Arkansas Legal Resource Navigator

42 U.S.C. § 7513a — Plan provisions and schedules for plan submissions

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7513a — Plan provisions and schedules for plan submissions

**(a) Moderate Areas** (1) **Plan provisions** — Each State in which all or part of a Moderate Area is located shall submit, according to the applicable schedule under paragraph (2), an implementation plan that includes each of the following: (A) For the purpose of meeting the requirements of [section 7502(c)(5) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7502/c/5&num=0&edition=prelim), a permit program providing that permits meeting the requirements of [section 7503 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7503&num=0&edition=prelim) are required for the construction and operation of new and modified major stationary sources of PM–10. (B) Either (i) a demonstration (including air quality modeling) that the plan will provide for attainment by the applicable attainment date; or (ii) a demonstration that attainment by such date is impracticable. (C) Provisions to assure that reasonably available control measures for the control of PM–10 shall be implemented no later than December 10, 1993, or 4 years after designation in the case of an area classified as moderate after November 15, 1990. (2) **Schedule for plan submissions** — A State shall submit the plan required under subparagraph (1) no later than the following: (A) Within 1 year of November 15, 1990, for areas designated nonattainment under [section 7407(d)(4) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7407/d/4&num=0&edition=prelim), except that the provision required under subparagraph (1)(A) shall be submitted no later than June 30, 1992. (B) 18 months after the designation as nonattainment, for those areas designated nonattainment after the designations pr

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7513a

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: ce8126eb85534e34a21cd4cda8894e12e40799a70753b071a7468cec396de963. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_4d9e84dd224f83be1c8bc6e2
Source file: Laws/federal/codes/united-states-code/title-42/section-7513a-plan-provisions-and-schedules-for-plan-submissions--02ab70926e.md
Pages: Not recorded – Not recorded
Passage SHA-256: a85b9c0eb9d612cfc5cc7840e5bbe6a83f4eca7df37e6af5ac97315471bc059e

Source location: Title 42, Chapter 85, § 7513a; chapter-085-air-pollution-prevention-and-control.md

Stored source content

**(a) Moderate Areas** (1) **Plan provisions** — Each State in which all or part of a Moderate Area is located shall submit, according to the applicable schedule under paragraph (2), an implementation plan that includes each of the following: (A) For the purpose of meeting the requirements of [section 7502(c)(5) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7502/c/5&num=0&edition=prelim), a permit program providing that permits meeting the requirements of [section 7503 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7503&num=0&edition=prelim) are required for the construction and operation of new and modified major stationary sources of PM–10. (B) Either (i) a demonstration (including air quality modeling) that the plan will provide for attainment by the applicable attainment date; or (ii) a demonstration that attainment by such date is impracticable. (C) Provisions to assure that reasonably available control measures for the control of PM–10 shall be implemented no later than December 10, 1993, or 4 years after designation in the case of an area classified as moderate after November 15, 1990. (2) **Schedule for plan submissions** — A State shall submit the plan required under subparagraph (1) no later than the following: (A) Within 1 year of November 15, 1990, for areas designated nonattainment under [section 7407(d)(4) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7407/d/4&num=0&edition=prelim), except that the provision required under subparagraph (1)(A) shall be submitted no later than June 30, 1992. (B) 18 months after the designation as nonattainment, for those areas designated nonattainment after the designations prescribed under [section 7407(d)(4) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7407/d/4&num=0&edition=prelim). **(b) Serious Areas** (1) **Plan provisions** — In addition to the provisions submitted to meet the requirements of paragraph 11 So in original. Probably should be “subsection”. (a)(1) (relating to Moderate Areas), each State in which all or part of a Serious Area is located shall submit an implementation plan for such area that includes each of the following: (A) A demonstration (including air quality modeling)— (i) that the plan provides for attainment of the PM–10 national ambient air quality standard by the applicable attainment date, or (ii) for any area for which the State is seeking, pursuant to [section 7513(e) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7513/e&num=0&edition=prelim), an extension of the attainment date beyond the date set forth in [section 7513(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7513/c&num=0&edition=prelim), that attainment by that date would be impracticable, and that the plan provides for attainment by the most expeditious alternative date practicable. (B) Provisions to assure that the best available control measures for the control of PM–10 shall be implemented no later than 4 years after the date the area is classified (or reclassified) as a Serious Area. (2) **Schedule for plan submissions** — A State shall submit the demonstration required for an area under paragraph (1)(A) no later than 4 years after reclassification of the area to Serious, except that for areas reclassified under [section 7513(b)(2) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7513/b/2&num=0&edition=prelim), the State shall submit the attainment demonstration within 18 months after reclassification to Serious. A State shall submit the provisions described under paragraph (1)(B) no later than 18 months after reclassification of the area as a Serious Area. (3) **Major sources** — For any Serious Area, the terms “major source” and “major stationary source” include any stationary source or group of stationary sources located within a contiguous area and under common control that emits, or has the potential to emit, at least 70 tons per year of PM–10. **(c) Milestones** (1) Plan revisions demonstrating attainment submitted to the Administrator for approval under this subpart shall contain quantitative milestones which are to be achieved every 3 years until the area is redesignated attainment and which demonstrate reasonable further progress, as defined in [section 7501(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7501/1&num=0&edition=prelim), toward attainment by the applicable date. (2) Not later than 90 days after the date on which a milestone applicable to the area occurs, each State in which all or part of such area is located shall submit to the Administrator a demonstration that all measures in the plan approved under this section have been implemented and that the milestone has been met. A demonstration under this subsection shall be submitted in such form and manner, and shall contain such information and analysis, as the Administrator shall require. The Administrator shall determine whether or not a State’s demonstration under this subsection is adequate within 90 days after the Administrator’s receipt of a demonstration which contains the information and analysis required by the Administrator. (3) If a State fails to submit a demonstration under paragraph (2) with respect to a milestone within the required period or if the Administrator determines that the area has not met any applicable milestone, the Administrator shall require the State, within 9 months after such failure or determination to submit a plan revision that assures that the State will achieve the next milestone (or attain the national ambient air quality standard for PM–10, if there is no next milestone) by the applicable date. **(d) Failure to attain** In the case of a Serious PM–10 nonattainment area in which the PM–10 standard is not attained by the applicable attainment date, the State in which such area is located shall, after notice and opportunity for public comment, submit within 12 months after the applicable attainment date, plan revisions which provide for attainment of the PM–10 air quality standard and, from the date of such submission until attainment, for an annual reduction in PM–10 or PM–10 precursor emissions within the area of not less than 5 percent of the amount of such emissions as reported in the most recent inventory prepared for such area. **(e) PM–10 precursors** The control requirements applicable under plans in effect under this part for major stationary sources of PM–10 shall also apply to major stationary sources of PM–10 precursors, except where the Administrator determines that such sources do not contribute significantly to PM–10 levels which exceed the standard in the area. The Administrator shall issue guidelines regarding the application of the preceding sentence.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7503 — Permit requirements

**(a) In general** The permit program required by section 7502(b)(6) 11 See References in Text note below. of this title shall provide that permits to construct and operate may be issued if— (1) in accordance with regulations issued by the Administrator for the determination of baseline emissions in a manner consistent with the assumptions underlying the applicable implementation plan approved under [section 7410 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7410&num=0&edition=prelim) and this part, the permitting agency determines that— (A) by the time the source is to commence operation, sufficient offsetting emissions reductions have been obtained, such that total allowable emissions from existing sources in the region, from new or modified sources which are not major emitting facilities, and from the proposed source will be sufficiently less than total emissions from existing sources (as determined in accordance with the regulations under this paragraph) prior to the application for such permit to construct or modify so as to represent (when considered together with the plan provisions required under [section 7502 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7502&num=0&edition=prelim)) reasonable further progress (as defined in [section 7501 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7501&num=0&edition=prelim)); or (B) in the case of a new or modified major stationary source which is located in a zone (within the nonattainment area) identified by the Administrator, in consultation with the Secretary of Housing and Urban Development, as a zone to which economic development should be targeted, that emissions of such pollutan

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7503

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7513a — Plan provisions and schedules for plan

Page 7309 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 7513a 1 So in original. Probably should be ‘‘subsection’’. (July 14, 1955, ch. 360, title I, § 188, as added Pub. L. 101–549, title I, § 105(a), Nov. 15, 1990, 104 Stat. 2458.) § 7513a. Plan provisions and schedules for plan submissions (a) Moderate Areas (1) Plan provisions Each State in which all or part of a Mod- erate Area is located shall submit, according to the applicable schedule under paragraph (2), an implementation plan that includes each of the following: (A) For the purpose of meeting the re- quirements of section 7502(c)(5) of this title, a permit program providing that permits meeting the requirements of section 7503 of this title are required for the construction and operation of new and modified major stationary sources of PM–10. (B) Either (i) a demonstration (including air quality modeling) that the plan will pro- vide for attainment by the applicable attain- ment date; or (ii) a demonstration that at- tainment by such date is impracticable. (C) Provisions to assure that reasonably available control measures for the control of PM–10 shall be implemented no later than December 10, 1993, or 4 years after designa- tion in the case of an area classified as mod- erate after November 15, 1990. (2) Schedule for plan submissions A State shall submit the plan required under subparagraph (1) no later than the following: (A) Within 1 year of November 15, 1990, for areas designated nonattainment under sec- tion 7407(d)(4) of this title, except that the provision required under subparagraph (1)(A) shall be submitted no later than June 30, 1992. (B) 18 months after the designation as non- attainment, for those areas designated non- attainment after the designations prescribed under

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 7513a

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.