Arkansas Legal Resource Navigator

43 U.S.C. § 1595 — Salinity control units; authority and functions of the Secretary of the Interior

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1595 — Salinity control units; authority and functions of the Secretary of the Interior

**(a) Allocation of costs** The Secretary shall allocate the total costs (excluding costs borne by non-Federal participants) of the on-farm measures authorized by [section 1592(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592/c&num=0&edition=prelim), of all measures to replace incidental fish and wildlife values foregone, and of each unit or separable feature thereof authorized by [section 1592(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592/a&num=0&edition=prelim), as follows: (1) **Nonreimbursable costs; reimbursable costs.—** (A) *Nonreimbursable costs.—* (i) *In general.—* — In recognition of Federal responsibility for the Colorado River as an interstate stream and for international comity with Mexico, Federal ownership of the land of the Colorado River Basin from which most of the dissolved salts originate, and the policy established in the Federal Water Pollution Control Act ([33 U.S.C. 1251](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1251&num=0&edition=prelim) et seq.) and except as provided in clause (ii), the following shall be nonreimbursable: (I) 75 percent of the total costs of construction and replacement of each unit or separable feature of a unit authorized by [section 1592(a)(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592/a/1&num=0&edition=prelim), including 90 percent of— (aa) the costs of operation and maintenance of each unit or separable feature of a unit authorized by that section; and (bb) the total costs of construction, operation, and maintenance of the associated measures to replace incidental fish and wildlife values foregone.

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1595

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 55b6310a2beb544b8f28c6b60d2ceb376447cc95905c839f5d6f5cb7aa9798b6. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_d387963b8ef4ec57105b5964
Source file: Laws/federal/codes/united-states-code/title-43/section-1595-salinity-control-units-authority-and-functions-of-the-secretary-of-the-i--7eca8678ee.md
Pages: Not recorded – Not recorded
Passage SHA-256: be2cc42af292765057b07df91cef257f7a22b7a8502cfdf27c09ce4dcf7cbfb0

Source location: Title 43, Chapter 32A, § 1595; chapter-32a-colorado-river-basin-salinity-control.md

Stored source content

**(a) Allocation of costs** The Secretary shall allocate the total costs (excluding costs borne by non-Federal participants) of the on-farm measures authorized by [section 1592(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592/c&num=0&edition=prelim), of all measures to replace incidental fish and wildlife values foregone, and of each unit or separable feature thereof authorized by [section 1592(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592/a&num=0&edition=prelim), as follows: (1) **Nonreimbursable costs; reimbursable costs.—** (A) *Nonreimbursable costs.—* (i) *In general.—* — In recognition of Federal responsibility for the Colorado River as an interstate stream and for international comity with Mexico, Federal ownership of the land of the Colorado River Basin from which most of the dissolved salts originate, and the policy established in the Federal Water Pollution Control Act ([33 U.S.C. 1251](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1251&num=0&edition=prelim) et seq.) and except as provided in clause (ii), the following shall be nonreimbursable: (I) 75 percent of the total costs of construction and replacement of each unit or separable feature of a unit authorized by [section 1592(a)(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592/a/1&num=0&edition=prelim), including 90 percent of— (aa) the costs of operation and maintenance of each unit or separable feature of a unit authorized by that section; and (bb) the total costs of construction, operation, and maintenance of the associated measures to replace incidental fish and wildlife values foregone. (II) 75 percent of the total costs of construction and replacement of each unit or separable feature of a unit authorized by [section 1592(a)(2) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592/a/2&num=0&edition=prelim), including 100 percent of— (aa) the costs of operation and maintenance of each unit or separable feature of a unit authorized by that section; and (bb) the total costs of construction, operation, and maintenance of the associated measures to replace incidental fish and wildlife values foregone. (III) 75 percent of the total costs of construction, operation, maintenance, and replacement of each unit or separable feature of a unit authorized by [section 1592(a)(3) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592/a/3&num=0&edition=prelim), including 75 percent of the total costs of construction, operation, and maintenance of the associated measures to replace incidental fish and wildlife values foregone. (IV) 70 percent of the total costs of construction, operation, maintenance, and replacement of each unit or separable feature of a unit authorized by paragraphs (4) and (6) of [section 1592(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592/a&num=0&edition=prelim), including 70 percent of the total costs of construction, operation, and maintenance of the associated measures to replace incidental fish and wildlife values foregone. (V) 70 percent of the total costs of construction and replacement of each unit or separable feature of a unit authorized by [section 1592(a)(5) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592/a/5&num=0&edition=prelim), including 100 percent of— (aa) the costs of operation and maintenance of each unit or separable feature of a unit authorized by that section; and (bb) the total costs of construction, operation, and maintenance of the associated measures to replace incidental fish and wildlife values foregone. (VI) 85 percent of the total costs of implementation of the on-farm measures authorized by [section 1592(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592/c&num=0&edition=prelim), including 85 percent of the total costs of the associated measures to replace incidental fish and wildlife values foregone. (ii) *Special rule for nonreimbursable costs for fiscal years 2024 and 2025.—* — Notwithstanding clause (i), for each of fiscal years 2024 and 2025, the following shall be nonreimbursable: (I) 75 percent of all costs described in clause (i)(I). (II) 75 percent of all costs described in clause (i)(II). (III) 70 percent of all costs described in clause (i)(V). (IV) The percentages of all costs described in subclauses (III), (IV), and (VI) of clause (i). (B) *Reimbursable costs.—* — The total costs remaining after the allocations under clauses (i) and (ii) of subparagraph (A) shall be reimbursable as provided for in paragraphs (2), (3), (4), and (5). (2) The reimbursable portion of the total costs shall be allocated between the Upper Colorado River Basin Fund established by section 5(a) of the Colorado River Storage Project Act (70 Stat. 107) [[43 U.S.C. 620d(a)](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section620d/a&num=0&edition=prelim)] and the Lower Colorado River Basin Development Fund established by [section 1543(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1543/a&num=0&edition=prelim), after consultation with the Advisory Council created in [section 1594(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1594/a&num=0&edition=prelim) and consideration of the following items: (i) benefits to be derived in each basin from the use of water of improved quality and the use of works for improved water management; (ii) causes of salinity; and (iii) availability of revenues in the Lower Colorado River Basin Development Fund and increased revenues to the Upper Colorado River Basin Fund made available under [section 620d(d)(5) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section620d/d/5&num=0&edition=prelim): Provided, That costs allocated to the Upper Colorado River Basin Fund under this paragraph (2) shall not exceed 15 per centum of the costs allocated to the Upper Colorado River Basin Fund and the Lower Colorado River Basin Development Fund. (3) Costs of construction and replacement of each unit or separable feature thereof authorized by sections 11 So in original. Probably should be “section”. 1592(a)(1), (2), and (3) of this title and costs of construction of measures to replace incidental fish and wildlife values foregone, when such measures are a part of the units authorized by sections 1 1592(a)(1), (2), and (3) of this title, allocated to the upper basin and to the lower basin under subsection (a)(2) shall be repaid within a fifty-year period or within a period equal to the estimated life of the unit, separable feature thereof, or replacement, whichever is less, without interest from the date such unit, separable feature, or replacement is determined by the Secretary to be in operation. (4) (i) Costs of construction and replacement of each unit or separable feature thereof authorized by paragraphs (4) through (6) of section 1592 22 So in original. Probably should be section “1592(a)”. of this title, costs of construction of measures to replace incidental fish and wildlife values foregone, when such measures are a part of the on-farm measures authorized by [section 1592(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592/c&num=0&edition=prelim) or of the units authorized by paragraphs (4) through (6) of section 1592 2 of this title, and costs of implementation of the on-farm measures authorized by [section 1592(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592/c&num=0&edition=prelim) allocated to the upper basin and to the lower basin under subsection (a)(2) shall be repaid as provided in subparagraphs (ii) and (iii), respectively, of this paragraph. (ii) Costs allocated to the upper basin shall be repaid with interest within a fifty-year period, or within a period equal to the estimated life of the unit, separable feature thereof, replacement, or on-farm measure, whichever is less, from the date such unit, separable feature thereof, replacement, or on-farm measure is determined by the Secretary or the Secretary of Agriculture to be in operation. (iii) Costs allocated to the lower basin shall be repaid without interest as such costs are incurred to the extent that money is available from the Lower Colorado River Basin development fund to repay costs allocated to the lower basin. If in any fiscal year the money available from the Lower Colorado River Basin development fund for such repayment is insufficient to repay the costs allocated to the lower basin, as provided in the preceding sentence, the deficiency shall be repaid with interest as soon as money becomes available in the fund for repayment of those costs. (iv) The interest rates used pursuant to this chapter shall be determined by the Secretary of the Treasury, taking into consideration average market yields on outstanding marketable obligations of the United States with remaining periods to maturity comparable to the reimbursement period during the month preceding October 30, 1984, for costs outstanding at that date, or, in the case of costs incurred subsequent to October 30, 1984, during the month preceding the fiscal year in which the costs are incurred. (5) Costs of operation and maintenance of each unit or separable feature thereof authorized by [section 1592(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592/a&num=0&edition=prelim) and of measures to replace incidental fish and wildlife values foregone allocated to the upper basin and to the lower basin under subsection (a)(2) shall be repaid without interest in the fiscal year next succeeding the fiscal year in which such costs are incurred. In the event that revenues are not available to repay the portion of operation and maintenance costs allocated to the Upper Colorado River Basin fund and to the Lower Colorado River Basin development fund in the year next succeeding the fiscal year in which such costs are incurred, the deficiency shall be repayed 33 So in original. with interest calculated in the same manner as provided in subsection (a)(4)(iv). Any reimbursement due non-Federal entities pursuant to [section 1592(b)(2) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592/b/2&num=0&edition=prelim) shall be repaid without interest in the fiscal year next succeeding the fiscal year in which such operation and maintenance costs are incurred. **(b) Costs payable from Lower Colorado River Basin Development Fund** (1) **In general.—** — Costs of construction, operation, maintenance, and replacement of each unit or separable feature thereof authorized by [section 1592(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592/a&num=0&edition=prelim), costs of construction, operation, and maintenance of measures to replace incidental fish and wildlife values foregone, and costs of implementation of the on-farm measures authorized by [section 1592(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592/c&num=0&edition=prelim), allocated for repayment by the lower basin under subsection (a)(2) shall be paid in accordance with [section 1543(g)(2) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1543/g/2&num=0&edition=prelim), from the Lower Colorado River Basin Development Fund. (2) Omitted **(c) Costs payable from Upper Colorado River Basin Fund** Costs of construction, operation, maintenance, and replacement of each unit or separable feature thereof authorized by [section 1592(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592/a&num=0&edition=prelim), costs of construction, operation, and maintenance of measures to replace incidental fish and wildlife values foregone, and costs of implementation of the on-farm measures authorized by [section 1592(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592/c&num=0&edition=prelim) allocated for repayment by the upper basin under subsection (a)(2) shall be paid in accordance with [section 620d(d)(5) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section620d/d/5&num=0&edition=prelim) from the Upper Colorado River Basin Fund within the limit of the funds made available under subsection (e). **(d) Omitted** **(e) Upward adjustment of rates for electrical energy** The Secretary is authorized to make upward adjustments in rates charged for electrical energy under all contracts administered by the Secretary under the Colorado River Storage Project Act (70 Stat. 105; [43 U.S.C. 620](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section620&num=0&edition=prelim)) as soon as practicable and to the extent necessary to cover the costs allocated to the Upper Colorado River Basin Fund under subsection (a)(2) and in conformity with subsection (a)(3), subsection (a)(4) and subsection (a)(5): Provided, That revenues derived from said rate adjustments shall be available solely for the construction, operation, maintenance, and replacement of salinity control units, for the construction, operation, and maintenance of measures to replace incidental fish and wildlife values foregone, and for the implementation of on-farm measures in the Colorado River Basin herein authorized. **(f) Up-front cost share** (1) **In general** — Effective beginning on the date of enactment of this paragraph, subject to paragraph (3), the cost share obligations required by this section shall be met through an up-front cost share from the Basin Funds, in the same proportions as the cost allocations required under subsection (a), as provided in paragraph (2). (2) **Basin States Program** — The Secretary shall expend the required cost share funds described in paragraph (1) through the Basin States Program for salinity control activities established under [section 1592(a)(7) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592/a/7&num=0&edition=prelim). (3) **Existing salinity control activities** — The cost share contribution required by this section shall continue to be met through repayment in a manner consistent with this section for all salinity control activities for which repayment was commenced prior to the date of enactment of this paragraph.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 1251 — Congressional declaration of goals and policy

**(a) Restoration and maintenance of chemical, physical and biological integrity of Nation’s waters; national goals for achievement of objective** The objective of this chapter is to restore and maintain the chemical, physical, and biological integrity of the Nation’s waters. In order to achieve this objective it is hereby declared that, consistent with the provisions of this chapter— (1) it is the national goal that the discharge of pollutants into the navigable waters be eliminated by 1985; (2) it is the national goal that wherever attainable, an interim goal of water quality which provides for the protection and propagation of fish, shellfish, and wildlife and provides for recreation in and on the water be achieved by July 1, 1983; (3) it is the national policy that the discharge of toxic pollutants in toxic amounts be prohibited; (4) it is the national policy that Federal financial assistance be provided to construct publicly owned waste treatment works; (5) it is the national policy that areawide waste treatment management planning processes be developed and implemented to assure adequate control of sources of pollutants in each State; (6) it is the national policy that a major research and demonstration effort be made to develop technology necessary to eliminate the discharge of pollutants into the navigable waters, waters of the contiguous zone, and the oceans; and (7) it is the national policy that programs for the control of nonpoint sources of pollution be developed and implemented in an expeditious manner so as to enable the goals of this chapter to be met through the control of both point and nonpoint sources of pollution. **(b) Congressional recognition, preservation, and protection of primary responsibilities and rights of States** It is the policy

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 1251

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1591 — Salinity control policy

**(a) Implementation by Secretary of the Interior** The Secretary of the Interior shall implement the salinity control policy adopted for the Colorado River in the “Conclusions and Recommendations” published in the Proceedings of the Reconvened Seventh Session of the Conference in the Matter of Pollution of the Interstate Waters of the Colorado River and Its Tributaries in the States of California, Colorado, Utah, Arizona, Nevada, New Mexico, and Wyoming, held in Denver, Colorado, on April 26–27, 1972, under the authority of section 10 of the Federal Water Pollution Control Act ([33 U.S.C. 1160](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1160&num=0&edition=prelim)), and approved by the Administrator of the Environmental Protection Agency on June 9, 1972. **(b) Expeditious investigation, planning, and implementation of salinity control program** The Secretary is hereby directed to expedite the investigation, planning, and implementation of the salinity control program generally as described in chapter VI of the Secretary’s report entitled, “Colorado River Water Quality Improvement Program, February 1972”. In determining the relative priority of implementing additional units or new self-contained portions of units authorized by [section 1592 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592&num=0&edition=prelim), the Secretary or the Secretary of Agriculture, as the case may be, shall give preference to those additional units or new self-contained portions of units which reduce salinity of the Colorado River at the least cost per unit of salinity reduction. **(c) Cooperation with other Federal agencies** In conformity with subsection (a) and the authority of the Environmental Protection Agenc

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1591

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 620 — Upper Colorado River Basin; purpose of development of water resources; initial units; construction of Wayne N. Aspinall unit contingent upon certification; participating projects; Rainbow Bridge National Monument

In order to initiate the comprehensive development of the water resources of the Upper Colorado River Basin, for the purposes, among others, of regulating the flow of the Colorado River, storing water for beneficial consumptive use, making it possible for the States of the Upper Basin to utilize, consistently with the provisions of the Colorado River Compact, the apportionments made to and among them in the Colorado River Compact and the Upper Colorado River Basin Compact, respectively, providing for the reclamation of arid and semiarid land, for the control of floods, and for the generation of hydroelectric power, as an incident of the foregoing purposes, the Secretary of the Interior is authorized (1) to construct, operate, and maintain the following initial units of the Colorado River storage project, consisting of dams, reservoirs, powerplants, transmission facilities and appurtenant works: Wayne N. Aspinall, Flaming Gorge, Navajo (dam and reservoir only), and Glen Canyon: Provided, That the Wayne N. Aspinall Dam shall be constructed to a height which will impound not less than nine hundred and forty thousand acre-feet of water or will create a reservoir of such greater capacity as can be obtained by a high waterline located at seven thousand five hundred and twenty feet above mean sea level, and that construction thereof shall not be undertaken until the Secretary has, on the basis of further engineering and economic investigations, reexamined the economic justification of such unit and, accompanied by appropriate documentation in the form of a supplemental report, has certified to the Congress and to the President that, in his judgment, the benefits of such unit will exceed its costs; and (2) to construct, operate, and maintain the following additional reclamation

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 620

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

7 U.S.C. § 8701 — Geographically disadvantaged farmers and ranchers

**(a) Definitions** In this section: (1) **Agricultural commodity** — The term “agricultural commodity” has the meaning given the term in [section 5602 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section5602&num=0&edition=prelim). (2) **Geographically disadvantaged farmer or rancher** — The term “geographically disadvantaged farmer or rancher” has the meaning given the term in section 10906(a) of the Farm Security and Rural Investment Act of 2002 ([7 U.S.C. 2204](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section2204&num=0&edition=prelim) note; Public Law 107–171). **(b) Authorization** Subject to the availability of funds under subsection (d), the Secretary may provide geographically disadvantaged farmers or ranchers direct reimbursement payments for activities described in subsection (c). **(c) Transportation** (1) **In general** — Subject to paragraphs (2) and (3), the Secretary may provide direct reimbursement payments to a geographically disadvantaged farmer or rancher to transport an agricultural commodity, or inputs used to produce an agricultural commodity, during a fiscal year. (2) **Proof of eligibility** — To be eligible to receive assistance under paragraph (1), a geographically disadvantaged farmer or rancher shall demonstrate to the Secretary that transportation of the agricultural commodity or inputs occurred over a distance of more than 30 miles, as determined by the Secretary. (3) **Amount** (A) *In general* — Subject to paragraph (2), the amount of direct reimbursement payments made to a geographically disadvantaged farmer or rancher under this section for a fiscal year shall equal the product obtained by multiplying— (i) the amount of costs incurred by the geographically di

Source: Supplied U.S. Code snapshot — release unconfirmed · 7 U.S.C. § 8701

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1571 — Water quality improvement

**(a) Authority to proceed with program** The Secretary of the Interior, hereinafter referred to as the “Secretary”, is authorized and directed to proceed with a program of works of improvement for the enhancement and protection of the quality of water available in the Colorado River for use in the United States and the Republic of Mexico, and to enable the United States to comply with its obligations under the agreement with Mexico of August 30, 1973 (Minute No. 242 of the International Boundary and Water Commission, United States and Mexico), concluded pursuant to the Treaty of February 3, 1944 (TS 994), in accordance with the provisions of this chapter. **(b) Desalting complexes and plants** (1) The Secretary is authorized to construct, operate, and maintain a desalting complex, including (1) a desalting plant to reduce the salinity of drain water from the Wellton-Mohawk division of the Gila project, Arizona (hereinafter referred to as the division), including a pretreatment plant for settling, softening, and filtration of the drain water to be desalted; (2) the necessary appurtenant works including the intake pumping plant system, product waterline, power transmission facilities, and permanent operating facilities; (3) the necessary extension in the United States and Mexico of the existing bypass drain to carry the reject stream from the desalting plant and other drainage waters to the Santa Clara Slough in Mexico, with the part in Mexico, subject to arrangements made pursuant to subsection (d); (4) replacement of the metal flume in the existing main outlet drain extension with a concrete siphon; (5) reduction of the quantity of irrigation return flows through acquisition of lands to reduce the size of the division, and irrigation efficiency improvements to minimi

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1571

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 1251 — Congressional declaration of goals and

Page 350 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 1251 Sec. 1320. International pollution abatement. 1321. Oil and hazardous substance liability. 1321a. Prevention of small oil spills. 1321b. Improved coordination with tribal govern- ments. 1321c. International efforts on enforcement. 1322. Marine sanitation devices; discharges inci- dental to the normal operation of vessels. 1323. Federal facilities pollution control. 1324. Clean lakes. 1325. National Study Commission. 1326. Thermal discharges. 1327. Omitted. 1328. Aquaculture. 1329. Nonpoint source management programs. 1330. National estuary program. SUBCHAPTER IV—PERMITS AND LICENSES 1341. Certification. 1342. National pollutant discharge elimination sys- tem. 1343. Ocean discharge criteria. 1344. Permits for dredged or fill material. 1345. Disposal or use of sewage sludge. 1346. Coastal recreation water quality monitoring and notification. SUBCHAPTER V—GENERAL PROVISIONS 1361. Administration. 1362. Definitions. 1363. Water Pollution Control Advisory Board. 1364. Emergency powers. 1365. Citizen suits. 1366. Appearance. 1367. Employee protection. 1368. Federal procurement. 1369. Administrative procedure and judicial review. 1370. State authority. 1371. Authority under other laws and regulations. 1372. Labor standards. 1373. Public health agency coordination. 1374. Effluent Standards and Water Quality Infor- mation Advisory Committee. 1375. Reports to Congress; detailed estimates and comprehensive study on costs; State esti- mates. 1375a. Report on coastal recreation waters. 1376. Authorization of appropriations. 1377. Indian tribes. 1377a. Green infrastructure promotion. SUBCHAPTER VI—STATE WATER POLLUTION CONTROL REVOLVING FUNDS 13

Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 1251

Stored review status: historical_2024_not_currentness_verified. The source passage cites 33 U.S.C. § 1251. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1595 — Salinity control units; authority and func-

Page 423 TITLE 43—PUBLIC LANDS § 1595 River from lands administered by the Bureau of Land Management and submit a report which describes the program and rec- ommended implementation actions to the Congress and to the members of the advisory council established by section 1594(a) of this title by July 1, 1987; (4) to undertake feasibility investigations of saline water use and disposal opportunities, including measures and all necessary appur- tenant and associated works, to demonstrate saline water use technology and to bene- ficially use and dispose of saline and brackish waters of the Colorado River Basin in joint ventures with current and future industrial water users, using, but not limited to, the con- cepts generally described in the Bureau of Reclamation Special Report of September 1981, entitled ‘‘Saline water use and disposal opportunities’’; and (5) to undertake advance planning activities on the Sinbad Valley Unit, Colorado, as de- scribed in the Bureau of Land Management Salinity Status Report, covering the period 1978–1979 and dated February 1980. (Pub. L. 93–320, title II, § 203, June 24, 1974, 88 Stat. 271; Pub. L. 98–569, § 3, Oct. 30, 1984, 98 Stat. 2937.) Editorial Notes AMENDMENTS 1984—Subsec. (b)(3) to (5). Pub. L. 98–569 added pars. (3) to (5). Statutory Notes and Related Subsidiaries EFFECTIVE DATE OF 1984 AMENDMENT Amendment by Pub. L. 98–569 effective Oct. 30, 1984, see section 6 of Pub. L. 98–569, set out as a note under section 1591 of this title. § 1594. Colorado River Basin Salinity Control Ad- visory Council (a) There is created the Colorado River Basin Salinity Control Advisory Council composed of no more than three members from each State appointed by the Governor of each of the Colo- rado River Basin

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 1595

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 620 — Upper Colorado River Basin; purpose of

Page 228 TITLE 43—PUBLIC LANDS § 620 Sec. 620d. Upper Colorado River Basin Fund. 620d–1. Reimbursement of Fund from Colorado River Development Fund; operation of Hoover Dam. 620e. Cost allocations; Indian lands; report to Con- gress. 620f. Powerplant operations. 620g. Recreational and fish and wildlife facilities. 620h. Saving provisions. 620i. Expenditures; units excepted from soil survey and land classification requirements. 620j. Court decree; effectivity and approval. 620k. Authorization of appropriations. 620l. Net power revenues. 620m. Compliance with law required in operation of facilities; enforcement of provisions. 620n. Water quality study and reports. 620n–1. Top water bank. 620o. Definitions. § 620. Upper Colorado River Basin; purpose of development of water resources; initial units; construction of Wayne N. Aspinall unit con- tingent upon certification; participating projects; Rainbow Bridge National Monu- ment In order to initiate the comprehensive devel- opment of the water resources of the Upper Col- orado River Basin, for the purposes, among oth- ers, of regulating the flow of the Colorado River, storing water for beneficial consumptive use, making it possible for the States of the Upper Basin to utilize, consistently with the provi- sions of the Colorado River Compact, the appor- tionments made to and among them in the Colo- rado River Compact and the Upper Colorado River Basin Compact, respectively, providing for the reclamation of arid and semiarid land, for the control of floods, and for the generation of hydroelectric power, as an incident of the fore- going purposes, the Secretary of the Interior is authorized (1) to construct, operate, and main- tain the following initial units of the Colorado Rive

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 620

Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 620. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 620d — Upper Colorado River Basin Fund

**(a) Authorization and availability** There is authorized a separate fund in the Treasury of the United States to be known as the Upper Colorado River Basin Fund (hereinafter referred to as the Basin Fund), which shall remain available until expended, as hereafter provided, for carrying out provisions of this chapter other than [section 620g of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section620g&num=0&edition=prelim). **(b) Crediting of appropriations** All appropriations made for the purpose of carrying out the provisions of this chapter, other than [section 620g of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section620g&num=0&edition=prelim) shall be credited to the Basin Fund as advances from the general fund of the Treasury. **(c) Crediting and availability of revenues** All revenues collected in connection with the operation of the Colorado River storage project and participating projects shall be credited to the Basin Fund, and shall be available, without further appropriation, for (1) defraying the costs of operation, maintenance, and replacements of, and emergency expenditures for, all facilities of the Colorado River storage project and participating projects, within such separate limitations as may be included in annual appropriation acts: Provided, That with respect to each participating project, such costs shall be paid from revenues received from each such project; (2) payment as required by subsection (d) of this section; and (3) payment as required by subsection (e) of this section. Revenues credited to the Basin Fund shall not be available for appropriation for construction of the units and participating projects authorized by or pursuant to this chapter. **(d) Payments of

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 620d

Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 620d. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 620d — Upper Colorado River Basin Fund

Page 234 TITLE 43—PUBLIC LANDS § 620c–1 Editorial Notes REFERENCES IN TEXT Act of June 17, 1902, referred to in text, is popularly known as the Reclamation Act, which is classified gen- erally to chapter 12 (§ 371 et seq.) of this title. For com- plete classification of this Act to the Code, see Short Title note set out under section 371 of this title and Ta- bles. The Agricultural Act of 1949, referred to in text, is act Oct. 31, 1949, ch. 792, 63 Stat. 1051, which is classified principally to chapter 35A (§ 1421 et seq.) of Title 7, Ag- riculture. For complete classification of this Act to the Code, see Short Title note set out under section 1421 of Title 7 and Tables. § 620c–1. Laws governing priority of appropria- tion In the diversion and storage of water for any project or any parts thereof constructed under the authority of the Colorado River Basin Project Act [43 U.S.C. 1501 et seq.] or the Colo- rado River Storage Project Act [43 U.S.C. 620 et seq.] within and for the benefit of the State of Colorado only, the Secretary is directed to com- ply with the constitution and statutes of the State of Colorado relating to priority of appro- priation; with State and Federal court decrees entered pursuant thereto; and with operating principles, if any, adopted by the Secretary and approved by the State of Colorado. (Pub. L. 90–537, title V, § 501(e), Sept. 30, 1968, 82 Stat. 898.) Editorial Notes REFERENCES IN TEXT The Colorado River Basin Project Act, referred to in text, is Pub. L. 90–537, Sept. 30, 1968, 82 Stat. 885, which is classified principally to chapter 32 (§ 1501 et seq.) of this title. For complete classification of this Act to the Code, see Short Title note set out under section 1501 of this title and Tables. The Colorado River

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 620d

Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 620d. This identifies an authority to review, not proof of applicability.