Browse Arkansas Code titles and sections
30 U.S.C. § 1266 — Surface effects of underground coal mining operations
Federal law — U.S. Code and appendices · legal_authorities
**(a) Rules and regulations** The Secretary shall promulgate rules and regulations directed toward the surface effects of underground coal mining operations, embodying the following requirements and in accordance with the procedures established under [section 1251 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1251&num=0&edition=prelim): Provided, however, That in adopting any rules and regulations the Secretary shall consider the distinct difference between surface coal mining and underground coal mining. Such rules and regulations shall not conflict with nor supersede any provision of the Federal Coal Mine Health and Safety Act of 1969 [[30 U.S.C. 801](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section801&num=0&edition=prelim) et seq.] nor any regulation issued pursuant thereto, and shall not be promulgated until the Secretary has obtained the written concurrence of the head of the department which administers such Act.
**(b) Permit requirements** Each permit issued under any approved State or Federal program pursuant to this chapter and relating to underground coal mining shall require the operator to—
(1) adopt measures consistent with known technology in order to prevent subsidence causing material damage to the extent technologically and economically feasible, maximize mine stability, and maintain the value and reasonably foreseeable use of such surface lands, except in those instances where the mining technology used requires planned subsidence in a predictable and controlled manner: Provided, That nothing in this subsection shall be construed to prohibit the standard method of room and pillar mining;
(2) seal all portals, entryways, drifts, shafts, or other openings between the surface and
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1266
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 1813079cbe8a1cc9b6b74f7b60096b1f4e3e366eba7615769f1414fc70f1840b. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_24e8e69ce01aaa71607afe7f
Source file: Laws/federal/codes/united-states-code/title-30/section-1266-surface-effects-of-underground-coal-mining-operations--88b027b969.md
Pages: Not recorded – Not recorded
Passage SHA-256: 004da231f420f39c3c450399d8f15540d5ab092ff9fa80bf075f19e24e912975
Source location: Title 30, Chapter 25, § 1266; chapter-025-surface-mining-control-and-reclamation.md
Stored source content
**(a) Rules and regulations** The Secretary shall promulgate rules and regulations directed toward the surface effects of underground coal mining operations, embodying the following requirements and in accordance with the procedures established under [section 1251 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1251&num=0&edition=prelim): Provided, however, That in adopting any rules and regulations the Secretary shall consider the distinct difference between surface coal mining and underground coal mining. Such rules and regulations shall not conflict with nor supersede any provision of the Federal Coal Mine Health and Safety Act of 1969 [[30 U.S.C. 801](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section801&num=0&edition=prelim) et seq.] nor any regulation issued pursuant thereto, and shall not be promulgated until the Secretary has obtained the written concurrence of the head of the department which administers such Act.
**(b) Permit requirements** Each permit issued under any approved State or Federal program pursuant to this chapter and relating to underground coal mining shall require the operator to—
(1) adopt measures consistent with known technology in order to prevent subsidence causing material damage to the extent technologically and economically feasible, maximize mine stability, and maintain the value and reasonably foreseeable use of such surface lands, except in those instances where the mining technology used requires planned subsidence in a predictable and controlled manner: Provided, That nothing in this subsection shall be construed to prohibit the standard method of room and pillar mining;
(2) seal all portals, entryways, drifts, shafts, or other openings between the surface and underground mine working when no longer needed for the conduct of the mining operations;
(3) fill or seal exploratory holes no longer necessary for mining, maximizing to the extent technologically and economically feasible return of mine and processing waste, tailings, and any other waste incident to the mining operation, to the mine workings or excavations;
(4) with respect to surface disposal of mine wastes, tailings, coal processing wastes, and other wastes in areas other than the mine workings or excavations, stabilize all waste piles created by the permittee from current operations through construction in compacted layers including the use of incombustible and impervious materials if necessary and assure that the leachate will not degrade below water quality standards established pursuant to applicable Federal and State law surface or ground waters and that the final contour of the waste accumulation will be compatible with natural surroundings and that the site is stabilized and revegetated according to the provisions of this section;
(5) design, locate, construct, operate, maintain, enlarge, modify, and remove, or abandon, in accordance with the standards and criteria developed pursuant to [section 1265(f) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1265/f&num=0&edition=prelim), all existing and new coal mine waste piles consisting of mine wastes, tailings, coal processing wastes, or other liquid and solid wastes and used either temporarily or permanently as dams or embankments;
(6) establish on regraded areas and all other lands affected, a diverse and permanent vegetative cover capable of self-regeneration and plant succession and at least equal in extent of cover to the natural vegetation of the area;
(7) protect offsite areas from damages which may result from such mining operations;
(8) eliminate fire hazards and otherwise eliminate conditions which constitute a hazard to health and safety of the public;
(9) minimize the disturbances of the prevailing hydrologic balance at the minesite and in associated offsite areas and to the quantity of water in surface ground water systems both during and after coal mining operations and during reclamation by—
(A) avoiding acid or other toxic mine drainage by such measures as, but not limited to—
(i) preventing or removing water from contact with toxic producing deposits;
(ii) treating drainage to reduce toxic content which adversely affects downstream water upon being released to water courses;
(iii) casing, sealing, or otherwise managing boreholes, shafts, and wells to keep acid or other toxic drainage from entering ground and surface waters; and
(B) conducting surface coal mining operations so as to prevent, to the extent possible using the best technology currently available, additional contributions of suspended solids to streamflow or runoff outside the permit area (but in no event shall such contributions be in excess of requirements set by applicable State or Federal law), and avoiding channel deepening or enlargement in operations requiring the discharge of water from mines;
(10) with respect to other surface impacts not specified in this subsection including the construction of new roads or the improvement or use of existing roads to gain access to the site of such activities and for haulage, repair areas, storage areas, processing areas, shipping areas, and other areas upon which are sited structures, facilities, or other property or materials on the surface, resulting from or incident to such activities, operate in accordance with the standards established under [section 1265 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1265&num=0&edition=prelim) for such effects which result from surface coal mining operations: Provided, That the Secretary shall make such modifications in the requirements imposed by this paragraph as are necessary to accommodate the distinct difference between surface and underground coal mining;
(11) to the extent possible using the best technology currently available, minimize disturbances and adverse impacts of the operation on fish, wildlife, and related environmental values, and achieve enhancement of such resources where practicable;
(12) locate openings for all new drift mines working acid-producing or iron-producing coal seams in such a manner as to prevent a gravity discharge of water from the mine.
**(c) Suspension of underground coal mining operations in urbanized areas** In order to protect the stability of the land, the regulatory authority shall suspend underground coal mining under urbanized areas, cities, towns, and communities and adjacent to industrial or commercial buildings, major impoundments, or permanent streams if he finds imminent danger to inhabitants of the urbanized areas, cities, towns, and communities.
**(d) Applicability of this subchapter to surface operations and surface impacts incident to underground coal mining operations** The provisions of this subchapter relating to State and Federal programs, permits, bonds, inspections and enforcement, public review, and administrative and judicial review shall be applicable to surface operations and surface impacts incident to an underground coal mine with such modifications to the permit application requirements, permit approval or denial procedures, and bond requirements as are necessary to accommodate the distinct difference between surface and underground coal mining. The Secretary shall promulgate such modifications in accordance with the rulemaking procedure established in [section 1251 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1251&num=0&edition=prelim).
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Permit requirement** Any permit issued under any approved State or Federal program pursuant to this chapter to conduct surface coal mining operations shall require that such surface coal mining operations will meet all applicable performance standards of this chapter, and such other requirements as the regulatory authority shall promulgate.
**(b) General standards** General performance standards shall be applicable to all surface coal mining and reclamation operations and shall require the operation as a minimum to—
(1) conduct surface coal mining operations so as to maximize the utilization and conservation of the solid fuel resource being recovered so that reaffecting the land in the future through surface coal mining can be minimized;
(2) restore the land affected to a condition capable of supporting the uses which it was capable of supporting prior to any mining, or higher or better uses of which there is reasonable likelihood, so long as such use or uses do not present any actual or probable hazard to public health or safety or pose any actual or probable threat of water diminution or pollution, and the permit applicants’ declared proposed land use following reclamation is not deemed to be impractical or unreasonable, inconsistent with applicable land use policies and plans, involves unreasonable delay in implementation, or is violative of Federal, State, or local law;
(3) except as provided in subsection (c) with respect to all surface coal mining operations backfill, compact (where advisable to insure stability or to prevent leaching of toxic materials), and grade in order to restore the approximate original contour of the land with all highwalls, spoil piles, and depressions eliminated (unless small depressions are needed in order to retain moisture to
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1265
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Establishment** There is established a Technical Study Panel (referred to in this section as the “Panel”) which shall provide independent scientific and engineering review and recommendations with respect to the utilization of belt air and the composition and fire retardant properties of belt materials in underground coal mining.
**(b) Membership** The Panel shall be composed of—
(1) two individuals to be appointed by the Secretary of Health and Human Services, in consultation with the Director of the National Institute for Occupational Safety and Health and the Associate Director of the Office of Mine Safety;
(2) two individuals to be appointed by the Secretary of Labor, in consultation with the Assistant Secretary for Mine Safety and Health; and
(3) two individuals, one to be appointed jointly by the majority leaders of the Senate and House of Representatives and one to be appointed jointly by the minority leader of the Senate and House of Representatives, each to be appointed prior to the sine die adjournment of the second session of the 109th Congress.
**(c) Qualifications** Four of the six individuals appointed to the Panel under subsection (b) shall possess a masters or doctoral level degree in mining engineering or another scientific field demonstrably related to the subject of the report. No individual appointed to the Panel shall be an employee of any coal or other mine, or of any labor organization, or of any State or Federal agency primarily responsible for regulating the mining industry.
**(d) Report**
(1) **In general** — Not later than 1 year after the date on which all members of the Panel are appointed under subsection (b), the Panel shall prepare and submit to the Secretary of Labor, the Secretary of Health and Human Services, the Committee
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 801
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a)** Not later than the end of the ninety-day period immediately following August 3, 1977, the Secretary shall promulgate and publish in the Federal Register regulations covering an interim regulatory procedure for surface coal mining and reclamation operations setting mining and reclamation performance standards based on and incorporating the provisions set out in [section 1252(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1252/c&num=0&edition=prelim). The issuance of the interim regulations shall be deemed not to be a major Federal action within the meaning of section 4332(2)(c) 11 So in original. Probably should be “4332(2)(C)”. of title 42. Such regulations, which shall be concise and written in plain, understandable language shall not be promulgated and published by the Secretary until he has—
(A) published proposed regulations in the Federal Register and afforded interested persons and State and local governments a period of not less than thirty days after such publication to submit written comments thereon;
(B) obtained the written concurrence of the Administrator of the Environmental Protection Agency with respect to those regulations promulgated under this section which relate to air or water quality standards promulgated under the authority of the Federal Water Pollution Control Act, as amended [[33 U.S.C. 1251](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1251&num=0&edition=prelim) et seq.]; and the Clean Air Act, as amended [[42 U.S.C. 7401](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7401&num=0&edition=prelim) et seq.]; and
(C) held at least one public hearing on the proposed regulations.
The date, time, and place of any hearing held on the p
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1251
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
For the purposes of this chapter—
(1) “alluvial valley floors” means the unconsolidated stream laid deposits holding streams where water availability is sufficient for subirrigation or flood irrigation agricultural activities but does not include upland areas which are generally overlain by a thin veneer of colluvial deposits composed chiefly of debris from sheet erosion, deposits by unconcentrated runoff or slope wash, together with talus, other mass movement accumulation and windblown deposits;
(2) “approximate original contour” means that surface configuration achieved by backfilling and grading of the mined area so that the reclaimed area, including any terracing or access roads, closely resembles the general surface configuration of the land prior to mining and blends into and complements the drainage pattern of the surrounding terrain, with all highwalls and spoil piles eliminated; water impoundments may be permitted where the regulatory authority determines that they are in compliance with [section 1265(b)(8) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1265/b/8&num=0&edition=prelim);
(3) “commerce” means trade, traffic, commerce, transportation, transmission, or communication among the several States, or between a State and any other place outside thereof, or between points in the same State which directly or indirectly affect interstate commerce;
(4) “Federal lands” means any land, including mineral interests, owned by the United States without regard to how the United States acquired ownership of the land and without regard to the agency having responsibility for management thereof, except Indian lands: Provided, That for the purposes of this chapter lands or mineral interests east of the one hundredth meridian
Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1291
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 291
TITLE 30—MINERAL LANDS AND MINING
§ 1266
tate compliance with the environmental protec-
tion standards of this section: Provided, however,
That the land disturbed above the highwall shall
be limited to that amount necessary to facili-
tate said compliance.
(4) For the purposes of this subsection (d), the
term ‘‘steep slope’’ is any slope above twenty de-
grees or such lesser slope as may be defined by
the regulatory authority after consideration of
soil, climate, and other characteristics of a re-
gion or State.
(e) Variances to original contour restoration re-
quirements
(1) Each State program may and each Federal
program shall include procedures pursuant to
which the regulatory authority may permit
variances for the purposes set forth in paragraph
(3) of this subsection, provided that the water-
shed control of the area is improved; and further
provided complete backfilling with spoil mate-
rial shall be required to cover completely the
highwall which material will maintain stability
following mining and reclamation.
(2) Where an applicant meets the requirements
of paragraphs (3) and (4) of this subsection a
variance from the requirement to restore to ap-
proximate original contour set forth in sub-
section (d)(2) of this section may be granted for
the surface mining of coal where the owner of
the surface knowingly requests in writing, as a
part of the permit application that such a vari-
ance be granted so as to render the land, after
reclamation, suitable for an industrial, commer-
cial, residential, or public use (including rec-
reational facilities) in accord with the further
provisions of (3) and (4) of this subsection.
(3)(A) After consultation with the appropriate
land use planning agencies, if any, the potential
use of the af
Source: Supplied 2024 U.S. Code historical extraction · 30 U.S.C. § 1266
Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 126
TITLE 30—MINERAL LANDS AND MINING
§ 801
Sec.
824.
Authorization of appropriations.
825.
Mandatory health and safety training.
826.
Limitation on certain liability for rescue op-
erations.
SUBCHAPTER II—INTERIM MANDATORY HEALTH
STANDARDS
841.
Mandatory health standards for underground
mines; enforcement; review; purpose.
842.
Dust concentration and respiratory equip-
ment.
843.
Medical examinations.
844.
Rock dust and gas hazards; controls.
845.
Dust standards in presence of quartz.
846.
Noise standards; promulgation of new stand-
ards; tests; procedures; protective devices.
SUBCHAPTER III—INTERIM MANDATORY SAFETY
STANDARDS FOR UNDERGROUND COAL MINES
861.
Mandatory safety standards for underground
mines.
862.
Roof support.
863.
Ventilation.
864.
Combustible materials and rock dusting.
865.
Electrical equipment.
866.
Trailing cables.
867.
Grounding of equipment.
868.
Underground high-voltage distribution.
869.
Underground low- and medium-voltage alter-
nating current circuits.
870.
Trolley wires and trolley feeder wires.
871.
Fire protection.
872.
Maps.
873.
Blasting and explosives.
874.
Hoisting and mantrips.
875.
Emergency shelters; construction; contents;
implementation plans.
876.
Communication
facilities;
locations
and
emergency response plans.
877.
General safety provisions.
878.
Definitions.
SUBCHAPTER IV—BLACK LUNG BENEFITS
PART A—GENERAL PROVISIONS
901.
Congressional findings and declaration of pur-
pose; short title.
902.
Definitions.
903.
Field offices.
904.
Repealed.
PART B—CLAIMS FOR BENEFITS FILED ON OR BEFORE
DECEMBER 31, 1973
921.
Regulations and presumptions.
922.
Payment of benefits.
923.
Filing of notice of claim.
924.
Time for filing claims.
924a.
Repealed.
Source: Supplied 2024 U.S. Code historical extraction · 30 U.S.C. § 801
Stored review status: historical_2024_not_currentness_verified. The source passage cites 30 U.S.C. § 801. This identifies an authority to review, not proof of applicability.