Arkansas Legal Resource Navigator

30 U.S.C. § 1252 — Initial regulatory procedures

Federal law — U.S. Code and appendices · legal_authorities

30 U.S.C. § 1252 — Initial regulatory procedures

**(a) State regulation** No person shall open or develop any new or previously mined or abandoned site for surface coal mining operations on lands on which such operations are regulated by a State unless such person has obtained a permit from the State’s regulatory authority. **(b) Interim standards** All surface coal mining operations on lands on which such operations are regulated by a State which commence operations pursuant to a permit issued on or after six months from August 3, 1977, shall comply, and such permits shall contain terms requiring compliance with, the provisions set out in subsection (c) of this section. Prior to final disapproval of a State program or prior to promulgation of a Federal program or a Federal lands program pursuant to this chapter, a State may issue such permits. **(c) Full compliance with environmental protection performance standards** On and after nine months from August 3, 1977, all surface coal mining operations on lands on which such operations are regulated by a State shall comply with the provisions of subsections (b)(2), (b)(3), (b)(5), (b)(10), (b)(13), (b)(15), (b)(19), and (d) of [section 1265 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1265&num=0&edition=prelim) or, where a surface coal mining operation will remove an entire coal seam or seams running through the upper fraction of a mountain, ridge, or hill by removing all of the overburden and creating a level plateau or a gently rolling contour with no highwalls remaining, such operation shall comply with the requirements of section 1265(c)(4) and (5) of this title without regard to the requirements of section 1265(b)(3) or (d)(2) and (3) of this title, with respect to lands from which overburden and the coal seam being min

Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1252

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: e104539eba9fd624c08d18e3da2616fead5b2a96a423ef2be73046a0ee888fdc. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_afcda3dff040a9a6194a19f4
Source file: Laws/federal/codes/united-states-code/title-30/section-1252-initial-regulatory-procedures--de69e8e656.md
Pages: Not recorded – Not recorded
Passage SHA-256: a12f4aa20d5cf5234936d4961bfb69b84ec84f736b3d9bf29c64888c1ae931e9

Source location: Title 30, Chapter 25, § 1252; chapter-025-surface-mining-control-and-reclamation.md

Stored source content

**(a) State regulation** No person shall open or develop any new or previously mined or abandoned site for surface coal mining operations on lands on which such operations are regulated by a State unless such person has obtained a permit from the State’s regulatory authority. **(b) Interim standards** All surface coal mining operations on lands on which such operations are regulated by a State which commence operations pursuant to a permit issued on or after six months from August 3, 1977, shall comply, and such permits shall contain terms requiring compliance with, the provisions set out in subsection (c) of this section. Prior to final disapproval of a State program or prior to promulgation of a Federal program or a Federal lands program pursuant to this chapter, a State may issue such permits. **(c) Full compliance with environmental protection performance standards** On and after nine months from August 3, 1977, all surface coal mining operations on lands on which such operations are regulated by a State shall comply with the provisions of subsections (b)(2), (b)(3), (b)(5), (b)(10), (b)(13), (b)(15), (b)(19), and (d) of [section 1265 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1265&num=0&edition=prelim) or, where a surface coal mining operation will remove an entire coal seam or seams running through the upper fraction of a mountain, ridge, or hill by removing all of the overburden and creating a level plateau or a gently rolling contour with no highwalls remaining, such operation shall comply with the requirements of section 1265(c)(4) and (5) of this title without regard to the requirements of section 1265(b)(3) or (d)(2) and (3) of this title, with respect to lands from which overburden and the coal seam being mined have not been removed: Provided, however, That surface coal mining operations in operation pursuant to a permit issued by a State before August 3, 1977, issued to a person as defined in [section 1291(19) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1291/19&num=0&edition=prelim) in existence prior to May 2, 1977 and operated by a person whose total annual production of coal from surface and underground coal mining operations does not exceed one hundred thousand tons shall not be subject to the provisions of this subsection except with reference to the provision of [section 1265(d)(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1265/d/1&num=0&edition=prelim) until January 1, 1979. **(d) Permit application** Not later than two months following the approval of a State program pursuant to [section 1253 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1253&num=0&edition=prelim) or the implementation of a Federal program pursuant to [section 1254 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1254&num=0&edition=prelim), regardless of litigation contesting that approval or implementation, all operators of surface coal mines in expectation of operating such mines after the expiration of eight months from the approval of a State program or the implementation of a Federal program, shall file an application for a permit with the regulatory authority. Such application shall cover those lands to be mined after the expiration of eight months from the approval of a State program or the implementation of a Federal program. The regulatory authority shall process such applications and grant or deny a permit within eight months after the date of approval of the State program or the implementation of the Federal program, unless specially enjoined by a court of competent jurisdiction, but in no case later than forty-two months from August 3, 1977. **(e) Federal enforcement program** Within six months after August 3, 1977, the Secretary shall implement a Federal enforcement program which shall remain in effect in each State as surface coal mining operations are required to comply with the provisions of this chapter, until the State program has been approved pursuant to this chapter or until a Federal program has been implemented pursuant to this chapter. The enforcement program shall— (1) include inspections of surface coal mine sites which may be made (but at least one inspection for every site every six months), without advance notice to the mine operator and for the purpose of ascertaining compliance with the standards of subsections (b) and (c) above. The Secretary shall order any necessary enforcement action to be implemented pursuant to the Federal enforcement provision of this subchapter to correct violations identified at the inspections; (2) provide that upon receipt of inspection reports indicating that any surface coal mining operation has been found in violation of subsections (b) and (c) above, during not less than two consecutive State inspections or upon receipt by the Secretary of information which would give rise to reasonable belief that such standards are being violated by any surface coal mining operation, the Secretary shall order the immediate inspection of such operation by Federal inspectors and the necessary enforcement actions, if any, to be implemented pursuant to the Federal enforcement provisions of this subchapter. When the Federal inspection results from information provided to the Secretary by any person, the Secretary shall notify such person when the Federal inspection is proposed to be carried out and such person shall be allowed to accompany the inspector during the inspection; (3) provide that the State regulatory agency file with the Secretary and with a designated Federal office centrally located in the county or area in which the inspected surface coal mine is located copies of inspection reports made; (4) provide that moneys authorized by [section 1302 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1302&num=0&edition=prelim) shall be available to the Secretary prior to the approval of a State program pursuant to this chapter to reimburse the State for conducting those inspections in which the standards of this chapter are enforced and for the administration of this section.11 So in original. The period probably should be a semicolon. (5) for purposes of this section, the term “Federal inspector” means personnel of the Office of Surface Mining Reclamation and Enforcement and such additional personnel of the United States Geological Survey, Bureau of Land Management, or of the Mining Enforcement and Safety Administration so designated by the Secretary, or such other personnel of the Forest Service, Soil Conservation Service, or the Agricultural Stabilization and Conservation Service as arranged by appropriate agreement with the Secretary on a reimbursable or other basis; 22 So in original. The semicolon probably should be a period. **(f) Interim period** Following the final disapproval of a State program, and prior to promulgation of a Federal program or a Federal lands program pursuant to this chapter, including judicial review of such a program, existing surface coal mining operations may continue surface mining operations pursuant to the provisions of this section. During such period no new permits shall be issued by the State whose program has been disapproved. Permits which lapse during such period may continue in full force and effect until promulgation of a Federal program or a Federal lands program.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

30 U.S.C. § 1265 — Environmental protection performance standards

**(a) Permit requirement** Any permit issued under any approved State or Federal program pursuant to this chapter to conduct surface coal mining operations shall require that such surface coal mining operations will meet all applicable performance standards of this chapter, and such other requirements as the regulatory authority shall promulgate. **(b) General standards** General performance standards shall be applicable to all surface coal mining and reclamation operations and shall require the operation as a minimum to— (1) conduct surface coal mining operations so as to maximize the utilization and conservation of the solid fuel resource being recovered so that reaffecting the land in the future through surface coal mining can be minimized; (2) restore the land affected to a condition capable of supporting the uses which it was capable of supporting prior to any mining, or higher or better uses of which there is reasonable likelihood, so long as such use or uses do not present any actual or probable hazard to public health or safety or pose any actual or probable threat of water diminution or pollution, and the permit applicants’ declared proposed land use following reclamation is not deemed to be impractical or unreasonable, inconsistent with applicable land use policies and plans, involves unreasonable delay in implementation, or is violative of Federal, State, or local law; (3) except as provided in subsection (c) with respect to all surface coal mining operations backfill, compact (where advisable to insure stability or to prevent leaching of toxic materials), and grade in order to restore the approximate original contour of the land with all highwalls, spoil piles, and depressions eliminated (unless small depressions are needed in order to retain moisture to

Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1265

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

30 U.S.C. § 1302 — Authorization of appropriations

There is authorized to be appropriated to the Secretary for the purposes of this chapter the following sums; and all such funds appropriated shall remain available until expended: **(a)** For the implementation and funding of sections 1252, 1273, and 1300 of this title, there are authorized to be appropriated to the Secretary of the Interior the sum of $10,000,000 for the fiscal year ending September 30, 1978, $25,000,000 for each of the two succeeding fiscal years, and in such fiscal years such additional amounts as may be necessary for increases in salary, pay, retirement, other employee benefits authorized by law, and other nondiscretionary costs. **(b)** For the implementation and funding of [section 1257(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1257/c&num=0&edition=prelim), see the provisions of [section 1231(c)(9) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1231/c/9&num=0&edition=prelim). **(c)** For the implementation and funding of [section 1295 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1295&num=0&edition=prelim) and for the administrative and other purposes of this chapter, except as otherwise provided for in this chapter, authorization is provided for the sum of $20,000,000 for the fiscal year ending September 30, 1978, and $30,000,000 for each of the two succeeding fiscal years and such funds that are required thereafter. **(d)** In order that the implementation of the requirements of this chapter may be initiated in a timely and orderly manner, the Secretary is authorized, subject to the approval of the appropriation Committees of the House and of the Senate, to utilize not to exceed $2,000,000 of the approp

Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1302

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

30 U.S.C. § 1254 — Federal programs

**(a) Promulgation and implementation by Secretary for State** The Secretary shall prepare and, subject to the provisions of this section, promulgate and implement a Federal program for a State no later than thirty-four months after August 3, 1977, if such State— (1) fails to submit a State program covering surface coal mining and reclamation operations by the end of the eighteen-month period beginning on August 3, 1977; (2) fails to resubmit an acceptable State program within sixty days of disapproval of a proposed State program: Provided, That the Secretary shall not implement a Federal program prior to the expiration of the initial period allowed for submission of a State program as provided for in clause (1) of this subsection; or (3) fails to implement, enforce, or maintain its approved State program as provided for in this chapter. If State compliance with clause (1) of this subsection requires an act of the State legislature, the Secretary may extend the period of submission of a State program up to an additional six months. Promulgation and implementation of a Federal program vests the Secretary with exclusive jurisdiction for the regulation and control of surface coal mining and reclamation operations taking place on lands within any State not in compliance with this chapter. After promulgation and implementation of a Federal program the Secretary shall be the regulatory authority. If a Federal program is implemented for a State, section 1272(a), (c), and (d) of this title shall not apply for a period of one year following the date of such implementation. In promulgating and implementing a Federal program for a particular State the Secretary shall take into consideration the nature of that State’s terrain, climate, biological, chemical, and other relevant ph

Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1254

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

30 U.S.C. § 1253 — State programs

**(a) Regulation of surface coal mining and reclamation operations; submittal to Secretary; time limit; demonstration of effectiveness** Each State in which there are or may be conducted surface coal mining operations on non-Federal lands, and which wishes to assume exclusive jurisdiction over the regulation of surface coal mining and reclamation operations, except as provided in sections 1271 and 1273 of this title and subchapter IV of this chapter, shall submit to the Secretary, by the end of the eighteenth-month 11 So in original. period beginning on August 3, 1977, a State program which demonstrates that such State has the capability of carrying out the provisions of this chapter and meeting its purposes through— (1) a State law which provides for the regulation of surface coal mining and reclamation operations in accordance with the requirements of this chapter; (2) a State law which provides sanctions for violations of State laws, regulations, or conditions of permits concerning surface coal mining and reclamation operations, which sanctions shall meet the minimum requirements of this chapter, including civil and criminal actions, forfeiture of bonds, suspensions, revocations, and withholding of permits, and the issuance of cease-and-desist orders by the State regulatory authority or its inspectors; (3) a State regulatory authority with sufficient administrative and technical personnel, and sufficient funding to enable the State to regulate surface coal mining and reclamation operations in accordance with the requirements of this chapter; (4) a State law which provides for the effective implementations,1 maintenance, and enforcement of a permit system, meeting the requirements of this subchapter for the regulations 1 of surface coal mining and reclamation oper

Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1253

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

30 U.S.C. § 1256 — Permits

**(a) Persons engaged in surface coal mining within State; time limit; exception** No later than eight months from the date on which a State program is approved by the Secretary, pursuant to [section 1253 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1253&num=0&edition=prelim), or no later than eight months from the date on which the Secretary has promulgated a Federal program for a State not having a State program pursuant to [section 1254 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1254&num=0&edition=prelim), no person shall engage in or carry out on lands within a State any surface coal mining operations unless such person has first obtained a permit issued by such State pursuant to an approved State program or by the Secretary pursuant to a Federal program; except a person conducting surface coal mining operations under a permit from the State regulatory authority, issued in accordance with the provisions of [section 1252 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1252&num=0&edition=prelim), may conduct such operations beyond such period if an application for a permit has been filed in accordance with the provisions of this chapter, but the initial administrative decision has not been rendered. **(b) Term** All permits issued pursuant to the requirements of this chapter shall be issued for a term not to exceed five years: Provided, That if the applicant demonstrates that a specified longer term is reasonably needed to allow the applicant to obtain necessary financing for equipment and the opening of the operation and if the application is full and complete for such specified longer term, the regulatory authority may grant a per

Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1256

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

30 U.S.C. § 1268 — Penalties

**(a) Civil penalties for violations of permit conditions and provisions of this subchapter** In the enforcement of a Federal program or Federal lands program, or during Federal enforcement pursuant to [section 1252 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1252&num=0&edition=prelim) or during Federal enforcement of a State program pursuant to [section 1271 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1271&num=0&edition=prelim), any permittee who violates any permit condition or who violates any other provision of this subchapter, may be assessed a civil penalty by the Secretary, except that if such violation leads to the issuance of a cessation order under [section 1271 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1271&num=0&edition=prelim), the civil penalty shall be assessed. Such penalty shall not exceed $5,000 for each violation. Each day of continuing violation may be deemed a separate violation for purposes of penalty assessments. In determining the amount of the penalty, consideration shall be given to the permittee’s history of previous violations at the particular surface coal mining operation; the seriousness of the violation, including any irreparable harm to the environment and any hazard to the health or safety of the public; whether the permittee was negligent; and the demonstrated good faith of the permittee charged in attempting to achieve rapid compliance after notification of the violation. **(b) Hearing** A civil penalty shall be assessed by the Secretary only after the person charged with a violation described under subsection (a) of this section has been given an opportunity for a public hearing. Where such a

Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1268

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

30 U.S.C. § 1273 — Federal lands

**(a) Promulgation and implementation of Federal lands program** No later than one year after August 3, 1977, the Secretary shall promulgate and implement a Federal lands program which shall be applicable to all surface coal mining and reclamation operations taking place pursuant to any Federal law on any Federal lands: Provided, That except as provided in [section 1300 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1300&num=0&edition=prelim) the provisions of this chapter shall not be applicable to Indian lands. The Federal lands program shall, at a minimum, incorporate all of the requirements of this chapter and shall take into consideration the diverse physical, climatological, and other unique characteristics of the Federal lands in question. Where Federal lands in a State with an approved State program are involved, the Federal lands program shall, at a minimum, include the requirements of the approved State program: Provided, That the Secretary shall retain his duties under sections 201(a), (2)(B) 11 So in original. Probably should be “201(a)(2)(B)”. and 201(a)(3) of this title, and shall continue to be responsible for designation of Federal lands as unsuitable for mining in accordance with [section 1272(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1272/b&num=0&edition=prelim). **(b) Incorporation of requirements into any lease, permit, or contract issued by Secretary which may involve surface coal mining and reclamation operations** The requirements of this chapter and the Federal lands program or an approved State program for State regulation of surface coal mining on Federal lands under subsection (c), whichever is applicable, shall be incorporated by reference or othe

Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1273

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

30 U.S.C. § 1252 — Initial regulatory procedures

Page 273 TITLE 30—MINERAL LANDS AND MINING § 1252 1977 [30 U.S.C. 1201 et seq.] to the contrary, the Secretary of the Interior shall, within one year after October 24, 1992, publish proposed regula- tions in the Federal Register, and after oppor- tunity for public comment publish final regula- tions, establishing environmental protection performance and reclamation standards, and separate permit systems applicable to oper- ations for the on-site reprocessing of abandoned coal refuse and operations for the removal of abandoned coal refuse on lands that would oth- erwise be eligible for expenditure under section 404 and section 402(g)(4) of the Surface Mining Control and Reclamation Act of 1977 [30 U.S.C. 1234, 1232(g)(4)]. (2) The standards and permit systems referred to in paragraph (1) shall distinguish between those operations which reprocess abandoned coal refuse on-site, and those operations which completely remove abandoned coal refuse from a site for the direct use of such coal refuse, or for the reprocessing of such coal refuse, at another location. Such standards and permit systems shall be premised on the distinct differences be- tween operations for the on-site reprocessing, and operations for the removal, of abandoned coal refuse and other types of surface coal min- ing operations. (3) The Secretary of the Interior may devise a different standard than any of those set forth in section 515 and section 516 of the Surface Mining Control and Reclamation Act of 1977 [30 U.S.C. 1265, 1266], and devise a separate permit system, if he determines, on a standard-by-standard basis, that a different standard may facilitate the on-site reprocessing, or the removal, of abandoned coal refuse in a manner that would provide the same level of envi

Source: Supplied 2024 U.S. Code historical extraction · 30 U.S.C. § 1252

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.