42 U.S.C. § 7419 — Primary nonferrous smelter orders

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7419 — Primary nonferrous smelter orders

**(a) Issuance; hearing; enforcement orders; statement of grounds for application; findings** (1) Upon application by the owner or operator of a primary nonferrous smelter, a primary nonferrous smelter order under subsection (b) may be issued— (A) by the Administrator, after thirty days’ notice to the State, or (B) by the State in which such source is located, but no such order issued by the State shall take effect until the Administrator determines that such order has been issued in accordance with the requirements of this chapter. Not later than ninety days after submission by the State to the Administrator of notice of the issuance of a primary nonferrous smelter order under this section, the Administrator shall determine whether or not such order has been issued by the State in accordance with the requirements of this chapter. If the Administrator determines that such order has not been issued in accordance with such requirements, he shall conduct a hearing respecting the reasonably available control technology for primary nonferrous smelters. (2) (A) An order issued under this section to a primary nonferrous smelter shall be referred to as a “primary nonferrous smelter order”. No primary nonferrous smelter may receive both an enforcement order under section 7413(d) 11 See References in Text note below. of this title and a primary nonferrous smelter order under this section. (B) Before any hearing conducted under this section, in the case of an application made by the owner or operator of a primary nonferrous smelter for a second order under this section, the applicant shall furnish the Administrator (or the State as the case may be) with a statement of the grounds on which such application is based (including all supporting documents and information

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7419

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 3247a2b5f0a5dbd0b0fdea829d267b997aa67543fa68dc5c6f2d3cfdc626f60e. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_e52f6bebd29c36d36a032e0e
Source file: Laws/federal/codes/united-states-code/title-42/section-7419-primary-nonferrous-smelter-orders--123ac6bad8.md
Pages: Not recorded – Not recorded
Passage SHA-256: 1491c5933c1ac884a461bd50208c9214ffc7a2b5662a90d0fc574192c86ebfde

Source location: Title 42, Chapter 85, § 7419; chapter-085-air-pollution-prevention-and-control.md

Stored source content

**(a) Issuance; hearing; enforcement orders; statement of grounds for application; findings** (1) Upon application by the owner or operator of a primary nonferrous smelter, a primary nonferrous smelter order under subsection (b) may be issued— (A) by the Administrator, after thirty days’ notice to the State, or (B) by the State in which such source is located, but no such order issued by the State shall take effect until the Administrator determines that such order has been issued in accordance with the requirements of this chapter. Not later than ninety days after submission by the State to the Administrator of notice of the issuance of a primary nonferrous smelter order under this section, the Administrator shall determine whether or not such order has been issued by the State in accordance with the requirements of this chapter. If the Administrator determines that such order has not been issued in accordance with such requirements, he shall conduct a hearing respecting the reasonably available control technology for primary nonferrous smelters. (2) (A) An order issued under this section to a primary nonferrous smelter shall be referred to as a “primary nonferrous smelter order”. No primary nonferrous smelter may receive both an enforcement order under section 7413(d) 11 See References in Text note below. of this title and a primary nonferrous smelter order under this section. (B) Before any hearing conducted under this section, in the case of an application made by the owner or operator of a primary nonferrous smelter for a second order under this section, the applicant shall furnish the Administrator (or the State as the case may be) with a statement of the grounds on which such application is based (including all supporting documents and information). The statement of the grounds for the proposed order shall be provided by the Administrator or the State in any case in which such State or Administrator is acting on its own initiative. Such statement (including such documents and information) shall be made available to the public for a thirty-day period before such hearing and shall be considered as part of such hearing. No primary nonferrous smelter order may be granted unless the applicant establishes that he meets the conditions required for the issuance of such order (or the Administrator or State establishes the meeting of such conditions when acting on their own initiative). (C) Any decision with respect to the issuance of a primary nonferrous smelter order shall be accompanied by a concise statement of the findings and of the basis of such findings. (3) For the purposes of sections 7410, 7604, and 7607 of this title, any order issued by the State and in effect pursuant to this subsection shall become part of the applicable implementation plan. **(b) Prerequisites to issuance of orders** A primary nonferrous smelter order under this section may be issued to a primary nonferrous smelter if— (1) such smelter is in existence on August 7, 1977; (2) the requirement of the applicable implementation plan with respect to which the order is issued is an emission limitation or standard for sulfur oxides which is necessary and intended to be itself sufficient to enable attainment and maintenance of national primary and secondary ambient air quality standards for sulfur oxides; and (3) such smelter is unable to comply with such requirement by the applicable date for compliance because no means of emission limitation applicable to such smelter which will enable it to achieve compliance with such requirement has been adequately demonstrated to be reasonably available (as determined by the Administrator, taking into account the cost of compliance, non-air quality health and environmental impact, and energy consideration). **(c) Second orders** (1) A second order issued to a smelter under this section shall set forth compliance schedules containing increments of progress which require compliance with the requirement postponed as expeditiously as practicable. The increments of progress shall be limited to requiring compliance with subsection (d) and, in the case of a second order, to procuring, installing, and operating the necessary means of emission limitation as expeditiously as practicable after the Administrator determines such means have been adequately demonstrated to be reasonably available within the meaning of subsection (b)(3). (2) Not in excess of two primary nonferrous smelter orders may be issued under this section to any primary nonferrous smelter. The first such order issued to a smelter shall not result in the postponement of the requirement with respect to which such order is issued beyond January 1, 1983. The second such order shall not result in the postponement of such requirement beyond January 1, 1988. **(d) Interim measures; continuous emission reduction technology** (1) (A) Each primary nonferrous smelter to which an order is issued under this section shall be required to use such interim measures for the period during which such order is in effect as may be necessary in the judgment of the Administrator to assure attainment and maintenance of the national primary and secondary ambient air quality standards during such period, taking into account the aggregate effect on air quality of such order together with all variances, extensions, waivers, enforcement orders, delayed compliance orders and primary nonferrous smelter orders previously issued under this chapter. (B) Such interim requirements shall include— (i) a requirement that the source to which the order applies comply with such reporting requirements and conduct such monitoring as the Administrator determines may be necessary, and (ii) such measures as the Administrator determines are necessary to avoid an imminent and substantial endangerment to health of persons. (C) Such interim measures shall also, except as provided in paragraph (2), include continuous emission reduction technology. The Administrator shall condition the use of any such interim measures upon the agreement of the owner or operator of the smelter— (i) to comply with such conditions as the Administrator determines are necessary to maximize the reliability and enforceability of such interim measures, as applied to the smelter, in attaining and maintaining the national ambient air quality standards to which the order relates, and (ii) to commit reasonable resources to research and development of appropriate emission control technology. (2) The requirement of paragraph (1) for the use of continuous emission reduction technology may be waived with respect to a particular smelter by the State or the Administrator, after notice and a hearing on the record, and upon a showing by the owner or operator of the smelter that such requirement would be so costly as to necessitate permanent or prolonged temporary cessation of operations of the smelter. Upon application for such waiver, the Administrator shall be notified and shall, within ninety days, hold a hearing on the record in accordance with [section 554 of title 5](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section554&num=0&edition=prelim). At such hearing the Administrator shall require the smelter involved to present information relating to any alleged cessation of operations and the detailed reasons or justifications therefor. On the basis of such hearing the Administrator shall make findings of fact as to the effect of such requirement and on the alleged cessation of operations and shall make such recommendations as he deems appropriate. Such report, findings, and recommendations shall be available to the public, and shall be taken into account by the State or the Administrator in making the decision whether or not to grant such waiver. (3) In order to obtain information for purposes of a waiver under paragraph (2), the Administrator may, on his own motion, conduct an investigation and use the authority of [section 7621 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7621&num=0&edition=prelim). (4) In the case of any smelter which on August 7, 1977, uses continuous emission reduction technology and supplemental controls and which receives an initial primary nonferrous smelter order under this section, no additional continuous emission reduction technology shall be required as a condition of such order unless the Administrator determines, at any time, after notice and public hearing, that such additional continuous emission reduction technology is adequately demonstrated to be reasonably available for the primary nonferrous smelter industry. **(e) Termination of orders** At any time during which an order under this section applies, the Administrator may enter upon a public hearing respecting the availability of technology. Any order under this section shall be terminated if the Administrator determines on the record, after notice and public hearing, that the conditions upon which the order was based no longer exist. If the owner or operator of the smelter to which the order is issued demonstrates that prompt termination of such order would result in undue hardship, the termination shall become effective at the earliest practicable date on which such undue hardship would not result, but in no event later than the date required under subsection (c). **(f) Violation of requirements** If the Administrator determines that a smelter to which an order is issued under this section is in violation of any requirement of subsection (c) or (d), he shall— (1) enforce such requirement under [section 7413 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7413&num=0&edition=prelim), (2) (after notice and opportunity for public hearing) revoke such order and enforce compliance with the requirement with respect to which such order was granted, (3) give notice of noncompliance and commence action under [section 7420 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7420&num=0&edition=prelim), or (4) take any appropriate combination of such actions.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

5 U.S.C. § 554 — Adjudications

**(a)** This section applies, according to the provisions thereof, in every case of adjudication required by statute to be determined on the record after opportunity for an agency hearing, except to the extent that there is involved— (1) a matter subject to a subsequent trial of the law and the facts de novo in a court; (2) the selection or tenure of an employee, except a 11 So in original. administrative law judge appointed under [section 3105 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section3105&num=0&edition=prelim); (3) proceedings in which decisions rest solely on inspections, tests, or elections; (4) the conduct of military or foreign affairs functions; (5) cases in which an agency is acting as an agent for a court; or (6) the certification of worker representatives. **(b)** Persons entitled to notice of an agency hearing shall be timely informed of— (1) the time, place, and nature of the hearing; (2) the legal authority and jurisdiction under which the hearing is to be held; and (3) the matters of fact and law asserted. When private persons are the moving parties, other parties to the proceeding shall give prompt notice of issues controverted in fact or law; and in other instances agencies may by rule require responsive pleading. In fixing the time and place for hearings, due regard shall be had for the convenience and necessity of the parties or their representatives. **(c)** The agency shall give all interested parties opportunity for— (1) the submission and consideration of facts, arguments, offers of settlement, or proposals of adjustment when time, the nature of the proceeding, and the public interest permit; and (2) to the extent that the parties are unable so to determine a controversy by consent, heari

Source: Supplied U.S. Code snapshot — release unconfirmed · 5 U.S.C. § 554

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7420 — Noncompliance penalty

**(a) Assessment and collection** (1) (A) Not later than 6 months after August 7, 1977, and after notice and opportunity for a public hearing, the Administrator shall promulgate regulations requiring the assessment and collection of a noncompliance penalty against persons referred to in paragraph (2)(A). (B) (i) Each State may develop and submit to the Administrator a plan for carrying out this section in such State. If the Administrator finds that the State plan meets the requirements of this section, he may delegate to such State any authority he has to carry out this section. (ii) Notwithstanding a delegation to a State under clause (i), the Administrator may carry out this section in such State under the circumstances described in subsection (b)(2)(B). (2) (A) Except as provided in subparagraph (B) or (C) of this paragraph, the State or the Administrator shall assess and collect a noncompliance penalty against every person who owns or operates— (i) a major stationary source (other than a primary nonferrous smelter which has received a primary nonferrous smelter order under [section 7419 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7419&num=0&edition=prelim)), which is not in compliance with any emission limitation, emission standard or compliance schedule under any applicable implementation plan (whether or not such source is subject to a Federal or State consent decree), or (ii) a stationary source which is not in compliance with an emission limitation, emission standard, standard of performance, or other requirement established under section 7411, 7477, 7603, or 7412 of this title, or (iii) a stationary source which is not in compliance with any requirement of subchapter IV–A, V, or

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7420

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7621 — Employment effects

**(a) Continuous evaluation of potential loss or shifts of employment** The Administrator shall conduct continuing evaluations of potential loss or shifts of employment which may result from the administration or enforcement of the provision of this chapter and applicable implementation plans, including where appropriate, investigating threatened plant closures or reductions in employment allegedly resulting from such administration or enforcement. **(b) Request for investigation; hearings; record; report** Any employee, or any representative of such employee, who is discharged or laid off, threatened with discharge or layoff, or whose employment is otherwise adversely affected or threatened to be adversely affected because of the alleged results of any requirement imposed or proposed to be imposed under this chapter, including any requirement applicable to Federal facilities and any requirement imposed by a State or political subdivision thereof, may request the Administrator to conduct a full investigation of the matter. Any such request shall be reduced to writing, shall set forth with reasonable particularity the grounds for the request, and shall be signed by the employee, or representative of such employee, making the request. The Administrator shall thereupon investigate the matter and, at the request of any party, shall hold public hearings on not less than five days’ notice. At such hearings, the Administrator shall require the parties, including the employer involved, to present information relating to the actual or potential effect of such requirements on employment and the detailed reasons or justification therefor. If the Administrator determines that there are no reasonable grounds for conducting a public hearing he shall notify (in writing) the party req

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7621

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7401 — Congressional findings and declaration of purpose

**(a) Findings** The Congress finds— (1) that the predominant part of the Nation’s population is located in its rapidly expanding metropolitan and other urban areas, which generally cross the boundary lines of local jurisdictions and often extend into two or more States; (2) that the growth in the amount and complexity of air pollution brought about by urbanization, industrial development, and the increasing use of motor vehicles, has resulted in mounting dangers to the public health and welfare, including injury to agricultural crops and livestock, damage to and the deterioration of property, and hazards to air and ground transportation; (3) that air pollution prevention (that is, the reduction or elimination, through any measures, of the amount of pollutants produced or created at the source) and air pollution control at its source is the primary responsibility of States and local governments; and (4) that Federal financial assistance and leadership is essential for the development of cooperative Federal, State, regional, and local programs to prevent and control air pollution. **(b) Declaration** The purposes of this subchapter are— (1) to protect and enhance the quality of the Nation’s air resources so as to promote the public health and welfare and the productive capacity of its population; (2) to initiate and accelerate a national research and development program to achieve the prevention and control of air pollution; (3) to provide technical and financial assistance to State and local governments in connection with the development and execution of their air pollution prevention and control programs; and (4) to encourage and assist the development and operation of regional air pollution prevention and control programs. **(c) Pollution prevention** A prim

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7401

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7413 — Federal enforcement

**(a) In general** (1) **Order to comply with SIP** — Whenever, on the basis of any information available to the Administrator, the Administrator finds that any person has violated or is in violation of any requirement or prohibition of an applicable implementation plan or permit, the Administrator shall notify the person and the State in which the plan applies of such finding. At any time after the expiration of 30 days following the date on which such notice of a violation is issued, the Administrator may, without regard to the period of violation (subject to [section 2462 of title 28](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title28-section2462&num=0&edition=prelim))— (A) issue an order requiring such person to comply with the requirements or prohibitions of such plan or permit, (B) issue an administrative penalty order in accordance with subsection (d), or (C) bring a civil action in accordance with subsection (b). (2) **State failure to enforce SIP or permit program** — Whenever, on the basis of information available to the Administrator, the Administrator finds that violations of an applicable implementation plan or an approved permit program under subchapter V are so widespread that such violations appear to result from a failure of the State in which the plan or permit program applies to enforce the plan or permit program effectively, the Administrator shall so notify the State. In the case of a permit program, the notice shall be made in accordance with subchapter V. If the Administrator finds such failure extends beyond the 30th day after such notice (90 days in the case of such permit program), the Administrator shall give public notice of such finding. During the period beginning with such public notice and ending when such Sta

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7413

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

15 U.S.C. § 793 — Protection of public health and environment

**(a) Distribution of low sulfur fuel** Any allocation program provided for in [section 792 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section792&num=0&edition=prelim) or in the Emergency Petroleum Allocation Act of 1973 [[15 U.S.C. 751](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section751&num=0&edition=prelim) et seq.],11 See References in Text note below. shall, to the maximum extent practicable, include measures to assure that available low sulfur fuel will be distributed on a priority basis to those areas of the United States designated by the Administrator of the Environmental Protection Agency as requiring low sulfur fuel to avoid or minimize adverse impact on public health. **(b) Study of chronic effects of sulfur oxide emissions among exposed populations** In order to determine the health effects of emissions of sulfur oxides to the air resulting from any conversions to burning coal to which section 119 1 of the Clean Air Act [[42 U.S.C. 1857c–10](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section1857c–10&num=0&edition=prelim)] applies, the Department of Health and Human Services shall, through the National Institute of Environmental Health Sciences and in cooperation with the Environmental Protection Agency, conduct a study of chronic effects among exposed populations. The sum of $3,500,000 is authorized to be appropriated for such a study. In order to assure that long-term studies can be conducted without interruption, such sums as are appropriated shall be available until expended. **(c) Major Federal actions significantly affecting the quality of the human environment** (1) No action taken under the Clean Air Act [[42 U.S.C. 7401](https://uscode.house.gov/view.xh

Source: Supplied U.S. Code snapshot — release unconfirmed · 15 U.S.C. § 793

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

15 U.S.C. § 798 — Definitions

**(a)** For purposes of this chapter and the Clean Air Act [[42 U.S.C. 7401](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7401&num=0&edition=prelim) et seq.] the term “Federal Energy Administrator” means the Administrator of the Federal Energy Administration established by Federal Energy Administration Act of 1974 [[15 U.S.C. 761](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section761&num=0&edition=prelim) et seq.]; except that until such Administrator takes office and after such Administration ceases to exist, such term means any officer of the United States designated as Federal Energy Administrator by the President for purposes of this chapter and section 119 11 See References in Text note below. of the Clean Air Act [[42 U.S.C. 1857c–10](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section1857c–10&num=0&edition=prelim)]. **(b)** For purposes of this chapter, the term “petroleum product” means crude oil, residual fuel oil, or any refined petroleum product (as defined in section 752(5) 1 of this title).

Source: Supplied U.S. Code snapshot — release unconfirmed · 15 U.S.C. § 798

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7410 — State implementation plans for national primary and secondary ambient air quality standards

**(a) Adoption of plan by State; submission to Administrator; content of plan; revision; new sources; indirect source review program; supplemental or intermittent control systems** (1) Each State shall, after reasonable notice and public hearings, adopt and submit to the Administrator, within 3 years (or such shorter period as the Administrator may prescribe) after the promulgation of a national primary ambient air quality standard (or any revision thereof) under [section 7409 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7409&num=0&edition=prelim) for any air pollutant, a plan which provides for implementation, maintenance, and enforcement of such primary standard in each air quality control region (or portion thereof) within such State. In addition, such State shall adopt and submit to the Administrator (either as a part of a plan submitted under the preceding sentence or separately) within 3 years (or such shorter period as the Administrator may prescribe) after the promulgation of a national ambient air quality secondary standard (or revision thereof), a plan which provides for implementation, maintenance, and enforcement of such secondary standard in each air quality control region (or portion thereof) within such State. Unless a separate public hearing is provided, each State shall consider its plan implementing such secondary standard at the hearing required by the first sentence of this paragraph. (2) Each implementation plan submitted by a State under this chapter shall be adopted by the State after reasonable notice and public hearing. Each such plan shall— (A) include enforceable emission limitations and other control measures, means, or techniques (including economic incentives such as fees, marketable permit

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7410

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7416 — Retention of State authority

Except as otherwise provided in sections 1857c–10(c), (e), and (f) (as in effect before August 7, 1977), 7543, 7545(c)(4), and 7573 of this title (preempting certain State regulation of moving sources) nothing in this chapter shall preclude or deny the right of any State or political subdivision thereof to adopt or enforce (1) any standard or limitation respecting emissions of air pollutants or (2) any requirement respecting control or abatement of air pollution; except that if an emission standard or limitation is in effect under an applicable implementation plan or under section 7411 or [section 7412 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7412&num=0&edition=prelim), such State or political subdivision may not adopt or enforce any emission standard or limitation which is less stringent than the standard or limitation under such plan or section.

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7416

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7604 — Citizen suits

**(a) Authority to bring civil action; jurisdiction** Except as provided in subsection (b), any person may commence a civil action on his own behalf— (1) against any person (including (i) the United States, and (ii) any other governmental instrumentality or agency to the extent permitted by the Eleventh Amendment to the Constitution) who is alleged to have violated (if there is evidence that the alleged violation has been repeated) or to be in violation of (A) an emission standard or limitation under this chapter or (B) an order issued by the Administrator or a State with respect to such a standard or limitation, (2) against the Administrator where there is alleged a failure of the Administrator to perform any act or duty under this chapter which is not discretionary with the Administrator, or (3) against any person who proposes to construct or constructs any new or modified major emitting facility without a permit required under part C of subchapter I (relating to significant deterioration of air quality) or part D of subchapter I (relating to nonattainment) or who is alleged to have violated (if there is evidence that the alleged violation has been repeated) or to be in violation of any condition of such permit. The district courts shall have jurisdiction, without regard to the amount in controversy or the citizenship of the parties, to enforce such an emission standard or limitation, or such an order, or to order the Administrator to perform such act or duty, as the case may be, and to apply any appropriate civil penalties (except for actions under paragraph (2)). The district courts of the United States shall have jurisdiction to compel (consistent with paragraph (2) of this subsection) agency action unreasonably delayed, except that an action to compel agency ac

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7604

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.