30 U.S.C. § 1258 — Reclamation plan requirements

Federal law — U.S. Code and appendices · legal_authorities

30 U.S.C. § 1258 — Reclamation plan requirements

**(a)** Each reclamation plan submitted as part of a permit application pursuant to any approved State program or a Federal program under the provisions of this chapter shall include, in the degree of detail necessary to demonstrate that reclamation required by the State or Federal program can be accomplished, a statement of: (1) the identification of the lands subject to surface coal mining operations over the estimated life of those operations and the size, sequence, and timing of the subareas for which it is anticipated that individual permits for mining will be sought; (2) the condition of the land to be covered by the permit prior to any mining including: (A) the uses existing at the time of the application, and if the land has a history of previous mining, the uses which preceded any mining; and (B) the capability of the land prior to any mining to support a variety of uses giving consideration to soil and foundation characteristics, topography, and vegetative cover, and, if applicable, a soil survey prepared pursuant to [section 1257(b)(16) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1257/b/16&num=0&edition=prelim); and (C) the productivity of the land prior to mining, including appropriate classification as prime farm lands, as well as the average yield of food, fiber, forage, or wood products from such lands obtained under high levels of management; (3) the use which is proposed to be made of the land following reclamation, including a discussion of the utility and capacity of the reclaimed land to support a variety of alternative uses and the relationship of such use to existing land use policies and plans, and the comments of any owner of the surface, State and local governments or agencies thereof wh

Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1258

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: e194e221c54eafe17f2f451eb47998405aebd05dea4abe988b03cfb280416873. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_666b3ff69ef9a61dddc1c08c
Source file: Laws/federal/codes/united-states-code/title-30/section-1258-reclamation-plan-requirements--f64523215a.md
Pages: Not recorded – Not recorded
Passage SHA-256: be8666fb56f93c5a8edc9ab1a6169c0c8fe82a33e7cb74289d85c73380f01280

Source location: Title 30, Chapter 25, § 1258; chapter-025-surface-mining-control-and-reclamation.md

Stored source content

**(a)** Each reclamation plan submitted as part of a permit application pursuant to any approved State program or a Federal program under the provisions of this chapter shall include, in the degree of detail necessary to demonstrate that reclamation required by the State or Federal program can be accomplished, a statement of: (1) the identification of the lands subject to surface coal mining operations over the estimated life of those operations and the size, sequence, and timing of the subareas for which it is anticipated that individual permits for mining will be sought; (2) the condition of the land to be covered by the permit prior to any mining including: (A) the uses existing at the time of the application, and if the land has a history of previous mining, the uses which preceded any mining; and (B) the capability of the land prior to any mining to support a variety of uses giving consideration to soil and foundation characteristics, topography, and vegetative cover, and, if applicable, a soil survey prepared pursuant to [section 1257(b)(16) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1257/b/16&num=0&edition=prelim); and (C) the productivity of the land prior to mining, including appropriate classification as prime farm lands, as well as the average yield of food, fiber, forage, or wood products from such lands obtained under high levels of management; (3) the use which is proposed to be made of the land following reclamation, including a discussion of the utility and capacity of the reclaimed land to support a variety of alternative uses and the relationship of such use to existing land use policies and plans, and the comments of any owner of the surface, State and local governments or agencies thereof which would have to initiate, implement, approve or authorize the proposed use of the land following reclamation; (4) a detailed description of how the proposed postmining land use is to be achieved and the necessary support activities which may be needed to achieve the proposed land use; (5) the engineering techniques proposed to be used in mining and reclamation and a description of the major equipment; a plan for the control of surface water drainage and of water accumulation; a plan, where appropriate, for backfilling, soil stabilization, and compacting, grading, and appropriate revegetation; a plan for soil reconstruction, replacement, and stabilization, pursuant to the performance standards in section 1265(b)(7)(A), (B), (C), and (D) of this title, for those food, forage, and forest lands identified in [section 1265(b)(7) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1265/b/7&num=0&edition=prelim); an estimate of the cost per acre of the reclamation, including a statement as to how the permittee plans to comply with each of the requirements set out in [section 1265 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1265&num=0&edition=prelim); (6) the consideration which has been given to maximize the utilization and conservation of the solid fuel resource being recovered so that reaffecting the land in the future can be minimized; (7) a detailed estimated timetable for the accomplishment of each major step in the reclamation plan; (8) the consideration which has been given to making the surface mining and reclamation operations consistent with surface owner plans, and applicable State and local land use plans and programs; (9) the steps to be taken to comply with applicable air and water quality laws and regulations and any applicable health and safety standards; (10) the consideration which has been given to developing the reclamation plan in a manner consistent with local physical environmental, and climatological conditions; (11) all lands, interests in lands, or options on such interests held by the applicant or pending bids on interests in lands by the applicant, which lands are contiguous to the area to be covered by the permit; (12) the results of test boring which the applicant has made at the area to be covered by the permit, or other equivalent information and data in a form satisfactory to the regulatory authority, including the location of subsurface water, and an analysis of the chemical properties including acid forming properties of the mineral and overburden: Provided, That information which pertains only to the analysis of the chemical and physical properties of the coal (excepting information regarding such mineral or elemental contents which is potentially toxic in the environment) shall be kept confidential and not made a matter of public record; (13) a detailed description of the measures to be taken during the mining and reclamation process to assure the protection of: (A) the quality of surface and ground water systems, both on- and off-site, from adverse effects of the mining and reclamation process; (B) the rights of present users to such water; and (C) the quantity of surface and ground water systems, both on- and off-site, from adverse effects of the mining and reclamation process or to provide alternative sources of water where such protection of quantity cannot be assured; (14) such other requirements as the regulatory authority shall prescribe by regulations. **(b)** Any information required by this section which is not on public file pursuant to State law shall be held in confidence by the regulatory authority.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

30 U.S.C. § 1265 — Environmental protection performance standards

**(a) Permit requirement** Any permit issued under any approved State or Federal program pursuant to this chapter to conduct surface coal mining operations shall require that such surface coal mining operations will meet all applicable performance standards of this chapter, and such other requirements as the regulatory authority shall promulgate. **(b) General standards** General performance standards shall be applicable to all surface coal mining and reclamation operations and shall require the operation as a minimum to— (1) conduct surface coal mining operations so as to maximize the utilization and conservation of the solid fuel resource being recovered so that reaffecting the land in the future through surface coal mining can be minimized; (2) restore the land affected to a condition capable of supporting the uses which it was capable of supporting prior to any mining, or higher or better uses of which there is reasonable likelihood, so long as such use or uses do not present any actual or probable hazard to public health or safety or pose any actual or probable threat of water diminution or pollution, and the permit applicants’ declared proposed land use following reclamation is not deemed to be impractical or unreasonable, inconsistent with applicable land use policies and plans, involves unreasonable delay in implementation, or is violative of Federal, State, or local law; (3) except as provided in subsection (c) with respect to all surface coal mining operations backfill, compact (where advisable to insure stability or to prevent leaching of toxic materials), and grade in order to restore the approximate original contour of the land with all highwalls, spoil piles, and depressions eliminated (unless small depressions are needed in order to retain moisture to

Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1265

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

30 U.S.C. § 1256 — Permits

**(a) Persons engaged in surface coal mining within State; time limit; exception** No later than eight months from the date on which a State program is approved by the Secretary, pursuant to [section 1253 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1253&num=0&edition=prelim), or no later than eight months from the date on which the Secretary has promulgated a Federal program for a State not having a State program pursuant to [section 1254 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1254&num=0&edition=prelim), no person shall engage in or carry out on lands within a State any surface coal mining operations unless such person has first obtained a permit issued by such State pursuant to an approved State program or by the Secretary pursuant to a Federal program; except a person conducting surface coal mining operations under a permit from the State regulatory authority, issued in accordance with the provisions of [section 1252 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1252&num=0&edition=prelim), may conduct such operations beyond such period if an application for a permit has been filed in accordance with the provisions of this chapter, but the initial administrative decision has not been rendered. **(b) Term** All permits issued pursuant to the requirements of this chapter shall be issued for a term not to exceed five years: Provided, That if the applicant demonstrates that a specified longer term is reasonably needed to allow the applicant to obtain necessary financing for equipment and the opening of the operation and if the application is full and complete for such specified longer term, the regulatory authority may grant a per

Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1256

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

30 U.S.C. § 1291 — Definitions

For the purposes of this chapter— (1) “alluvial valley floors” means the unconsolidated stream laid deposits holding streams where water availability is sufficient for subirrigation or flood irrigation agricultural activities but does not include upland areas which are generally overlain by a thin veneer of colluvial deposits composed chiefly of debris from sheet erosion, deposits by unconcentrated runoff or slope wash, together with talus, other mass movement accumulation and windblown deposits; (2) “approximate original contour” means that surface configuration achieved by backfilling and grading of the mined area so that the reclaimed area, including any terracing or access roads, closely resembles the general surface configuration of the land prior to mining and blends into and complements the drainage pattern of the surrounding terrain, with all highwalls and spoil piles eliminated; water impoundments may be permitted where the regulatory authority determines that they are in compliance with [section 1265(b)(8) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section1265/b/8&num=0&edition=prelim); (3) “commerce” means trade, traffic, commerce, transportation, transmission, or communication among the several States, or between a State and any other place outside thereof, or between points in the same State which directly or indirectly affect interstate commerce; (4) “Federal lands” means any land, including mineral interests, owned by the United States without regard to how the United States acquired ownership of the land and without regard to the agency having responsibility for management thereof, except Indian lands: Provided, That for the purposes of this chapter lands or mineral interests east of the one hundredth meridian

Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 1291

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

30 U.S.C. § 1258 — Reclamation plan requirements

Page 280 TITLE 30—MINERAL LANDS AND MINING § 1258 tained in full force and effect during the terms of the permit or any renewal, including the length of all reclamation operations. (g) Blasting plan Each applicant for a surface coal mining and reclamation permit shall submit to the regu- latory authority as part of the permit applica- tion a blasting plan which shall outline the pro- cedures and standards by which the operator will meet the provisions of section 1265(b)(15) of this title. (h) Reimbursement of costs A coal operator that has received assistance pursuant to subsection (c)(1) or (2) shall reim- burse the regulatory authority for the cost of the services rendered if the program adminis- trator finds that the operator’s actual and at- tributed annual production of coal for all loca- tions exceeds 300,000 tons during the 12 months immediately following the date on which the op- erator is issued the surface coal mining and rec- lamation permit. (Pub. L. 95–87, title V, § 507, Aug. 3, 1977, 91 Stat. 474; Pub. L. 101–508, title VI, § 6011, Nov. 5, 1990, 104 Stat. 1388–297; Pub. L. 102–486, title XXV, § 2513, Oct. 24, 1992, 106 Stat. 3112.) Editorial Notes AMENDMENTS 1992—Subsec. (c). Pub. L. 102–486, § 2513(a), amended subsec. (c) generally. Prior to amendment, subsec. (c) read as follows: ‘‘If the regulatory authority finds that the probable total annual production at all locations of any coal surface mining operator will not exceed 300,000 tons, the determination of probable hydrologic con- sequences required by subsection (b)(11) of this section and the statement of the result of test borings or core samplings required by subsection (b)(15) of this section shall, upon the written request of the operator be per- formed by a qualified p