Browse Arkansas Code titles and sections
30 U.S.C. § 1265 — Environmental protection performance
Federal law — U.S. Code and appendices · legal_authorities
Page 286
TITLE 30—MINERAL LANDS AND MINING
§ 1265
as an objector, and who is aggrieved by the deci-
sion of the regulatory authority, or if the regu-
latory authority fails to act within the time
limits specified in this chapter shall have the
right to appeal in accordance with section 1276
of this title.
(Pub. L. 95–87, title V, § 514, Aug. 3, 1977, 91 Stat.
485.)
§ 1265. Environmental protection performance
standards
(a) Permit requirement
Any permit issued under any approved State
or Federal program pursuant to this chapter to
conduct surface coal mining operations shall re-
quire that such surface coal mining operations
will meet all applicable performance standards
of this chapter, and such other requirements as
the regulatory authority shall promulgate.
(b) General standards
General performance standards shall be appli-
cable to all surface coal mining and reclamation
operations and shall require the operation as a
minimum to—
(1) conduct surface coal mining operations
so as to maximize the utilization and con-
servation of the solid fuel resource being re-
covered so that reaffecting the land in the fu-
ture through surface coal mining can be mini-
mized;
(2) restore the land affected to a condition
capable of supporting the uses which it was ca-
pable of supporting prior to any mining, or
higher or better uses of which there is reason-
able likelihood, so long as such use or uses do
not present any actual or probable hazard to
public health or safety or pose any actual or
probable threat of water diminution or pollu-
tion, and the permit applicants’ declared pro-
posed land use following reclamation is not
deemed to be impractical or unreasonable, in-
consistent with applicable land use policies
and plans, involves unreasonable delay i
Source: Supplied 2024 U.S. Code historical extraction · 30 U.S.C. § 1265
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 94c26cb17cd6456316f2301b21f6ab4811f0be227d7a2f5fcca58ef28ced631b. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-02002ef9065510e4b63fcbac
Source file: Laws/federal/codes/united-states-code-2024/title-30/section-1265-environmental-protection-performance--0991acab1b.md
Pages: Not recorded – Not recorded
Passage SHA-256: 8453042b134c1fbbdf6f2e5c17ec2faf36e16e6a65423b138dbc24de975a0293
Source location: USCODE-2024-title30-chap25-subchapV-sec1265.pdf
Stored source content
Page 286
TITLE 30—MINERAL LANDS AND MINING
§ 1265
as an objector, and who is aggrieved by the deci-
sion of the regulatory authority, or if the regu-
latory authority fails to act within the time
limits specified in this chapter shall have the
right to appeal in accordance with section 1276
of this title.
(Pub. L. 95–87, title V, § 514, Aug. 3, 1977, 91 Stat.
485.)
§ 1265. Environmental protection performance
standards
(a) Permit requirement
Any permit issued under any approved State
or Federal program pursuant to this chapter to
conduct surface coal mining operations shall re-
quire that such surface coal mining operations
will meet all applicable performance standards
of this chapter, and such other requirements as
the regulatory authority shall promulgate.
(b) General standards
General performance standards shall be appli-
cable to all surface coal mining and reclamation
operations and shall require the operation as a
minimum to—
(1) conduct surface coal mining operations
so as to maximize the utilization and con-
servation of the solid fuel resource being re-
covered so that reaffecting the land in the fu-
ture through surface coal mining can be mini-
mized;
(2) restore the land affected to a condition
capable of supporting the uses which it was ca-
pable of supporting prior to any mining, or
higher or better uses of which there is reason-
able likelihood, so long as such use or uses do
not present any actual or probable hazard to
public health or safety or pose any actual or
probable threat of water diminution or pollu-
tion, and the permit applicants’ declared pro-
posed land use following reclamation is not
deemed to be impractical or unreasonable, in-
consistent with applicable land use policies
and plans, involves unreasonable delay in im-
plementation, or is violative of Federal, State,
or local law;
(3) except as provided in subsection (c) with
respect to all surface coal mining operations
backfill, compact (where advisable to insure
stability or to prevent leaching of toxic mate-
rials), and grade in order to restore the ap-
proximate original contour of the land with
all highwalls, spoil piles, and depressions
eliminated (unless small depressions are need-
ed in order to retain moisture to assist revege-
tation or as otherwise authorized pursuant to
this chapter): Provided, however, That in sur-
face coal mining which is carried out at the
same location over a substantial period of
time where the operation transects the coal
deposit, and the thickness of the coal deposits
relative to the volume of the overburden is
large and where the operator demonstrates
that the overburden and other spoil and waste
materials at a particular point in the permit
area or otherwise available from the entire
permit area is insufficient, giving due consid-
eration to volumetric expansion, to restore
the approximate original contour, the oper-
ator, at a minimum, shall backfill, grade, and
compact (where advisable) using all available
overburden and other spoil and waste mate-
rials to attain the lowest practicable grade
but not more than the angle of repose, to pro-
vide adequate drainage and to cover all acid-
forming and other toxic materials, in order to
achieve an ecologically sound land use com-
patible with the surrounding region: And pro-
vided further, That in surface coal mining
where the volume of overburden is large rel-
ative to the thickness of the coal deposit and
where the operator demonstrates that due to
volumetric expansion the amount of overbur-
den and other spoil and waste materials re-
moved in the course of the mining operation is
more than sufficient to restore the approxi-
mate original contour, the operator shall after
restoring the approximate contour, backfill,
grade, and compact (where advisable) the ex-
cess overburden and other spoil and waste ma-
terials to attain the lowest grade but not more
than the angle of repose, and to cover all acid-
forming and other toxic materials, in order to
achieve an ecologically sound land use com-
patible with the surrounding region and that
such overburden or spoil shall be shaped and
graded in such a way as to prevent slides, ero-
sion, and water pollution and is revegetated in
accordance with the requirements of this
chapter;
(4) stabilize and protect all surface areas in-
cluding spoil piles affected by the surface coal
mining and reclamation operation to effec-
tively control erosion and attendant air and
water pollution;
(5) remove the topsoil from the land in a sep-
arate layer, replace it on the backfill area, or
if not utilized immediately, segregate it in a
separate pile from other spoil and when the
topsoil is not replaced on a backfill area with-
in a time short enough to avoid deterioration
of the topsoil, maintain a successful cover by
quick growing plant or other means thereafter
so that the topsoil is preserved from wind and
water erosion, remains free of any contamina-
tion by other acid or toxic material, and is in
a usable condition for sustaining vegetation
when restored during reclamation, except if
topsoil is of insufficient quantity or of poor
quality for sustaining vegetation, or if other
strata can be shown to be more suitable for
vegetation requirements, then the operator
shall remove, segregate, and preserve in a like
manner such other strata which is best able to
support vegetation;
(6) restore the topsoil or the best available
subsoil which is best able to support vegeta-
tion;
(7) for all prime farm lands as identified in
section 1257(b)(16) of this title to be mined and
reclaimed, specifications for soil removal,
storage, replacement, and reconstruction shall
be established by the Secretary of Agriculture,
and the operator shall, as a minimum, be re-
quired to—
(A) segregate the A horizon of the natural
soil, except where it can be shown that other
available soil materials will create a final
soil having a greater productive capacity;
and if not utilized immediately, stockpile
this material separately from other spoil,
Page 287
TITLE 30—MINERAL LANDS AND MINING
§ 1265
1 So in original. Probably should be followed by a comma.
2 So in original. Probably should be ‘‘conduct’’.
3 So in original. Probably should be ‘‘keeping’’.
and provide needed protection from wind and
water erosion or contamination by other
acid or toxic material;
(B) segregate the B horizon of the natural
soil, or underlying C horizons or other stra-
ta, or a combination of such horizons or
other strata that are shown to be both
texturally and chemically suitable for plant
growth and that can be shown to be equally
or more favorable for plant growth than the
B horizon, in sufficient quantities to create
in the regraded final soil a root zone of com-
parable depth and quality to that which ex-
isted in the natural soil; and if not utilized
immediately, stockpile this material sepa-
rately from other spoil, and provide needed
protection from wind and water erosion or
contamination by other acid or toxic mate-
rial;
(C) replace and regrade the root zone ma-
terial described in (B) above with proper
compaction and uniform depth over the re-
graded spoil material; and
(D) redistribute and grade in a uniform
manner the surface soil horizon described in
subparagraph (A);
(8) create, if authorized in the approved min-
ing and reclamation plan and permit, perma-
nent impoundments of water on mining sites
as part of reclamation activities only when it
is adequately demonstrated that—
(A) the size of the impoundment is ade-
quate for its intended purposes;
(B) the impoundment dam construction
will be so designed as to achieve necessary
stability with an adequate margin of safety
compatible with that of structures con-
structed under Public Law 83–566 (16 U.S.C.
1006);
(C) the quality of impounded water will be
suitable on a permanent basis for its in-
tended use and that discharges from the im-
poundment will not degrade the water qual-
ity below water quality standards estab-
lished pursuant to applicable Federal and
State law in the receiving stream;
(D) the level of water will be reasonably
stable;
(E) final grading will provide adequate
safety and access for proposed water users;
and
(F) such water impoundments will not re-
sult in the diminution of the quality or
quantity of water utilized by adjacent or
surrounding landowners for agricultural, in-
dustrial 1 recreational, or domestic uses;
(9) conducting 2 any augering operation asso-
ciated with surface mining in a manner to
maximize recoverability of mineral reserves
remaining after the operation and reclamation
are complete; and seal all auger holes with an
impervious and noncombustible material in
order to prevent drainage except where the
regulatory authority determines that the re-
sulting impoundment of water in such auger
holes may create a hazard to the environment
or the public health or safety: Provided, That
the
permitting
authority
may
prohibit
augering if necessary to maximize the utiliza-
tion, recoverability or conservation of the
solid fuel resources or to protect against ad-
verse water quality impacts;
(10) minimize the disturbances to the pre-
vailing hydrologic balance at the mine-site
and in associated offsite areas and to the qual-
ity and quantity of water in surface and
ground water systems both during and after
surface coal mining operations and during rec-
lamation by—
(A) avoiding acid or other toxic mine
drainage by such measures as, but not lim-
ited to—
(i) preventing or removing water from
contact with toxic producing deposits;
(ii) treating drainage to reduce toxic
content which adversely affects down-
stream water upon being released to water
courses;
(iii) casing, sealing, or otherwise man-
aging boreholes, shafts, and wells and
keep 3 acid or other toxic drainage from
entering ground and surface waters;
(B)(i) conducting surface coal mining oper-
ations so as to prevent, to the extent pos-
sible using the best technology currently
available, additional contributions of sus-
pended solids to streamflow, or runoff out-
side the permit area, but in no event shall
contributions be in excess of requirements
set by applicable State or Federal law;
(ii) constructing any siltation structures
pursuant to subparagraph (B)(i) of this sub-
section prior to commencement of surface
coal mining operations, such structures to
be certified by a qualified registered engi-
neer or a qualified registered professional
land surveyor in any State which authorizes
land surveyors to prepare and certify such
maps or plans to be constructed as designed
and as approved in the reclamation plan;
(C) cleaning out and removing temporary
or large settling ponds or other siltation
structures from drainways after disturbed
areas are revegetated and stabilized; and de-
positing the silt and debris at a site and in
a manner approved by the regulatory au-
thority;
(D) restoring recharge capacity of the
mined area to approximate premining condi-
tions;
(E) avoiding channel deepening or enlarge-
ment in operations requiring the discharge
of water from mines;
(F) preserving throughout the mining and
reclamation process the essential hydrologic
functions of alluvial valley floors in the arid
and semiarid areas of the country; and
(G) such other actions as the regulatory
authority may prescribe;
(11) with respect to surface disposal of mine
wastes, tailings, coal processing wastes, and
other wastes in areas other than the mine
working or excavations, stabilize all waste
piles in designated areas through construction
in compacted layers including the use of in-
Page 288
TITLE 30—MINERAL LANDS AND MINING
§ 1265
4 So in original. The period probably should be a semicolon.
combustible and impervious materials if nec-
essary and assure the final contour of the
waste pile will be compatible with natural sur-
roundings and that the site can and will be
stabilized and revegetated according to the
provisions of this chapter;
(12) refrain from surface coal mining within
five hundred feet from active and abandoned
underground mines in order to prevent break-
throughs and to protect health or safety of
miners: Provided, That the regulatory author-
ity shall permit an operator to mine near,
through or partially through an abandoned un-
derground mine or closer to an active under-
ground mine if (A) the nature, timing, and se-
quencing of the approximate coincidence of
specific surface mine activities with specific
underground mine activities are jointly ap-
proved by the regulatory authorities con-
cerned with surface mine regulation and the
health and safety of underground miners, and
(B) such operations will result in improved re-
source recovery, abatement of water pollution,
or elimination of hazards to the health and
safety of the public;
(13) design, locate, construct, operate, main-
tain, enlarge, modify, and remove or abandon,
in accordance with the standards and criteria
developed pursuant to subsection (f) of this
section, all existing and new coal mine waste
piles consisting of mine wastes, tailings, coal
processing wastes, or other liquid and solid
wastes, and used either temporarily or perma-
nently as dams or embankments;
(14) insure that all debris, acid-forming ma-
terials, toxic materials, or materials consti-
tuting a fire hazard are treated or buried and
compacted or otherwise disposed of in a man-
ner designed to prevent contamination of
ground or surface waters and that contingency
plans are developed to prevent sustained com-
bustion;
(15) insure that explosives are used only in
accordance with existing State and Federal
law and the regulations promulgated by the
regulatory authority, which shall include pro-
visions to—
(A) provide adequate advance written no-
tice to local governments and residents who
might be affected by the use of such explo-
sives by publication of the planned blasting
schedule in a newspaper of general circula-
tion in the locality and by mailing a copy of
the proposed blasting schedule to every resi-
dent living within one-half mile of the pro-
posed blasting site and by providing daily
notice to resident/occupiers in such areas
prior to any blasting;
(B) maintain for a period of at least three
years and make available for public inspec-
tion upon request a log detailing the loca-
tion of the blasts, the pattern and depth of
the drill holes, the amount of explosives
used per hole, and the order and length of
delay in the blasts;
(C) limit the type of explosives and deto-
nating equipment, the size, the timing and
frequency of blasts based upon the physical
conditions of the site so as to prevent (i) in-
jury to persons, (ii) damage to public and
private property outside the permit area,
(iii) adverse impacts on any underground
mine, and (iv) change in the course, channel,
or availability of ground or surface water
outside the permit area;
(D) require that all blasting operations be
conducted by trained and competent persons
as certified by the regulatory authority;
(E) provide that upon the request of a resi-
dent or owner of a man-made dwelling or
structure within one-half mile of any por-
tion of the permitted area the applicant or
permittee shall conduct a pre-blasting sur-
vey of such structures and submit the survey
to the regulatory authority and a copy to
the resident or owner making the request.
The area of the survey shall be decided by
the regulatory authority and shall include
such provisions as the Secretary shall pro-
mulgate.4
(16) insure that all reclamation efforts pro-
ceed in an environmentally sound manner and
as contemporaneously as practicable with the
surface coal mining operations: Provided, how-
ever, That where the applicant proposes to
combine surface mining operations with un-
derground mining operations to assure max-
imum practical recovery of the mineral re-
sources, the regulatory authority may grant a
variance for specific areas within the reclama-
tion plan from the requirement that reclama-
tion efforts proceed as contemporaneously as
practicable to permit underground mining op-
erations prior to reclamation:
(A) if the regulatory authority finds in
writing that:
(i) the applicant has presented, as part of
the permit application, specific, feasible
plans for the proposed underground mining
operations;
(ii) the proposed underground mining op-
erations are necessary or desirable to as-
sure maximum practical recovery of the
mineral resource and will avoid multiple
disturbance of the surface;
(iii) the applicant has satisfactorily dem-
onstrated that the plan for the under-
ground mining operations conforms to re-
quirements for underground mining in the
jurisdiction and that permits necessary for
the underground mining operations have
been issued by the appropriate authority;
(iv) the areas proposed for the variance
have been shown by the applicant to be
necessary for the implementing of the pro-
posed underground mining operations;
(v) no substantial adverse environmental
damage, either on-site or off-site, will re-
sult from the delay in completion of rec-
lamation as required by this chapter;
(vi) provisions for the off-site storage of
spoil will comply with paragraph (22);
(B) if the Secretary has promulgated spe-
cific regulations to govern the granting of
such variances in accordance with the provi-
sions of this subsection and section 1251 of
this title, and has imposed such additional
requirements as he deems necessary;
(C) if variances granted under the provi-
sions of this subsection are to be reviewed by
Page 289
TITLE 30—MINERAL LANDS AND MINING
§ 1265
5 So in original. The word ‘‘and’’ probably should appear at end
of par. (24).
the regulatory authority not more than
three years from the date of issuance of the
permit; and
(D) if liability under the bond filed by the
applicant with the regulatory authority pur-
suant to section 1259(b) of this title shall be
for the duration of the underground mining
operations and until the requirements of
this subsection and section 1269 of this title
have been fully complied with.4
(17) insure that the construction, mainte-
nance, and postmining conditions of access
roads into and across the site of operations
will control or prevent erosion and siltation,
pollution of water, damage to fish or wildlife
or their habitat, or public or private property;
(18) refrain from the construction of roads or
other access ways up a stream bed or drainage
channel or in such proximity to such channel
so as to seriously alter the normal flow of
water;
(19) establish on the regraded areas, and all
other lands affected, a diverse, effective, and
permanent vegetative cover of the same sea-
sonal variety native to the area of land to be
affected and capable of self-regeneration and
plant succession at least equal in extent of
cover to the natural vegetation of the area;
except, that introduced species may be used in
the revegetation process where desirable and
necessary to achieve the approved postmining
land use plan;
(20)(A) assume the responsibility for success-
ful revegetation, as required by paragraph (19)
above, for a period of five full years after the
last year of augmented seeding, fertilizing, ir-
rigation, or other work in order to assure com-
pliance with paragraph (19) above, except in
those areas or regions of the country where
the annual average precipitation is twenty-six
inches or less, then the operator’s assumption
of responsibility and liability will extend for a
period of ten full years after the last year of
augmented seeding, fertilizing, irrigation, or
other work: Provided, That when the regu-
latory authority approves a long-term inten-
sive agricultural postmining land use, the ap-
plicable five- or ten-year period of responsi-
bility for revegetation shall commence at the
date of initial planting for such long-term in-
tensive agricultural postmining land use: Pro-
vided further, That when the regulatory au-
thority issues a written finding approving a
long-term, intensive, agricultural postmining
land use as part of the mining and reclamation
plan, the authority may grant exception to
the provisions of paragraph (19) above;
(B) on lands eligible for remining assume the
responsibility for successful revegetation for a
period of two full years after the last year of
augmented seeding, fertilizing, irrigation, or
other work in order to assure compliance with
the applicable standards, except in those areas
or regions of the country where the annual av-
erage precipitation is twenty-six inches or
less, then the operator’s assumption of respon-
sibility and liability will be extended for a pe-
riod of five full years after the last year of
augmented seeding, fertilizing, irrigation, or
other work in order to assure compliance with
the applicable standards.4
(21) protect offsite areas from slides or dam-
age occurring during the surface coal mining
and reclamation operations, and not deposit
spoil material or locate any part of the oper-
ations or waste accumulations outside the per-
mit area;
(22) place all excess spoil material resulting
from coal surface mining and reclamation ac-
tivities in such a manner that—
(A) spoil is transported and placed in a
controlled manner in position for concurrent
compaction and in such a way to assure
mass stability and to prevent mass move-
ment;
(B) the areas of disposal are within the
bonded permit areas and all organic matter
shall be removed immediately prior to spoil
placement;
(C) appropriate surface and internal drain-
age systems and diversion ditches are used
so as to prevent spoil erosion and movement;
(D) the disposal area does not contain
springs, natural water courses or wet weath-
er seeps unless lateral drains are con-
structed from the wet areas to the main
underdrains in such a manner that filtration
of the water into the spoil pile will be pre-
vented;
(E) if placed on a slope, the spoil is placed
upon the most moderate slope among those
upon which, in the judgment of the regu-
latory authority, the spoil could be placed in
compliance with all the requirements of this
chapter, and shall be placed, where possible,
upon, or above, a natural terrace, bench, or
berm, if such placement provides additional
stability and prevents mass movement;
(F) where the toe of the spoil rests on a
downslope, a rock toe buttress, of sufficient
size to prevent mass movement, is con-
structed;
(G) the final configuration is compatible
with the natural drainage pattern and sur-
roundings and suitable for intended uses;
(H) design of the spoil disposal area is cer-
tified by a qualified registered professional
engineer in conformance with professional
standards; and
(I) all other provisions of this chapter are
met.4
(23) meet such other criteria as are nec-
essary to achieve reclamation in accordance
with the purposes of this chapter, taking into
consideration the physical, climatological,
and other characteristics of the site; and 5
(24) to the extent possible using the best
technology currently available, minimize dis-
turbances and adverse impacts of the oper-
ation on fish, wildlife, and related environ-
mental values, and achieve enhancement of
such resources where practicable;
(25) provide for an undisturbed natural bar-
rier beginning at the elevation of the lowest
coal seam to be mined and extending from the
outslope for such distance as the regulatory
authority shall determine shall be retained in
place as a barrier to slides and erosion.
Page 290
TITLE 30—MINERAL LANDS AND MINING
§ 1265
6 So in original. Probably should be ‘‘for’’.
7 So in original. The semicolon probably should be a period.
(c) Procedures; exception to original contour res-
toration requirements
(1) Each State program may and each Federal
program shall include procedures pursuant to
which the regulatory authority may permit sur-
face mining operations for the purposes set forth
in paragraph (3) of this subsection.
(2) Where an applicant meets the requirements
of paragraphs (3) and (4) of this subsection a per-
mit without regard to the requirement to re-
store to approximate original contour set forth
in subsection (b)(3) or (d)(2) and (3) of this sec-
tion may be granted for the surface mining of
coal where the mining operation will remove an
entire coal seam or seams running through the
upper fraction of a mountain, ridge, or hill (ex-
cept as provided in subsection (c)(4)(A) hereof)
by removing all of the overburden and creating
a level plateau or a gently rolling contour with
no highwalls remaining, and capable of sup-
porting postmining uses in accord with the re-
quirements of this subsection.
(3) In cases where an industrial, commercial,
agricultural, residential or public facility (in-
cluding recreational facilities) use is proposed
or 6 the postmining use of the affected land, the
regulatory authority may grant a permit for a
surface mining operation of the nature described
in subsection (c)(2) where—
(A) after consultation with the appropriate
land use planning agencies, if any, the pro-
posed postmining land use is deemed to con-
stitute an equal or better economic or public
use of the affected land, as compared with
premining use;
(B) the applicant presents specific plans for
the proposed postmining land use and appro-
priate assurances that such use will be—
(i) compatible with adjacent land uses;
(ii) obtainable according to data regarding
expected need and market;
(iii) assured of investment in necessary
public facilities;
(iv) supported by commitments from pub-
lic agencies where appropriate;
(v) practicable with respect to private fi-
nancial capability for completion of the pro-
posed use;
(vi) planned pursuant to a schedule at-
tached to the reclamation plan so as to inte-
grate the mining operation and reclamation
with the postmining land use; and
(vii) designed by a registered engineer in
conformance with professional standards es-
tablished to assure the stability, drainage,
and configuration necessary for the intended
use of the site;
(C) the proposed use would be consistent
with adjacent land uses, and existing State
and local land use plans and programs;
(D) the regulatory authority provides the
governing body of the unit of general-purpose
government in which the land is located and
any State or Federal agency which the regu-
latory agency, in its discretion, determines to
have an interest in the proposed use, an oppor-
tunity of not more than sixty days to review
and comment on the proposed use;
(E) all other requirements of this chapter
will be met.
(4) In granting any permit pursuant to this
subsection the regulatory authority shall re-
quire that—
(A) the toe of the lowest coal seam and the
overburden associated with it are retained in
place as a barrier to slides and erosion;
(B) the reclaimed area is stable;
(C) the resulting plateau or rolling contour
drains inward from the outslopes except at
specified points;
(D) no damage will be done to natural water-
courses;
(E) spoil will be placed on the mountaintop
bench as is necessary to achieve the planned
postmining land use: Provided, That all excess
spoil material not retained on the mountain-
top shall be placed in accordance with the pro-
visions of subsection (b)(22) of this section;
(F) insure stability of the spoil retained on
the mountaintop and meet the other require-
ments of this chapter; 7
(5) The regulatory authority shall promulgate
specific regulations to govern the granting of
permits in accord with the provisions of this
subsection, and may impose such additional re-
quirements as he deems to be necessary.
(6) All permits granted under the provisions of
this subsection shall be reviewed not more than
three years from the date of issuance of the per-
mit, unless the applicant affirmatively dem-
onstrates that the proposed development is pro-
ceeding in accordance with the terms of the ap-
proved schedule and reclamation plan.
(d) Steep-slope surface coal mining standards
The following performance standards shall be
applicable to steep-slope surface coal mining
and shall be in addition to those general per-
formance standards required by this section:
Provided, however, That the provisions of this
subsection (d) shall not apply to those situations
in which an operator is mining on flat or gently
rolling terrain, on which an occasional steep
slope is encountered through which the mining
operation is to proceed, leaving a plain or pre-
dominantly flat area or where an operator is in
compliance with provisions of subsection (c)
hereof:
(1) Insure that when performing surface coal
mining on steep slopes, no debris, abandoned or
disabled equipment, spoil material, or waste
mineral matter be placed on the downslope
below the bench or mining cut: Provided, That
spoil material in excess of that required for the
reconstruction of the approximate original con-
tour under the provisions of subsection (b)(3) or
(d)(2) shall be permanently stored pursuant to
subsection (b)(22).
(2) Complete backfilling with spoil material
shall be required to cover completely the
highwall and return the site to the appropriate
original contour, which material will maintain
stability following mining and reclamation.
(3) The operator may not disturb land above
the top of the highwall unless the regulatory au-
thority finds that such disturbance will facili-
Page 291
TITLE 30—MINERAL LANDS AND MINING
§ 1266
tate compliance with the environmental protec-
tion standards of this section: Provided, however,
That the land disturbed above the highwall shall
be limited to that amount necessary to facili-
tate said compliance.
(4) For the purposes of this subsection (d), the
term ‘‘steep slope’’ is any slope above twenty de-
grees or such lesser slope as may be defined by
the regulatory authority after consideration of
soil, climate, and other characteristics of a re-
gion or State.
(e) Variances to original contour restoration re-
quirements
(1) Each State program may and each Federal
program shall include procedures pursuant to
which the regulatory authority may permit
variances for the purposes set forth in paragraph
(3) of this subsection, provided that the water-
shed control of the area is improved; and further
provided complete backfilling with spoil mate-
rial shall be required to cover completely the
highwall which material will maintain stability
following mining and reclamation.
(2) Where an applicant meets the requirements
of paragraphs (3) and (4) of this subsection a
variance from the requirement to restore to ap-
proximate original contour set forth in sub-
section (d)(2) of this section may be granted for
the surface mining of coal where the owner of
the surface knowingly requests in writing, as a
part of the permit application that such a vari-
ance be granted so as to render the land, after
reclamation, suitable for an industrial, commer-
cial, residential, or public use (including rec-
reational facilities) in accord with the further
provisions of (3) and (4) of this subsection.
(3)(A) After consultation with the appropriate
land use planning agencies, if any, the potential
use of the affected land is deemed to constitute
an equal or better economic or public use;
(B) is designed and certified by a qualified reg-
istered professional engineer in conformance
with professional standards established to as-
sure the stability, drainage, and configuration
necessary for the intended use of the site; and
(C) after approval of the appropriate State en-
vironmental agencies, the watershed of the af-
fected land is deemed to be improved.
(4) In granting a variance pursuant to this sub-
section the regulatory authority shall require
that only such amount of spoil will be placed off
the mine bench as is necessary to achieve the
planned postmining land use, insure stability of
the spoil retained on the bench, meet all other
requirements of this chapter, and all spoil place-
ment off the mine bench must comply with sub-
section (b)(22).
(5) The regulatory authority shall promulgate
specific regulations to govern the granting of
variances in accord with the provisions of this
subsection, and may impose such additional re-
quirements as he deems to be necessary.
(6) All exceptions granted under the provisions
of this subsection shall be reviewed not more
than three years from the date of issuance of the
permit, unless the permittee affirmatively dem-
onstrates that the proposed development is pro-
ceeding in accordance with the terms of the rec-
lamation plan.
(f) Standards and criteria for coal mine waste
piles
The Secretary, with the written concurrence
of the Chief of Engineers, shall establish within
one hundred and thirty-five days from August 3,
1977, standards and criteria regulating the de-
sign, location, construction, operation, mainte-
nance, enlargement, modification, removal, and
abandonment of new and existing coal mine
waste piles referred to in subsection (b)(13) and
section 1266(b)(5) of this title. Such standards
and criteria shall conform to the standards and
criteria used by the Chief of Engineers to insure
that flood control structures are safe and effec-
tively perform their intended function. In addi-
tion to engineering and other technical speci-
fications the standards and criteria developed
pursuant to this subsection must include provi-
sions for: review and approval of plans and speci-
fications prior to construction, enlargement,
modification, removal, or abandonment; per-
formance of periodic inspections during con-
struction; issuance of certificates of approval
upon completion of construction; performance of
periodic safety inspections; and issuance of no-
tices for required remedial or maintenance
work.
(Pub. L. 95–87, title V, § 515, Aug. 3, 1977, 91 Stat.
486; Pub. L. 99–500, § 101(h) [title I, § 123], Oct. 18,
1986, 100 Stat. 1783–242, 1783–267, and Pub. L.
99–591, § 101(h) [title I, § 123], Oct. 30, 1986, 100
Stat. 3341–242, 3341–267; Pub. L. 102–486, title
XXV, § 2503(b), Oct. 24, 1992, 106 Stat. 3102.)
Editorial Notes
REFERENCES IN TEXT
Public Law 83–566, referred to in subsec. (b)(8)(B), is
act Aug. 4, 1954, ch. 656, 68 Stat. 666, known as the Wa-
tershed Protection and Flood Prevention Act, which is
classified principally to chapter 18 (§ 1001 et seq.) of
Title 16, Conservation. For complete classification of
this Act to the Code, see Short Title note set out under
section 1001 of Title 16 and Tables.
CODIFICATION
Pub. L. 99–591 is a corrected version of Pub. L. 99–500.
AMENDMENTS
1992—Subsec. (b)(20). Pub. L. 102–486 designated exist-
ing provisions as subpar. (A) and added subpar. (B).
1986—Subsec. (b)(10)(B)(ii). Pub. L. 99–500 and Pub. L.
99–591 inserted ‘‘or a qualified registered professional
land surveyor in any State which authorizes land sur-
veyors to prepare and certify such maps or plans’’.
§ 1266. Surface effects of underground coal min-
ing operations
(a) Rules and regulations
The Secretary shall promulgate rules and reg-
ulations directed toward the surface effects of
underground coal mining operations, embodying
the following requirements and in accordance
with the procedures established under section
1251 of this title: Provided, however, That in
adopting any rules and regulations the Sec-
retary shall consider the distinct difference be-
tween surface coal mining and underground coal
mining. Such rules and regulations shall not
conflict with nor supersede any provision of the
Federal Coal Mine Health and Safety Act of 1969
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
The Secretary is authorized in cooperation with other Federal and with States and local agencies to make investigations and surveys of the watershed of rivers and other waterways as a basis for the development of coordinated programs. In areas where the programs of the Secretary of Agriculture may affect public or other lands under the jurisdiction of the Secretary of the Interior, the Secretary of the Interior is authorized to cooperate with the Secretary of Agriculture in the planning and development of works or programs for such lands.
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 1006
Stored review status: release_metadata_unconfirmed. The source passage cites 16 U.S.C. § 1006. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 1596
TITLE 16—CONSERVATION
§ 1006
trol of water resources at minimum cost. Whenever ap-
proximately equivalent benefits can be obtained from
alternative works of improvement, or combinations of
improvements, with approximately the same cost the
alternative or combination lease costly to the Federal
Government shall be given preferential consideration.
In case benefits are produced jointly by more than one
work of improvement, or in case complementary rela-
tionships exist between the projects and plans of the
several agencies, the benefits claimed in justification
of a system of improvements shall not include any du-
plication or compounding of benefits.
SEC. 7. Basic data. In the utilization of existing basic
physical and economic data, and in the acquisition of
additional basic data required for planning, design,
construction, operation and evaluation of works of im-
provement authorized under the Act [this chapter], the
Department of Agriculture shall be assisted by the
principal basic-data collection agencies, including the
Geological Survey in the Department of the Interior
and the Weather Bureau [now the National Weather
Service] in the Department of Commerce. The basic-
data collection agencies shall assist and cooperate with
the Department of Agriculture with respect to the fol-
lowing:
(a) Provision of pertinent information in the prelimi-
nary planning of works of improvement.
(b) Collaboration in planning programs of hydrologic-
data collection in project areas, in the selection of sta-
tion sites and installation of equipment for collecting
hydrologic data, and in the collection of such data.
(c) Collaboration in the analysis and interpretation of
hydrologic data collected specifically for projects initi-
ated under the Act, and o
Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 1006
Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 1006. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Permit requirement** Any permit issued under any approved State or Federal program pursuant to this chapter to conduct surface coal mining operations shall require that such surface coal mining operations will meet all applicable performance standards of this chapter, and such other requirements as the regulatory authority shall promulgate.
**(b) General standards** General performance standards shall be applicable to all surface coal mining and reclamation operations and shall require the operation as a minimum to—
(1) conduct surface coal mining operations so as to maximize the utilization and conservation of the solid fuel resource being recovered so that reaffecting the land in the future through surface coal mining can be minimized;
(2) restore the land affected to a condition capable of supporting the uses which it was capable of supporting prior to any mining, or higher or better uses of which there is reasonable likelihood, so long as such use or uses do not present any actual or probable hazard to public health or safety or pose any actual or probable threat of water diminution or pollution, and the permit applicants’ declared proposed land use following reclamation is not deemed to be impractical or unreasonable, inconsistent with applicable land use policies and plans, involves unreasonable delay in implementation, or is violative of Federal, State, or local law;
(3) except as provided in subsection (c) with respect to all surface coal mining operations backfill, compact (where advisable to insure stability or to prevent leaching of toxic materials), and grade in order to restore the approximate original contour of the land with all highwalls, spoil piles, and depressions eliminated (unless small depressions are needed in order to retain moisture to
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1265
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.