Browse Arkansas Code titles and sections
42 U.S.C. § 7410 — State implementation plans for national primary and secondary ambient air quality standards
Federal law — U.S. Code and appendices · legal_authorities
**(a) Adoption of plan by State; submission to Administrator; content of plan; revision; new sources; indirect source review program; supplemental or intermittent control systems**
(1) Each State shall, after reasonable notice and public hearings, adopt and submit to the Administrator, within 3 years (or such shorter period as the Administrator may prescribe) after the promulgation of a national primary ambient air quality standard (or any revision thereof) under [section 7409 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7409&num=0&edition=prelim) for any air pollutant, a plan which provides for implementation, maintenance, and enforcement of such primary standard in each air quality control region (or portion thereof) within such State. In addition, such State shall adopt and submit to the Administrator (either as a part of a plan submitted under the preceding sentence or separately) within 3 years (or such shorter period as the Administrator may prescribe) after the promulgation of a national ambient air quality secondary standard (or revision thereof), a plan which provides for implementation, maintenance, and enforcement of such secondary standard in each air quality control region (or portion thereof) within such State. Unless a separate public hearing is provided, each State shall consider its plan implementing such secondary standard at the hearing required by the first sentence of this paragraph.
(2) Each implementation plan submitted by a State under this chapter shall be adopted by the State after reasonable notice and public hearing. Each such plan shall—
(A) include enforceable emission limitations and other control measures, means, or techniques (including economic incentives such as fees, marketable permit
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7410
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 127086cb7da0a7f7bfa62d37b2cd8ebb864c34e63177761c52968984649cdceb. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_21ccd8e28d7491b6b09ce733
Source file: Laws/federal/codes/united-states-code/title-42/section-7410-state-implementation-plans-for-national-primary-and-secondary-ambient-ai--cf203f8630.md
Pages: Not recorded – Not recorded
Passage SHA-256: 54226b74f9c59d50946e29d7a53c88907d7171f4bf869586270c81aae6a36e84
Source location: Title 42, Chapter 85, § 7410; chapter-085-air-pollution-prevention-and-control.md
Stored source content
**(a) Adoption of plan by State; submission to Administrator; content of plan; revision; new sources; indirect source review program; supplemental or intermittent control systems**
(1) Each State shall, after reasonable notice and public hearings, adopt and submit to the Administrator, within 3 years (or such shorter period as the Administrator may prescribe) after the promulgation of a national primary ambient air quality standard (or any revision thereof) under [section 7409 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7409&num=0&edition=prelim) for any air pollutant, a plan which provides for implementation, maintenance, and enforcement of such primary standard in each air quality control region (or portion thereof) within such State. In addition, such State shall adopt and submit to the Administrator (either as a part of a plan submitted under the preceding sentence or separately) within 3 years (or such shorter period as the Administrator may prescribe) after the promulgation of a national ambient air quality secondary standard (or revision thereof), a plan which provides for implementation, maintenance, and enforcement of such secondary standard in each air quality control region (or portion thereof) within such State. Unless a separate public hearing is provided, each State shall consider its plan implementing such secondary standard at the hearing required by the first sentence of this paragraph.
(2) Each implementation plan submitted by a State under this chapter shall be adopted by the State after reasonable notice and public hearing. Each such plan shall—
(A) include enforceable emission limitations and other control measures, means, or techniques (including economic incentives such as fees, marketable permits, and auctions of emissions rights), as well as schedules and timetables for compliance, as may be necessary or appropriate to meet the applicable requirements of this chapter;
(B) provide for establishment and operation of appropriate devices, methods, systems, and procedures necessary to—
(i) monitor, compile, and analyze data on ambient air quality, and
(ii) upon request, make such data available to the Administrator;
(C) include a program to provide for the enforcement of the measures described in subparagraph (A), and regulation of the modification and construction of any stationary source within the areas covered by the plan as necessary to assure that national ambient air quality standards are achieved, including a permit program as required in parts C and D;
(D) contain adequate provisions—
(i) prohibiting, consistent with the provisions of this subchapter, any source or other type of emissions activity within the State from emitting any air pollutant in amounts which will—
(I) contribute significantly to nonattainment in, or interfere with maintenance by, any other State with respect to any such national primary or secondary ambient air quality standard, or
(II) interfere with measures required to be included in the applicable implementation plan for any other State under part C to prevent significant deterioration of air quality or to protect visibility,
(ii) insuring compliance with the applicable requirements of sections 7426 and 7415 of this title (relating to interstate and international pollution abatement);
(E) provide (i) necessary assurances that the State (or, except where the Administrator deems inappropriate, the general purpose local government or governments, or a regional agency designated by the State or general purpose local governments for such purpose) will have adequate personnel, funding, and authority under State (and, as appropriate, local) law to carry out such implementation plan (and is not prohibited by any provision of Federal or State law from carrying out such implementation plan or portion thereof), (ii) requirements that the State comply with the requirements respecting State boards under [section 7428 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7428&num=0&edition=prelim), and (iii) necessary assurances that, where the State has relied on a local or regional government, agency, or instrumentality for the implementation of any plan provision, the State has responsibility for ensuring adequate implementation of such plan provision;
(F) require, as may be prescribed by the Administrator—
(i) the installation, maintenance, and replacement of equipment, and the implementation of other necessary steps, by owners or operators of stationary sources to monitor emissions from such sources,
(ii) periodic reports on the nature and amounts of emissions and emissions-related data from such sources, and
(iii) correlation of such reports by the State agency with any emission limitations or standards established pursuant to this chapter, which reports shall be available at reasonable times for public inspection;
(G) provide for authority comparable to that in [section 7603 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7603&num=0&edition=prelim) and adequate contingency plans to implement such authority;
(H) provide for revision of such plan—
(i) from time to time as may be necessary to take account of revisions of such national primary or secondary ambient air quality standard or the availability of improved or more expeditious methods of attaining such standard, and
(ii) except as provided in paragraph (3)(C), whenever the Administrator finds on the basis of information available to the Administrator that the plan is substantially inadequate to attain the national ambient air quality standard which it implements or to otherwise comply with any additional requirements established under this chapter;
(I) in the case of a plan or plan revision for an area designated as a nonattainment area, meet the applicable requirements of part D (relating to nonattainment areas);
(J) meet the applicable requirements of [section 7421 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7421&num=0&edition=prelim) (relating to consultation), [section 7427 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7427&num=0&edition=prelim) (relating to public notification), and part C (relating to prevention of significant deterioration of air quality and visibility protection);
(K) provide for—
(i) the performance of such air quality modeling as the Administrator may prescribe for the purpose of predicting the effect on ambient air quality of any emissions of any air pollutant for which the Administrator has established a national ambient air quality standard, and
(ii) the submission, upon request, of data related to such air quality modeling to the Administrator;
(L) require the owner or operator of each major stationary source to pay to the permitting authority, as a condition of any permit required under this chapter, a fee sufficient to cover—
(i) the reasonable costs of reviewing and acting upon any application for such a permit, and
(ii) if the owner or operator receives a permit for such source, the reasonable costs of implementing and enforcing the terms and conditions of any such permit (not including any court costs or other costs associated with any enforcement action),
until such fee requirement is superseded with respect to such sources by the Administrator’s approval of a fee program under subchapter V; and
(M) provide for consultation and participation by local political subdivisions affected by the plan.
(3)
(A) Repealed. Pub. L. 101–549, title I, § 101(d)(1), Nov. 15, 1990, 104 Stat. 2409.
(B) As soon as practicable, the Administrator shall, consistent with the purposes of this chapter and the Energy Supply and Environmental Coordination Act of 1974 [[15 U.S.C. 791](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section791&num=0&edition=prelim) et seq.], review each State’s applicable implementation plans and report to the State on whether such plans can be revised in relation to fuel burning stationary sources (or persons supplying fuel to such sources) without interfering with the attainment and maintenance of any national ambient air quality standard within the period permitted in this section. If the Administrator determines that any such plan can be revised, he shall notify the State that a plan revision may be submitted by the State. Any plan revision which is submitted by the State shall, after public notice and opportunity for public hearing, be approved by the Administrator if the revision relates only to fuel burning stationary sources (or persons supplying fuel to such sources), and the plan as revised complies with paragraph (2) of this subsection. The Administrator shall approve or disapprove any revision no later than three months after its submission.
(C) Neither the State, in the case of a plan (or portion thereof) approved under this subsection, nor the Administrator, in the case of a plan (or portion thereof) promulgated under subsection (c), shall be required to revise an applicable implementation plan because one or more exemptions under [section 7418 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7418&num=0&edition=prelim) (relating to Federal facilities), enforcement orders under section 7413(d) 11 See References in Text note below. of this title, suspensions under subsection (f) or (g) (relating to temporary energy or economic authority), orders under [section 7419 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7419&num=0&edition=prelim) (relating to primary nonferrous smelters), or extensions of compliance in decrees entered under section 7413(e) 1 of this title (relating to iron- and steel-producing operations) have been granted, if such plan would have met the requirements of this section if no such exemptions, orders, or extensions had been granted.
(4) Repealed. Pub. L. 101–549, title I, § 101(d)(2), Nov. 15, 1990, 104 Stat. 2409.
(5)
(A)
(i) Any State may include in a State implementation plan, but the Administrator may not require as a condition of approval of such plan under this section, any indirect source review program. The Administrator may approve and enforce, as part of an applicable implementation plan, an indirect source review program which the State chooses to adopt and submit as part of its plan.
(ii) Except as provided in subparagraph (B), no plan promulgated by the Administrator shall include any indirect source review program for any air quality control region, or portion thereof.
(iii) Any State may revise an applicable implementation plan approved under this subsection to suspend or revoke any such program included in such plan, provided that such plan meets the requirements of this section.
(B) The Administrator shall have the authority to promulgate, implement and enforce regulations under subsection (c) respecting indirect source review programs which apply only to federally assisted highways, airports, and other major federally assisted indirect sources and federally owned or operated indirect sources.
(C) For purposes of this paragraph, the term “indirect source” means a facility, building, structure, installation, real property, road, or highway which attracts, or may attract, mobile sources of pollution. Such term includes parking lots, parking garages, and other facilities subject to any measure for management of parking supply (within the meaning of subsection (c)(2)(D)(ii)), including regulation of existing off-street parking but such term does not include new or existing on-street parking. Direct emissions sources or facilities at, within, or associated with, any indirect source shall not be deemed indirect sources for the purpose of this paragraph.
(D) For purposes of this paragraph the term “indirect source review program” means the facility-by-facility review of indirect sources of air pollution, including such measures as are necessary to assure, or assist in assuring, that a new or modified indirect source will not attract mobile sources of air pollution, the emissions from which would cause or contribute to air pollution concentrations—
(i) exceeding any national primary ambient air quality standard for a mobile source-related air pollutant after the primary standard attainment date, or
(ii) preventing maintenance of any such standard after such date.
(E) For purposes of this paragraph and paragraph (2)(B), the term “transportation control measure” does not include any measure which is an “indirect source review program”.
(6) No State plan shall be treated as meeting the requirements of this section unless such plan provides that in the case of any source which uses a supplemental, or intermittent control system for purposes of meeting the requirements of an order under section 7413(d) 1 of this title or [section 7419 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7419&num=0&edition=prelim) (relating to primary nonferrous smelter orders), the owner or operator of such source may not temporarily reduce the pay of any employee by reason of the use of such supplemental or intermittent or other dispersion dependent control system.
**(b) Extension of period for submission of plans** The Administrator may, wherever he determines necessary, extend the period for submission of any plan or portion thereof which implements a national secondary ambient air quality standard for a period not to exceed 18 months from the date otherwise required for submission of such plan.
**(c) Preparation and publication by Administrator of proposed regulations setting forth implementation plan; transportation regulations study and report; parking surcharge; suspension authority; plan implementation**
(1) The Administrator shall promulgate a Federal implementation plan at any time within 2 years after the Administrator—
(A) finds that a State has failed to make a required submission or finds that the plan or plan revision submitted by the State does not satisfy the minimum criteria established under subsection (k)(1)(A), or
(B) disapproves a State implementation plan submission in whole or in part,
unless the State corrects the deficiency, and the Administrator approves the plan or plan revision, before the Administrator promulgates such Federal implementation plan.
(2)
(A) Repealed. Pub. L. 101–549, title I, § 101(d)(3)(A), Nov. 15, 1990, 104 Stat. 2409.
(B) No parking surcharge regulation may be required by the Administrator under paragraph (1) of this subsection as a part of an applicable implementation plan. All parking surcharge regulations previously required by the Administrator shall be void upon June 22, 1974. This subparagraph shall not prevent the Administrator from approving parking surcharges if they are adopted and submitted by a State as part of an applicable implementation plan. The Administrator may not condition approval of any implementation plan submitted by a State on such plan’s including a parking surcharge regulation.
(C) Repealed. Pub. L. 101–549, title I, § 101(d)(3)(B), Nov. 15, 1990, 104 Stat. 2409.
(D) For purposes of this paragraph—
(i) The term “parking surcharge regulation” means a regulation imposing or requiring the imposition of any tax, surcharge, fee, or other charge on parking spaces, or any other area used for the temporary storage of motor vehicles.
(ii) The term “management of parking supply” shall include any requirement providing that any new facility containing a given number of parking spaces shall receive a permit or other prior approval, issuance of which is to be conditioned on air quality considerations.
(iii) The term “preferential bus/carpool lane” shall include any requirement for the setting aside of one or more lanes of a street or highway on a permanent or temporary basis for the exclusive use of buses or carpools, or both.
(E) No standard, plan, or requirement, relating to management of parking supply or preferential bus/carpool lanes shall be promulgated after June 22, 1974, by the Administrator pursuant to this section, unless such promulgation has been subjected to at least one public hearing which has been held in the area affected and for which reasonable notice has been given in such area. If substantial changes are made following public hearings, one or more additional hearings shall be held in such area after such notice.
(3) Upon application of the chief executive officer of any general purpose unit of local government, if the Administrator determines that such unit has adequate authority under State or local law, the Administrator may delegate to such unit the authority to implement and enforce within the jurisdiction of such unit any part of a plan promulgated under this subsection. Nothing in this paragraph shall prevent the Administrator from implementing or enforcing any applicable provision of a plan promulgated under this subsection.
(4) Repealed. Pub. L. 101–549, title I, § 101(d)(3)(C), Nov. 15, 1990, 104 Stat. 2409.
(5)
(A) Any measure in an applicable implementation plan which requires a toll or other charge for the use of a bridge located entirely within one city shall be eliminated from such plan by the Administrator upon application by the Governor of the State, which application shall include a certification by the Governor that he will revise such plan in accordance with subparagraph (B).
(B) In the case of any applicable implementation plan with respect to which a measure has been eliminated under subparagraph (A), such plan shall, not later than one year after August 7, 1977, be revised to include comprehensive measures to:
(i) establish, expand, or improve public transportation measures to meet basic transportation needs, as expeditiously as is practicable; and
(ii) implement transportation control measures necessary to attain and maintain national ambient air quality standards,
and such revised plan shall, for the purpose of implementing such comprehensive public transportation measures, include requirements to use (insofar as is necessary) Federal grants, State or local funds, or any combination of such grants and funds as may be consistent with the terms of the legislation providing such grants and funds. Such measures shall, as a substitute for the tolls or charges eliminated under subparagraph (A), provide for emissions reductions equivalent to the reductions which may reasonably be expected to be achieved through the use of the tolls or charges eliminated.
(C) Any revision of an implementation plan for purposes of meeting the requirements of subparagraph (B) shall be submitted in coordination with any plan revision required under part D.
**(d) , (e) Repealed. Pub. L. 101–549, title I, § 101(d)(4), (5), Nov. 15, 1990, 104 Stat. 2409**
**(f) National or regional energy emergencies; determination by President**
(1) Upon application by the owner or operator of a fuel burning stationary source, and after notice and opportunity for public hearing, the Governor of the State in which such source is located may petition the President to determine that a national or regional energy emergency exists of such severity that—
(A) a temporary suspension of any part of the applicable implementation plan or of any requirement under [section 7651j of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651j&num=0&edition=prelim) (concerning excess emissions penalties or offsets) may be necessary, and
(B) other means of responding to the energy emergency may be inadequate.
Such determination shall not be delegable by the President to any other person. If the President determines that a national or regional energy emergency of such severity exists, a temporary emergency suspension of any part of an applicable implementation plan or of any requirement under [section 7651j of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651j&num=0&edition=prelim) (concerning excess emissions penalties or offsets) adopted by the State may be issued by the Governor of any State covered by the President’s determination under the condition specified in paragraph (2) and may take effect immediately.
(2) A temporary emergency suspension under this subsection shall be issued to a source only if the Governor of such State finds that—
(A) there exists in the vicinity of such source a temporary energy emergency involving high levels of unemployment or loss of necessary energy supplies for residential dwellings; and
(B) such unemployment or loss can be totally or partially alleviated by such emergency suspension.
Not more than one such suspension may be issued for any source on the basis of the same set of circumstances or on the basis of the same emergency.
(3) A temporary emergency suspension issued by a Governor under this subsection shall remain in effect for a maximum of four months or such lesser period as may be specified in a disapproval order of the Administrator, if any. The Administrator may disapprove such suspension if he determines that it does not meet the requirements of paragraph (2).
(4) This subsection shall not apply in the case of a plan provision or requirement promulgated by the Administrator under subsection (c) of this section, but in any such case the President may grant a temporary emergency suspension for a four month period of any such provision or requirement if he makes the determinations and findings specified in paragraphs (1) and (2).
(5) The Governor may include in any temporary emergency suspension issued under this subsection a provision delaying for a period identical to the period of such suspension any compliance schedule (or increment of progress) to which such source is subject under section 1857c–10 1 of this title, as in effect before August 7, 1977, or section 7413(d) 1 of this title, upon a finding that such source is unable to comply with such schedule (or increment) solely because of the conditions on the basis of which a suspension was issued under this subsection.
**(g) Governor’s authority to issue temporary emergency suspensions**
(1) In the case of any State which has adopted and submitted to the Administrator a proposed plan revision which the State determines—
(A) meets the requirements of this section, and
(B) is necessary (i) to prevent the closing for one year or more of any source of air pollution, and (ii) to prevent substantial increases in unemployment which would result from such closing, and
which the Administrator has not approved or disapproved under this section within 12 months of submission of the proposed plan revision, the Governor may issue a temporary emergency suspension of the part of the applicable implementation plan for such State which is proposed to be revised with respect to such source. The determination under subparagraph (B) may not be made with respect to a source which would close without regard to whether or not the proposed plan revision is approved.
(2) A temporary emergency suspension issued by a Governor under this subsection shall remain in effect for a maximum of four months or such lesser period as may be specified in a disapproval order of the Administrator. The Administrator may disapprove such suspension if he determines that it does not meet the requirements of this subsection.
(3) The Governor may include in any temporary emergency suspension issued under this subsection a provision delaying for a period identical to the period of such suspension any compliance schedule (or increment of progress) to which such source is subject under section 1857c–10 1 of this title as in effect before August 7, 1977, or under section 7413(d) 1 of this title upon a finding that such source is unable to comply with such schedule (or increment) solely because of the conditions on the basis of which a suspension was issued under this subsection.
**(h) Publication of comprehensive document for each State setting forth requirements of applicable implementation plan**
(1) Not later than 5 years after November 15, 1990, and every 3 years thereafter, the Administrator shall assemble and publish a comprehensive document for each State setting forth all requirements of the applicable implementation plan for such State and shall publish notice in the Federal Register of the availability of such documents.
(2) The Administrator may promulgate such regulations as may be reasonably necessary to carry out the purpose of this subsection.
**(i) Modification of requirements prohibited** Except for a primary nonferrous smelter order under [section 7419 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7419&num=0&edition=prelim), a suspension under subsection (f) or (g) (relating to emergency suspensions), an exemption under [section 7418 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7418&num=0&edition=prelim) (relating to certain Federal facilities), an order under section 7413(d) 1 of this title (relating to compliance orders), a plan promulgation under subsection (c), or a plan revision under subsection (a)(3); no order, suspension, plan revision, or other action modifying any requirement of an applicable implementation plan may be taken with respect to any stationary source by the State or by the Administrator.
**(j) Technological systems of continuous emission reduction on new or modified stationary sources; compliance with performance standards** As a condition for issuance of any permit required under this subchapter, the owner or operator of each new or modified stationary source which is required to obtain such a permit must show to the satisfaction of the permitting authority that the technological system of continuous emission reduction which is to be used at such source will enable it to comply with the standards of performance which are to apply to such source and that the construction or modification and operation of such source will be in compliance with all other requirements of this chapter.
**(k) Environmental Protection Agency action on plan submissions**
(1) **Completeness of plan submissions**
(A) *Completeness criteria* — Within 9 months after November 15, 1990, the Administrator shall promulgate minimum criteria that any plan submission must meet before the Administrator is required to act on such submission under this subsection. The criteria shall be limited to the information necessary to enable the Administrator to determine whether the plan submission complies with the provisions of this chapter.
(B) *Completeness finding* — Within 60 days of the Administrator’s receipt of a plan or plan revision, but no later than 6 months after the date, if any, by which a State is required to submit the plan or revision, the Administrator shall determine whether the minimum criteria established pursuant to subparagraph (A) have been met. Any plan or plan revision that a State submits to the Administrator, and that has not been determined by the Administrator (by the date 6 months after receipt of the submission) to have failed to meet the minimum criteria established pursuant to subparagraph (A), shall on that date be deemed by operation of law to meet such minimum criteria.
(C) *Effect of finding of incompleteness* — Where the Administrator determines that a plan submission (or part thereof) does not meet the minimum criteria established pursuant to subparagraph (A), the State shall be treated as not having made the submission (or, in the Administrator’s discretion, part thereof).
(2) **Deadline for action** — Within 12 months of a determination by the Administrator (or a determination deemed by operation of law) under paragraph (1) that a State has submitted a plan or plan revision (or, in the Administrator’s discretion, part thereof) that meets the minimum criteria established pursuant to paragraph (1), if applicable (or, if those criteria are not applicable, within 12 months of submission of the plan or revision), the Administrator shall act on the submission in accordance with paragraph (3).
(3) **Full and partial approval and disapproval** — In the case of any submittal on which the Administrator is required to act under paragraph (2), the Administrator shall approve such submittal as a whole if it meets all of the applicable requirements of this chapter. If a portion of the plan revision meets all the applicable requirements of this chapter, the Administrator may approve the plan revision in part and disapprove the plan revision in part. The plan revision shall not be treated as meeting the requirements of this chapter until the Administrator approves the entire plan revision as complying with the applicable requirements of this chapter.
(4) **Conditional approval** — The Administrator may approve a plan revision based on a commitment of the State to adopt specific enforceable measures by a date certain, but not later than 1 year after the date of approval of the plan revision. Any such conditional approval shall be treated as a disapproval if the State fails to comply with such commitment.
(5) **Calls for plan revisions** — Whenever the Administrator finds that the applicable implementation plan for any area is substantially inadequate to attain or maintain the relevant national ambient air quality standard, to mitigate adequately the interstate pollutant transport described in [section 7506a of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7506a&num=0&edition=prelim) or [section 7511c of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7511c&num=0&edition=prelim), or to otherwise comply with any requirement of this chapter, the Administrator shall require the State to revise the plan as necessary to correct such inadequacies. The Administrator shall notify the State of the inadequacies, and may establish reasonable deadlines (not to exceed 18 months after the date of such notice) for the submission of such plan revisions. Such findings and notice shall be public. Any finding under this paragraph shall, to the extent the Administrator deems appropriate, subject the State to the requirements of this chapter to which the State was subject when it developed and submitted the plan for which such finding was made, except that the Administrator may adjust any dates applicable under such requirements as appropriate (except that the Administrator may not adjust any attainment date prescribed under part D, unless such date has elapsed).
(6) **Corrections** — Whenever the Administrator determines that the Administrator’s action approving, disapproving, or promulgating any plan or plan revision (or part thereof), area designation, redesignation, classification, or reclassification was in error, the Administrator may in the same manner as the approval, disapproval, or promulgation revise such action as appropriate without requiring any further submission from the State. Such determination and the basis thereof shall be provided to the State and public.
**(l) Plan revisions** Each revision to an implementation plan submitted by a State under this chapter shall be adopted by such State after reasonable notice and public hearing. The Administrator shall not approve a revision of a plan if the revision would interfere with any applicable requirement concerning attainment and reasonable further progress (as defined in [section 7501 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7501&num=0&edition=prelim)), or any other applicable requirement of this chapter.
**(m) Sanctions** The Administrator may apply any of the sanctions listed in [section 7509(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7509/b&num=0&edition=prelim) at any time (or at any time after) the Administrator makes a finding, disapproval, or determination under paragraphs (1) through (4), respectively, of [section 7509(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7509/a&num=0&edition=prelim) in relation to any plan or plan item (as that term is defined by the Administrator) required under this chapter, with respect to any portion of the State the Administrator determines reasonable and appropriate, for the purpose of ensuring that the requirements of this chapter relating to such plan or plan item are met. The Administrator shall, by rule, establish criteria for exercising his authority under the previous sentence with respect to any deficiency referred to in [section 7509(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7509/a&num=0&edition=prelim) to ensure that, during the 24-month period following the finding, disapproval, or determination referred to in [section 7509(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7509/a&num=0&edition=prelim), such sanctions are not applied on a statewide basis where one or more political subdivisions covered by the applicable implementation plan are principally responsible for such deficiency.
**(n) Savings clauses**
(1) **Existing plan provisions** — Any provision of any applicable implementation plan that was approved or promulgated by the Administrator pursuant to this section as in effect before November 15, 1990, shall remain in effect as part of such applicable implementation plan, except to the extent that a revision to such provision is approved or promulgated by the Administrator pursuant to this chapter.
(2) **Attainment dates** — For any area not designated nonattainment, any plan or plan revision submitted or required to be submitted by a State—
(A) in response to the promulgation or revision of a national primary ambient air quality standard in effect on November 15, 1990, or
(B) in response to a finding of substantial inadequacy under subsection (a)(2) (as in effect immediately before November 15, 1990),
shall provide for attainment of the national primary ambient air quality standards within 3 years of November 15, 1990, or within 5 years of issuance of such finding of substantial inadequacy, whichever is later.
(3) **Retention of construction moratorium in certain areas** — In the case of an area to which, immediately before November 15, 1990, the prohibition on construction or modification of major stationary sources prescribed in subsection (a)(2)(I) (as in effect immediately before November 15, 1990) applied by virtue of a finding of the Administrator that the State containing such area had not submitted an implementation plan meeting the requirements of [section 7502(b)(6) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7502/b/6&num=0&edition=prelim) (relating to establishment of a permit program) (as in effect immediately before November 15, 1990) or 7502(a)(1) of this title (to the extent such requirements relate to provision for attainment of the primary national ambient air quality standard for sulfur oxides by December 31, 1982) as in effect immediately before November 15, 1990, no major stationary source of the relevant air pollutant or pollutants shall be constructed or modified in such area until the Administrator finds that the plan for such area meets the applicable requirements of [section 7502(c)(5) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7502/c/5&num=0&edition=prelim) (relating to permit programs) or subpart 5 of part D (relating to attainment of the primary national ambient air quality standard for sulfur dioxide), respectively.
**(o) Indian tribes** If an Indian tribe submits an implementation plan to the Administrator pursuant to [section 7601(d) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7601/d&num=0&edition=prelim), the plan shall be reviewed in accordance with the provisions for review set forth in this section for State plans, except as otherwise provided by regulation promulgated pursuant to [section 7601(d)(2) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7601/d/2&num=0&edition=prelim). When such plan becomes effective in accordance with the regulations promulgated under [section 7601(d) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7601/d&num=0&edition=prelim), the plan shall become applicable to all areas (except as expressly provided otherwise in the plan) located within the exterior boundaries of the reservation, notwithstanding the issuance of any patent and including rights-of-way running through the reservation.
**(p) Reports** Any State shall submit, according to such schedule as the Administrator may prescribe, such reports as the Administrator may require relating to emission reductions, vehicle miles traveled, congestion levels, and any other information the Administrator may deem necessary to assess the development 22 So in original. Probably should be followed by a comma. effectiveness, need for revision, or implementation of any plan or plan revision required under this chapter.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Endangerment of public health or welfare in foreign countries from pollution emitted in United States** Whenever the Administrator, upon receipt of reports, surveys or studies from any duly constituted international agency has reason to believe that any air pollutant or pollutants emitted in the United States cause or contribute to air pollution which may reasonably be anticipated to endanger public health or welfare in a foreign country or whenever the Secretary of State requests him to do so with respect to such pollution which the Secretary of State alleges is of such a nature, the Administrator shall give formal notification thereof to the Governor of the State in which such emissions originate.
**(b) Prevention or elimination of endangerment** The notice of the Administrator shall be deemed to be a finding under [section 7410(a)(2)(H)(ii) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7410/a/2/H/ii&num=0&edition=prelim) which requires a plan revision with respect to so much of the applicable implementation plan as is inadequate to prevent or eliminate the endangerment referred to in subsection (a). Any foreign country so affected by such emission of pollutant or pollutants shall be invited to appear at any public hearing associated with any revision of the appropriate portion of the applicable implementation plan.
**(c) Reciprocity** This section shall apply only to a foreign country which the Administrator determines has given the United States essentially the same rights with respect to the prevention or control of air pollution occurring in that country as is given that country by this section.
**(d) Recommendations** Recommendations issued following any abatement conference conducted prior to August 7, 1977,
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7415
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Ozone transport regions** A single transport region for ozone (within the meaning of [section 7506a(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7506a/a&num=0&edition=prelim)), comprised of the States of Connecticut, Delaware, Maine, Maryland, Massachusetts, New Hampshire, New Jersey, New York, Pennsylvania, Rhode Island, Vermont, and the Consolidated Metropolitan Statistical Area that includes the District of Columbia, is hereby established by operation of law. The provisions of section 7506a(a)(1) and (2) of this title shall apply with respect to the transport region established under this section and any other transport region established for ozone, except to the extent inconsistent with the provisions of this section. The Administrator shall convene the commission required (under [section 7506a(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7506a/b&num=0&edition=prelim)) as a result of the establishment of such region within 6 months of November 15, 1990.
**(b) Plan provisions for States in ozone transport regions**
(1) In accordance with [section 7410 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7410&num=0&edition=prelim), not later than 2 years after November 15, 1990 (or 9 months after the subsequent inclusion of a State in a transport region established for ozone), each State included within a transport region established for ozone shall submit a State implementation plan or revision thereof to the Administrator which requires the following—
(A) that each area in such State that is in an ozone transport region, and that is a metropolitan statistical area or part thereof with a population of 100,000 or more compl
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7511c
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Establishment; membership** In order to obtain assistance in the development and implementation of the purposes of this chapter including air quality criteria, recommended control techniques, standards, research and development, and to encourage the continued efforts on the part of industry to improve air quality and to develop economically feasible methods for the control and abatement of air pollution, the Administrator shall from time to time establish advisory committees. Committee members shall include, but not be limited to, persons who are knowledgeable concerning air quality from the standpoint of health, welfare, economics or technology.
**(b) Compensation** The members of any other advisory committees appointed pursuant to this chapter who are not officers or employees of the United States while attending conferences or meetings or while otherwise serving at the request of the Administrator, shall be entitled to receive compensation at a rate to be fixed by the Administrator, but not exceeding $100 per diem, including traveltime, and while away from their homes or regular places of business they may be allowed travel expenses, including per diem in lieu of subsistence, as authorized by [section 5703 of title 5](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section5703&num=0&edition=prelim) for persons in the Government service employed intermittently.
**(c) 11 See Codification note below. Consultations by Administrator** Prior to—
(1) issuing criteria for an air pollutant under [section 7408(a)(2) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7408/a/2&num=0&edition=prelim),
(2) publishing any list under section 7411(b)(1)(A) or section 7412(b)(1)(A) 22 See References in Text note belo
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7417
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Written notice to all nearby States** Each applicable implementation plan shall—
(1) require each major proposed new (or modified) source—
(A) subject to part C (relating to significant deterioration of air quality) or
(B) which may significantly contribute to levels of air pollution in excess of the national ambient air quality standards in any air quality control region outside the State in which such source intends to locate (or make such modification),
to provide written notice to all nearby States the air pollution levels of which may be affected by such source at least sixty days prior to the date on which commencement of construction is to be permitted by the State providing notice, and
(2) identify all major existing stationary sources which may have the impact described in paragraph (1) with respect to new or modified sources and provide notice to all nearby States of the identity of such sources not later than three months after August 7, 1977.
**(b) Petition for finding that major sources emit or would emit prohibited air pollutants** Any State or political subdivision may petition the Administrator for a finding that any major source or group of stationary sources emits or would emit any air pollutant in violation of the prohibition of [section 7410(a)(2)(D)(ii) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7410/a/2/D/ii&num=0&edition=prelim) or this section. Within 60 days after receipt of any petition under this subsection and after public hearing, the Administrator shall make such a finding or deny the petition.
**(c) Violations; allowable continued operation** Notwithstanding any permit which may have been granted by the State in which the source is located (or intends to locate), it shall be
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7426
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) General compliance** Each department, agency, and instrumentality of the executive, legislative, and judicial branches of the Federal Government (1) having jurisdiction over any property or facility, or (2) engaged in any activity resulting, or which may result, in the discharge of air pollutants, and each officer, agent, or employee thereof, shall be subject to, and comply with, all Federal, State, interstate, and local requirements, administrative authority, and process and sanctions respecting the control and abatement of air pollution in the same manner, and to the same extent as any nongovernmental entity. The preceding sentence shall apply (A) to any requirement whether substantive or procedural (including any recordkeeping or reporting requirement, any requirement respecting permits and any other requirement whatsoever), (B) to any requirement to pay a fee or charge imposed by any State or local agency to defray the costs of its air pollution regulatory program, (C) to the exercise of any Federal, State, or local administrative authority, and (D) to any process and sanction, whether enforced in Federal, State, or local courts, or in any other manner. This subsection shall apply notwithstanding any immunity of such agencies, officers, agents, or employees under any law or rule of law. No officer, agent, or employee of the United States shall be personally liable for any civil penalty for which he is not otherwise liable.
**(b) Exemption** The President may exempt any emission source of any department, agency, or instrumentality in the executive branch from compliance with such a requirement if he determines it to be in the paramount interest of the United States to do so, except that no exemption may be granted from [section 7411 of this title](https://usc
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7418
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Warning signs; television, radio, or press notices or information** Each State plan shall contain measures which will be effective to notify the public during any calendar 11 So in original. Probably should be “calendar year”. on a regular basis of instances or areas in which any national primary ambient air quality standard is exceeded or was exceeded during any portion of the preceding calendar year to advise the public of the health hazards associated with such pollution, and to enhance public awareness of the measures which can be taken to prevent such standards from being exceeded and the ways in which the public can participate in regulatory and other efforts to improve air quality. Such measures may include the posting of warning signs on interstate highway access points to metropolitan areas or television, radio, or press notices or information.
**(b) Grants** The Administrator is authorized to make grants to States to assist in carrying out the requirements of subsection (a).
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7427
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Notwithstanding any other provision of this chapter, the Administrator, upon receipt of evidence that a pollution source or combination of sources (including moving sources) is presenting an imminent and substantial endangerment to public health or welfare, or the environment, may bring suit on behalf of the United States in the appropriate United States district court to immediately restrain any person causing or contributing to the alleged pollution to stop the emission of air pollutants causing or contributing to such pollution or to take such other action as may be necessary. If it is not practicable to assure prompt protection of public health or welfare or the environment by commencement of such a civil action, the Administrator may issue such orders as may be necessary to protect public health or welfare or the environment. Prior to taking any action under this section, the Administrator shall consult with appropriate State and local authorities and attempt to confirm the accuracy of the information on which the action proposed to be taken is based. Any order issued by the Administrator under this section shall be effective upon issuance and shall remain in effect for a period of not more than 60 days, unless the Administrator brings an action pursuant to the first sentence of this section before the expiration of that period. Whenever the Administrator brings such an action within the 60-day period, such order shall remain in effect for an additional 14 days or for such longer period as may be authorized by the court in which such action is brought.
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7603
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
In carrying out the requirements of this chapter requiring applicable implementation plans to contain—
(1) any transportation controls, air quality maintenance plan requirements or preconstruction review of direct sources of air pollution, or
(2) any measure referred to—
(A) in part D (pertaining to nonattainment requirements), or
(B) in part C (pertaining to prevention of significant deterioration),
and in carrying out the requirements of section 7413(d) 11 See References in Text note below. of this title (relating to certain enforcement orders), the State shall provide a satisfactory process of consultation with general purpose local governments, designated organizations of elected officials of local governments and any Federal land manager having authority over Federal land to which the State plan applies, effective with respect to any such requirement which is adopted more than one year after August 7, 1977, as part of such plan. Such process shall be in accordance with regulations promulgated by the Administrator to assure adequate consultation. The Administrator shall update as necessary the original regulations required and promulgated under this section (as in effect immediately before November 15, 1990) to ensure adequate consultation. Only a general purpose unit of local government, regional agency, or council of governments adversely affected by action of the Administrator approving any portion of a plan referred to in this subsection 22 So in original. may petition for judicial review of such action on the basis of a violation of the requirements of this section.
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7421
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Authority to establish interstate transport regions** Whenever, on the Administrator’s own motion or by petition from the Governor of any State, the Administrator has reason to believe that the interstate transport of air pollutants from one or more States contributes significantly to a violation of a national ambient air quality standard in one or more other States, the Administrator may establish, by rule, a transport region for such pollutant that includes such States. The Administrator, on the Administrator’s own motion or upon petition from the Governor of any State, or upon the recommendation of a transport commission established under subsection (b), may—
(1) add any State or portion of a State to any region established under this subsection whenever the Administrator has reason to believe that the interstate transport of air pollutants from such State significantly contributes to a violation of the standard in the transport region, or
(2) remove any State or portion of a State from the region whenever the Administrator has reason to believe that the control of emissions in that State or portion of the State pursuant to this section will not significantly contribute to the attainment of the standard in any area in the region.
The Administrator shall approve or disapprove any such petition or recommendation within 18 months of its receipt. The Administrator shall establish appropriate proceedings for public participation regarding such petitions and motions, including notice and comment.
**(b) Transport commissions**
(1) **Establishment** — Whenever the Administrator establishes a transport region under subsection (a), the Administrator shall establish a transport commission comprised of (at a minimum) each of the following members:
(A) The Governor o
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7506a
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
For the purpose of this part—
(1) **Reasonable further progress.—** — The term “reasonable further progress” means such annual incremental reductions in emissions of the relevant air pollutant as are required by this part or may reasonably be required by the Administrator for the purpose of ensuring attainment of the applicable national ambient air quality standard by the applicable date.
(2) **Nonattainment area.—** — The term “nonattainment area” means, for any air pollutant, an area which is designated “nonattainment” with respect to that pollutant within the meaning of [section 7407(d) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7407/d&num=0&edition=prelim).
(3) The term “lowest achievable emission rate” means for any source, that rate of emissions which reflects—
(A) the most stringent emission limitation which is contained in the implementation plan of any State for such class or category of source, unless the owner or operator of the proposed source demonstrates that such limitations are not achievable, or
(B) the most stringent emission limitation which is achieved in practice by such class or category of source, whichever is more stringent.
In no event shall the application of this term permit a proposed new or modified source to emit any pollutant in excess of the amount allowable under applicable new source standards of performance.
(4) The terms “modifications” and “modified” mean the same as the term “modification” as used in [section 7411(a)(4) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7411/a/4&num=0&edition=prelim).
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7501
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.