Browse Arkansas Code titles and sections
43 U.S.C. § 620d — Upper Colorado River Basin Fund
Federal law — U.S. Code and appendices · legal_authorities
Page 234
TITLE 43—PUBLIC LANDS
§ 620c–1
Editorial Notes
REFERENCES IN TEXT
Act of June 17, 1902, referred to in text, is popularly
known as the Reclamation Act, which is classified gen-
erally to chapter 12 (§ 371 et seq.) of this title. For com-
plete classification of this Act to the Code, see Short
Title note set out under section 371 of this title and Ta-
bles.
The Agricultural Act of 1949, referred to in text, is
act Oct. 31, 1949, ch. 792, 63 Stat. 1051, which is classified
principally to chapter 35A (§ 1421 et seq.) of Title 7, Ag-
riculture. For complete classification of this Act to the
Code, see Short Title note set out under section 1421 of
Title 7 and Tables.
§ 620c–1. Laws governing priority of appropria-
tion
In the diversion and storage of water for any
project or any parts thereof constructed under
the authority of the Colorado River Basin
Project Act [43 U.S.C. 1501 et seq.] or the Colo-
rado River Storage Project Act [43 U.S.C. 620 et
seq.] within and for the benefit of the State of
Colorado only, the Secretary is directed to com-
ply with the constitution and statutes of the
State of Colorado relating to priority of appro-
priation; with State and Federal court decrees
entered pursuant thereto; and with operating
principles, if any, adopted by the Secretary and
approved by the State of Colorado.
(Pub. L. 90–537, title V, § 501(e), Sept. 30, 1968, 82
Stat. 898.)
Editorial Notes
REFERENCES IN TEXT
The Colorado River Basin Project Act, referred to in
text, is Pub. L. 90–537, Sept. 30, 1968, 82 Stat. 885, which
is classified principally to chapter 32 (§ 1501 et seq.) of
this title. For complete classification of this Act to the
Code, see Short Title note set out under section 1501 of
this title and Tables.
The Colorado River
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 620d
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 2b84c04b15ea01cbd3717b5f1c7c9b5d03e19b53846f189ad10eca691ed6b88e. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-7f0dffea709671098736ae6f
Source file: Laws/federal/codes/united-states-code-2024/title-43/section-620d-upper-colorado-river-basin-fund--73cc58b59f.md
Pages: Not recorded – Not recorded
Passage SHA-256: bf646f5a154f0b3a6713bf417eefda70d1203b04b4bbe89a2d1f3def0d3b2350
Source location: USCODE-2024-title43-chap12B-sec620d.pdf
Stored source content
Page 234
TITLE 43—PUBLIC LANDS
§ 620c–1
Editorial Notes
REFERENCES IN TEXT
Act of June 17, 1902, referred to in text, is popularly
known as the Reclamation Act, which is classified gen-
erally to chapter 12 (§ 371 et seq.) of this title. For com-
plete classification of this Act to the Code, see Short
Title note set out under section 371 of this title and Ta-
bles.
The Agricultural Act of 1949, referred to in text, is
act Oct. 31, 1949, ch. 792, 63 Stat. 1051, which is classified
principally to chapter 35A (§ 1421 et seq.) of Title 7, Ag-
riculture. For complete classification of this Act to the
Code, see Short Title note set out under section 1421 of
Title 7 and Tables.
§ 620c–1. Laws governing priority of appropria-
tion
In the diversion and storage of water for any
project or any parts thereof constructed under
the authority of the Colorado River Basin
Project Act [43 U.S.C. 1501 et seq.] or the Colo-
rado River Storage Project Act [43 U.S.C. 620 et
seq.] within and for the benefit of the State of
Colorado only, the Secretary is directed to com-
ply with the constitution and statutes of the
State of Colorado relating to priority of appro-
priation; with State and Federal court decrees
entered pursuant thereto; and with operating
principles, if any, adopted by the Secretary and
approved by the State of Colorado.
(Pub. L. 90–537, title V, § 501(e), Sept. 30, 1968, 82
Stat. 898.)
Editorial Notes
REFERENCES IN TEXT
The Colorado River Basin Project Act, referred to in
text, is Pub. L. 90–537, Sept. 30, 1968, 82 Stat. 885, which
is classified principally to chapter 32 (§ 1501 et seq.) of
this title. For complete classification of this Act to the
Code, see Short Title note set out under section 1501 of
this title and Tables.
The Colorado River Storage Project Act, referred to
in text, is act Apr. 11, 1956, ch. 203, 70 Stat. 105, which
is classified generally to this chapter. For complete
classification of this Act to the Code, see Short Title
note set out under section 620 of this title and Tables.
CODIFICATION
Section consists of subsec. (e) of section 501 of Pub. L.
90–537. Subsecs. (a), (b), and (d) of section 501 are classi-
fied to sections 620, 620 note, 620a, 620a–1, 620a–2, and
620k note of this title. Subsecs. (c) and (f) of section 501
are not classified to the Code.
Section was enacted as part of the Colorado River
Basin Project Act, and not as part of act Apr. 11, 1956,
popularly known as the Colorado River Storage Project
Act, which comprises this chapter.
§ 620d. Upper Colorado River Basin Fund
(a) Authorization and availability
There is authorized a separate fund in the
Treasury of the United States to be known as
the Upper Colorado River Basin Fund (herein-
after referred to as the Basin Fund), which shall
remain available until expended, as hereafter
provided, for carrying out provisions of this
chapter other than section 620g of this title.
(b) Crediting of appropriations
All appropriations made for the purpose of
carrying out the provisions of this chapter,
other than section 620g of this title shall be
credited to the Basin Fund as advances from the
general fund of the Treasury.
(c) Crediting and availability of revenues
All revenues collected in connection with the
operation of the Colorado River storage project
and participating projects shall be credited to
the Basin Fund, and shall be available, without
further appropriation, for (1) defraying the costs
of operation, maintenance, and replacements of,
and emergency expenditures for, all facilities of
the Colorado River storage project and partici-
pating projects, within such separate limita-
tions as may be included in annual appropria-
tion acts: Provided, That with respect to each
participating project, such costs shall be paid
from revenues received from each such project;
(2) payment as required by subsection (d) of this
section; and (3) payment as required by sub-
section (e) of this section. Revenues credited to
the Basin Fund shall not be available for appro-
priation for construction of the units and par-
ticipating projects authorized by or pursuant to
this chapter.
(d) Payments of revenues in excess of operating
needs to Treasury
Revenues in the Basin Fund in excess of oper-
ating needs shall be paid annually to the general
fund of the Treasury to return—
(1) the costs of each unit, participating
project, or any separable feature thereof which
are allocated to power pursuant to section 620e
of this title, within a period not exceeding
fifty years from the date of completion of such
unit, participating project, or separable fea-
ture thereof;
(2) the costs of each unit, participating
project, or any separable feature thereof which
are allocated to municipal water supply pursu-
ant to section 620e of this title, within a period
not exceeding fifty years from the date of
completion of such unit, participating project,
or separable feature thereof;
(3) interest on the unamortized balance of
the investment (including interest during con-
struction) in the power and municipal water
supply features of each unit, participating
project, or any separable feature thereof, at a
rate determined by the Secretary of the Treas-
ury as provided in subsection (f), and interest
due shall be a first charge;
(4) the costs of each storage unit which are
allocated to irrigation pursuant to section
620e of this title within a period not exceeding
fifty years; and
(5) the costs of each salinity control unit or
separable feature thereof, the costs of meas-
ures to replace incidental fish and wildlife val-
ues foregone, and the costs of the on-farm
measures payable from the Upper Colorado
River Basin Fund in accordance with sections
1595(a)(2), 1595(a)(3), and 1595(c) of this title.
(e) Apportionment of excess revenues among
States
Revenues in the Basin Fund in excess of the
amounts needed to meet the requirements of
clause (1) of subsection (c) of this section, and to
return to the general fund of the Treasury the
costs set out in subsection (d) of this section,
shall be apportioned among the States of the
Page 235
TITLE 43—PUBLIC LANDS
§ 620d–1
Upper Division in the following percentages:
Colorado, 46 per centum; Utah, 21.5 per centum;
Wyoming, 15.5 per centum; and New Mexico, 17
per centum: Provided, That prior to the applica-
tion of such percentages, all revenues remaining
in the Basin Fund from each participating
project (or part thereof), herein or hereafter au-
thorized, after payments, where applicable, with
respect to such projects, to the general fund of
the Treasury under subparagraphs (1), (2), and
(3) of subsection (d) of this section shall be ap-
portioned to the State in which such partici-
pating project, or part thereof, is located.
Revenues so apportioned to each State shall
be used only for the repayment of construction
costs of participating projects or parts of such
projects in the State to which such revenues are
apportioned and shall not be used for such pur-
pose in any other State without the consent, as
expressed through its legally constituted au-
thority, of the State to which such revenues are
apportioned. Subject to such requirement, there
shall be paid annually into the general fund of
the Treasury from the revenues apportioned to
each State (1) the costs of each participating
project herein authorized (except Paonia) or any
separable feature thereof, which are allocated to
irrigation pursuant to section 620e of this title,
within a period not exceeding fifty years, in ad-
dition to any development period authorized by
law, from the date of completion of such partici-
pating project or separable feature thereof, or,
in the case of Indian lands, payment in accord-
ance with section 620c of this title; (2) costs of
the Paonia project, which are beyond the ability
of the water users to repay, within a period pre-
scribed in the Act of June 25, 1947 (61 Stat. 181);
and (3) costs in connection with the irrigation
features of the Eden project as specified in the
Act of June 28, 1949 (63 Stat. 277).
(f) Determination of interest rate
The interest rate applicable to each unit of
the storage project and each participating
project for purposes of computing interest dur-
ing construction and interest on the unpaid bal-
ance shall be determined by the Secretary of the
Treasury, as of the beginning of the fiscal year
in which construction is initiated, on the basis
of the computed average interest rate payable
by the Treasury upon its outstanding market-
able public obligations, which are neither due
nor callable for redemption for fifteen years
from the date of issue.
(g) Budget to be submitted to Congress
Business-type budgets shall be submitted to
the Congress annually for all operations fi-
nanced by the Basin Fund.
(Apr. 11, 1956, ch. 203, § 5, 70 Stat. 107; Pub. L.
86–529, § 9 (part), June 27, 1960, 74 Stat. 227; Pub.
L. 87–483, § 18, June 13, 1962, 76 Stat. 102; Pub. L.
93–320, title II, § 205(d), June 24, 1974, 88 Stat. 273;
Pub. L. 98–569, § 4(h), Oct. 30, 1984, 98 Stat. 2939.)
Editorial Notes
REFERENCES IN TEXT
Act of June 25, 1947, referred to in subsec. (e), is act
June 25, 1947, ch. 148, 61 Stat. 181, which authorized the
construction, operation, and maintenance of the
Paonia Federal reclamation project, Colorado, and
which is not classified to the Code.
Act of June 28, 1949, referred to in subsec. (e), is act
June 28, 1949, ch. 255, 63 Stat. 277, which authorized the
completion of construction and development of the
Eden project, Wyoming, and which is not classified to
the Code.
AMENDMENTS
1984—Subsec. (d)(5). Pub. L. 98–569 inserted ‘‘, the
costs of measures to replace incidental fish and wildlife
values foregone, and the costs of the on-farm meas-
ures’’ before ‘‘payable’’.
1974—Subsec. (d)(5). Pub. L. 93–320 added par. (5).
1962—Subsec. (e). Pub. L. 87–483 substituted ‘‘here-
after’’ for ‘‘hereinafter’’ in proviso in first par.
1960—Subsec. (f). Pub. L. 86–529 required Secretary,
for purposes of computing interest during construction
and interest on unpaid balance, to determine interest
rate as of beginning of fiscal year in which construc-
tion is initiated, on basis of computed average interest
rate payable by the Treasury upon its outstanding mar-
ketable public obligations, which are neither due nor
callable for redemption for fifteen years from date of
issue.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 1984 AMENDMENT
Amendment by Pub. L. 98–569 effective Oct. 30, 1984,
see section 6 of Pub. L. 98–569, set out as a note under
section 1591 of this title.
EFFECTIVE DATE OF 1960 AMENDMENT
Pub. L. 86–529, § 9, June 27, 1960, 74 Stat. 227, provided
that the amendment made by section 9 is effective June
1, 1960.
TERMINATION OF REPORTING REQUIREMENTS
For termination, effective May 15, 2000, of provisions
of law requiring submittal to Congress of any annual,
semiannual, or other regular periodic report listed in
House Document No. 103–7 (in which a report required
under subsec. (g) of this section is listed as the 8th item
on page 114), see section 3003 of Pub. L. 104–66, as
amended, and section 1(a)(4) [div. A, § 1402(1)] of Pub. L.
106–554, set out as notes under section 1113 of Title 31,
Money and Finance.
§ 620d–1. Reimbursement of Fund from Colorado
River Development Fund; operation of Hoo-
ver Dam
The Upper Colorado River Basin Fund estab-
lished under section 620d of this title shall be re-
imbursed from the Colorado River Development
Fund established by section 618a of this title for
the money expended heretofore or hereafter
from the Upper Colorado River Basin Fund to
meet deficiencies in generation at Hoover Dam
during the filling period of storage units of the
Colorado River storage project pursuant to the
criteria for the filling of Glen Canyon Reservoir
(27 Fed. Reg. 6851, July 19, 1962). For this pur-
pose, $500,000 for each year of operation of Hoo-
ver Dam and powerplant, commencing with fis-
cal year 1970, shall be transferred from the Colo-
rado River Development Fund to the Upper Col-
orado River Basin Fund, in lieu of application of
said amounts to the purposes stated in section
618a(d) of this title, until such reimbursement is
accomplished. To the extent that any deficiency
in such reimbursement remains as of June 1,
1987, the amount of the remaining deficiency
shall then be transferred to the Upper Colorado
River Basin Fund from the Lower Colorado
River Basin Development Fund, as provided in
section 1543(g) of this title.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a)** It is the object of this chapter to provide a program for the further comprehensive development of the water resources of the Colorado River Basin and for the provision of additional and adequate water supplies for use in the upper as well as in the lower Colorado River Basin. This program is declared to be for the purposes, among others, of regulating the flow of the Colorado River; controlling floods; improving navigation; providing for the storage and delivery of the waters of the Colorado River for reclamation of lands, including supplemental water supplies, and for municipal, industrial, and other beneficial purposes; improving water quality; providing for basic public outdoor recreation facilities; improving conditions for fish and wildlife, and the generation and sale of electrical power as an incident of the foregoing purposes.
**(b)** It is the policy of the Congress that the Secretary of the Interior (hereinafter referred to the “Secretary”) shall continue to develop, after consultation with affected States and appropriate Federal agencies, a regional water plan, consistent with the provisions of this chapter and with future authorizations, to serve as the framework under which projects in the Colorado River Basin may be coordinated and constructed with proper timing to the end that an adequate supply of water may be made available for such projects, whether heretofore, herein, or hereafter authorized.
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1501
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 1501. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 398
TITLE 43—PUBLIC LANDS
§ 1501
documents, handbooks, standard operating pro-
cedures, and statements of policy specific to the
scoping, contracting, and review of appraisals
performed for the Department by Federal or
non-Federal covered appraisers, shall be made
publicly available online and provided upon re-
quest.
(f) Definitions
In this section:
(1) Covered appraiser
The term ‘‘covered appraiser’’ means a
State-licensed or -certified real property ap-
praiser.
(2) Department
The term ‘‘Department’’ means the Depart-
ment of the Interior.
(3) Reporting period
The term ‘‘reporting period’’ means the 1-
year period before the date on which a report
is submitted under subsection (c).
(4) Secretary
The term ‘‘Secretary’’ means the Secretary
of the Interior.
(5) State
The term ‘‘State’’ means each of the several
States, the District of Columbia, and each ter-
ritory and possession of the United States.
(Pub. L. 118–230, § 2, Jan. 4, 2025, 138 Stat. 2826.)
CHAPTER 32—COLORADO RIVER BASIN
PROJECT
SUBCHAPTER I—OBJECTIVES
Sec.
1501.
Congressional declaration of purpose and pol-
icy.
SUBCHAPTER II—INVESTIGATIONS AND
PLANNING
1511.
Reconnaissance investigations by Secretary
of the Interior; reports; 10-year moratorium
on water importation studies.
1511a.
Cooperation and participation by Secretary
of the Army with Federal, State, and local
agencies.
1512.
Mexican Water Treaty.
1513.
Importation of water; protection of exporting
areas.
1514.
Authorization of appropriations.
SUBCHAPTER III—AUTHORIZED UNITS;
PROTECTION OF EXISTING USES
1521.
Central Arizona Project.
1522.
Orme Dam and Reservoir.
1523.
Power
requirements
of
Central
Arizona
Project and augmentation of Lower Colo-
rado River Basin Development Fund.
1524.
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 1501
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 1501. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
In order to initiate the comprehensive development of the water resources of the Upper Colorado River Basin, for the purposes, among others, of regulating the flow of the Colorado River, storing water for beneficial consumptive use, making it possible for the States of the Upper Basin to utilize, consistently with the provisions of the Colorado River Compact, the apportionments made to and among them in the Colorado River Compact and the Upper Colorado River Basin Compact, respectively, providing for the reclamation of arid and semiarid land, for the control of floods, and for the generation of hydroelectric power, as an incident of the foregoing purposes, the Secretary of the Interior is authorized (1) to construct, operate, and maintain the following initial units of the Colorado River storage project, consisting of dams, reservoirs, powerplants, transmission facilities and appurtenant works: Wayne N. Aspinall, Flaming Gorge, Navajo (dam and reservoir only), and Glen Canyon: Provided, That the Wayne N. Aspinall Dam shall be constructed to a height which will impound not less than nine hundred and forty thousand acre-feet of water or will create a reservoir of such greater capacity as can be obtained by a high waterline located at seven thousand five hundred and twenty feet above mean sea level, and that construction thereof shall not be undertaken until the Secretary has, on the basis of further engineering and economic investigations, reexamined the economic justification of such unit and, accompanied by appropriate documentation in the form of a supplemental report, has certified to the Congress and to the President that, in his judgment, the benefits of such unit will exceed its costs; and (2) to construct, operate, and maintain the following additional reclamation
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 620
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 620. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 228
TITLE 43—PUBLIC LANDS
§ 620
Sec.
620d.
Upper Colorado River Basin Fund.
620d–1.
Reimbursement of Fund from Colorado River
Development Fund; operation of Hoover
Dam.
620e.
Cost allocations; Indian lands; report to Con-
gress.
620f.
Powerplant operations.
620g.
Recreational and fish and wildlife facilities.
620h.
Saving provisions.
620i.
Expenditures; units excepted from soil survey
and land classification requirements.
620j.
Court decree; effectivity and approval.
620k.
Authorization of appropriations.
620l.
Net power revenues.
620m.
Compliance with law required in operation of
facilities; enforcement of provisions.
620n.
Water quality study and reports.
620n–1.
Top water bank.
620o.
Definitions.
§ 620. Upper Colorado River Basin; purpose of
development of water resources; initial units;
construction of Wayne N. Aspinall unit con-
tingent
upon
certification;
participating
projects; Rainbow Bridge National Monu-
ment
In order to initiate the comprehensive devel-
opment of the water resources of the Upper Col-
orado River Basin, for the purposes, among oth-
ers, of regulating the flow of the Colorado River,
storing water for beneficial consumptive use,
making it possible for the States of the Upper
Basin to utilize, consistently with the provi-
sions of the Colorado River Compact, the appor-
tionments made to and among them in the Colo-
rado River Compact and the Upper Colorado
River Basin Compact, respectively, providing for
the reclamation of arid and semiarid land, for
the control of floods, and for the generation of
hydroelectric power, as an incident of the fore-
going purposes, the Secretary of the Interior is
authorized (1) to construct, operate, and main-
tain the following initial units of the Colorado
Rive
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 620
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 620. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Authorization and availability** There is authorized a separate fund in the Treasury of the United States to be known as the Upper Colorado River Basin Fund (hereinafter referred to as the Basin Fund), which shall remain available until expended, as hereafter provided, for carrying out provisions of this chapter other than [section 620g of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section620g&num=0&edition=prelim).
**(b) Crediting of appropriations** All appropriations made for the purpose of carrying out the provisions of this chapter, other than [section 620g of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section620g&num=0&edition=prelim) shall be credited to the Basin Fund as advances from the general fund of the Treasury.
**(c) Crediting and availability of revenues** All revenues collected in connection with the operation of the Colorado River storage project and participating projects shall be credited to the Basin Fund, and shall be available, without further appropriation, for (1) defraying the costs of operation, maintenance, and replacements of, and emergency expenditures for, all facilities of the Colorado River storage project and participating projects, within such separate limitations as may be included in annual appropriation acts: Provided, That with respect to each participating project, such costs shall be paid from revenues received from each such project; (2) payment as required by subsection (d) of this section; and (3) payment as required by subsection (e) of this section. Revenues credited to the Basin Fund shall not be available for appropriation for construction of the units and participating projects authorized by or pursuant to this chapter.
**(d) Payments of
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 620d
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.