30 U.S.C. § 1265 — Environmental protection performance standards
Federal law — U.S. Code and appendices · legal_authorities
**(a) Permit requirement** Any permit issued under any approved State or Federal program pursuant to this chapter to conduct surface coal mining operations shall require that such surface coal mining operations will meet all applicable performance standards of this chapter, and such other requirements as the regulatory authority shall promulgate.
**(b) General standards** General performance standards shall be applicable to all surface coal mining and reclamation operations and shall require the operation as a minimum to—
(1) conduct surface coal mining operations so as to maximize the utilization and conservation of the solid fuel resource being recovered so that reaffecting the land in the future through surface coal mining can be minimized;
(2) restore the land affected to a condition capable of supporting the uses which it was capable of supporting prior to any mining, or higher or better uses of which there is reasonable likelihood, so long as such use or uses do not present any actual or probable hazard to public health or safety or pose any actual or probable threat of water diminution or pollution, and the permit applicants’ declared proposed land use following reclamation is not deemed to be impractical or unreasonable, inconsistent with applicable land use policies and plans, involves unreasonable delay in implementation, or is violative of Federal, State, or local law;
(3) except as provided in subsection (c) with respect to all surface coal mining operations backfill, compact (where advisable to insure stability or to prevent leaching of toxic materials), and grade in order to restore the approximate original contour of the land with all highwalls, spoil piles, and depressions eliminated (unless small depressions are needed in order to retain moisture to
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1265
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 8962a5d17217c3eb8be6d04d2016d4e71761e7b838f838da4970afbff62d9e72. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_06ee7f7da25ab4beabf4cd55
Source file: Laws/federal/codes/united-states-code/title-30/section-1265-environmental-protection-performance-standards--c08a69d7cf.md
Pages: Not recorded – Not recorded
Passage SHA-256: 147e4145e9ef27b64b6c3339d28ae491ed8416d536be45021478a1acf293e15c
Source location: Title 30, Chapter 25, § 1265; chapter-025-surface-mining-control-and-reclamation.md
Stored source content
**(a) Permit requirement** Any permit issued under any approved State or Federal program pursuant to this chapter to conduct surface coal mining operations shall require that such surface coal mining operations will meet all applicable performance standards of this chapter, and such other requirements as the regulatory authority shall promulgate.
**(b) General standards** General performance standards shall be applicable to all surface coal mining and reclamation operations and shall require the operation as a minimum to—
(1) conduct surface coal mining operations so as to maximize the utilization and conservation of the solid fuel resource being recovered so that reaffecting the land in the future through surface coal mining can be minimized;
(2) restore the land affected to a condition capable of supporting the uses which it was capable of supporting prior to any mining, or higher or better uses of which there is reasonable likelihood, so long as such use or uses do not present any actual or probable hazard to public health or safety or pose any actual or probable threat of water diminution or pollution, and the permit applicants’ declared proposed land use following reclamation is not deemed to be impractical or unreasonable, inconsistent with applicable land use policies and plans, involves unreasonable delay in implementation, or is violative of Federal, State, or local law;
(3) except as provided in subsection (c) with respect to all surface coal mining operations backfill, compact (where advisable to insure stability or to prevent leaching of toxic materials), and grade in order to restore the approximate original contour of the land with all highwalls, spoil piles, and depressions eliminated (unless small depressions are needed in order to retain moisture to assist revegetation or as otherwise authorized pursuant to this chapter): Provided, however, That in surface coal mining which is carried out at the same location over a substantial period of time where the operation transects the coal deposit, and the thickness of the coal deposits relative to the volume of the overburden is large and where the operator demonstrates that the overburden and other spoil and waste materials at a particular point in the permit area or otherwise available from the entire permit area is insufficient, giving due consideration to volumetric expansion, to restore the approximate original contour, the operator, at a minimum, shall backfill, grade, and compact (where advisable) using all available overburden and other spoil and waste materials to attain the lowest practicable grade but not more than the angle of repose, to provide adequate drainage and to cover all acid-forming and other toxic materials, in order to achieve an ecologically sound land use compatible with the surrounding region: And provided further, That in surface coal mining where the volume of overburden is large relative to the thickness of the coal deposit and where the operator demonstrates that due to volumetric expansion the amount of overburden and other spoil and waste materials removed in the course of the mining operation is more than sufficient to restore the approximate original contour, the operator shall after restoring the approximate contour, backfill, grade, and compact (where advisable) the excess overburden and other spoil and waste materials to attain the lowest grade but not more than the angle of repose, and to cover all acid-forming and other toxic materials, in order to achieve an ecologically sound land use compatible with the surrounding region and that such overburden or spoil shall be shaped and graded in such a way as to prevent slides, erosion, and water pollution and is revegetated in accordance with the requirements of this chapter;
(4) stabilize and protect all surface areas including spoil piles affected by the surface coal mining and reclamation operation to effectively control erosion and attendant air and water pollution;
(5) remove the topsoil from the land in a separate layer, replace it on the backfill area, or if not utilized immediately, segregate it in a separate pile from other spoil and when the topsoil is not replaced on a backfill area within a time short enough to avoid deterioration of the topsoil, maintain a successful cover by quick growing plant or other means thereafter so that the topsoil is preserved from wind and water erosion, remains free of any contamination by other acid or toxic material, and is in a usable condition for sustaining vegetation when restored during reclamation, except if topsoil is of insufficient quantity or of poor quality for sustaining vegetation, or if other strata can be shown to be more suitable for vegetation requirements, then the operator shall remove, segregate, and preserve in a like manner such other strata which is best able to support vegetation;
(6) restore the topsoil or the best available subsoil which is best able to support vegetation;
(7) for all prime farm lands as identified in [section 1257(b)(16) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1257/b/16&num=0&edition=prelim) to be mined and reclaimed, specifications for soil removal, storage, replacement, and reconstruction shall be established by the Secretary of Agriculture, and the operator shall, as a minimum, be required to—
(A) segregate the A horizon of the natural soil, except where it can be shown that other available soil materials will create a final soil having a greater productive capacity; and if not utilized immediately, stockpile this material separately from other spoil, and provide needed protection from wind and water erosion or contamination by other acid or toxic material;
(B) segregate the B horizon of the natural soil, or underlying C horizons or other strata, or a combination of such horizons or other strata that are shown to be both texturally and chemically suitable for plant growth and that can be shown to be equally or more favorable for plant growth than the B horizon, in sufficient quantities to create in the regraded final soil a root zone of comparable depth and quality to that which existed in the natural soil; and if not utilized immediately, stockpile this material separately from other spoil, and provide needed protection from wind and water erosion or contamination by other acid or toxic material;
(C) replace and regrade the root zone material described in (B) above with proper compaction and uniform depth over the regraded spoil material; and
(D) redistribute and grade in a uniform manner the surface soil horizon described in subparagraph (A);
(8) create, if authorized in the approved mining and reclamation plan and permit, permanent impoundments of water on mining sites as part of reclamation activities only when it is adequately demonstrated that—
(A) the size of the impoundment is adequate for its intended purposes;
(B) the impoundment dam construction will be so designed as to achieve necessary stability with an adequate margin of safety compatible with that of structures constructed under Public Law 83–566 ([16 U.S.C. 1006](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section1006&num=0&edition=prelim));
(C) the quality of impounded water will be suitable on a permanent basis for its intended use and that discharges from the impoundment will not degrade the water quality below water quality standards established pursuant to applicable Federal and State law in the receiving stream;
(D) the level of water will be reasonably stable;
(E) final grading will provide adequate safety and access for proposed water users; and
(F) such water impoundments will not result in the diminution of the quality or quantity of water utilized by adjacent or surrounding landowners for agricultural, industrial 11 So in original. Probably should be followed by a comma. recreational, or domestic uses;
(9) conducting 22 So in original. Probably should be “conduct”. any augering operation associated with surface mining in a manner to maximize recoverability of mineral reserves remaining after the operation and reclamation are complete; and seal all auger holes with an impervious and noncombustible material in order to prevent drainage except where the regulatory authority determines that the resulting impoundment of water in such auger holes may create a hazard to the environment or the public health or safety: Provided, That the permitting authority may prohibit augering if necessary to maximize the utilization, recoverability or conservation of the solid fuel resources or to protect against adverse water quality impacts;
(10) minimize the disturbances to the prevailing hydrologic balance at the mine-site and in associated offsite areas and to the quality and quantity of water in surface and ground water systems both during and after surface coal mining operations and during reclamation by—
(A) avoiding acid or other toxic mine drainage by such measures as, but not limited to—
(i) preventing or removing water from contact with toxic producing deposits;
(ii) treating drainage to reduce toxic content which adversely affects downstream water upon being released to water courses;
(iii) casing, sealing, or otherwise managing boreholes, shafts, and wells and keep 33 So in original. Probably should be “keeping”. acid or other toxic drainage from entering ground and surface waters;
(B)
(i) conducting surface coal mining operations so as to prevent, to the extent possible using the best technology currently available, additional contributions of suspended solids to streamflow, or runoff outside the permit area, but in no event shall contributions be in excess of requirements set by applicable State or Federal law;
(ii) constructing any siltation structures pursuant to subparagraph (B)(i) of this subsection prior to commencement of surface coal mining operations, such structures to be certified by a qualified registered engineer or a qualified registered professional land surveyor in any State which authorizes land surveyors to prepare and certify such maps or plans to be constructed as designed and as approved in the reclamation plan;
(C) cleaning out and removing temporary or large settling ponds or other siltation structures from drainways after disturbed areas are revegetated and stabilized; and depositing the silt and debris at a site and in a manner approved by the regulatory authority;
(D) restoring recharge capacity of the mined area to approximate premining conditions;
(E) avoiding channel deepening or enlargement in operations requiring the discharge of water from mines;
(F) preserving throughout the mining and reclamation process the essential hydrologic functions of alluvial valley floors in the arid and semiarid areas of the country; and
(G) such other actions as the regulatory authority may prescribe;
(11) with respect to surface disposal of mine wastes, tailings, coal processing wastes, and other wastes in areas other than the mine working or excavations, stabilize all waste piles in designated areas through construction in compacted layers including the use of incombustible and impervious materials if necessary and assure the final contour of the waste pile will be compatible with natural surroundings and that the site can and will be stabilized and revegetated according to the provisions of this chapter;
(12) refrain from surface coal mining within five hundred feet from active and abandoned underground mines in order to prevent breakthroughs and to protect health or safety of miners: Provided, That the regulatory authority shall permit an operator to mine near, through or partially through an abandoned underground mine or closer to an active underground mine if (A) the nature, timing, and sequencing of the approximate coincidence of specific surface mine activities with specific underground mine activities are jointly approved by the regulatory authorities concerned with surface mine regulation and the health and safety of underground miners, and (B) such operations will result in improved resource recovery, abatement of water pollution, or elimination of hazards to the health and safety of the public;
(13) design, locate, construct, operate, maintain, enlarge, modify, and remove or abandon, in accordance with the standards and criteria developed pursuant to subsection (f) of this section, all existing and new coal mine waste piles consisting of mine wastes, tailings, coal processing wastes, or other liquid and solid wastes, and used either temporarily or permanently as dams or embankments;
(14) insure that all debris, acid-forming materials, toxic materials, or materials constituting a fire hazard are treated or buried and compacted or otherwise disposed of in a manner designed to prevent contamination of ground or surface waters and that contingency plans are developed to prevent sustained combustion;
(15) insure that explosives are used only in accordance with existing State and Federal law and the regulations promulgated by the regulatory authority, which shall include provisions to—
(A) provide adequate advance written notice to local governments and residents who might be affected by the use of such explosives by publication of the planned blasting schedule in a newspaper of general circulation in the locality and by mailing a copy of the proposed blasting schedule to every resident living within one-half mile of the proposed blasting site and by providing daily notice to resident/occupiers in such areas prior to any blasting;
(B) maintain for a period of at least three years and make available for public inspection upon request a log detailing the location of the blasts, the pattern and depth of the drill holes, the amount of explosives used per hole, and the order and length of delay in the blasts;
(C) limit the type of explosives and detonating equipment, the size, the timing and frequency of blasts based upon the physical conditions of the site so as to prevent (i) injury to persons, (ii) damage to public and private property outside the permit area, (iii) adverse impacts on any underground mine, and (iv) change in the course, channel, or availability of ground or surface water outside the permit area;
(D) require that all blasting operations be conducted by trained and competent persons as certified by the regulatory authority;
(E) provide that upon the request of a resident or owner of a man-made dwelling or structure within one-half mile of any portion of the permitted area the applicant or permittee shall conduct a pre-blasting survey of such structures and submit the survey to the regulatory authority and a copy to the resident or owner making the request. The area of the survey shall be decided by the regulatory authority and shall include such provisions as the Secretary shall promulgate.44 So in original. The period probably should be a semicolon.
(16) insure that all reclamation efforts proceed in an environmentally sound manner and as contemporaneously as practicable with the surface coal mining operations: Provided, however, That where the applicant proposes to combine surface mining operations with underground mining operations to assure maximum practical recovery of the mineral resources, the regulatory authority may grant a variance for specific areas within the reclamation plan from the requirement that reclamation efforts proceed as contemporaneously as practicable to permit underground mining operations prior to reclamation:
(A) if the regulatory authority finds in writing that:
(i) the applicant has presented, as part of the permit application, specific, feasible plans for the proposed underground mining operations;
(ii) the proposed underground mining operations are necessary or desirable to assure maximum practical recovery of the mineral resource and will avoid multiple disturbance of the surface;
(iii) the applicant has satisfactorily demonstrated that the plan for the underground mining operations conforms to requirements for underground mining in the jurisdiction and that permits necessary for the underground mining operations have been issued by the appropriate authority;
(iv) the areas proposed for the variance have been shown by the applicant to be necessary for the implementing of the proposed underground mining operations;
(v) no substantial adverse environmental damage, either on-site or off-site, will result from the delay in completion of reclamation as required by this chapter;
(vi) provisions for the off-site storage of spoil will comply with paragraph (22);
(B) if the Secretary has promulgated specific regulations to govern the granting of such variances in accordance with the provisions of this subsection and [section 1251 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1251&num=0&edition=prelim), and has imposed such additional requirements as he deems necessary;
(C) if variances granted under the provisions of this subsection are to be reviewed by the regulatory authority not more than three years from the date of issuance of the permit; and
(D) if liability under the bond filed by the applicant with the regulatory authority pursuant to [section 1259(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1259/b&num=0&edition=prelim) shall be for the duration of the underground mining operations and until the requirements of this subsection and [section 1269 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1269&num=0&edition=prelim) have been fully complied with.4
(17) insure that the construction, maintenance, and postmining conditions of access roads into and across the site of operations will control or prevent erosion and siltation, pollution of water, damage to fish or wildlife or their habitat, or public or private property;
(18) refrain from the construction of roads or other access ways up a stream bed or drainage channel or in such proximity to such channel so as to seriously alter the normal flow of water;
(19) establish on the regraded areas, and all other lands affected, a diverse, effective, and permanent vegetative cover of the same seasonal variety native to the area of land to be affected and capable of self-regeneration and plant succession at least equal in extent of cover to the natural vegetation of the area; except, that introduced species may be used in the revegetation process where desirable and necessary to achieve the approved postmining land use plan;
(20)
(A) assume the responsibility for successful revegetation, as required by paragraph (19) above, for a period of five full years after the last year of augmented seeding, fertilizing, irrigation, or other work in order to assure compliance with paragraph (19) above, except in those areas or regions of the country where the annual average precipitation is twenty-six inches or less, then the operator’s assumption of responsibility and liability will extend for a period of ten full years after the last year of augmented seeding, fertilizing, irrigation, or other work: Provided, That when the regulatory authority approves a long-term intensive agricultural postmining land use, the applicable five- or ten-year period of responsibility for revegetation shall commence at the date of initial planting for such long-term intensive agricultural postmining land use: Provided further, That when the regulatory authority issues a written finding approving a long-term, intensive, agricultural postmining land use as part of the mining and reclamation plan, the authority may grant exception to the provisions of paragraph (19) above;
(B) on lands eligible for remining assume the responsibility for successful revegetation for a period of two full years after the last year of augmented seeding, fertilizing, irrigation, or other work in order to assure compliance with the applicable standards, except in those areas or regions of the country where the annual average precipitation is twenty-six inches or less, then the operator’s assumption of responsibility and liability will be extended for a period of five full years after the last year of augmented seeding, fertilizing, irrigation, or other work in order to assure compliance with the applicable standards.4
(21) protect offsite areas from slides or damage occurring during the surface coal mining and reclamation operations, and not deposit spoil material or locate any part of the operations or waste accumulations outside the permit area;
(22) place all excess spoil material resulting from coal surface mining and reclamation activities in such a manner that—
(A) spoil is transported and placed in a controlled manner in position for concurrent compaction and in such a way to assure mass stability and to prevent mass movement;
(B) the areas of disposal are within the bonded permit areas and all organic matter shall be removed immediately prior to spoil placement;
(C) appropriate surface and internal drainage systems and diversion ditches are used so as to prevent spoil erosion and movement;
(D) the disposal area does not contain springs, natural water courses or wet weather seeps unless lateral drains are constructed from the wet areas to the main underdrains in such a manner that filtration of the water into the spoil pile will be prevented;
(E) if placed on a slope, the spoil is placed upon the most moderate slope among those upon which, in the judgment of the regulatory authority, the spoil could be placed in compliance with all the requirements of this chapter, and shall be placed, where possible, upon, or above, a natural terrace, bench, or berm, if such placement provides additional stability and prevents mass movement;
(F) where the toe of the spoil rests on a downslope, a rock toe buttress, of sufficient size to prevent mass movement, is constructed;
(G) the final configuration is compatible with the natural drainage pattern and surroundings and suitable for intended uses;
(H) design of the spoil disposal area is certified by a qualified registered professional engineer in conformance with professional standards; and
(I) all other provisions of this chapter are met.4
(23) meet such other criteria as are necessary to achieve reclamation in accordance with the purposes of this chapter, taking into consideration the physical, climatological, and other characteristics of the site; and 55 So in original. The word “and” probably should appear at end of par. (24).
(24) to the extent possible using the best technology currently available, minimize disturbances and adverse impacts of the operation on fish, wildlife, and related environmental values, and achieve enhancement of such resources where practicable;
(25) provide for an undisturbed natural barrier beginning at the elevation of the lowest coal seam to be mined and extending from the outslope for such distance as the regulatory authority shall determine shall be retained in place as a barrier to slides and erosion.
**(c) Procedures; exception to original contour restoration requirements**
(1) Each State program may and each Federal program shall include procedures pursuant to which the regulatory authority may permit surface mining operations for the purposes set forth in paragraph (3) of this subsection.
(2) Where an applicant meets the requirements of paragraphs (3) and (4) of this subsection a permit without regard to the requirement to restore to approximate original contour set forth in subsection (b)(3) or (d)(2) and (3) of this section may be granted for the surface mining of coal where the mining operation will remove an entire coal seam or seams running through the upper fraction of a mountain, ridge, or hill (except as provided in subsection (c)(4)(A) hereof) by removing all of the overburden and creating a level plateau or a gently rolling contour with no highwalls remaining, and capable of supporting postmining uses in accord with the requirements of this subsection.
(3) In cases where an industrial, commercial, agricultural, residential or public facility (including recreational facilities) use is proposed or 66 So in original. Probably should be “for”. the postmining use of the affected land, the regulatory authority may grant a permit for a surface mining operation of the nature described in subsection (c)(2) where—
(A) after consultation with the appropriate land use planning agencies, if any, the proposed postmining land use is deemed to constitute an equal or better economic or public use of the affected land, as compared with premining use;
(B) the applicant presents specific plans for the proposed postmining land use and appropriate assurances that such use will be—
(i) compatible with adjacent land uses;
(ii) obtainable according to data regarding expected need and market;
(iii) assured of investment in necessary public facilities;
(iv) supported by commitments from public agencies where appropriate;
(v) practicable with respect to private financial capability for completion of the proposed use;
(vi) planned pursuant to a schedule attached to the reclamation plan so as to integrate the mining operation and reclamation with the postmining land use; and
(vii) designed by a registered engineer in conformance with professional standards established to assure the stability, drainage, and configuration necessary for the intended use of the site;
(C) the proposed use would be consistent with adjacent land uses, and existing State and local land use plans and programs;
(D) the regulatory authority provides the governing body of the unit of general-purpose government in which the land is located and any State or Federal agency which the regulatory agency, in its discretion, determines to have an interest in the proposed use, an opportunity of not more than sixty days to review and comment on the proposed use;
(E) all other requirements of this chapter will be met.
(4) In granting any permit pursuant to this subsection the regulatory authority shall require that—
(A) the toe of the lowest coal seam and the overburden associated with it are retained in place as a barrier to slides and erosion;
(B) the reclaimed area is stable;
(C) the resulting plateau or rolling contour drains inward from the outslopes except at specified points;
(D) no damage will be done to natural watercourses;
(E) spoil will be placed on the mountaintop bench as is necessary to achieve the planned postmining land use: Provided, That all excess spoil material not retained on the mountaintop shall be placed in accordance with the provisions of subsection (b)(22) of this section;
(F) insure stability of the spoil retained on the mountaintop and meet the other requirements of this chapter; 77 So in original. The semicolon probably should be a period.
(5) The regulatory authority shall promulgate specific regulations to govern the granting of permits in accord with the provisions of this subsection, and may impose such additional requirements as he deems to be necessary.
(6) All permits granted under the provisions of this subsection shall be reviewed not more than three years from the date of issuance of the permit, unless the applicant affirmatively demonstrates that the proposed development is proceeding in accordance with the terms of the approved schedule and reclamation plan.
**(d) Steep-slope surface coal mining standards** The following performance standards shall be applicable to steep-slope surface coal mining and shall be in addition to those general performance standards required by this section: Provided, however, That the provisions of this subsection (d) shall not apply to those situations in which an operator is mining on flat or gently rolling terrain, on which an occasional steep slope is encountered through which the mining operation is to proceed, leaving a plain or predominantly flat area or where an operator is in compliance with provisions of subsection (c) hereof:
(1) Insure that when performing surface coal mining on steep slopes, no debris, abandoned or disabled equipment, spoil material, or waste mineral matter be placed on the downslope below the bench or mining cut: Provided, That spoil material in excess of that required for the reconstruction of the approximate original contour under the provisions of subsection (b)(3) or (d)(2) shall be permanently stored pursuant to subsection (b)(22).
(2) Complete backfilling with spoil material shall be required to cover completely the highwall and return the site to the appropriate original contour, which material will maintain stability following mining and reclamation.
(3) The operator may not disturb land above the top of the highwall unless the regulatory authority finds that such disturbance will facilitate compliance with the environmental protection standards of this section: Provided, however, That the land disturbed above the highwall shall be limited to that amount necessary to facilitate said compliance.
(4) For the purposes of this subsection (d), the term “steep slope” is any slope above twenty degrees or such lesser slope as may be defined by the regulatory authority after consideration of soil, climate, and other characteristics of a region or State.
**(e) Variances to original contour restoration requirements**
(1) Each State program may and each Federal program shall include procedures pursuant to which the regulatory authority may permit variances for the purposes set forth in paragraph (3) of this subsection, provided that the watershed control of the area is improved; and further provided complete backfilling with spoil material shall be required to cover completely the highwall which material will maintain stability following mining and reclamation.
(2) Where an applicant meets the requirements of paragraphs (3) and (4) of this subsection a variance from the requirement to restore to approximate original contour set forth in subsection (d)(2) of this section may be granted for the surface mining of coal where the owner of the surface knowingly requests in writing, as a part of the permit application that such a variance be granted so as to render the land, after reclamation, suitable for an industrial, commercial, residential, or public use (including recreational facilities) in accord with the further provisions of (3) and (4) of this subsection.
(3)
(A) After consultation with the appropriate land use planning agencies, if any, the potential use of the affected land is deemed to constitute an equal or better economic or public use;
(B) is designed and certified by a qualified registered professional engineer in conformance with professional standards established to assure the stability, drainage, and configuration necessary for the intended use of the site; and
(C) after approval of the appropriate State environmental agencies, the watershed of the affected land is deemed to be improved.
(4) In granting a variance pursuant to this subsection the regulatory authority shall require that only such amount of spoil will be placed off the mine bench as is necessary to achieve the planned postmining land use, insure stability of the spoil retained on the bench, meet all other requirements of this chapter, and all spoil placement off the mine bench must comply with subsection (b)(22).
(5) The regulatory authority shall promulgate specific regulations to govern the granting of variances in accord with the provisions of this subsection, and may impose such additional requirements as he deems to be necessary.
(6) All exceptions granted under the provisions of this subsection shall be reviewed not more than three years from the date of issuance of the permit, unless the permittee affirmatively demonstrates that the proposed development is proceeding in accordance with the terms of the reclamation plan.
**(f) Standards and criteria for coal mine waste piles** The Secretary, with the written concurrence of the Chief of Engineers, shall establish within one hundred and thirty-five days from August 3, 1977, standards and criteria regulating the design, location, construction, operation, maintenance, enlargement, modification, removal, and abandonment of new and existing coal mine waste piles referred to in subsection (b)(13) and [section 1266(b)(5) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1266/b/5&num=0&edition=prelim). Such standards and criteria shall conform to the standards and criteria used by the Chief of Engineers to insure that flood control structures are safe and effectively perform their intended function. In addition to engineering and other technical specifications the standards and criteria developed pursuant to this subsection must include provisions for: review and approval of plans and specifications prior to construction, enlargement, modification, removal, or abandonment; performance of periodic inspections during construction; issuance of certificates of approval upon completion of construction; performance of periodic safety inspections; and issuance of notices for required remedial or maintenance work.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Filing of request; submittal of copy of advertisement; notification by letter of intent to seek release** The permittee may file a request with the regulatory authority for the release of all or part of a performance bond or deposit. Within thirty days after any application for bond or deposit release has been filed with the regulatory authority, the operator shall submit a copy of an advertisement placed at least once a week for four successive weeks in a newspaper of general circulation in the locality of the surface coal mining operation. Such advertisement shall be considered part of any bond release application and shall contain a notification of the precise location of the land affected, the number of acres, the permit and the date approved, the amount of the bond filed and the portion sought to be released, and the type and appropriate dates of reclamation work performed, and a description of the results achieved as they relate to the operator’s approved reclamation plan. In addition, as part of any bond release application, the applicant shall submit copies of letters which he has sent to adjoining property owners, local governmental bodies, planning agencies, and sewage and water treatment authorities, or water companies in the locality in which the surface coal mining and reclamation activities took place, notifying them of his intention to seek release from the bond.
**(b) Inspection and evaluation; notification of decision** Upon receipt of the notification and request, the regulatory authority shall within thirty days conduct an inspection and evaluation of the reclamation work involved. Such evaluation shall consider, among other things, the degree of difficulty to complete any remaining reclamation, whether pollution of surface and subsurface water
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1269
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Erosion, floodwater, and sediment damages in the watersheds of the rivers and streams of the United States, causing loss of life and damage to property, constitute a menace to the national welfare; and it is the sense of Congress that the Federal Government should cooperate with States and their political subdivisions, soil or water conservation districts, flood prevention or control districts, and other local public agencies for the purpose of preventing such damages, of furthering the conservation, development, utilization, and disposal of water, and the conservation and utilization of land and thereby of preserving, protecting, and improving the Nation’s land and water resources and the quality of the environment.
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 1001
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
The Secretary is authorized in cooperation with other Federal and with States and local agencies to make investigations and surveys of the watershed of rivers and other waterways as a basis for the development of coordinated programs. In areas where the programs of the Secretary of Agriculture may affect public or other lands under the jurisdiction of the Secretary of the Interior, the Secretary of the Interior is authorized to cooperate with the Secretary of Agriculture in the planning and development of works or programs for such lands.
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 1006
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a)** Not later than the end of the ninety-day period immediately following August 3, 1977, the Secretary shall promulgate and publish in the Federal Register regulations covering an interim regulatory procedure for surface coal mining and reclamation operations setting mining and reclamation performance standards based on and incorporating the provisions set out in [section 1252(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1252/c&num=0&edition=prelim). The issuance of the interim regulations shall be deemed not to be a major Federal action within the meaning of section 4332(2)(c) 11 So in original. Probably should be “4332(2)(C)”. of title 42. Such regulations, which shall be concise and written in plain, understandable language shall not be promulgated and published by the Secretary until he has—
(A) published proposed regulations in the Federal Register and afforded interested persons and State and local governments a period of not less than thirty days after such publication to submit written comments thereon;
(B) obtained the written concurrence of the Administrator of the Environmental Protection Agency with respect to those regulations promulgated under this section which relate to air or water quality standards promulgated under the authority of the Federal Water Pollution Control Act, as amended [[33 U.S.C. 1251](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1251&num=0&edition=prelim) et seq.]; and the Clean Air Act, as amended [[42 U.S.C. 7401](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7401&num=0&edition=prelim) et seq.]; and
(C) held at least one public hearing on the proposed regulations.
The date, time, and place of any hearing held on the p
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1251
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
(1) Notwithstanding any other provision of the Surface Mining Control and Reclamation Act of 1977 [[30 U.S.C. 1201](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1201&num=0&edition=prelim) et seq.] to the contrary, the Secretary of the Interior shall, within one year after October 24, 1992, publish proposed regulations in the Federal Register, and after opportunity for public comment publish final regulations, establishing environmental protection performance and reclamation standards, and separate permit systems applicable to operations for the on-site reprocessing of abandoned coal refuse and operations for the removal of abandoned coal refuse on lands that would otherwise be eligible for expenditure under section 404 and section 402(g)(4) of the Surface Mining Control and Reclamation Act of 1977 [[30 U.S.C. 1234](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1234&num=0&edition=prelim), 1232(g)(4)].
(2) The standards and permit systems referred to in paragraph (1) shall distinguish between those operations which reprocess abandoned coal refuse on-site, and those operations which completely remove abandoned coal refuse from a site for the direct use of such coal refuse, or for the reprocessing of such coal refuse, at another location. Such standards and permit systems shall be premised on the distinct differences between operations for the on-site reprocessing, and operations for the removal, of abandoned coal refuse and other types of surface coal mining operations.
(3) The Secretary of the Interior may devise a different standard than any of those set forth in section 515 and section 516 of the Surface Mining Control and Reclamation Act of 1977 [[30 U.S.C. 1265](https://uscode.house.gov/view.xhtml?req=gran
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1251a
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) State regulation** No person shall open or develop any new or previously mined or abandoned site for surface coal mining operations on lands on which such operations are regulated by a State unless such person has obtained a permit from the State’s regulatory authority.
**(b) Interim standards** All surface coal mining operations on lands on which such operations are regulated by a State which commence operations pursuant to a permit issued on or after six months from August 3, 1977, shall comply, and such permits shall contain terms requiring compliance with, the provisions set out in subsection (c) of this section. Prior to final disapproval of a State program or prior to promulgation of a Federal program or a Federal lands program pursuant to this chapter, a State may issue such permits.
**(c) Full compliance with environmental protection performance standards** On and after nine months from August 3, 1977, all surface coal mining operations on lands on which such operations are regulated by a State shall comply with the provisions of subsections (b)(2), (b)(3), (b)(5), (b)(10), (b)(13), (b)(15), (b)(19), and (d) of [section 1265 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1265&num=0&edition=prelim) or, where a surface coal mining operation will remove an entire coal seam or seams running through the upper fraction of a mountain, ridge, or hill by removing all of the overburden and creating a level plateau or a gently rolling contour with no highwalls remaining, such operation shall comply with the requirements of section 1265(c)(4) and (5) of this title without regard to the requirements of section 1265(b)(3) or (d)(2) and (3) of this title, with respect to lands from which overburden and the coal seam being min
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1252
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a)** Each reclamation plan submitted as part of a permit application pursuant to any approved State program or a Federal program under the provisions of this chapter shall include, in the degree of detail necessary to demonstrate that reclamation required by the State or Federal program can be accomplished, a statement of:
(1) the identification of the lands subject to surface coal mining operations over the estimated life of those operations and the size, sequence, and timing of the subareas for which it is anticipated that individual permits for mining will be sought;
(2) the condition of the land to be covered by the permit prior to any mining including:
(A) the uses existing at the time of the application, and if the land has a history of previous mining, the uses which preceded any mining; and
(B) the capability of the land prior to any mining to support a variety of uses giving consideration to soil and foundation characteristics, topography, and vegetative cover, and, if applicable, a soil survey prepared pursuant to [section 1257(b)(16) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1257/b/16&num=0&edition=prelim); and
(C) the productivity of the land prior to mining, including appropriate classification as prime farm lands, as well as the average yield of food, fiber, forage, or wood products from such lands obtained under high levels of management;
(3) the use which is proposed to be made of the land following reclamation, including a discussion of the utility and capacity of the reclaimed land to support a variety of alternative uses and the relationship of such use to existing land use policies and plans, and the comments of any owner of the surface, State and local governments or agencies thereof wh
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1258
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Filing with regulatory authority; scope; number and amount** After a surface coal mining and reclamation permit application has been approved but before such a permit is issued, the applicant shall file with the regulatory authority, on a form prescribed and furnished by the regulatory authority, a bond for performance payable, as appropriate, to the United States or to the State, and conditional upon faithful performance of all the requirements of this chapter and the permit. The bond shall cover that area of land within the permit area upon which the operator will initiate and conduct surface coal mining and reclamation operations within the initial term of the permit. As succeeding increments of surface coal mining and reclamation operations are to be initiated and conducted within the permit area, the permittee shall file with the regulatory authority an additional bond or bonds to cover such increments in accordance with this section. The amount of the bond required for each bonded area shall depend upon the reclamation requirements of the approved permit; shall reflect the probable difficulty of reclamation giving consideration to such factors as topography, geology of the site, hydrology, and revegetation potential, and shall be determined by the regulatory authority. The amount of the bond shall be sufficient to assure the completion of the reclamation plan if the work had to be performed by the regulatory authority in the event of forfeiture and in no case shall the bond for the entire area under one permit be less than $10,000.
**(b) Liability period; execution** Liability under the bond shall be for the duration of the surface coal mining and reclamation operation and for a period coincident with operator’s responsibility for revegetation requirements
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1259
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Regulations; contents** Each State or Federal program shall include a requirement that coal exploration operations which substantially disturb the natural land surface be conducted in accordance with exploration regulations issued by the regulatory authority. Such regulations shall include, at a minimum (1) the requirement that prior to conducting any exploration under this section, any person must file with the regulatory authority notice of intention to explore and such notice shall include a description of the exploration area and the period of supposed exploration and (2) provisions for reclamation in accordance with the performance standards in [section 1265 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1265&num=0&edition=prelim) of all lands disturbed in exploration, including excavations, roads, drill holes, and the removal of necessary facilities and equipment.
**(b) Confidential information** Information submitted to the regulatory authority pursuant to this subsection as confidential concerning trade secrets or privileged commercial or financial information which relates to the competitive rights of the person or entity intended to explore the described area shall not be available for public examination.
**(c) Penalties** Any person who conducts any coal exploration activities which substantially disturb the natural land surface in violation of this section or regulations issued pursuant thereto shall be subject to the provisions of [section 1268 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1268&num=0&edition=prelim).
**(d) Limitation on removal of coal** No operator shall remove more than two hundred and fifty tons of coal pursuant to an exploration permit with
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1262
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Rules and regulations** The Secretary shall promulgate rules and regulations directed toward the surface effects of underground coal mining operations, embodying the following requirements and in accordance with the procedures established under [section 1251 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1251&num=0&edition=prelim): Provided, however, That in adopting any rules and regulations the Secretary shall consider the distinct difference between surface coal mining and underground coal mining. Such rules and regulations shall not conflict with nor supersede any provision of the Federal Coal Mine Health and Safety Act of 1969 [[30 U.S.C. 801](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section801&num=0&edition=prelim) et seq.] nor any regulation issued pursuant thereto, and shall not be promulgated until the Secretary has obtained the written concurrence of the head of the department which administers such Act.
**(b) Permit requirements** Each permit issued under any approved State or Federal program pursuant to this chapter and relating to underground coal mining shall require the operator to—
(1) adopt measures consistent with known technology in order to prevent subsidence causing material damage to the extent technologically and economically feasible, maximize mine stability, and maintain the value and reasonably foreseeable use of such surface lands, except in those instances where the mining technology used requires planned subsidence in a predictable and controlled manner: Provided, That nothing in this subsection shall be construed to prohibit the standard method of room and pillar mining;
(2) seal all portals, entryways, drifts, shafts, or other openings between the surface and
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1266
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.