42 U.S.C. § 7503 — Permit requirements
Federal law — U.S. Code and appendices · legal_authorities
Page 7276
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7503
1 See References in Text note below.
2 So in original. The word ‘‘and’’ probably should not appear.
quirements of section 406(d)(2) [set out as an Effective
Date of 1977 Amendment note under section 7401 of this
title] (relating to date required for submission of cer-
tain implementation plan revisions), for purposes of
section 110(a)(2) of the Clean Air Act [section 7410(a)(2)
of this title] each State in which there is any non-
attainment area (as defined in part D of title I of the
Clean Air Act) [this part] shall adopt and submit an im-
plementation plan revision which meets the require-
ments of section 110(a)(2)(I) [section 7410(a)(2)(I) of this
title] and part D of title I of the Clean Air Act [this
part] not later than January 1, 1979. In the case of any
State for which a plan revision adopted and submitted
before such date has made the demonstration required
under section 172(a)(2) of the Clean Air Act [subsec.
(a)(2) of this section] (respecting impossibility of at-
tainment before 1983), such State shall adopt and sub-
mit to the Administrator a plan revision before July 1,
1982, which meets the requirements of section 172(b)
and (c) of such Act [subsecs. (b) and (c) of this sec-
tion].’’
§ 7503. Permit requirements
(a) In general
The permit program required by section
7502(b)(6) 1 of this title shall provide that permits
to construct and operate may be issued if—
(1) in accordance with regulations issued by
the Administrator for the determination of
baseline emissions in a manner consistent
with the assumptions underlying the applica-
ble implementation plan approved under sec-
tion 7410 of this title and this part, the permit-
ting agency determines that—
(A) by the time the sourc
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 7503
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: c45c73fe3628e91e84a49e7c8b097d5c550f1d3b2b90a8da72380111728cfbd5. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-756b2aa47fe72a213c374ded
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-7503-permit-requirements--ab61bd9fa8.md
Pages: Not recorded – Not recorded
Passage SHA-256: f9ac728a337273a5710ed44b45b48f8129ec4db2dc5438a8758aee9f0e850d2a
Source location: USCODE-2024-title42-chap85-subchapI-partD-subpart1-sec7503.pdf
Stored source content
Page 7276
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7503
1 See References in Text note below.
2 So in original. The word ‘‘and’’ probably should not appear.
quirements of section 406(d)(2) [set out as an Effective
Date of 1977 Amendment note under section 7401 of this
title] (relating to date required for submission of cer-
tain implementation plan revisions), for purposes of
section 110(a)(2) of the Clean Air Act [section 7410(a)(2)
of this title] each State in which there is any non-
attainment area (as defined in part D of title I of the
Clean Air Act) [this part] shall adopt and submit an im-
plementation plan revision which meets the require-
ments of section 110(a)(2)(I) [section 7410(a)(2)(I) of this
title] and part D of title I of the Clean Air Act [this
part] not later than January 1, 1979. In the case of any
State for which a plan revision adopted and submitted
before such date has made the demonstration required
under section 172(a)(2) of the Clean Air Act [subsec.
(a)(2) of this section] (respecting impossibility of at-
tainment before 1983), such State shall adopt and sub-
mit to the Administrator a plan revision before July 1,
1982, which meets the requirements of section 172(b)
and (c) of such Act [subsecs. (b) and (c) of this sec-
tion].’’
§ 7503. Permit requirements
(a) In general
The permit program required by section
7502(b)(6) 1 of this title shall provide that permits
to construct and operate may be issued if—
(1) in accordance with regulations issued by
the Administrator for the determination of
baseline emissions in a manner consistent
with the assumptions underlying the applica-
ble implementation plan approved under sec-
tion 7410 of this title and this part, the permit-
ting agency determines that—
(A) by the time the source is to commence
operation, sufficient offsetting emissions re-
ductions have been obtained, such that total
allowable emissions from existing sources in
the region, from new or modified sources
which are not major emitting facilities, and
from the proposed source will be sufficiently
less than total emissions from existing
sources (as determined in accordance with
the regulations under this paragraph) prior
to the application for such permit to con-
struct or modify so as to represent (when
considered together with the plan provisions
required under section 7502 of this title) rea-
sonable further progress (as defined in sec-
tion 7501 of this title); or
(B) in the case of a new or modified major
stationary source which is located in a zone
(within the nonattainment area) identified
by the Administrator, in consultation with
the Secretary of Housing and Urban Devel-
opment, as a zone to which economic devel-
opment should be targeted, that emissions of
such pollutant resulting from the proposed
new or modified major stationary source
will not cause or contribute to emissions
levels which exceed the allowance permitted
for such pollutant for such area from new or
modified major stationary sources under
section 7502(c) of this title;
(2) the proposed source is required to comply
with the lowest achievable emission rate;
(3) the owner or operator of the proposed
new or modified source has demonstrated that
all major stationary sources owned or oper-
ated by such person (or by any entity control-
ling, controlled by, or under common control
with such person) in such State are subject to
emission limitations and are in compliance, or
on a schedule for compliance, with all applica-
ble emission limitations and standards under
this chapter; and 2
(4) the Administrator has not determined
that the applicable implementation plan is not
being adequately implemented for the non-
attainment area in which the proposed source
is to be constructed or modified in accordance
with the requirements of this part; and
(5) an analysis of alternative sites, sizes,
production processes, and environmental con-
trol techniques for such proposed source dem-
onstrates that benefits of the proposed source
significantly outweigh the environmental and
social costs imposed as a result of its location,
construction, or modification.
Any emission reductions required as a pre-
condition of the issuance of a permit under para-
graph (1) shall be federally enforceable before
such permit may be issued.
(b) Prohibition on use of old growth allowances
Any growth allowance included in an applica-
ble implementation plan to meet the require-
ments of section 7502(b)(5) of this title (as in ef-
fect immediately before November 15, 1990) shall
not be valid for use in any area that received or
receives a notice under section 7410(a)(2)(H)(ii)
of this title (as in effect immediately before No-
vember 15, 1990) or under section 7410(k)(1) of
this title that its applicable implementation
plan containing such allowance is substantially
inadequate.
(c) Offsets
(1) The owner or operator of a new or modified
major stationary source may comply with any
offset requirement in effect under this part for
increased emissions of any air pollutant only by
obtaining emission reductions of such air pollut-
ant from the same source or other sources in the
same nonattainment area, except that the State
may allow the owner or operator of a source to
obtain such emission reductions in another non-
attainment area if (A) the other area has an
equal or higher nonattainment classification
than the area in which the source is located and
(B) emissions from such other area contribute to
a violation of the national ambient air quality
standard in the nonattainment area in which
the source is located. Such emission reductions
shall be, by the time a new or modified source
commences operation, in effect and enforceable
and shall assure that the total tonnage of in-
creased emissions of the air pollutant from the
new or modified source shall be offset by an
equal or greater reduction, as applicable, in the
actual emissions of such air pollutant from the
same or other sources in the area.
(2) Emission reductions otherwise required by
this chapter shall not be creditable as emissions
reductions for purposes of any such offset re-
quirement.
Incidental
emission
reductions
which are not otherwise required by this chapter
shall be creditable as emission reductions for
such purposes if such emission reductions meet
the requirements of paragraph (1).
Page 7277
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7503
(d) Control technology information
The State shall provide that control tech-
nology information from permits issued under
this section will be promptly submitted to the
Administrator for purposes of making such in-
formation available through the RACT/BACT/
LAER clearinghouse to other States and to the
general public.
(e) Rocket engines or motors
The permitting authority of a State shall
allow a source to offset by alternative or inno-
vative means emission increases from rocket en-
gine and motor firing, and cleaning related to
such firing, at an existing or modified major
source that tests rocket engines or motors under
the following conditions:
(1) Any modification proposed is solely for
the purpose of expanding the testing of rocket
engines or motors at an existing source that is
permitted to test such engines on November
15, 1990.
(2) The source demonstrates to the satisfac-
tion of the permitting authority of the State
that it has used all reasonable means to obtain
and utilize offsets, as determined on an annual
basis, for the emissions increases beyond al-
lowable levels, that all available offsets are
being used, and that sufficient offsets are not
available to the source.
(3) The source has obtained a written finding
from the Department of Defense, Department
of Transportation, National Aeronautics and
Space Administration or other appropriate
Federal agency, that the testing of rocket mo-
tors or engines at the facility is required for a
program essential to the national security.
(4) The source will comply with an alter-
native measure, imposed by the permitting au-
thority, designed to offset any emission in-
creases beyond permitted levels not directly
offset by the source. In lieu of imposing any
alternative offset measures, the permitting
authority may impose an emissions fee to be
paid to such authority of a State which shall
be an amount no greater than 1.5 times the av-
erage cost of stationary source control meas-
ures adopted in that area during the previous
3 years. The permitting authority shall utilize
the fees in a manner that maximizes the emis-
sions reductions in that area.
(July 14, 1955, ch. 360, title I, § 173, as added Pub.
L. 95–95, title I, § 129(b), Aug. 7, 1977, 91 Stat. 748;
amended Pub. L. 95–190, § 14(a)(57), (58), Nov. 16,
1977, 91 Stat. 1403; Pub. L. 101–549, title I, § 102(c),
Nov. 15, 1990, 104 Stat. 2415.)
Editorial Notes
REFERENCES IN TEXT
Section 7502(b) of this title, referred to in subsec. (a),
was amended generally by Pub. L. 101–549, title I,
§ 102(b), Nov. 15, 1990, 104 Stat. 2412, and, as so amended,
does not contain a par. (6). See section 7502(c)(5) of this
title.
AMENDMENTS
1990—Pub. L. 101–549, § 102(c)(1), made technical
amendment to section catchline.
Pub. L. 101–549, § 102(c)(2), (8), designated existing pro-
visions as subsec. (a), inserted heading, and substituted
‘‘(1) shall be federally enforceable’’ for ‘‘(1)(A) shall be
legally binding’’ in last sentence.
Subsec. (a)(1). Pub. L. 101–549, § 102(c)(3), inserted at
beginning ‘‘in accordance with regulations issued by
the Administrator for the determination of baseline
emissions in a manner consistent with the assumptions
underlying the applicable implementation plan ap-
proved under section 7410 of this title and this part,’’.
Subsec. (a)(1)(A). Pub. L. 101–549, § 102(c)(4), inserted
‘‘sufficient offsetting emissions reductions have been
obtained, such that’’ after ‘‘to commence operation,’’
and substituted ‘‘(as determined in accordance with the
regulations under this paragraph)’’ for ‘‘allowed under
the applicable implementation plan’’.
Subsec. (a)(1)(B). Pub. L. 101–549, § 102(c)(5), inserted
at beginning ‘‘in the case of a new or modified major
stationary source which is located in a zone (within the
nonattainment area) identified by the Administrator,
in consultation with the Secretary of Housing and
Urban Development, as a zone to which economic de-
velopment
should
be
targeted,’’
and
substituted
‘‘7502(c)’’ for ‘‘7502(b)’’.
Subsec. (a)(4). Pub. L. 101–549, § 102(c)(6), inserted at
beginning ‘‘the Administrator has not determined
that’’,
substituted
‘‘not
being
adequately
imple-
mented’’ for ‘‘being carried out’’, and substituted
‘‘; and’’ for period at end.
Subsec. (a)(5). Pub. L. 101–549, § 102(c)(7), added par.
(5).
Subsec. (b). Pub. L. 101–549, § 102(c)(9), added subsec.
(b).
Subsecs. (c) to (e). Pub. L. 101–549, § 102(c)(10), added
subsecs. (c) to (e).
1977—Par. (1)(A). Pub. L. 95–190, § 14(a)(57), inserted
‘‘or modified’’ after ‘‘from new’’ and ‘‘applicable’’ be-
fore ‘‘implementation plan’’, and substituted ‘‘source’’
for ‘‘facility’’ wherever appearing.
Par. (4). Pub. L. 95–190, § 14(a)(58), added par. (4).
Statutory Notes and Related Subsidiaries
FAILURE TO ATTAIN NATIONAL PRIMARY AMBIENT AIR
QUALITY STANDARDS UNDER CLEAN AIR ACT
Pub. L. 100–202, § 101(f) [title II], Dec. 22, 1987, 101 Stat.
1329–187, 1329–199, provided that: ‘‘No restriction or pro-
hibition on construction, permitting, or funding under
sections 110(a)(2)(I), 173(4), 176(a), 176(b), or 316 of the
Clean Air Act [sections 7410(a)(2)(I), 7503(4), 7506(a), (b),
7616 of this title] shall be imposed or take effect during
the period prior to August 31, 1988, by reason of (1) the
failure of any nonattainment area to attain the na-
tional primary ambient air quality standard under the
Clean
Air
Act
[this
chapter]
for
photochemical
oxidants (ozone) or carbon monoxide (or both) by De-
cember 31, 1987, (2) the failure of any State to adopt and
submit to the Administrator of the Environmental Pro-
tection Agency an implementation plan that meets the
requirements of part D of title I of such Act [this part]
and provides for attainment of such standards by De-
cember 31, 1987, (3) the failure of any State or des-
ignated local government to implement the applicable
implementation plan, or (4) any combination of the
foregoing. During such period and consistent with the
preceding sentence, the issuance of a permit (including
required offsets) under section 173 of such Act [this sec-
tion] for the construction or modification of a source in
a nonattainment area shall not be denied solely or par-
tially by reason of the reference contained in section
171(l) of such Act [section 7501(1) of this title] to the ap-
plicable date established in section 172(a) [section
7502(a) of this title]. This subsection [probably means
the first 3 sentences of this note] shall not apply to any
restriction or prohibition in effect under sections
110(a)(2)(I), 173(4), 176(a), 176(b), or 316 of such Act prior
to the enactment of this section [Dec. 22, 1987]. Prior to
August 31, 1988, the Administrator of the Environ-
mental Protection Agency shall evaluate air quality
data and make determinations with respect to which
areas throughout the nation have attained, or failed to
attain, either or both of the national primary ambient
air quality standards referred to in subsection (a)
Page 7278
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7504
[probably means the first 3 sentences of this note] and
shall take appropriate steps to designate those areas
failing to attain either or both of such standards as
nonattainment areas within the meaning of part D of
title I of the Clean Air Act.’’
§ 7504. Planning procedures
(a) In general
For any ozone, carbon monoxide, or PM–10
nonattainment area, the State containing such
area and elected officials of affected local gov-
ernments shall, before the date required for sub-
mittal of the inventory described under sections
7511a(a)(1) and 7512a(a)(1) of this title, jointly re-
view and update as necessary the planning pro-
cedures adopted pursuant to this subsection as
in effect immediately before November 15, 1990,
or develop new planning procedures pursuant to
this subsection, as appropriate. In preparing
such procedures the State and local elected offi-
cials shall determine which elements of a re-
vised implementation plan will be developed,
adopted, and implemented (through means in-
cluding enforcement) by the State and which by
local governments or regional agencies, or any
combination of local governments, regional
agencies, or the State. The implementation plan
required by this part shall be prepared by an or-
ganization certified by the State, in consulta-
tion with elected officials of local governments
and in accordance with the determination under
the second sentence of this subsection. Such or-
ganization shall include elected officials of local
governments in the affected area, and represent-
atives of the State air quality planning agency,
the State transportation planning agency, the
metropolitan planning organization designated
to conduct the continuing, cooperative and com-
prehensive transportation planning process for
the area under section 134 of title 23, the organi-
zation responsible for the air quality mainte-
nance planning process under regulations imple-
menting this chapter, and any other organiza-
tion with responsibilities for developing, sub-
mitting, or implementing the plan required by
this part. Such organization may be one that
carried out these functions before November 15,
1990.
(b) Coordination
The preparation of implementation plan provi-
sions and subsequent plan revisions under the
continuing transportation-air quality planning
process described in section 7408(e) of this title
shall be coordinated with the continuing, coop-
erative and comprehensive transportation plan-
ning process required under section 134 of title
23, and such planning processes shall take into
account the requirements of this part.
(c) Joint planning
In the case of a nonattainment area that is in-
cluded within more than one State, the affected
States may jointly, through interstate compact
or otherwise, undertake and implement all or
part of the planning procedures described in this
section.
(July 14, 1955, ch. 360, title I, § 174, as added Pub.
L. 95–95, title I, § 129(b), Aug. 7, 1977, 91 Stat. 748;
amended Pub. L. 101–549, title I, § 102(d), Nov. 15,
1990, 104 Stat. 2417.)
Editorial Notes
AMENDMENTS
1990—Pub. L. 101–549 amended section generally, sub-
stituting present provisions for provisions which re-
lated to: in subsec. (a), preparation of implementation
plan by designated organization; and in subsec. (b), co-
ordination of plan preparation.
§ 7505. Environmental Protection Agency grants
(a) Plan revision development costs
The Administrator shall make grants to any
organization of local elected officials with
transportation or air quality maintenance plan-
ning responsibilities recognized by the State
under section 7504(a) of this title for payment of
the reasonable costs of developing a plan revi-
sion under this part.
(b) Uses of grant funds
The amount granted to any organization
under subsection (a) shall be 100 percent of any
additional costs of developing a plan revision
under this part for the first two fiscal years fol-
lowing receipt of the grant under this para-
graph, and shall supplement any funds available
under Federal law to such organization for
transportation or air quality maintenance plan-
ning. Grants under this section shall not be used
for construction.
(July 14, 1955, ch. 360, title I, § 175, as added Pub.
L. 95–95, title I, § 129(b), Aug. 7, 1977, 91 Stat. 749.)
§ 7505a. Maintenance plans
(a) Plan revision
Each State which submits a request under sec-
tion 7407(d) of this title for redesignation of a
nonattainment area for any air pollutant as an
area which has attained the national primary
ambient air quality standard for that air pollut-
ant shall also submit a revision of the applicable
State implementation plan to provide for the
maintenance of the national primary ambient
air quality standard for such air pollutant in the
area concerned for at least 10 years after the re-
designation. The plan shall contain such addi-
tional measures, if any, as may be necessary to
ensure such maintenance.
(b) Subsequent plan revisions
8 years after redesignation of any area as an
attainment area under section 7407(d) of this
title, the State shall submit to the Adminis-
trator an additional revision of the applicable
State implementation plan for maintaining the
national primary ambient air quality standard
for 10 years after the expiration of the 10-year
period referred to in subsection (a).
(c)
Nonattainment
requirements
applicable
pending plan approval
Until such plan revision is approved and an
area is redesignated as attainment for any area
designated as a nonattainment area, the re-
quirements of this part shall continue in force
and effect with respect to such area.
(d) Contingency provisions
Each plan revision submitted under this sec-
tion shall contain such contingency provisions
as the Administrator deems necessary to assure
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) In general** The permit program required by section 7502(b)(6) 11 See References in Text note below. of this title shall provide that permits to construct and operate may be issued if—
(1) in accordance with regulations issued by the Administrator for the determination of baseline emissions in a manner consistent with the assumptions underlying the applicable implementation plan approved under [section 7410 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7410&num=0&edition=prelim) and this part, the permitting agency determines that—
(A) by the time the source is to commence operation, sufficient offsetting emissions reductions have been obtained, such that total allowable emissions from existing sources in the region, from new or modified sources which are not major emitting facilities, and from the proposed source will be sufficiently less than total emissions from existing sources (as determined in accordance with the regulations under this paragraph) prior to the application for such permit to construct or modify so as to represent (when considered together with the plan provisions required under [section 7502 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7502&num=0&edition=prelim)) reasonable further progress (as defined in [section 7501 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7501&num=0&edition=prelim)); or
(B) in the case of a new or modified major stationary source which is located in a zone (within the nonattainment area) identified by the Administrator, in consultation with the Secretary of Housing and Urban Development, as a zone to which economic development should be targeted, that emissions of such pollutan
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 7503
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.