42 U.S.C. § 7503 — Permit requirements

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7503 — Permit requirements

**(a) In general** The permit program required by section 7502(b)(6) 11 See References in Text note below. of this title shall provide that permits to construct and operate may be issued if— (1) in accordance with regulations issued by the Administrator for the determination of baseline emissions in a manner consistent with the assumptions underlying the applicable implementation plan approved under [section 7410 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7410&num=0&edition=prelim) and this part, the permitting agency determines that— (A) by the time the source is to commence operation, sufficient offsetting emissions reductions have been obtained, such that total allowable emissions from existing sources in the region, from new or modified sources which are not major emitting facilities, and from the proposed source will be sufficiently less than total emissions from existing sources (as determined in accordance with the regulations under this paragraph) prior to the application for such permit to construct or modify so as to represent (when considered together with the plan provisions required under [section 7502 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7502&num=0&edition=prelim)) reasonable further progress (as defined in [section 7501 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7501&num=0&edition=prelim)); or (B) in the case of a new or modified major stationary source which is located in a zone (within the nonattainment area) identified by the Administrator, in consultation with the Secretary of Housing and Urban Development, as a zone to which economic development should be targeted, that emissions of such pollutan

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7503

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 25a3273e9b5381afaf05104efff08f39eecbebc953be570bece50ff02a011233. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_7d59599748b1d7016dbe4293
Source file: Laws/federal/codes/united-states-code/title-42/section-7503-permit-requirements--cc79015c75.md
Pages: Not recorded – Not recorded
Passage SHA-256: 874c2bff5dd5a280050c795bf6bcb56d37693b23ef1e25e4ae9d6144b98866c8

Source location: Title 42, Chapter 85, § 7503; chapter-085-air-pollution-prevention-and-control.md

Stored source content

**(a) In general** The permit program required by section 7502(b)(6) 11 See References in Text note below. of this title shall provide that permits to construct and operate may be issued if— (1) in accordance with regulations issued by the Administrator for the determination of baseline emissions in a manner consistent with the assumptions underlying the applicable implementation plan approved under [section 7410 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7410&num=0&edition=prelim) and this part, the permitting agency determines that— (A) by the time the source is to commence operation, sufficient offsetting emissions reductions have been obtained, such that total allowable emissions from existing sources in the region, from new or modified sources which are not major emitting facilities, and from the proposed source will be sufficiently less than total emissions from existing sources (as determined in accordance with the regulations under this paragraph) prior to the application for such permit to construct or modify so as to represent (when considered together with the plan provisions required under [section 7502 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7502&num=0&edition=prelim)) reasonable further progress (as defined in [section 7501 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7501&num=0&edition=prelim)); or (B) in the case of a new or modified major stationary source which is located in a zone (within the nonattainment area) identified by the Administrator, in consultation with the Secretary of Housing and Urban Development, as a zone to which economic development should be targeted, that emissions of such pollutant resulting from the proposed new or modified major stationary source will not cause or contribute to emissions levels which exceed the allowance permitted for such pollutant for such area from new or modified major stationary sources under [section 7502(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7502/c&num=0&edition=prelim); (2) the proposed source is required to comply with the lowest achievable emission rate; (3) the owner or operator of the proposed new or modified source has demonstrated that all major stationary sources owned or operated by such person (or by any entity controlling, controlled by, or under common control with such person) in such State are subject to emission limitations and are in compliance, or on a schedule for compliance, with all applicable emission limitations and standards under this chapter; and 22 So in original. The word “and” probably should not appear. (4) the Administrator has not determined that the applicable implementation plan is not being adequately implemented for the nonattainment area in which the proposed source is to be constructed or modified in accordance with the requirements of this part; and (5) an analysis of alternative sites, sizes, production processes, and environmental control techniques for such proposed source demonstrates that benefits of the proposed source significantly outweigh the environmental and social costs imposed as a result of its location, construction, or modification. Any emission reductions required as a precondition of the issuance of a permit under paragraph (1) shall be federally enforceable before such permit may be issued. **(b) Prohibition on use of old growth allowances** Any growth allowance included in an applicable implementation plan to meet the requirements of [section 7502(b)(5) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7502/b/5&num=0&edition=prelim) (as in effect immediately before November 15, 1990) shall not be valid for use in any area that received or receives a notice under [section 7410(a)(2)(H)(ii) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7410/a/2/H/ii&num=0&edition=prelim) (as in effect immediately before November 15, 1990) or under [section 7410(k)(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7410/k/1&num=0&edition=prelim) that its applicable implementation plan containing such allowance is substantially inadequate. **(c) Offsets** (1) The owner or operator of a new or modified major stationary source may comply with any offset requirement in effect under this part for increased emissions of any air pollutant only by obtaining emission reductions of such air pollutant from the same source or other sources in the same nonattainment area, except that the State may allow the owner or operator of a source to obtain such emission reductions in another nonattainment area if (A) the other area has an equal or higher nonattainment classification than the area in which the source is located and (B) emissions from such other area contribute to a violation of the national ambient air quality standard in the nonattainment area in which the source is located. Such emission reductions shall be, by the time a new or modified source commences operation, in effect and enforceable and shall assure that the total tonnage of increased emissions of the air pollutant from the new or modified source shall be offset by an equal or greater reduction, as applicable, in the actual emissions of such air pollutant from the same or other sources in the area. (2) Emission reductions otherwise required by this chapter shall not be creditable as emissions reductions for purposes of any such offset requirement. Incidental emission reductions which are not otherwise required by this chapter shall be creditable as emission reductions for such purposes if such emission reductions meet the requirements of paragraph (1). **(d) Control technology information** The State shall provide that control technology information from permits issued under this section will be promptly submitted to the Administrator for purposes of making such information available through the RACT/BACT/LAER clearinghouse to other States and to the general public. **(e) Rocket engines or motors** The permitting authority of a State shall allow a source to offset by alternative or innovative means emission increases from rocket engine and motor firing, and cleaning related to such firing, at an existing or modified major source that tests rocket engines or motors under the following conditions: (1) Any modification proposed is solely for the purpose of expanding the testing of rocket engines or motors at an existing source that is permitted to test such engines on November 15, 1990. (2) The source demonstrates to the satisfaction of the permitting authority of the State that it has used all reasonable means to obtain and utilize offsets, as determined on an annual basis, for the emissions increases beyond allowable levels, that all available offsets are being used, and that sufficient offsets are not available to the source. (3) The source has obtained a written finding from the Department of Defense, Department of Transportation, National Aeronautics and Space Administration or other appropriate Federal agency, that the testing of rocket motors or engines at the facility is required for a program essential to the national security. (4) The source will comply with an alternative measure, imposed by the permitting authority, designed to offset any emission increases beyond permitted levels not directly offset by the source. In lieu of imposing any alternative offset measures, the permitting authority may impose an emissions fee to be paid to such authority of a State which shall be an amount no greater than 1.5 times the average cost of stationary source control measures adopted in that area during the previous 3 years. The permitting authority shall utilize the fees in a manner that maximizes the emissions reductions in that area.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7502 — Nonattainment plan provisions in general

**(a) Classifications and attainment dates** (1) **Classifications** (A) On or after the date the Administrator promulgates the designation of an area as a nonattainment area pursuant to [section 7407(d) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7407/d&num=0&edition=prelim) with respect to any national ambient air quality standard (or any revised standard, including a revision of any standard in effect on November 15, 1990), the Administrator may classify the area for the purpose of applying an attainment date pursuant to paragraph (2), and for other purposes. In determining the appropriate classification, if any, for a nonattainment area, the Administrator may consider such factors as the severity of nonattainment in such area and the availability and feasibility of the pollution control measures that the Administrator believes may be necessary to provide for attainment of such standard in such area. (B) The Administrator shall publish a notice in the Federal Register announcing each classification under subparagraph (A), except the Administrator shall provide an opportunity for at least 30 days for written comment. Such classification shall not be subject to the provisions of sections 553 through 557 of title 5 (concerning notice and comment) and shall not be subject to judicial review until the Administrator takes final action under subsection (k) or (l) of [section 7410 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7410&num=0&edition=prelim) (concerning action on plan submissions) or [section 7509 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7509&num=0&edition=prelim) (concerning sanctions) with respect to any plan submis

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7502

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7410 — State implementation plans for national primary and secondary ambient air quality standards

**(a) Adoption of plan by State; submission to Administrator; content of plan; revision; new sources; indirect source review program; supplemental or intermittent control systems** (1) Each State shall, after reasonable notice and public hearings, adopt and submit to the Administrator, within 3 years (or such shorter period as the Administrator may prescribe) after the promulgation of a national primary ambient air quality standard (or any revision thereof) under [section 7409 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7409&num=0&edition=prelim) for any air pollutant, a plan which provides for implementation, maintenance, and enforcement of such primary standard in each air quality control region (or portion thereof) within such State. In addition, such State shall adopt and submit to the Administrator (either as a part of a plan submitted under the preceding sentence or separately) within 3 years (or such shorter period as the Administrator may prescribe) after the promulgation of a national ambient air quality secondary standard (or revision thereof), a plan which provides for implementation, maintenance, and enforcement of such secondary standard in each air quality control region (or portion thereof) within such State. Unless a separate public hearing is provided, each State shall consider its plan implementing such secondary standard at the hearing required by the first sentence of this paragraph. (2) Each implementation plan submitted by a State under this chapter shall be adopted by the State after reasonable notice and public hearing. Each such plan shall— (A) include enforceable emission limitations and other control measures, means, or techniques (including economic incentives such as fees, marketable permit

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7410

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7501 — Definitions

For the purpose of this part— (1) **Reasonable further progress.—** — The term “reasonable further progress” means such annual incremental reductions in emissions of the relevant air pollutant as are required by this part or may reasonably be required by the Administrator for the purpose of ensuring attainment of the applicable national ambient air quality standard by the applicable date. (2) **Nonattainment area.—** — The term “nonattainment area” means, for any air pollutant, an area which is designated “nonattainment” with respect to that pollutant within the meaning of [section 7407(d) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7407/d&num=0&edition=prelim). (3) The term “lowest achievable emission rate” means for any source, that rate of emissions which reflects— (A) the most stringent emission limitation which is contained in the implementation plan of any State for such class or category of source, unless the owner or operator of the proposed source demonstrates that such limitations are not achievable, or (B) the most stringent emission limitation which is achieved in practice by such class or category of source, whichever is more stringent. In no event shall the application of this term permit a proposed new or modified source to emit any pollutant in excess of the amount allowable under applicable new source standards of performance. (4) The terms “modifications” and “modified” mean the same as the term “modification” as used in [section 7411(a)(4) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7411/a/4&num=0&edition=prelim).

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7501

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7509 — Sanctions and consequences of failure to attain

**(a) State failure** For any implementation plan or plan revision required under this part (or required in response to a finding of substantial inadequacy as described in [section 7410(k)(5) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7410/k/5&num=0&edition=prelim)), if the Administrator— (1) finds that a State has failed, for an area designated nonattainment under [section 7407(d) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7407/d&num=0&edition=prelim), to submit a plan, or to submit 1 or more of the elements (as determined by the Administrator) required by the provisions of this chapter applicable to such an area, or has failed to make a submission for such an area that satisfies the minimum criteria established in relation to any such element under [section 7410(k) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7410/k&num=0&edition=prelim), (2) disapproves a submission under [section 7410(k) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7410/k&num=0&edition=prelim), for an area designated nonattainment under [section 7407 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7407&num=0&edition=prelim), based on the submission’s failure to meet one or more of the elements required by the provisions of this chapter applicable to such an area, (3) (A) determines that a State has failed to make any submission as may be required under this chapter, other than one described under paragraph (1) or (2), including an adequate maintenance plan, or has failed to make any submission, as may be required under this chapter, other than one described under par

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7509

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7513a — Plan provisions and schedules for plan submissions

**(a) Moderate Areas** (1) **Plan provisions** — Each State in which all or part of a Moderate Area is located shall submit, according to the applicable schedule under paragraph (2), an implementation plan that includes each of the following: (A) For the purpose of meeting the requirements of [section 7502(c)(5) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7502/c/5&num=0&edition=prelim), a permit program providing that permits meeting the requirements of [section 7503 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7503&num=0&edition=prelim) are required for the construction and operation of new and modified major stationary sources of PM–10. (B) Either (i) a demonstration (including air quality modeling) that the plan will provide for attainment by the applicable attainment date; or (ii) a demonstration that attainment by such date is impracticable. (C) Provisions to assure that reasonably available control measures for the control of PM–10 shall be implemented no later than December 10, 1993, or 4 years after designation in the case of an area classified as moderate after November 15, 1990. (2) **Schedule for plan submissions** — A State shall submit the plan required under subparagraph (1) no later than the following: (A) Within 1 year of November 15, 1990, for areas designated nonattainment under [section 7407(d)(4) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7407/d/4&num=0&edition=prelim), except that the provision required under subparagraph (1)(A) shall be submitted no later than June 30, 1992. (B) 18 months after the designation as nonattainment, for those areas designated nonattainment after the designations pr

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7513a

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7503 — Permit requirements

Page 7276 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 7503 1 See References in Text note below. 2 So in original. The word ‘‘and’’ probably should not appear. quirements of section 406(d)(2) [set out as an Effective Date of 1977 Amendment note under section 7401 of this title] (relating to date required for submission of cer- tain implementation plan revisions), for purposes of section 110(a)(2) of the Clean Air Act [section 7410(a)(2) of this title] each State in which there is any non- attainment area (as defined in part D of title I of the Clean Air Act) [this part] shall adopt and submit an im- plementation plan revision which meets the require- ments of section 110(a)(2)(I) [section 7410(a)(2)(I) of this title] and part D of title I of the Clean Air Act [this part] not later than January 1, 1979. In the case of any State for which a plan revision adopted and submitted before such date has made the demonstration required under section 172(a)(2) of the Clean Air Act [subsec. (a)(2) of this section] (respecting impossibility of at- tainment before 1983), such State shall adopt and sub- mit to the Administrator a plan revision before July 1, 1982, which meets the requirements of section 172(b) and (c) of such Act [subsecs. (b) and (c) of this sec- tion].’’ § 7503. Permit requirements (a) In general The permit program required by section 7502(b)(6) 1 of this title shall provide that permits to construct and operate may be issued if— (1) in accordance with regulations issued by the Administrator for the determination of baseline emissions in a manner consistent with the assumptions underlying the applica- ble implementation plan approved under sec- tion 7410 of this title and this part, the permit- ting agency determines that— (A) by the time the sourc

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 7503

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.