoned or left in an inadequate reclamation status prior to August 3, 1977, and for which there is no continuing reclamation responsibility under State or other Federal laws. For other provisions relating to lands and waters eligible for such expenditures, see [section 1232(g)(4) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1232/g/4&num=0&edition=prelim), [section 1233(b)(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1233/b/1&num=0&edition=prelim), and [section 1239 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1239&num=0&edition=prelim). Surface coal mining operations on lands eligible for remining shall not affect the eligibility of such lands for reclamation and restoration under this subchapter after the release of the bond or deposit for any such operation as provided under [section 1269 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1269&num=0&edition=prelim). In the event the bond or deposit for a surface coal mining operation on lands eligible for remining is forfeited, funds available under this subchapter may be used if the amount of such bond or deposit is not sufficient to provide for adequate reclamation or abatement, except that if conditions warrant the Secretary shall immediate
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1234
Stored review status: release_metadata_unconfirmed. The source passage cites 30 U.S.C. § 1234. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 253
TITLE 30—MINERAL LANDS AND MINING
§ 1235
semicolon after ‘‘protection’’, struck out ‘‘general wel-
fare,’’ after ‘‘safety,’’, and added subpar. (B).
Subsec. (a)(2). Pub. L. 109–432, § 203(1)(B), designated
existing provisions as subpar. (A), substituted ‘‘health
and safety’’ for ‘‘health, safety, and general welfare’’,
and added subpar. (B).
Subsec. (a)(3). Pub. L. 109–432, § 203(1)(C), which di-
rected that a period be substituted for the semicolon at
end, could not be executed because a period already ap-
peared at end.
Subsec. (a)(4), (5). Pub. L. 109–432, § 203(1)(D), struck
out pars. (4) and (5) which read as follows:
‘‘(4) the protection, repair, replacement, construc-
tion, or enhancement of public facilities such as utili-
ties, roads, recreation, and conservation facilities ad-
versely affected by coal mining practices;
‘‘(5) the development of publicly owned land ad-
versely affected by coal mining practices including
land acquired as provided in this subchapter for recre-
ation and historic purposes, conservation, and reclama-
tion purposes and open space benefits.’’
Subsec. (b). Pub. L. 109–432, § 203(2)(A), substituted
‘‘Water supply restoration’’ for ‘‘Utilities and other fa-
cilities’’ in heading.
Subsec. (b)(1). Pub. L. 109–432, § 203(2)(B), struck out
‘‘up to 30 percent of the’’ before ‘‘funds’’.
Subsec.
(c).
Pub.
L.
109–432,
§ 203(3),
inserted
‘‘, subject to the approval of the Secretary,’’ after
‘‘amendments’’ in second sentence.
1992—Subsec. (a)(4) to (6). Pub. L. 102–486, § 2504(c)(2),
redesignated pars. (5) and (6) as (4) and (5), respectively,
and struck out former par. (4) which read as follows:
‘‘research and demonstration projects relating to the
development of surface mining reclamation and water
quality c
Source: Supplied 2024 U.S. Code historical extraction · 30 U.S.C. § 1234
Stored review status: historical_2024_not_currentness_verified. The source passage cites 30 U.S.C. § 1234. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) State regulation** No person shall open or develop any new or previously mined or abandoned site for surface coal mining operations on lands on which such operations are regulated by a State unless such person has obtained a permit from the State’s regulatory authority.
**(b) Interim standards** All surface coal mining operations on lands on which such operations are regulated by a State which commence operations pursuant to a permit issued on or after six months from August 3, 1977, shall comply, and such permits shall contain terms requiring compliance with, the provisions set out in subsection (c) of this section. Prior to final disapproval of a State program or prior to promulgation of a Federal program or a Federal lands program pursuant to this chapter, a State may issue such permits.
**(c) Full compliance with environmental protection performance standards** On and after nine months from August 3, 1977, all surface coal mining operations on lands on which such operations are regulated by a State shall comply with the provisions of subsections (b)(2), (b)(3), (b)(5), (b)(10), (b)(13), (b)(15), (b)(19), and (d) of [section 1265 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1265&num=0&edition=prelim) or, where a surface coal mining operation will remove an entire coal seam or seams running through the upper fraction of a mountain, ridge, or hill by removing all of the overburden and creating a level plateau or a gently rolling contour with no highwalls remaining, such operation shall comply with the requirements of section 1265(c)(4) and (5) of this title without regard to the requirements of section 1265(b)(3) or (d)(2) and (3) of this title, with respect to lands from which overburden and the coal seam being min
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1252
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Permit requirement** Any permit issued under any approved State or Federal program pursuant to this chapter to conduct surface coal mining operations shall require that such surface coal mining operations will meet all applicable performance standards of this chapter, and such other requirements as the regulatory authority shall promulgate.
**(b) General standards** General performance standards shall be applicable to all surface coal mining and reclamation operations and shall require the operation as a minimum to—
(1) conduct surface coal mining operations so as to maximize the utilization and conservation of the solid fuel resource being recovered so that reaffecting the land in the future through surface coal mining can be minimized;
(2) restore the land affected to a condition capable of supporting the uses which it was capable of supporting prior to any mining, or higher or better uses of which there is reasonable likelihood, so long as such use or uses do not present any actual or probable hazard to public health or safety or pose any actual or probable threat of water diminution or pollution, and the permit applicants’ declared proposed land use following reclamation is not deemed to be impractical or unreasonable, inconsistent with applicable land use policies and plans, involves unreasonable delay in implementation, or is violative of Federal, State, or local law;
(3) except as provided in subsection (c) with respect to all surface coal mining operations backfill, compact (where advisable to insure stability or to prevent leaching of toxic materials), and grade in order to restore the approximate original contour of the land with all highwalls, spoil piles, and depressions eliminated (unless small depressions are needed in order to retain moisture to
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1265
Stored review status: release_metadata_unconfirmed. The source passage cites 30 U.S.C. § 1265. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 286
TITLE 30—MINERAL LANDS AND MINING
§ 1265
as an objector, and who is aggrieved by the deci-
sion of the regulatory authority, or if the regu-
latory authority fails to act within the time
limits specified in this chapter shall have the
right to appeal in accordance with section 1276
of this title.
(Pub. L. 95–87, title V, § 514, Aug. 3, 1977, 91 Stat.
485.)
§ 1265. Environmental protection performance
standards
(a) Permit requirement
Any permit issued under any approved State
or Federal program pursuant to this chapter to
conduct surface coal mining operations shall re-
quire that such surface coal mining operations
will meet all applicable performance standards
of this chapter, and such other requirements as
the regulatory authority shall promulgate.
(b) General standards
General performance standards shall be appli-
cable to all surface coal mining and reclamation
operations and shall require the operation as a
minimum to—
(1) conduct surface coal mining operations
so as to maximize the utilization and con-
servation of the solid fuel resource being re-
covered so that reaffecting the land in the fu-
ture through surface coal mining can be mini-
mized;
(2) restore the land affected to a condition
capable of supporting the uses which it was ca-
pable of supporting prior to any mining, or
higher or better uses of which there is reason-
able likelihood, so long as such use or uses do
not present any actual or probable hazard to
public health or safety or pose any actual or
probable threat of water diminution or pollu-
tion, and the permit applicants’ declared pro-
posed land use following reclamation is not
deemed to be impractical or unreasonable, in-
consistent with applicable land use policies
and plans, involves unreasonable delay i
Source: Supplied 2024 U.S. Code historical extraction · 30 U.S.C. § 1265
Stored review status: historical_2024_not_currentness_verified. The source passage cites 30 U.S.C. § 1265. This identifies an authority to review, not proof of applicability.