Arkansas Legal Resource Navigator

43 U.S.C. § 1571 — Water quality improvement

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1571 — Water quality improvement

**(a) Authority to proceed with program** The Secretary of the Interior, hereinafter referred to as the “Secretary”, is authorized and directed to proceed with a program of works of improvement for the enhancement and protection of the quality of water available in the Colorado River for use in the United States and the Republic of Mexico, and to enable the United States to comply with its obligations under the agreement with Mexico of August 30, 1973 (Minute No. 242 of the International Boundary and Water Commission, United States and Mexico), concluded pursuant to the Treaty of February 3, 1944 (TS 994), in accordance with the provisions of this chapter. **(b) Desalting complexes and plants** (1) The Secretary is authorized to construct, operate, and maintain a desalting complex, including (1) a desalting plant to reduce the salinity of drain water from the Wellton-Mohawk division of the Gila project, Arizona (hereinafter referred to as the division), including a pretreatment plant for settling, softening, and filtration of the drain water to be desalted; (2) the necessary appurtenant works including the intake pumping plant system, product waterline, power transmission facilities, and permanent operating facilities; (3) the necessary extension in the United States and Mexico of the existing bypass drain to carry the reject stream from the desalting plant and other drainage waters to the Santa Clara Slough in Mexico, with the part in Mexico, subject to arrangements made pursuant to subsection (d); (4) replacement of the metal flume in the existing main outlet drain extension with a concrete siphon; (5) reduction of the quantity of irrigation return flows through acquisition of lands to reduce the size of the division, and irrigation efficiency improvements to minimi

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1571

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 537db6bc45abe2ea3907a8bea12bcb0b7bb4a68cf3636a19f166c4d35f432118. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_266751898280a12dd93e704c
Source file: Laws/federal/codes/united-states-code/title-43/section-1571-water-quality-improvement--0fc76d9b05.md
Pages: Not recorded – Not recorded
Passage SHA-256: c3b1b869325e3581d0994676e67225a39c5e79b0744ba9408d3979681b95bc88

Source location: Title 43, Chapter 32A, § 1571; chapter-32a-colorado-river-basin-salinity-control.md

Stored source content

**(a) Authority to proceed with program** The Secretary of the Interior, hereinafter referred to as the “Secretary”, is authorized and directed to proceed with a program of works of improvement for the enhancement and protection of the quality of water available in the Colorado River for use in the United States and the Republic of Mexico, and to enable the United States to comply with its obligations under the agreement with Mexico of August 30, 1973 (Minute No. 242 of the International Boundary and Water Commission, United States and Mexico), concluded pursuant to the Treaty of February 3, 1944 (TS 994), in accordance with the provisions of this chapter. **(b) Desalting complexes and plants** (1) The Secretary is authorized to construct, operate, and maintain a desalting complex, including (1) a desalting plant to reduce the salinity of drain water from the Wellton-Mohawk division of the Gila project, Arizona (hereinafter referred to as the division), including a pretreatment plant for settling, softening, and filtration of the drain water to be desalted; (2) the necessary appurtenant works including the intake pumping plant system, product waterline, power transmission facilities, and permanent operating facilities; (3) the necessary extension in the United States and Mexico of the existing bypass drain to carry the reject stream from the desalting plant and other drainage waters to the Santa Clara Slough in Mexico, with the part in Mexico, subject to arrangements made pursuant to subsection (d); (4) replacement of the metal flume in the existing main outlet drain extension with a concrete siphon; (5) reduction of the quantity of irrigation return flows through acquisition of lands to reduce the size of the division, and irrigation efficiency improvements to minimize return flows; (6) acquire on behalf of the United States such lands or interest in lands in the Painted Rock Reservoir as may be necessary to operate the project in accordance with the obligations of Minute No. 242, and (7) all associated facilities including roads, railroad spur, and transmission lines. (2) (A) The desalting plant shall be designed to treat approximately one hundred and twenty-nine million gallons a day of drain water using advanced technology commercially available. The plant shall effect recovery initially of not less than 70 per centum of the drain water as product water, and shall effect reduction of not less than 90 per centum of the dissolved solids in the feed water. The Secretary shall use sources of electric power supply for the desalting complex that will not diminish the supply of power to preference customers from Federal power systems operated by the Secretary. (B) The Secretary is authorized to use electrical power and energy available from the Navajo Generating Station which is in excess of the Central Arizona Project pumping requirements for the purpose of supplying power and energy requirements of the desalting plant and protective pumping well field constructed pursuant to this subchapter: Provided, That revenues credited to the Lower Colorado River Basin Development Fund shall not be diminished below those amounts which would have accrued had the power been marketed at the rate determined by the Secretary of Energy for the sale of power from the Navajo Generating Station to utilities and public entities, as a result of the use of power and energy for the desalting, protective pumping works, and other uses authorized by law, and that power and energy from the Navajo Generating Station shall be used first to meet the pumping requirements of the Central Arizona Project and after those needs have been met, for the desalting and protective pumping facilities constructed pursuant to this subchapter, and finally for other uses: Provided further, That prior to obtaining power from the Navajo Generating Station under the authority of this subsection, the Secretary shall complete an analysis of alternative sources of supply, including but not limited to the possibility of developing an agreement with the Republic of Mexico whereby the United States (or a non-Federal entity) would enter into contractual arrangements with Mexico for a sufficient supply of power to operate the desalting plant, the regulatory pumping fields and appurtenant facilities. (C) Effective October 1, 1979, and to such extent and in such amounts as are provided in advance in appropriation Acts, the Secretary of the Interior is authorized to purchase supplemental power and energy as required for the purposes of supplying the power and energy requirements of the desalting plant and protective pumping well field. **(c) Replacement water studies** Replacement of the reject stream from the desalting plant, Colorado River waters used for the mitigation of fish and wildlife habitat losses and of any Wellton-Mohawk drainage water bypassed to the Santa Clara Slough to accomplish essential operation except at such times when there exists surplus water of the Colorado River under the terms of the Mexican Water Treaty of 1944, is recognized as a national obligation as provided in [section 1512 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1512&num=0&edition=prelim). Studies to identify feasible measures to provide adequate replacement water shall be completed not later than June 30, 1980. Said studies shall be limited to potential sources within the States of Arizona, California, Colorado, New Mexico, and those portions of Nevada, Utah, and Wyoming which are within the natural drainage basin of the Colorado River. Measures found necessary to replace the reject stream from the desalting plant, Colorado River waters used for the mitigation of fish and wildlife habitat losses and any Wellton-Mohawk drainage bypassed to the Santa Clara Slough to accomplish essential operations may be undertaken independently of the national obligation set forth in [section 1512 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1512&num=0&edition=prelim). **(d) Advancement of funds for that portion of bypass drain within Mexico** The Secretary is hereby authorized to advance funds to the United States section, International Boundary and Water Commission (IBWC), for construction, operation, and maintenance by Mexico pursuant to Minute No. 242 of that portion of the bypass drain within Mexico. Such funds shall be transferred to an appropriate Mexican agency, under arrangements to be concluded by the IBWC providing for the construction, operation, and maintenance of such facility by Mexico. **(e) Desalted water exchange** Any desalted water not needed for the purposes of this subchapter may be exchanged at prices and under terms and conditions satisfactory to the Secretary and the proceeds therefrom shall be deposited in the General Fund of the Treasury. The city of Yuma, Arizona, shall have first right of refusal to any such water. **(f) Return flow reduction** For the purpose of reducing the return flows from the division to one hundred and seventy-five thousand acre-feet or less, annually, the Secretary is authorized to: (1) Accelerate the cooperative program of Irrigation Management Services with the Wellton-Mohawk Irrigation and Drainage District, hereinafter referred to as the district, for the purpose of improving irrigation efficiency. The district shall bear its share of the cost of such program as determined by the Secretary. (2) Acquire by purchase or through eminent domain or exchange, to the extent determined by him to be appropriate, lands or interests in lands to reduce the existing seventy-five thousand developed and undeveloped irrigable acres authorized by the Act of July 30, 1947 (61 Stat. 628), known as the Gila Reauthorization Act [[43 U.S.C. 613](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section613&num=0&edition=prelim) et seq.]. The initial reduction in irrigable acreage shall be limited to approximately ten thousand acres. If the Secretary determines that the irrigable acreage of the division must be reduced below sixty-five thousand acres of irrigable lands to carry out the purpose of this section, the Secretary is authorized, with the consent of the district, to acquire additional lands, as may be deemed by him to be appropriate. **(g) Disposal of acquired lands** The Secretary is authorized to dispose of the acquired lands and interests therein on terms and conditions satisfactory to him and meeting the objective of this chapter. **(h) Assistance to water users for installation of system improvements** The Secretary is authorized, either in conjunction with or in lieu of land acquisition, to assist water users in the division in installing system improvements, such as ditch lining, change of field layouts, automatic equipment, sprinkler systems and bubbler systems, as a means of increasing irrigation efficiencies: Provided, however, That all costs associated with the improvements authorized herein and allocated to the water users on the basis of benefits received, as determined by the Secretary, shall be reimbursed to the United States in amounts and on terms and conditions satisfactory to the Secretary. **(i) Contract amendment** The Secretary is authorized to amend the contract between the United States and the district dated March 4, 1952, as amended, to provide that— (1) the portion of the existing repayment obligation owing to the United States allocable to irrigable acreage eliminated from the division for the purposes of this subchapter, as determined by the Secretary, shall be nonreimbursable; and (2) if deemed appropriate by the Secretary, the district shall be given credit against its outstanding repayment obligation to offset any increase in operation and maintenance assessments per acre which may result from the district’s decreased operation and maintenance base, all as determined by the Secretary. **(j) Acquisition of land for storage** The Secretary is authorized to acquire through the Corps of Engineers fee title to, or other necessary interests in, additional lands above the Painted Rock Dam in Arizona that are required for the temporary storage capacity needed to permit operation of the dam and reservoir in times of serious flooding in accordance with the obligations of the United States under Minute No. 242. No funds shall be expended for acquisition of land or interests therein until it is finally determined by a Federal court of competent jurisdiction that the Corps of Engineers presently lacks legal authority to use said lands for this purpose. Nothing contained in this subchapter nor any action taken pursuant to it shall be deemed to be a recognition or admission of any obligation to the owners of such land on the part of the United States or a limitation or deficiency in the rights or powers of the United States with respect to such lands or the operation of the reservoir. **(k) Transfer of funds** To the extent desirable to carry out subsections (f)(1) and (h), the Secretary may transfer funds to the Secretary of Agriculture as may be required for technical assistance to farmers, conduct of research and demonstrations, and such related investigations as are required to achieve higher on-farm irrigation efficiencies. **(l) Nonreimbursable costs** All cost associated with the desalting complex shall be nonreimbursable except as provided in subsections (f) and (h).

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1512 — Mexican Water Treaty

The Congress declares that the satisfaction of the requirements of the Mexican Water Treaty from the Colorado River constitutes a national obligation which shall be the first obligation of any water augmentation project planned pursuant to [section 1511 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1511&num=0&edition=prelim) and authorized by the Congress. Accordingly, the States of the Upper Division (Colorado, New Mexico, Utah, and Wyoming) and the States of the Lower Division (Arizona, California, and Nevada) shall be relieved from all obligations which may have been imposed upon them by article III(c) of the Colorado River Compact so long as the Secretary shall determine and proclaim that means are available and in operation which augment the water supply of the Colorado River system in such quantity as to satisfy the requirements of the Mexican Water Treaty together with any losses of water associated with the performance of that treaty: Provided, That the satisfaction of the requirements of the Mexican Water Treaty (Treaty Series 994, 59 Stat. 1219), shall be from the waters of the Colorado River pursuant to the treaties, laws, and compacts presently relating thereto, until such time as a feasibility plan showing the most economical means of augmenting the water supply available in the Colorado River below Lee Ferry by two and one-half million acre-feet shall be authorized by the Congress and is in operation as provided in this chapter.

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1512

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1595 — Salinity control units; authority and functions of the Secretary of the Interior

**(a) Allocation of costs** The Secretary shall allocate the total costs (excluding costs borne by non-Federal participants) of the on-farm measures authorized by [section 1592(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592/c&num=0&edition=prelim), of all measures to replace incidental fish and wildlife values foregone, and of each unit or separable feature thereof authorized by [section 1592(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592/a&num=0&edition=prelim), as follows: (1) **Nonreimbursable costs; reimbursable costs.—** (A) *Nonreimbursable costs.—* (i) *In general.—* — In recognition of Federal responsibility for the Colorado River as an interstate stream and for international comity with Mexico, Federal ownership of the land of the Colorado River Basin from which most of the dissolved salts originate, and the policy established in the Federal Water Pollution Control Act ([33 U.S.C. 1251](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1251&num=0&edition=prelim) et seq.) and except as provided in clause (ii), the following shall be nonreimbursable: (I) 75 percent of the total costs of construction and replacement of each unit or separable feature of a unit authorized by [section 1592(a)(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1592/a/1&num=0&edition=prelim), including 90 percent of— (aa) the costs of operation and maintenance of each unit or separable feature of a unit authorized by that section; and (bb) the total costs of construction, operation, and maintenance of the associated measures to replace incidental fish and wildlife values foregone.

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1595

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 1329 — Nonpoint source management programs

**(a) State assessment reports** (1) **Contents** — The Governor of each State shall, after notice and opportunity for public comment, prepare and submit to the Administrator for approval, a report which— (A) identifies those navigable waters within the State which, without additional action to control nonpoint sources of pollution, cannot reasonably be expected to attain or maintain applicable water quality standards or the goals and requirements of this chapter; (B) identifies those categories and subcategories of nonpoint sources or, where appropriate, particular nonpoint sources which add significant pollution to each portion of the navigable waters identified under subparagraph (A) in amounts which contribute to such portion not meeting such water quality standards or such goals and requirements; (C) describes the process, including intergovernmental coordination and public participation, for identifying best management practices and measures to control each category and subcategory of nonpoint sources and, where appropriate, particular nonpoint sources identified under subparagraph (B) and to reduce, to the maximum extent practicable, the level of pollution resulting from such category, subcategory, or source; and (D) identifies and describes State and local programs for controlling pollution added from nonpoint sources to, and improving the quality of, each such portion of the navigable waters, including but not limited to those programs which are receiving Federal assistance under subsections (h) and (i). (2) **Information used in preparation** — In developing the report required by this section, the State (A) may rely upon information developed pursuant to sections 1288, 1313(e), 1314(f), 1315(b), and 1324 of this title, and other information as a

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 1329

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1573 — Construction and maintenance of well fields; land acquisition; land replacement; nonreimbursable costs

**(a)** The Secretary is authorized to: (1) Construct, operate, and maintain, consistent with Minute No. 242, well fields capable of furnishing approximately one hundred and sixty thousand acre-feet of water per year for use in the United States and for delivery to Mexico in satisfaction of the 1944 Mexican Water Treaty. (2) Acquire by purchase, eminent domain, or exchange, to the extent determined by him to be appropriate, approximately twenty-three thousand five hundred acres of lands or interests therein with approximately five miles of the Mexican border on the Yuma Mesa: Provided, however, That any such lands which are presently owned by the State of Arizona may be acquired or exchanged for Federal lands. (3) Any lands removed from the jurisdiction of the Yuma Mesa Irrigation and Drainage District pursuant to clause (2) of this subsection which were available for use under the Gila Reauthorization Act (61 Stat. 628) [[43 U.S.C. 613](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section613&num=0&edition=prelim) et. seq.], shall be replaced with like lands within or adjacent to the Yuma Mesa division of the project. In the development of these substituted lands or any other lands within the Gila project, the Secretary may provide for full utilization of the Gila Gravity Main Canal in addition to contracted capacities. (4) Effective October 1, 1979, and to such extent and in such amounts as are provided in advance in appropriation Acts, enter into contracts under the terms and conditions of the Act of June 17, 1902 ([43 U.S.C. 371](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section371&num=0&edition=prelim) et seq.) as amended and supplemented for the delivery of water from said well field to entities within the Unit

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1573

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1571 — Water quality improvement

Page 414 TITLE 43—PUBLIC LANDS § 1571 Sec. 1575. Contract authority. 1575a. Administration and disposition of lands and constructed facilities; revenues credited to general fund of Treasury. 1576. Interagency cooperation. 1577. Existing Federal laws not modified. 1578. Authorization of appropriations. 1579. Fish and wildlife habitat; mitigation of losses. 1580. Definitions. SUBCHAPTER II—MEASURES UPSTREAM FROM IMPERIAL DAM 1591. Salinity control policy. 1592. Authorization to construct, operate, and maintain salinity control units and salinity control programs. 1593. Planning reports; research and demonstration projects. 1594. Colorado River Basin Salinity Control Advi- sory Council. 1595. Salinity control units; authority and func- tions of the Secretary of the Interior. 1596. Biennial report to President, Congress, and Advisory Council. 1597. Construction of provisions of subchapter. 1598. Achieving project objectives. 1599. Definitions. SUBCHAPTER I—PROGRAMS DOWNSTREAM FROM IMPERIAL DAM § 1571. Water quality improvement (a) Authority to proceed with program The Secretary of the Interior, hereinafter re- ferred to as the ‘‘Secretary’’, is authorized and directed to proceed with a program of works of improvement for the enhancement and protec- tion of the quality of water available in the Col- orado River for use in the United States and the Republic of Mexico, and to enable the United States to comply with its obligations under the agreement with Mexico of August 30, 1973 (Minute No. 242 of the International Boundary and Water Commission, United States and Mex- ico), concluded pursuant to the Treaty of Feb- ruary 3, 1944 (TS 994), in accordance with the provisions of this chapter. (b) Desalting complexes and plants

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 1571

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 613 — Untitled legal text

Page 201 TITLE 43—PUBLIC LANDS §§ 615k to 615n SUBCHAPTER XXI—GILA PROJECT, ARIZONA §§ 613 to 613e. Omitted Editorial Notes CODIFICATION Section 613, act July 30, 1947, ch. 382, § 1, 61 Stat. 628, related to reduction in area of Gila project. Section 613a, act July 30, 1947, ch. 382, § 2, 61 Stat. 628, related to acquisition of property within or adjacent to Gila project. Section 613b, act July 30, 1947, ch. 382, § 3, 61 Stat. 629, related to authority of Secretary of the Interior to dis- pose of land within Gila project. Section 613c, act July 30, 1947, ch. 382, § 4, 61 Stat. 629, related to applicability of project land to State laws and liability of such land for assessments and taxes. Section 613d, act July 30, 1947, ch. 382, § 5, 61 Stat. 629, related to repayment of construction costs for Gila project in installments. Section 613e, act July 30, 1947, ch. 382, § 7, 61 Stat. 630, related to powers of Secretary of the Interior and his duly authorized representatives. Statutory Notes and Related Subsidiaries RECLAMATION LAW; AMENDMENT OF OTHER LAWS Act July 30, 1947, ch. 382, § 8, 61 Stat. 630, provided that this subchapter be deemed a supplement to the reclamation law and that nothing in this subchapter be construed to amend subchapter I of chapter 12A of this title. SUBCHAPTER XXII—WASHOE PROJECT, NEVADA-CALIFORNIA §§ 614 to 614d. Omitted Editorial Notes CODIFICATION Section 614, act Aug. 1, 1956, ch. 809, § 1, 70 Stat. 775, related to authorization for construction, operation, and maintenance of Washoe project, which was revoked by Pub. L. 101–618, title II, § 205(c), Nov. 16, 1990, 104 Stat. 3307. Section 614a, act Aug. 1, 1956, ch. 809, § 2, 70 Stat. 775, related to applicability of reclamation laws to duties of Secretary unde

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 613

Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 613. This identifies an authority to review, not proof of applicability.