Arkansas Legal Resource Navigator

33 U.S.C. § 2201 — ‘‘Secretary’’ defined

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2201 — ‘‘Secretary’’ defined

Page 688 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2201 Sec. 2326e. Non-Federal interest dredging authority. 2326f. Maintenance dredging data. 2326g. Beneficial use of dredged material; dredged material management plans. 2326h. Five-year regional dredged material manage- ment plans. 2326i. Beneficial use of dredged material. 2326j. Transfer of suitable dredged material. 2327. Definition of rehabilitation for inland water- way projects. 2327a. Rehabilitation of Corps of Engineers con- structed pump stations. 2328. Challenge cost-sharing program for manage- ment of recreation facilities. 2328a. Special use permits. 2329. International outreach program. 2330. Aquatic ecosystem restoration. 2330a. Monitoring ecosystem restoration. 2330b. Fish hatcheries. 2330c. Aquatic ecosystem restoration. 2330d. Public recreational amenities in ecosystem restoration projects. 2331. Use of continuing contracts for construction of certain projects. 2331a. Initiating work on separable elements. 2332. Shoreline and riverine protection and res- toration. 2333. Irrigation diversion protection and fisheries enhancement assistance. 2334. Innovative technologies for watershed res- toration. 2335. Coastal aquatic habitat management. 2336. Abandoned and inactive noncoal mine res- toration. 2337. Property protection program. 2338. Reburial and conveyance authority. 2339. Assistance programs. 2339a. Cooperative agreements with Indian tribes. 2340. Revision of project partnership agreement; cost sharing. 2341. Expedited actions for emergency flood dam- age reduction. 2341a. Prioritization. 2341b. Prioritization of certain projects. 2341c. Criteria for funding environmental infra- structure projects. 2342. Access to water resource

Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2201

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: c15a966741276103a38c5b8c9a68b53ecc83f43028bc377d45b057ff8bbc83bb. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-e206e17172977f13f32ed98a
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-2201-secretary-defined--da9ac694f2.md
Pages: Not recorded – Not recorded
Passage SHA-256: 6db19f87481ef5e9fecf704ca57a50725d9df50100bfef2c8eb22e2b47560e9c

Source location: USCODE-2024-title33-chap36-sec2201.pdf

Stored source content

Page 688 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2201 Sec. 2326e. Non-Federal interest dredging authority. 2326f. Maintenance dredging data. 2326g. Beneficial use of dredged material; dredged material management plans. 2326h. Five-year regional dredged material manage- ment plans. 2326i. Beneficial use of dredged material. 2326j. Transfer of suitable dredged material. 2327. Definition of rehabilitation for inland water- way projects. 2327a. Rehabilitation of Corps of Engineers con- structed pump stations. 2328. Challenge cost-sharing program for manage- ment of recreation facilities. 2328a. Special use permits. 2329. International outreach program. 2330. Aquatic ecosystem restoration. 2330a. Monitoring ecosystem restoration. 2330b. Fish hatcheries. 2330c. Aquatic ecosystem restoration. 2330d. Public recreational amenities in ecosystem restoration projects. 2331. Use of continuing contracts for construction of certain projects. 2331a. Initiating work on separable elements. 2332. Shoreline and riverine protection and res- toration. 2333. Irrigation diversion protection and fisheries enhancement assistance. 2334. Innovative technologies for watershed res- toration. 2335. Coastal aquatic habitat management. 2336. Abandoned and inactive noncoal mine res- toration. 2337. Property protection program. 2338. Reburial and conveyance authority. 2339. Assistance programs. 2339a. Cooperative agreements with Indian tribes. 2340. Revision of project partnership agreement; cost sharing. 2341. Expedited actions for emergency flood dam- age reduction. 2341a. Prioritization. 2341b. Prioritization of certain projects. 2341c. Criteria for funding environmental infra- structure projects. 2342. Access to water resource data. 2343. Independent peer review. 2344. Safety assurance review. 2345. Electronic submission and tracking of permit applications. 2346. Project administration. 2346a. Real estate administrative fees. 2347. Coordination and scheduling of Federal, State, and local actions. 2347a. Determination of project completion. 2347b. Purpose and need. 2347c. Small water storage projects. 2348. Project acceleration. 2348a. NEPA reporting. 2349. Categorical exclusions in emergencies. 2350. Corrosion prevention. 2351. Durability, sustainability, and resilience. 2351a. Operation and maintenance of existing infra- structure. 2351b. Federal breakwaters and jetties. 2352. Funding to process permits. 2353. Structural health monitoring. 2353a. Aging infrastructure. 2354. Easements for electric, telephone, or broadband service facilities. 2355. Prior project authorization. 2356. Project consultation. 2357. Managed aquifer recharge study and working group. § 2201. ‘‘Secretary’’ defined For purposes of this Act, the term ‘‘Sec- retary’’ means the Secretary of the Army. (Pub. L. 99–662, § 2, Nov. 17, 1986, 100 Stat. 4082.) Editorial Notes REFERENCES IN TEXT This Act, referred to in text, is Pub. L. 99–662, Nov. 17, 1986, 100 Stat. 4082, as amended, known as the Water Re- sources Development Act of 1986. For complete classi- fication of this Act to the Code, see Short Title note set out below and Tables. Statutory Notes and Related Subsidiaries SHORT TITLE OF 2025 AMENDMENT Pub. L. 118–272, § 101(a), Jan. 4, 2025, 138 Stat. 2992, pro- vided that: ‘‘This Act [see Tables for classification] may be cited as the ‘Thomas R. Carper Water Re- sources Development Act of 2024’.’’ Pub. L. 118–272, div. A, § 1001, Jan. 4, 2025, 138 Stat. 2996, provided that: ‘‘This division [see Tables for clas- sification] may be cited as the ‘Water Resources Devel- opment Act of 2024’.’’ Pub. L. 118–272, div. A, title I, § 1160, Jan. 4, 2025, 138 Stat. 3046, provided that: ‘‘This subtitle [subtitle B (§§ 1160–1165) of title I of div. A of Pub. L. 118–272, enact- ing section 2281d of this title, amending section 390b–2 of Title 43, Public Lands, and enacting provisions set out as notes under section 2319 of this title] may be cited as the ‘Grace F. Napolitano Priority for Water Supply, Water Conservation, and Drought Resiliency Act of 2024’.’’ SHORT TITLE OF 2022 AMENDMENT Pub. L. 117–263, div. H, title LXXXI, § 8001(a), Dec. 23, 2022, 136 Stat. 3691, provided that: ‘‘This title [see Ta- bles for classification] may be cited as the ‘Water Re- sources Development Act of 2022’.’’ SHORT TITLE OF 2020 AMENDMENT Pub. L. 116–260, div. AA, § 1(a), Dec. 27, 2020, 134 Stat. 2615, provided that: ‘‘This division [see Tables for clas- sification] may be cited as the ‘Water Resources Devel- opment Act of 2020’.’’ SHORT TITLE OF 2018 AMENDMENT Pub. L. 115–270, § 1(a), Oct. 23, 2018, 132 Stat. 3765, pro- vided that: ‘‘This Act [see Tables for classification] may be cited as ‘America’s Water Infrastructure Act of 2018’.’’ Pub. L. 115–270, title I, § 101, Oct. 23, 2018, 132 Stat. 3768, provided that: ‘‘This title [see Tables for classi- fication] may be cited as the ‘Water Resources Develop- ment Act of 2018’.’’ SHORT TITLE OF 2016 AMENDMENT Pub. L. 114–322, § 1(a), Dec. 16, 2016, 130 Stat. 1628, pro- vided that: ‘‘This Act [see Tables for classification] may be cited as the ‘Water Infrastructure Improve- ments for the Nation Act’ or the ‘WIIN Act’.’’ Pub. L. 114–322, title I, § 1001, Dec. 16, 2016, 130 Stat. 1632, provided that: ‘‘This title [see Tables for classi- fication] may be cited as the ‘Water Resources Develop- ment Act of 2016’.’’ SHORT TITLE OF 2014 AMENDMENT Pub. L. 113–121, § 1(a), June 10, 2014, 128 Stat. 1193, pro- vided that: ‘‘This Act [see Tables for classification] may be cited as the ‘Water Resources Reform and De- velopment Act of 2014’.’’ SHORT TITLE OF 2007 AMENDMENT Pub. L. 110–114, § 1(a), Nov. 8, 2007, 121 Stat. 1041, pro- vided that: ‘‘This Act [see Tables for classification] may be cited as the ‘Water Resources Development Act of 2007’.’’ SHORT TITLE OF 2000 AMENDMENT Pub. L. 106–541, § 1(a), Dec. 11, 2000, 114 Stat. 2572, pro- vided that: ‘‘This Act [see Tables for classification] Page 689 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2201 may be cited as the ‘Water Resources Development Act of 2000’.’’ SHORT TITLE OF 1999 AMENDMENT Pub. L. 106–53, § 1(a), Aug. 17, 1999, 113 Stat. 269, pro- vided that: ‘‘This Act [see Tables for classification] may be cited as the ‘Water Resources Development Act of 1999’.’’ SHORT TITLE OF 1996 AMENDMENT Pub. L. 104–303, § 1(a), Oct. 12, 1996, 110 Stat. 3658, pro- vided that: ‘‘This Act [see Tables for classification] may be cited as the ‘Water Resources Development Act of 1996’.’’ SHORT TITLE OF 1992 AMENDMENT Pub. L. 102–580, § 1(a), Oct. 31, 1992, 106 Stat. 4797, pro- vided that: ‘‘This Act [enacting sections 59gg, 426i–1, 569d to 569f, 653, 1271, 2268, and 2325 to 2329 of this title, amending sections 426j, 467f, 467j to 467l, 562, 652, 1342, 1412, 1413, 1414, 1415, 1416, 1420, 1421, 2211, 2213, 2283, and 2309a of this title, section 3036 of Title 10, Armed Forces, sections 460tt, 4702, and 4711 of Title 16, Con- servation, and section 1962d–16 of Title 42, The Public Health and Welfare, and enacting provisions set out as notes under this section and sections 541, 1271, 2211, 2239, 2267, and 2281 of this title, section 9505 of Title 26, Internal Revenue Code, and sections 390h–4 and 390h–5 of Title 43, Public Lands] may be cited as the ‘Water Resources Development Act of 1992’.’’ SHORT TITLE OF 1990 AMENDMENT Pub. L. 101–640, § 1(a), Nov. 28, 1990, 104 Stat. 4604, pro- vided that: ‘‘This Act [enacting sections 59bb and 2316 to 2324 of this title, amending sections 579a, 652, 701n, 709a, 2213, 2215, 2232, 2238, 2281, 2309a, and 2314a of this title, section 460tt of Title 16, Conservation, and sec- tion 1962d–16 of Title 42, The Public Health and Welfare, repealing sections 579 and 2239 of this title, enacting provisions set out as notes under this section, sections 426e, 1252, 1268, 2213, 2232, 2239, 2313, and 2317 of this title, and section 1405c of Title 48, Territories and Insu- lar Possessions, and amending provisions set out as notes under sections 2294 and 2314 of this title and sec- tion 460d of Title 16] may be cited as the ‘Water Re- sources Development Act of 1990’.’’ SHORT TITLE OF 1988 AMENDMENT Pub. L. 100–676, § 1(a), Nov. 17, 1988, 102 Stat. 4012, pro- vided that: ‘‘This Act [enacting sections 59j–1, 59y, 59z, and 2312 to 2315 of this title, amending sections 426j, 701b–12, 1293a, 2211, 2239, 2280, and 2291 of this title and section 1962d–5a of Title 42, The Public Health and Wel- fare, enacting provisions set out as notes under this section, sections 579a, 988, 2211, 2294, 2300, and 2314 of this title, and section 1962d–5g of Title 42, and amend- ing provisions set out as a note under section 2294 of this title] may be cited as the ‘Water Resources Devel- opment Act of 1988’.’’ SHORT TITLE Pub. L. 99–662, § 1(a), Nov. 17, 1986, 100 Stat. 4082, pro- vided that: ‘‘This Act [enacting this chapter and sec- tions 59n–1, 59v, 59w, 403b, 426n, 426o, 467f to 467n, 555a, 579a, 652, 701b–12, 709b, 988a, and 1414a of this title, sec- tions 460tt of Title 16, Conservation, sections 4461, 4462, 9505, and 9506 of Title 26, Internal Revenue Code, sec- tion 483d of former Title 40, Public Buildings, Property, and Works, and sections 1962d–11b and 1962d–20 of Title 42, The Public Health and Welfare, amending sections 409, 414, 415, 426g, 426i, 426j, 426m, 467, 467b, 555, 557, 603a, 610, 701a–1, 701g, 701n, 701r, 701s, 984, and 1804 of this title, section 3036 of Title 10, Armed Forces, sections 460ee and 1002 of Title 16, section 4042 of Title 26, sec- tions 1962d–5a, 1962d–5b, 1962d–5d, 1962d–5f, and 1962d–16 of Title 42, sections 390 and 390b of Title 43, Public Lands, and section 1121–1 of Title 46, Appendix, Ship- ping, repealing sections 1801 and 1802 of this title, en- acting provisions set out as notes under this section, sections 426, 426g, 467, 661, 984, 988, 1414a, and 2294 of this title, sections 460d and 1004 of Title 16, sections 1, 4042, 4461, 9505, and 9506 of Title 26, sections 1962d–5b, 1962d–20, and 10301 of Title 42, and section 390b of Title 43, and amending provisions set out as a note under sec- tion 1962b–3 of Title 42] may be cited as the ‘Water Re- sources Development Act of 1986’.’’ Pub. L. 99–662, title II, § 215, Nov. 17, 1986, 100 Stat. 4109, provided that: ‘‘This title [enacting subchapter II of this chapter] may be cited as the ‘Harbor Develop- ment and Navigation Improvement Act of 1986’.’’ NOTICE TO CONGRESS REGARDING WRDA IMPLEMENTATION Pub. L. 118–272, div. A, title I, § 1102, Jan. 4, 2025, 138 Stat. 2997, provided that: ‘‘(a) PLAN OF IMPLEMENTATION.— ‘‘(1) IN GENERAL.—Not later than 90 days after the date of enactment of this Act [Jan. 4, 2025], the Sec- retary [of the Army] shall develop a plan for imple- menting this division [div. A of Pub. L. 118–272, see Tables for classification] and the amendments made by this division. ‘‘(2) REQUIREMENTS.—In developing the plan under paragraph (1), the Secretary shall— ‘‘(A) identify each provision of this division (or an amendment made by this division) that will re- quire— ‘‘(i) the development and issuance of guidance, including whether that guidance will be signifi- cant guidance; ‘‘(ii) the development and issuance of a rule; or ‘‘(iii) appropriations; ‘‘(B) develop timelines for the issuance of— ‘‘(i) any guidance described in subparagraph (A)(i); and ‘‘(ii) each rule described in subparagraph (A)(ii); and ‘‘(C) establish a process to disseminate informa- tion about this division and the amendments made by this division to each District and Division Office of the Corps of Engineers. ‘‘(3) TRANSMITTAL.—On completion of the plan under paragraph (1), the Secretary shall transmit the plan to— ‘‘(A) the Committee on Environment and Public Works of the Senate; and ‘‘(B) the Committee on Transportation and Infra- structure of the House of Representatives. ‘‘(b) IMPLEMENTATION OF PRIOR WATER RESOURCES DE- VELOPMENT LAWS.— ‘‘(1) DEFINITION OF PRIOR WATER RESOURCES DEVEL- OPMENT LAW.—In this subsection, the term ‘‘prior water resources development law’’ means each of the following (including the amendments made by any of the following): ‘‘(A) The Water Resources Development Act of 2000 (Public Law 106–541). ‘‘(B) The Water Resources Development Act of 2007 (Public Law 110–114). ‘‘(C) The Water Resources Reform and Develop- ment Act of 2014 (Public Law 113–121). ‘‘(D) The Water Resources Development Act of 2016 (Public Law 114–322). ‘‘(E) The Water Resources Development Act of 2018 (Public Law 115–270). ‘‘(F) The Water Resources Development Act of 2020 ([div. AA of] Public Law 116–260). ‘‘(G) The Water Resources Development Act of 2022 ([title LXXXI of div. H of] Public Law 117–263). ‘‘(2) NOTICE.— ‘‘(A) IN GENERAL.—Not later than 60 days after the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Pub- lic Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a written notice of the status of ef- forts by the Secretary to implement the prior water resources development laws. Page 690 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2201 ‘‘(B) CONTENTS.— ‘‘(i) IN GENERAL.—As part of the notice under subparagraph (A), the Secretary shall include a list describing each provision of a prior water re- sources development law that has not been fully implemented as of the date of submission of the notice. ‘‘(ii) ADDITIONAL INFORMATION.—For each provi- sion included on the list under clause (i), the Sec- retary shall— ‘‘(I) establish a timeline for implementing the provision; ‘‘(II) provide a description of the status of the provision in the implementation process; and ‘‘(III) provide an explanation for the delay in implementing the provision. ‘‘(3) BRIEFINGS.— ‘‘(A) IN GENERAL.—Not later than 180 days after the date of enactment of this Act, and every 90 days thereafter until the Chairs of the Committee on En- vironment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives determine that this division, the amendments made by this division, and prior water resources development laws are fully implemented, the Secretary shall provide to relevant congressional committees a briefing on the implementation of this division, the amend- ments made by this division, and prior water re- sources development laws. ‘‘(B) INCLUSIONS.—A briefing under subparagraph (A) shall include— ‘‘(i) updates to the implementation plan under subsection (a); and ‘‘(ii) updates to the written notice under para- graph (2). ‘‘(c) ADDITIONAL NOTICE PENDING ISSUANCE.—Not later than 30 days before issuing any guidance, rule, notice in the Federal Register, or other documentation re- quired to implement this division, an amendment made by this division, or a prior water resources development law (as defined in subsection (b)(1)), the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transpor- tation and Infrastructure of the House of Representa- tives a written notice regarding the pending issuance. ‘‘(d) WRDA IMPLEMENTATION TEAM.— ‘‘(1) DEFINITIONS.—In this subsection: ‘‘(A) PRIOR WATER RESOURCES DEVELOPMENT LAW.—The term ‘‘prior water resources develop- ment law’’ has the meaning given the term in sub- section (b)(1). ‘‘(B) TEAM.—The term ‘‘team’’ means the Water Resources Development Act implementation team established under paragraph (2). ‘‘(2) ESTABLISHMENT.—The Secretary shall establish a Water Resources Development Act implementation team that shall consist of current employees of the Federal Government, including— ‘‘(A) not fewer than 2 employees in the Office of the Assistant Secretary of the Army for Civil Works; ‘‘(B) not fewer than 2 employees at the head- quarters of the Corps of Engineers; and ‘‘(C) a representative of each district and division of the Corps of Engineers. ‘‘(3) DUTIES.—The team shall be responsible for as- sisting with the implementation of this division, the amendments made by this division, and prior water resources development laws, including— ‘‘(A) performing ongoing outreach to— ‘‘(i) Congress; and ‘‘(ii) employees and servicemembers stationed in districts and divisions of the Corps of Engi- neers to ensure that all Corps of Engineers em- ployees are aware of and implementing provisions of this division, the amendments made by this di- vision, and prior water resources development laws, in a manner consistent with congressional intent; ‘‘(B) identifying any issues with implementation of a provision of this division, the amendments made by this division, and prior water resources de- velopment laws at the district, division, or national level; ‘‘(C) resolving the issues identified under subpara- graph (B), in consultation with Corps of Engineers leadership and the Secretary; and ‘‘(D) ensuring that any interpretation developed as a result of the process under subparagraph (C) is consistent with congressional intent for this divi- sion, the amendments made by this division, and prior water resources development laws.’’ CONTINUING AUTHORITY PROGRAMS Pub. L. 118–272, div. A, title I, § 1107(a), Jan. 4, 2025, 138 Stat. 3002, provided that: ‘‘(a) PILOT PROGRAM FOR ALTERNATIVE PROJECT DE- LIVERY FOR CONTINUING AUTHORITY PROGRAM PROJECTS.— ‘‘(1) IN GENERAL.—Not later than 180 days after the date of enactment of this Act [Jan. 4, 2025], the Sec- retary [of the Army] shall implement a pilot pro- gram, in accordance with this subsection, allowing a non-Federal interest or the Secretary, at the request of the non-Federal interest, to carry out a project under a continuing authority program through the use of an alternative delivery method. ‘‘(2) PARTICIPATION IN PILOT PROGRAM.—In carrying out paragraph (1), the Secretary shall— ‘‘(A) solicit project proposals from non-Federal interests by posting program information on a pub- lic-facing website and reaching out to non-Federal interests that have previously submitted project re- quests to the Secretary; ‘‘(B) review such proposals and select projects, taking into consideration geographic diversity among the selected projects and the alternative de- livery methods used for the selected projects; and ‘‘(C) notify the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate of each project selected under sub- paragraph (B), including— ‘‘(i) identification of the project name, type, and location, and the associated non-Federal in- terest; ‘‘(ii) a description of the type of alternative de- livery method being used to carry out the project; and ‘‘(iii) a description of how the project meets the authorized purposes and requirements of the ap- plicable continuing authority program. ‘‘(3) COST SHARE.—The Federal and non-Federal shares of the cost of a project carried out pursuant to this subsection shall be consistent with the cost share requirements of the applicable continuing au- thority program. ‘‘(4) MODIFICATIONS TO PROCESSES.—With respect to a project selected under paragraph (3), the Secretary, at the request of the non-federal interest, shall to the maximum extent practicable— ‘‘(A) allow the non-Federal interest to contribute more than the non-Federal share of the project re- quired under the applicable continuing authority program; ‘‘(B) allow the use of return on Federal invest- ment as an alternative to benefit-cost analysis; ‘‘(C) allow the use of a real estate acquisition audit process to replace existing crediting, over- sight, and review processes and procedures; and ‘‘(D) allow the use of a single contract with the non-Federal interest that incorporates the feasi- bility and construction phases. ‘‘(5) REIMBURSEMENT.— ‘‘(A) IN GENERAL.—A project selected under para- graph (3) that is carried out by a non-Federal inter- est pursuant to this subsection shall be eligible for reimbursement for the Federal share of the cost of the project if, before initiation of construction of the project— Page 691 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2201 ‘‘(i) the non-Federal interest enters into a writ- ten agreement with the Secretary under section 221 of the Flood Control Act of 1970 (42 U.S.C. 1962d–5b) consistent with the applicable con- tinuing authority program; and ‘‘(ii) the Secretary— ‘‘(I) reviews the plans for construction of the project developed by the non-Federal interest; ‘‘(II) determines that the project meets the requirements of the applicable continuing au- thority program; ‘‘(III) determines that the project outputs are consistent with the project scope; ‘‘(IV) determines that the plans comply with applicable Federal laws and regulations; and ‘‘(V) verifies that the construction docu- ments, including supporting information, have been signed by an Engineer of Record. ‘‘(B) APPLICATION OF REIMBURSEMENT.—The Sec- retary may only provide reimbursement under sub- paragraph (A) if the Secretary certifies that— ‘‘(i) the non-Federal interest has obligated funds for the cost of the project selected under paragraph (3) and has requested reimbursement of the Federal share of the cost of the project; and ‘‘(ii) the project has been constructed in accord- ance with— ‘‘(I) all applicable permits or approvals; and ‘‘(II) the requirements of this subsection. ‘‘(C) MONITORING.—The Secretary shall regularly monitor and audit any project being constructed by a non-Federal interest pursuant to this subsection to ensure that the construction is carried out in compliance with the requirements of— ‘‘(i) this subsection; and ‘‘(ii) the relevant continuing authorities pro- gram. ‘‘(6) EVALUATIONS AND REPORTING.—The Secretary shall annually submit to the Committee on Transpor- tation and Infrastructure of the House of Representa- tives and the Committee on Environment and Public Works of the Senate a report on the progress and out- comes of projects carried out pursuant to this sub- section, including— ‘‘(A) an assessment of whether the use of alter- native delivery methods has resulted in cost sav- ings or time efficiencies; and ‘‘(B) identification of changes to laws or policies needed in order to implement more projects using alternative delivery methods. ‘‘(7) DEFINITIONS.—In this subsection: ‘‘(A) ALTERNATIVE DELIVERY METHOD.—The term ‘alternative delivery method’ means a project deliv- ery method that is not the traditional design-bid- build method, including progressive design-build, public-private partnerships, and construction man- ager at risk. ‘‘(B) CONTINUING AUTHORITY PROGRAM.—The term ‘continuing authority program’ has the meaning given that term in the section 7001(c)(1)(D) of Water Resources Reform and Development Act of 2014 (33 U.S.C. 2282d [(c)(1)(D)]). ‘‘(C) RETURN ON FEDERAL INVESTMENT.—The term ‘return on Federal investment’ means, with respect to Federal investment in a water resources develop- ment project, the economic return on the invest- ment for the Federal Government, taking into con- sideration qualitative returns for any anticipated life safety, risk reduction, economic growth, envi- ronmental, and social benefits accruing as a result of the investment. ‘‘(8) MAXIMUM PROJECTS.—Not more than 25 projects may be carried out under this subsection. ‘‘(9) SUNSET.—The authority to commence pursuant to this subsection a project selected under paragraph (3) shall terminate on the date that is 10 years after the date of enactment of this Act [Jan. 4, 2025]. ‘‘(10) AUTHORIZATION OF APPROPRIATIONS.—There is authorized to be appropriated to carry out this sub- section $50,000,000 for each of fiscal years 2025 through 2032.’’ PRIOR GUIDANCE Pub. L. 118–272, div. A, title I, § 1150(c), Jan. 4, 2025, 138 Stat. 3042, provided that: ‘‘Not later than 180 days after the date of enactment of this Act [Jan. 4, 2025], the Sec- retary [of the Army] shall issue the guidance required pursuant to each of the following provisions: ‘‘(1) Section 1043(b)(9) of the Water Resources Re- form and Development Act of 2014 [Pub. L. 113–121] (33 U.S.C. 2201 note). ‘‘(2) Section 8101 of the Water Resources Develop- ment Act of 2022 (33 U.S.C. 2351b). ‘‘(3) Section 8107 of the Water Resources Develop- ment Act of 2022 [title LXXXI of div. H of Pub. L. 117–263] (42 U.S.C. 1962d–5b note). ‘‘(4) Section 8112 of the Water Resources Develop- ment Act of 2022 (33 U.S.C. 2281a). ‘‘(5) Section 8116 of the Water Resources Develop- ment Act of 2022 [title LXXXI of div. H of Pub. L. 117–263] (10 U.S.C. 7036 note). ‘‘(6) Section 8136 of the Water Resources Develop- ment Act of 2022 [title LXXXI of div. H of Pub. L. 117–263] (10 U.S.C. 2667 note).’’ PUBLIC-PRIVATE PARTNERSHIP USER’S GUIDE Pub. L. 118–272, div. A, title II, § 1241, Jan. 4, 2025, 138 Stat. 3090, provided that: ‘‘(a) IN GENERAL.—Not later than 1 year after the date of enactment of this Act [Jan. 4, 2025], the Sec- retary [of the Army] shall develop and make publicly available on an existing website of the Corps of Engi- neers a guide on the use of public-private partnerships for water resources development projects. ‘‘(b) INCLUSIONS.—In developing the guide under sub- section (a), the Secretary shall include— ‘‘(1) a description of— ‘‘(A) applicable authorities and programs of the Secretary that allow for the use of public-private partnerships to carry out water resources develop- ment projects; and ‘‘(B) opportunities across the civil works program of the Corps of Engineers for the use of public-pri- vate partnerships, including at recreational facili- ties; ‘‘(2) a summary of prior public-private partnerships for water resources development projects, including lessons learned and best practices from those partner- ships and projects; ‘‘(3) a discussion of— ‘‘(A) the roles and responsibilities of the Corps of Engineers and non-Federal interests when using a public-private partnership for a water resources de- velopment project, including the opportunities for risk-sharing; and ‘‘(B) the potential benefits associated with using a public-private partnership for a water resources development project, including the opportunities to accelerate funding as compared to the annual ap- propriations process; and ‘‘(4) a description of the process for executing a project partnership agreement for a water resources development project, including any unique consider- ations when using a public-private partnership. ‘‘(c) FLEXIBILITY.—The Secretary may satisfy the re- quirements of this section by modifying an existing partnership handbook in accordance with this section.’’ ENVIRONMENTAL INFRASTRUCTURE PILOT PROGRAM Pub. L. 118–272, div. A, title III, § 1305, Jan. 4, 2025, 138 Stat. 3134, provided that: ‘‘(a) IN GENERAL.—Notwithstanding subsection (b) of section 219 of the Water Resources Development Act of 1992 [Pub. L. 102–580] (106 Stat. 4835) and subject to the availability of appropriations, in carrying out projects under that section benefitting an economically dis- advantaged community (as defined by the Secretary [of the Army] under section 160 of the Water Resources De- velopment Act of 2020 [div. AA of Pub. L. 116–260] (33 U.S.C. 2201 note)), the Secretary may increase the Fed- eral share of the cost of those projects to not more than 90 percent. Page 692 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2201 ‘‘(b) LIMITATION.—The total amount expended for an increased Federal share for all projects under sub- section (a) shall not exceed $10,000,000 for each fiscal year. ‘‘(c) TERMINATION.—The authority provided by this section expires on the date that is 7 years after the date of enactment of this Act [Jan. 4, 2025].’’ PILOT PROGRAMS ON THE FORMULATION OF CORPS OF ENGINEERS PROJECTS IN RURAL COMMUNITIES AND ECONOMICALLY DISADVANTAGED COMMUNITIES Pub. L. 116–260, div. AA, title I, § 118, Dec. 27, 2020, 134 Stat. 2629, as amended by Pub. L. 117–263, div. H, title LXXXI, § 8118(a), Dec. 23, 2022, 136 Stat. 3710; Pub. L. 118–272, div. A, title III, § 1303(h), Jan. 4, 2025, 138 Stat. 3115, provided that: ‘‘(a) IN GENERAL.—The Secretary [of the Army] shall establish and implement pilot programs, in accordance with this section, to evaluate opportunities to address the flood risk management and hurricane and storm damage risk reduction needs of rural communities and economically disadvantaged communities. ‘‘(b) ECONOMICALLY DISADVANTAGED COMMUNITY FLOOD PROTECTION AND HURRICANE AND STORM DAMAGE REDUCTION STUDY PILOT PROGRAM.— ‘‘(1) IN GENERAL.—Not later than 180 days after the date of enactment of this Act [Dec. 27, 2020], the Sec- retary shall establish and implement a pilot program to carry out feasibility studies, in accordance with this subsection, for flood risk management and hurri- cane and storm damage risk reduction projects for economically disadvantaged communities, in coordi- nation with non-Federal interests. ‘‘(2) PARTICIPATION IN PILOT PROGRAM.—In carrying out paragraph (1), the Secretary shall— ‘‘(A) annually publish a notice in the Federal Register that requests from non-Federal interests proposals for the potential feasibility study of a flood risk management project or hurricane and storm damage risk reduction project for an eco- nomically disadvantaged community; ‘‘(B) upon request of a non-Federal interest for such a project, provide technical assistance to such non-Federal interest in the formulation of a pro- posal for a potential feasibility study to be sub- mitted to the Secretary under the pilot program; and ‘‘(C) review such proposals and, subject to the availability of appropriations, annually select 10 feasibility studies for such projects to be carried out by the Secretary, in coordination with the non- Federal interest, under this pilot program. ‘‘(3) SELECTION CRITERIA.—In selecting a feasibility study under paragraph (2)(C), the Secretary shall con- sider whether— ‘‘(A) the percentage of people living in poverty in the county or counties (or county-equivalent entity or entities) in which the project is located is great- er than the percentage of people living in poverty in the State, based on census bureau data; ‘‘(B) the percentage of families with income above the poverty threshold but below the average house- hold income in the county or counties (or county- equivalent entity or entities) in which the project is located is greater than such percentage for the State, based on census bureau data; ‘‘(C) the percentage of the population that identi- fies as belonging to a minority or indigenous group in the county or counties (or county-equivalent en- tity or entities) in which the project is located is greater than the average such percentage in the State, based on census bureau data; and ‘‘(D) the project is addressing flooding or hurri- cane or storm damage effects that have a dispropor- tionate impact on a rural community, a minority community, or an Indian Tribe. ‘‘(4) ADMINISTRATION.—Notwithstanding the re- quirements of section 105(a)(1)(A) of the Water Re- sources Development Act of 1986 (33 U.S.C. 2215), the Federal share of the cost of a feasibility study carried out under the pilot program shall be 100 percent. ‘‘(5) STUDY REQUIREMENTS.—Feasibility studies car- ried out under this subsection shall, to the maximum extent practicable, incorporate natural features or nature-based features (as such terms are defined in section 1184 of the Water Resources Development Act of 2016 (33 U.S.C. 2289a)), or a combination of such fea- tures and nonstructural features, that avoid or re- duce at least 50 percent of flood or storm damages in one or more of the alternatives included in the final alternatives evaluated. ‘‘(6) NOTIFICATION.—The Secretary shall notify the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate of the selection of each feasibility study under the pilot program. ‘‘(7) COMPLETION.—Upon completion of a feasibility report for a feasibility study selected to be carried out under this subsection, the Secretary shall trans- mit the report to Congress for authorization, and shall include the report in the next annual report submitted under section 7001 of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 2282d). ‘‘(c) PILOT PROGRAM FOR THE RECOMMENDATION OF FLOOD PROTECTION AND HURRICANE AND STORM DAMAGE REDUCTION PROJECTS IN RURAL COMMUNITIES AND ECO- NOMICALLY DISADVANTAGED COMMUNITIES.— ‘‘(1) IN GENERAL.—Not later than 180 days after the date of enactment of this Act, the Secretary shall es- tablish and implement a pilot program to evaluate, and make recommendations to Congress on, flood risk management projects and hurricane and storm damage risk reduction projects in rural communities or economically disadvantaged communities, without demonstrating that each project is justified solely by national economic development benefits. ‘‘(2) CONSIDERATIONS.—In carrying out this sub- section, the Secretary may make a recommendation to Congress on up to 10 projects annually, without demonstrating that the project is justified solely by national economic development benefits, if the Sec- retary determines that— ‘‘(A) the community to be served by the project is an economically disadvantaged community or a rural community; ‘‘(B) the long-term life safety, economic viability, and environmental sustainability of the community would be threatened without the project; and ‘‘(C) the project is consistent with the require- ments of section 1 of the Flood Control Act of 1936 (33 U.S.C. 701a). ‘‘(3) CONSISTENCY.—In carrying out this subsection, the Secretary shall ensure that project recommenda- tions are consistent with the principles and require- ments and the interagency guidelines, as such terms are defined in section 110 of this Act [42 U.S.C. 1962–4], including the consideration of quantifiable monetary and nonmonetary benefits of the project. ‘‘(4) PRIORITIZATION.—The Secretary may give equivalent budgetary consideration and priority to projects recommended under this subsection. ‘‘(d) GEOGRAPHIC DIVERSITY.—In selecting feasibility studies under subsection (b)(2)(C) or in making project recommendations under subsection (c), the Secretary shall consider the geographic diversity among proposed projects. ‘‘(e) REPORT.—Not later than 5 years, 10 years, and 15 years after the date of enactment of this Act, the Sec- retary shall submit to the Committee on Transpor- tation and Infrastructure of the House of Representa- tives and the Committee on Environment and Public Works of the Senate, and make publicly available, a re- port detailing the results of the pilot programs carried out under this section, including— ‘‘(1) a description of proposals received from non- Federal interests pursuant to subsection (b)(2)(A); ‘‘(2) a description of technical assistance provided to non-Federal interests under subsection (b)(2)(B); ‘‘(3) a description of proposals selected under sub- section (b)(2)(C) and criteria used to select such pro- posals; Page 693 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2201 ‘‘(4) a description of the projects evaluated or rec- ommended by the Secretary under subsection (c); ‘‘(5) a description of the quantifiable monetary and nonmonetary benefits associated with the projects recommended under subsection (c); and ‘‘(6) any recommendations to Congress on how the Secretary can address the flood risk management and hurricane and storm damage risk reduction needs of economically disadvantaged communities. ‘‘(f) STATE DEFINED.—In this section, the term ‘State’ means each of the several States, the District of Co- lumbia, and each of the commonwealths, territories, and possessions of the United States. ‘‘(g) SUNSET.—The authority to commence a feasi- bility study under subsection (b), and the authority make a recommendation under subsection (c), shall ter- minate on the date that is 15 years after the date of en- actment of this Act. ‘‘(h) PRIORITY PROJECTS.—In carrying out this sec- tion, the Secretary shall prioritize the following projects: ‘‘(1) The project for flood risk management, city of Rialto, California, authorized by section 1201 of the Water Resources Development Act of 2024 [Pub. L. 118–272, 138 Stat. 3050]. ‘‘(2) The project for ecosystem restoration and recreation, Santa Ana River, Jurupa Valley, Cali- fornia, authorized by section 1201 of the Water Re- sources Development Act of 2024 [Pub. L. 118–272, 138 Stat. 3051]. ‘‘(3) The project for flood control and other pur- poses, Kentucky River and its tributaries, Kentucky, authorized by section 6 of the Act of August 11, 1939 (chapter 699, 53 Stat. 1416) [33 U.S.C. 701f note]. ‘‘(4) The project for flood risk management, Ken- tucky River, Kentucky, authorized by section 8201(a)(31) of the Water Resources Development Act of 2022 [title LXXXI of div. H of Pub. L. 117–263] (136 Stat. 3746). ‘‘(5) The project for navigation, Hagaman Chute, Lake Providence, Louisiana, authorized by section 1201 of the Water Resources Development Act of 2024 [Pub. L. 118–272, 138 Stat. 3053]. ‘‘(6) The project for flood risk management, Otero County, New Mexico, authorized by section 1201 of the Water Resources Development Act of 2024 [Pub. L. 118–272, 138 Stat. 3055]. ‘‘(7) The project for flood control and other pur- poses, Susquehanna River Basin, Williamsport, Penn- sylvania, authorized by section 5 of the Act of June 22, 1936 (chapter 688, 49 Stat. 1573). ‘‘(8) The project for flood risk management and eco- system restoration, Winooski River basin, Vermont, authorized by section 1201 of the Water Resources De- velopment Act of 2024 [Pub. L. 118–272, 138 Stat. 3058]. ‘‘(9) The project for flood risk management and sediment management, Grays River, Wahkiakum County, Washington, authorized by section 1201 of the Water Resources Development Act of 2024 [Pub. L. 118–272, 138 Stat. 3058].’’ [For definition of ‘‘economically disadvantaged com- munity’’ as used in section 118 of div. AA of Pub. L. 116–260, set out above, see section 160 of div. AA of Pub. L. 116–260, set out as a note below.] NON-FEDERAL PROJECT IMPLEMENTATION FOR COM- PREHENSIVE EVERGLADES RESTORATION PLAN PROJECTS Pub. L. 116–260, div. AA, title I, § 134(b), Dec. 27, 2020, 134 Stat. 2649, provided that: ‘‘(1) IN GENERAL.—In carrying out the pilot program authorized under section 1043(b) of the Water Resources Reform and Development Act of 2014 [Pub. L. 113–121] (33 U.S.C. 2201 note), the Secretary [of the Army] is au- thorized to include a project authorized to be imple- mented by, or in accordance with, section 601 of the Water Resources Development Act of 2000 [Pub. L. 106–541, 114 Stat. 2680], in accordance with such section 1043(b). ‘‘(2) ELIGIBILITY.—In the case of a project described in paragraph (1) for which the non-Federal interest has initiated construction in compliance with authorities governing the provision of in-kind contributions for such project, the Secretary shall take into account the value of any in-kind contributions carried out by the non-Federal interest for such project prior to the date of execution of the project partnership agreement under section 1043(b) of the Water Resources Reform and Development Act of 2014 when determining the non-Federal share of the costs to complete construc- tion of the project. ‘‘(3) GUIDANCE.—Not later than 180 days after the date of enactment of this subsection [Dec. 27, 2020], and in accordance with the guidance issued under section 1043(b)(9) of the Water Resources Reform and Develop- ment Act of 2014 (as added by this section), the Sec- retary shall issue any additional guidance that the Sec- retary determines necessary for the implementation of this subsection.’’ UNIFORMITY OF NOTIFICATION SYSTEMS Pub. L. 116–260, div. AA, title I, § 139, Dec. 27, 2020, 134 Stat. 2651, provided that: ‘‘(a) INVENTORY.—Not later than 180 days after the date of enactment of this Act [Dec. 27, 2020], the Sec- retary [of the Army] shall complete an inventory of all systems used by the Corps of Engineers for external communication and notification with respect to projects, initiatives, and facilities of the Corps of Engi- neers. ‘‘(b) UNIFORM PLAN.— ‘‘(1) IN GENERAL.—Not later than 1 year after the date of enactment of this Act, the Secretary shall de- velop a plan for the uniformity of such communica- tion and notification systems for projects, initia- tives, and facilities of the Corps of Engineers. ‘‘(2) INCLUSIONS.—The plan developed under para- graph (1) shall— ‘‘(A) provide access to information in all forms practicable, including through email, text mes- sages, news programs and websites, radio, and other forms of notification; ‘‘(B) establish a notification system for any projects, initiatives, or facilities of the Corps of En- gineers that do not have a notification system; ‘‘(C) streamline existing communication and noti- fication systems to improve the strength and uni- formity of those systems; and ‘‘(D) emphasize the necessity of timeliness in no- tification systems and ensure that the methods of notification can transmit information in a timely manner. ‘‘(3) IMPLEMENTATION.— ‘‘(A) IN GENERAL.—Except as provided in subpara- graph (B), not later than 2 years after the date of enactment of this Act, the Secretary shall complete the implementation of the plan developed under paragraph (1). ‘‘(B) EMERGENCY MANAGEMENT NOTIFICATION.—Not later than 18 months after the date of enactment of this Act, the Secretary shall implement the provi- sions of the plan developed under paragraph (1) re- lating to emergency management notifications. ‘‘(4) SAVINGS PROVISION.—Nothing in this section authorizes the elimination of any existing commu- nication or notification system used by the Corps of Engineers.’’ CONTINUING AUTHORITY PROGRAMS Pub. L. 116–260, div. AA, title I, § 165, Dec. 27, 2020, 134 Stat. 2668, as amended by Pub. L. 117–263, div. H, title LXXXI, § 8118(b), Dec. 23, 2022, 136 Stat. 3711, which re- lated to continuing authority programs, was trans- ferred to section 2281c of this title. REPORTS TO CONGRESS Pub. L. 113–121, title I, § 1042, June 10, 2014, 128 Stat. 1243, provided that: ‘‘(a) IN GENERAL.—Subject to the availability of ap- propriations, the Secretary [of the Army] shall com- Page 694 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2201 plete and submit to Congress by the applicable date re- quired the reports that address public safety and en- hanced local participation in project delivery described in subsection (b). ‘‘(b) REPORTS.—The reports referred to in subsection (a) are the reports required under— ‘‘(1) subparagraphs (A) and (B) of section 1043(a)(5) [33 U.S.C. 2201 note]; ‘‘(2) section 1046(a)(2)(B) [33 U.S.C. 2319 note]; ‘‘(3) section 210(e)(3) of the Water Resources Devel- opment Act of 1986 ([former] 33 U.S.C. 2238(e)(3)) (as amended by section 2102(a)); and ‘‘(4) section 7001 [33 U.S.C. 2282d]. ‘‘(c) FAILURE TO PROVIDE A COMPLETED REPORT.— ‘‘(1) IN GENERAL.—Subject to subsection (d), if the Secretary fails to provide a report listed under sub- section (b) by the date that is 180 days after the appli- cable date required for that report, $5,000 shall be re- programmed from the General Expenses account of the civil works program of the Army Corps of Engi- neers into the account of the division of the Army Corps of Engineers with responsibility for completing that report. ‘‘(2) SUBSEQUENT REPROGRAMMING.—Subject to sub- section (d), for each additional week after the date described in paragraph (1) in which a report described in that paragraph remains uncompleted and unsubmitted to Congress, $5,000 shall be repro- grammed from the General Expenses account of the civil works program of the Army Corps of Engineers into the account of the division of the Secretary of the Army with responsibility for completing that re- port. ‘‘(d) LIMITATIONS.— ‘‘(1) IN GENERAL.—For each report, the total amounts reprogrammed under subsection (c) shall not exceed, in any fiscal year, $50,000. ‘‘(2) AGGREGATE LIMITATION.—The total amount re- programmed under subsection (c) in a fiscal year shall not exceed $200,000. ‘‘(e) NO FAULT OF THE SECRETARY.—Amounts shall not be reprogrammed under subsection (c) if the Sec- retary certifies in a letter to the applicable committees of Congress that— ‘‘(1) a major modification has been made to the con- tent of the report that requires additional analysis for the Secretary to make a final decision on the re- port; ‘‘(2) amounts have not been appropriated to the agency under this Act or any other Act to carry out the report; or ‘‘(3) additional information is required from an en- tity other than the Corps of Engineers and is not available in a timely manner to complete the report by the deadline. ‘‘(f) LIMITATION.—The Secretary shall not reprogram funds to the General Expenses account of the civil works program of the Corps of Engineers for the loss of the funds.’’ NON-FEDERAL IMPLEMENTATION PILOT PROGRAM Pub. L. 113–121, title I, § 1043, June 10, 2014, 128 Stat. 1244, as amended by Pub. L. 115–270, title I, § 1137, Oct. 23, 2018, 132 Stat. 3783; Pub. L. 116–260, div. AA, title I, § 134(a), Dec. 27, 2020, 134 Stat. 2648; Pub. L. 118–272, div. A, title III, § 1303(e), Jan. 4, 2025, 138 Stat. 3114, provided that: ‘‘(a) NON-FEDERAL IMPLEMENTATION OF FEASIBILITY STUDIES.— ‘‘(1) IN GENERAL.—Not later than 180 days after the date of enactment of this Act [June 10, 2014], the Sec- retary [of the Army] shall establish and implement a pilot program to evaluate the cost-effectiveness and project delivery efficiency of allowing non-Federal interests to carry out feasibility studies for flood risk management, hurricane and storm damage reduction, aquatic ecosystem restoration, and coastal harbor and channel and inland navigation. ‘‘(2) PURPOSES.—The purposes of the pilot program are— ‘‘(A) to identify project delivery and cost-saving alternatives to the existing feasibility study proc- ess; ‘‘(B) to evaluate the technical, financial, and or- ganizational efficiencies of a non-Federal interest carrying out a feasibility study of 1 or more projects; and ‘‘(C) to evaluate alternatives for the decentraliza- tion of the project planning, management, and operational decisionmaking process of the Corps of Engineers. ‘‘(3) ADMINISTRATION.— ‘‘(A) IN GENERAL.—On the request of a non-Fed- eral interest, the Secretary may enter into an agreement with the non-Federal interest for the non-Federal interest to provide full project man- agement control of a feasibility study for a project for— ‘‘(i) flood risk management; ‘‘(ii) hurricane and storm damage reduction, in- cluding levees, floodwalls, flood control channels, and water control structures; ‘‘(iii) coastal harbor and channel and inland navigation; and ‘‘(iv) aquatic ecosystem restoration. ‘‘(B) USE OF NON-FEDERAL FUNDS.— ‘‘(i) IN GENERAL.—A non-Federal interest that has entered into an agreement with the Secretary pursuant to subparagraph (A) may use non-Fed- eral funds to carry out the feasibility study. ‘‘(ii) CREDIT.—The Secretary shall credit to- wards the non-Federal share of the cost of con- struction of a project for which a feasibility study is carried out under this subsection an amount equal to the portion of the cost of developing the study that would have been the responsibility of the Secretary, if the study were carried out by the Secretary, subject to the conditions that— ‘‘(I) non-Federal funds were used to carry out the activities that would have been the respon- sibility of the Secretary; ‘‘(II) the Secretary determines that the feasi- bility study complies with all applicable Fed- eral laws and regulations; and ‘‘(III) the project is authorized by any provi- sion of Federal law enacted after the date on which an agreement is entered into under sub- paragraph (A). ‘‘(C) TRANSFER OF FUNDS.— ‘‘(i) IN GENERAL.—After the date on which an agreement is executed pursuant to subparagraph (A), the Secretary may transfer to the non-Fed- eral interest to carry out the feasibility study— ‘‘(I) if applicable, the balance of any unobli- gated amounts appropriated for the study, ex- cept that the Secretary shall retain sufficient amounts for the Corps of Engineers to carry out any responsibilities of the Corps of Engineers relating to the project and pilot program; and ‘‘(II) additional amounts, as determined by the Secretary, from amounts made available under paragraph (8), except that the total amount transferred to the non-Federal interest shall not exceed the updated estimate of the Federal share of the cost of the feasibility study. ‘‘(ii) ADMINISTRATION.—The Secretary shall in- clude such provisions as the Secretary determines to be necessary in an agreement under subpara- graph (A) to ensure that a non-Federal interest receiving Federal funds under this paragraph— ‘‘(I) has the necessary qualifications to ad- minister those funds; and ‘‘(II) will comply with all applicable Federal laws (including regulations) relating to the use of those funds. ‘‘(D) NOTIFICATION.—The Secretary shall notify the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives Page 695 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2201 on the initiation of each feasibility study under the pilot program. ‘‘(E) AUDITING.—The Secretary shall regularly monitor and audit each feasibility study carried out by a non-Federal interest under this section to ensure that the use of any funds transferred under subparagraph (C) are used in compliance with the agreement signed under subparagraph (A). ‘‘(F) TECHNICAL ASSISTANCE.—On the request of a non-Federal interest, the Secretary may provide technical assistance to the non-Federal interest re- lating to any aspect of the feasibility study, if the non-Federal interest contracts with the Secretary for the technical assistance and compensates the Secretary for the technical assistance. ‘‘(G) DETAILED PROJECT SCHEDULE.—Not later than 180 days after entering into an agreement under subparagraph (A), each non-Federal interest, to the maximum extent practicable, shall submit to the Secretary a detailed project schedule, based on full funding capability, that lists all deadlines for milestones relating to the feasibility study. ‘‘(4) COST SHARE.—Nothing in this subsection affects the cost-sharing requirement applicable on the day before the date of enactment of this Act to a feasi- bility study carried out under this subsection. ‘‘(5) REPORT.— ‘‘(A) IN GENERAL.—Not later than 2 years after the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Pub- lic Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives and make publicly available a re- port detailing the results of the pilot program car- ried out under this section, including— ‘‘(i) a description of the progress of the non- Federal interests in meeting milestones in de- tailed project schedules developed pursuant to paragraph (3)(G); and ‘‘(ii) any recommendations of the Secretary concerning whether the program or any compo- nent of the program should be implemented on a national basis. ‘‘(B) UPDATE.—Not later than 5 years after the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Pub- lic Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives an update of the report described in subparagraph (A). ‘‘(C) FAILURE TO MEET DEADLINE.—If the Secretary fails to submit a report by the required deadline under this paragraph, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a detailed explanation of why the deadline was missed and a projected date for submission of the report. ‘‘(6) ADMINISTRATION.—All laws and regulations that would apply to the Secretary if the Secretary were carrying out the feasibility study shall apply to a non-Federal interest carrying out a feasibility study under this subsection. ‘‘(7) TERMINATION OF AUTHORITY.—The authority to commence a feasibility study under this subsection terminates on the date that is 5 years after the date of enactment of this Act. ‘‘(8) AUTHORIZATION OF APPROPRIATIONS.—In addi- tion to any amounts appropriated for a specific project, there is authorized to be appropriated to the Secretary to carry out the pilot program under this subsection, including the costs of administration of the Secretary, $25,000,000 for each of fiscal years 2015 through 2019. ‘‘(b) NON-FEDERAL PROJECT IMPLEMENTATION PILOT PROGRAM.— ‘‘(1) IN GENERAL.—Not later than 180 days after the date of enactment of this Act, the Secretary shall es- tablish and implement a pilot program to evaluate the cost-effectiveness and project delivery efficiency of allowing non-Federal interests to carry out flood risk management, hurricane and storm damage re- duction, coastal harbor and channel inland naviga- tion, and aquatic ecosystem restoration projects. ‘‘(2) PURPOSES.—The purposes of the pilot program are— ‘‘(A) to identify project delivery and cost-saving alternatives that reduce the backlog of authorized Corps of Engineers projects; ‘‘(B) to evaluate the technical, financial, and or- ganizational efficiencies of a non-Federal interest carrying out the design, execution, management, and construction of 1 or more projects; and ‘‘(C) to evaluate alternatives for the decentraliza- tion of the project management, design, and con- struction for authorized Corps of Engineers water resources projects. ‘‘(3) ADMINISTRATION.— ‘‘(A) IN GENERAL.—In carrying out the pilot pro- gram, the Secretary shall— ‘‘(i) identify a total of not more than 20 projects for flood risk management, hurricane and storm damage reduction (including levees, floodwalls, flood control channels, and water control struc- tures), coastal harbor and channels, inland navi- gation, and aquatic ecosystem restoration that have been authorized for construction, includ- ing— ‘‘(I) not more than 12 projects that have been authorized for construction prior to the date of enactment of this Act and that— ‘‘(aa)(AA) have received Federal funds prior to the date of enactment of this Act; or ‘‘(BB) for more than 2 consecutive fiscal years, have an unobligated funding balance for that project in the Corps of Engineers con- struction account; and ‘‘(bb) to the maximum extent practicable, are located in each of the divisions of the Corps of Engineers; ‘‘(II) not more than 3 projects that have been authorized for construction prior to the date of enactment of this Act and that have not re- ceived Federal funds in the period beginning on the date on which the project was authorized and ending on the date of enactment of this Act; and ‘‘(III) not more than 5 projects that have been authorized for construction, but did not receive the authorization prior to the date of enact- ment of this Act; ‘‘(ii) notify the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives on the identification of each project under the pilot program; ‘‘(iii) in collaboration with the non-Federal in- terest, develop a detailed project management plan for each identified project that outlines the scope, budget, design, and construction resource requirements necessary for the non-Federal inter- est to execute the project, or a separable element of the project; ‘‘(iv) on the request of the non-Federal interest, enter into a project partnership agreement with the non-Federal interest for the non-Federal in- terest to provide full project management control for construction of the project, or a separable ele- ment of the project, in accordance with plans ap- proved by the Secretary; ‘‘(v) following execution of the project partner- ship agreement, transfer to the non-Federal inter- est to carry out construction of the project, or a separable element of the project— ‘‘(I) if applicable, the balance of the unobli- gated amounts appropriated for the project, ex- cept that the Secretary shall retain sufficient amounts for the Corps of Engineers to carry out any responsibilities of the Corps of Engineers relating to the project and pilot program; and Page 696 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2201 ‘‘(II) additional amounts, as determined by the Secretary, from amounts made available under paragraph (8), except that the total amount transferred to the non-Federal interest shall not exceed the updated estimate of the Federal share of the cost of construction, in- cluding any required design; and ‘‘(vi) regularly monitor and audit each project being constructed by a non-Federal interest under this section to ensure that the construction ac- tivities are carried out in compliance with the plans approved by the Secretary and that the con- struction costs are reasonable. ‘‘(B) DETAILED PROJECT SCHEDULE.—Not later than 180 days after entering into an agreement under subparagraph (A)(iv), each non-Federal interest, to the maximum extent practicable, shall submit to the Secretary a detailed project schedule, based on estimated funding levels, that lists all deadlines for each milestone in the construction of the project. ‘‘(C) TECHNICAL ASSISTANCE.—On the request of a non-Federal interest, the Secretary may provide technical assistance to the non-Federal interest, if the non-Federal interest contracts with and com- pensates the Secretary for the technical assistance relating to— ‘‘(i) any study, engineering activity, and design activity for construction carried out by the non- Federal interest under this subsection; and ‘‘(ii) expeditiously obtaining any permits nec- essary for the project. ‘‘(4) COST SHARE.—Nothing in this subsection affects the cost-sharing requirement applicable on the day before the date of enactment of this Act to a project carried out under this subsection. ‘‘(5) REPORT.— ‘‘(A) IN GENERAL.—Not later than 3 years after the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Pub- lic Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives and make publicly available a re- port detailing the results of the pilot program car- ried out under this subsection, including— ‘‘(i) a description of the progress of non-Federal interests in meeting milestones in detailed project schedules developed pursuant to para- graph (2)(B); and ‘‘(ii) any recommendations of the Secretary concerning whether the program or any compo- nent of the program should be implemented on a national basis. ‘‘(B) UPDATE.—Not later than 5 years after the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Pub- lic Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives an update of the report described in subparagraph (A). ‘‘(C) FAILURE TO MEET DEADLINE.—If the Secretary fails to submit a report by the required deadline under this paragraph, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a detailed explanation of why the deadline was missed and a projected date for submission of the report. ‘‘(6) ADMINISTRATION.—All laws and regulations that would apply to the Secretary if the Secretary were carrying out the project shall apply to a non- Federal interest carrying out a project under this subsection. ‘‘(7) TERMINATION OF AUTHORITY.—The authority to commence a project under this subsection terminates on September 30, 2030. ‘‘(8) AUTHORIZATION OF APPROPRIATIONS.—In addi- tion to any amounts appropriated for a specific project, there is authorized to be appropriated to the Secretary to carry out the pilot program under this subsection, including the costs of administration of the Secretary, $25,000,000 for each of fiscal years 2019 through 2030. ‘‘(9) IMPLEMENTATION GUIDANCE.— ‘‘(A) IN GENERAL.—Not later than 120 days after the date of enactment of this paragraph [Dec. 27, 2020], the Secretary shall issue guidance for the im- plementation of the pilot program that, to the ex- tent practicable, identifies— ‘‘(i) the metrics for measuring the success of the pilot program; ‘‘(ii) a process for identifying future projects to participate in the pilot program; ‘‘(iii) measures to address the risks of a non- Federal interest constructing projects under the pilot program, including which entity bears the risk for projects that fail to meet the Corps of En- gineers standards for design or quality; ‘‘(iv) the laws and regulations that a non-Fed- eral interest must follow in carrying out a project under the pilot program; and ‘‘(v) which entity bears the risk in the event that a project carried out under the pilot program fails to be carried out in accordance with the project authorization or this subsection. ‘‘(B) NEW PROJECT PARTNERSHIP AGREEMENTS.— The Secretary may not enter into a project part- nership agreement under this subsection during the period beginning on the date of enactment of this paragraph and ending on the date on which the Sec- retary issues the guidance under subparagraph (A).’’ WATER INFRASTRUCTURE PUBLIC-PRIVATE PARTNERSHIP PILOT PROGRAM Pub. L. 113–121, title V, § 5014, June 10, 2014, 128 Stat. 1329, as amended by Pub. L. 117–263, div. H, title LXXXI, § 8147, Dec. 23, 2022, 136 Stat. 3730, provided that: ‘‘(a) IN GENERAL.—The Secretary [of the Army] shall establish a pilot program to evaluate the cost effective- ness and project delivery efficiency of allowing non- Federal pilot applicants to carry out authorized water resources development projects for coastal harbor im- provement, channel improvement, inland navigation, flood damage reduction, ecosystem restoration, and hurricane and storm damage reduction. ‘‘(b) PURPOSES.—The purposes of the pilot program established under subsection (a) are— ‘‘(1) to identify cost-saving project delivery alter- natives that reduce the backlog of authorized Corps of Engineers projects; and ‘‘(2) to evaluate the technical, financial, and orga- nizational benefits of allowing a non-Federal pilot ap- plicant to carry out and manage the design or con- struction (or both) of 1 or more of such projects. ‘‘(c) SUBSEQUENT APPROPRIATIONS.—Any activity un- dertaken under this section is authorized only to the extent specifically provided for in subsequent appro- priations Acts. ‘‘(d) ADMINISTRATION.—In carrying out the pilot pro- gram established under subsection (a), the Secretary shall— ‘‘(1) identify for inclusion in the program at least 15 projects that are authorized for construction for coastal harbor improvement, channel improvement, inland navigation, flood damage reduction, eco- system restoration, or hurricane and storm damage reduction; ‘‘(2) notify in writing the Committee on Environ- ment and Public Works of the Senate and the Com- mittee on Transportation and Infrastructure of the House of Representatives of each project identified under paragraph (1); ‘‘(3) in consultation with the non-Federal pilot ap- plicant associated with each project identified under paragraph (1), develop a detailed project management plan for the project that outlines the scope, financ- ing, budget, design, and construction resource re- quirements necessary for the non-Federal pilot appli- cant to execute the project, or a separable element of the project; Page 697 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2201 ‘‘(4) at the request of the non-Federal pilot appli- cant associated with each project identified under paragraph (1), enter into a project partnership agree- ment with the non-Federal pilot applicant under which the non-Federal pilot applicant is provided full project management control for the financing, de- sign, or construction (or any combination thereof) of the project, or a separable element of the project, in accordance with plans approved by the Secretary; ‘‘(5) following execution of a project partnership agreement under paragraph (4) and completion of all work under the agreement, issue payment, in accord- ance with subsection (g), to the relevant non-Federal pilot applicant for that work; and ‘‘(6) regularly monitor and audit each project car- ried out under the program to ensure that all activi- ties related to the project are carried out in compli- ance with plans approved by the Secretary and that construction costs are reasonable. ‘‘(e) SELECTION CRITERIA.—In identifying projects under subsection (d)(1), the Secretary shall consider the extent to which the project— ‘‘(1) is significant to the economy of the United States; ‘‘(2) leverages Federal investment by encouraging non-Federal contributions to the project; ‘‘(3) employs innovative project delivery and cost- saving methods; ‘‘(4) received Federal funds in the past and experi- enced delays or missed scheduled deadlines; ‘‘(5) has unobligated Corps of Engineers funding bal- ances; and ‘‘(6) has not received Federal funding for recapital- ization and modernization since the project was au- thorized. ‘‘(f) DETAILED PROJECT SCHEDULE.—Not later than 180 days after entering into a project partnership agree- ment under subsection (d)(4), a non-Federal pilot appli- cant, to the maximum extent practicable, shall submit to the Secretary a detailed project schedule for the rel- evant project, based on estimated funding levels, that specifies deadlines for each milestone with respect to the project. ‘‘(g) PAYMENT.—Payment to the non-Federal pilot ap- plicant for work completed pursuant to a project part- nership agreement under subsection (d)(4) may be made from— ‘‘(1) if applicable, the balance of the unobligated amounts appropriated for the project; and ‘‘(2) other amounts appropriated to the Corps of En- gineers, subject to the condition that the total amount transferred to the non-Federal pilot appli- cant may not exceed the estimate of the Federal share of the cost of construction, including any re- quired design. ‘‘(h) TECHNICAL ASSISTANCE.—At the request of a non- Federal pilot applicant participating in the pilot pro- gram established under subsection (a), the Secretary may provide to the non-Federal pilot applicant, if the non-Federal pilot applicant contracts with and com- pensates the Secretary, technical assistance with re- spect to— ‘‘(1) a study, engineering activity, or design activ- ity related to a project carried out by the non-Fed- eral pilot applicant under the program; and ‘‘(2) obtaining permits necessary for such a project. ‘‘(i) IDENTIFICATION OF IMPEDIMENTS.— ‘‘(1) IN GENERAL.—The Secretary shall— ‘‘(A) except as provided in paragraph (2), identify any procedural requirements under the authority of the Secretary that impede greater use of public-pri- vate partnerships and private investment in water resources development projects; ‘‘(B) develop and implement, on a project-by- project basis, procedures and approaches that— ‘‘(i) address such impediments; and ‘‘(ii) protect the public interest and any public investment in water resources development projects that involve public-private partnerships or private investment in water resources develop- ment projects; and ‘‘(C) not later than 1 year after the date of enact- ment of this section [June 10, 2014], issue rules to carry out the procedures and approaches developed under subparagraph (B). ‘‘(2) RULE OF CONSTRUCTION.—Nothing in this sec- tion allows the Secretary to waive any requirement under— ‘‘(A) sections 3141 through 3148 and sections 3701 through 3708 of title 40, United States Code; ‘‘(B) the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); or ‘‘(C) any other provision of Federal law. ‘‘(j) PUBLIC BENEFIT STUDIES.— ‘‘(1) IN GENERAL.—Before entering into a project partnership agreement under subsection (d)(4), the Secretary shall conduct an assessment of whether, and provide justification in writing to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives that, the proposed agreement provides better public and financial bene- fits than a similar transaction using public funding or financing. ‘‘(2) REQUIREMENTS.—An assessment under para- graph (1) shall— ‘‘(A) be completed in a period of not more than 90 days; ‘‘(B) take into consideration any supporting ma- terials and data submitted by the relevant non-Fed- eral pilot applicant and other stakeholders; and ‘‘(C) determine whether the proposed project part- nership agreement is in the public interest by de- termining whether the agreement will provide pub- lic and financial benefits, including expedited project delivery and savings for taxpayers. ‘‘(k) NON-FEDERAL FUNDING.—The non-Federal pilot applicant may finance the non-Federal share of a project carried out under the pilot program established under subsection (a). ‘‘(l) APPLICABILITY OF FEDERAL LAW.—Any provision of Federal law that would apply to the Secretary if the Secretary were carrying out a project shall apply to a non-Federal pilot applicant carrying out a project under this section. ‘‘(m) COST SHARE.—Nothing in this section affects a cost-sharing requirement under Federal law that is ap- plicable to a project carried out under the pilot pro- gram established under subsection (a). ‘‘(n) REPORT.—Not later than 3 years after the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives and make publicly available a report describing the results of the pilot program established under subsection (a), including any recommendations of the Secretary con- cerning whether the program or any component of the program should be implemented on a national basis. ‘‘(o) NON-FEDERAL PILOT APPLICANT DEFINED.—In this section, the term ‘non-Federal pilot applicant’ means— ‘‘(1) the non-Federal sponsor of the water resources development project; ‘‘(2) a non-Federal interest, as defined in section 221 of the Flood Control Act of 1970 (42 U.S.C. 1982d–5b [1962d–5b]); or ‘‘(3) a private entity with the consent of the local government in which the project is located or that is otherwise affected by the project.’’ FUNDING TO PROCESS PERMITS Pub. L. 106–541, title II, § 214, Dec. 11, 2000, 114 Stat. 2594, as amended by Pub. L. 108–137, title I, § 114, Dec. 1, 2003, 117 Stat. 1836; Pub. L. 109–99, § 1, Nov. 11, 2005, 119 Stat. 2169; Pub. L. 109–209, § 1, Mar. 24, 2006, 120 Stat. 318; Pub. L. 109–434, § 1, Dec. 20, 2006, 120 Stat. 3197; Pub. L. 110–114, title II, § 2002, Nov. 8, 2007, 121 Stat. 1067; Pub. L. 111–120, § 1, Dec. 22, 2009, 123 Stat. 3478; Pub. L. 111–315, § 1, Dec. 18, 2010, 124 Stat. 3450; Pub. L. 113–121, title I, § 1006, June 10, 2014, 128 Stat. 1212, which related to funding to process permits and was formerly set out Page 698 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2201 as a note under this section, was transferred to section 2352 of this title. MONITORING Pub. L. 106–541, title II, § 223, Dec. 11, 2000, 114 Stat. 2597, provided that: ‘‘(a) IN GENERAL.—The Secretary shall conduct a monitoring program of the economic and environ- mental results of up to 5 eligible projects selected by the Secretary. ‘‘(b) DURATION.—The monitoring of a project selected by the Secretary under this section shall be for a period of not less than 12 years beginning on the date of its se- lection. ‘‘(c) REPORTS.—The Secretary shall transmit to Con- gress every 3 years a report on the performance of each project selected under this section. ‘‘(d) ELIGIBLE PROJECT DEFINED.—In this section, the term ‘eligible project’ means a water resources project, or separable element thereof— ‘‘(1) for which a contract for physical construction has not been awarded before the date of enactment of this Act [Dec. 11, 2000]; ‘‘(2) that has a total cost of more than $25,000,000; and ‘‘(3)(A) that has as a benefit-to-cost ratio of less than 1.5 to 1; or ‘‘(B) that has significant environmental benefits or significant environmental mitigation components. ‘‘(e) COSTS.—The cost of conducting monitoring under this section shall be a Federal expense.’’ WATER CONTROL MANAGEMENT Pub. L. 106–53, title V, § 511, Aug. 17, 1999, 113 Stat. 341, provided that: ‘‘(a) IN GENERAL.—In evaluating potential improve- ments for water control management activities and consolidation of water control management centers, the Secretary may consider a regionalized water con- trol management plan but may not implement such a plan until the date on which a report is submitted under subsection (b). ‘‘(b) REPORT.—Not later than 180 days after the date of enactment of this Act [Aug. 17, 1999], the Secretary shall submit to the Committee on Transportation and Infrastructure and the Committee on Appropriations of the House of Representatives and the Committee on Environment and Public Works and the Committee on Appropriations of the Senate a report containing— ‘‘(1) a description of the primary objectives of streamlining water control management activities; ‘‘(2) a description of the benefits provided by streamlining water control management activities through consolidation of centers for those activities; ‘‘(3) a determination whether the benefits to users of establishing regional water control management centers will be retained in each district office of the Corps of Engineers that does not have a regional cen- ter; ‘‘(4) a determination whether users of regional cen- ters will receive a higher level of benefits from streamlining water control management activities; and ‘‘(5) a list of the members of Congress who rep- resent a district that includes a water control man- agement center that is to be eliminated under a pro- posed regionalized plan.’’ BUY AMERICAN; SENSE OF CONGRESS; REQUIREMENT REGARDING NOTICE Pub. L. 106–53, title II, § 222, Aug. 17, 1999, 113 Stat. 295, provided that: ‘‘(a) IN GENERAL.—It is the sense of Congress that, to the extent practicable, all equipment and products pur- chased with funds made available under this Act [see Tables for classification] should be American made. ‘‘(b) NOTICE TO RECIPIENTS OF ASSISTANCE.—In pro- viding financial assistance under this Act, the Sec- retary, to the greatest extent practicable, shall provide to each recipient of the assistance a notice describing the statement made in subsection (a).’’ Pub. L. 104–303, title II, § 235, Oct. 12, 1996, 110 Stat. 3704, provided that: ‘‘(a) PURCHASE OF AMERICAN-MADE EQUIPMENT AND PRODUCTS.—It is the sense of Congress that, to the greatest extent practicable, all equipment and products purchased with funds made available under this Act [see Tables for classification] should be American- made. ‘‘(b) NOTICE TO RECIPIENTS OF ASSISTANCE.—In pro- viding financial assistance under this Act, the Sec- retary, to the greatest extent practicable, shall provide to each recipient of the assistance a notice describing the statement made in subsection (a).’’ BUDGET ACT REQUIREMENTS Pub. L. 99–662, title IX, § 948, Nov. 17, 1986, 100 Stat. 4201, provided that: ‘‘Any spending authority under this Act [see Short Title note above] shall be effective only to such extent and in such amounts as are provided in appropriation Acts. For purposes of this Act, the term ‘spending authority’ has the meaning provided in sec- tion 401(c)(2) of the Congressional Budget Act of 1974 [2 U.S.C. 651(c)(2)], except that such term does not include spending authority for which an exception is made under section 401(d) of such Act.’’ DEFINITION OF ECONOMICALLY DISADVANTAGED COMMUNITY Pub. L. 116–260, div. AA, title I, § 160, Dec. 27, 2020, 134 Stat. 2665, provided that: ‘‘(a) IN GENERAL.—Not later than 180 days after the date of enactment of this Act [Dec. 27, 2020], the Sec- retary [of the Army] shall issue guidance defining the term ‘economically disadvantaged community’ for the purposes of this Act [div. AA of Pub. L. 116–260, see Short Title of 2020 Amendment note above] and the amendments made by this Act. ‘‘(b) CONSIDERATIONS.—In defining the term ‘economi- cally disadvantaged community’ under subsection (a), the Secretary shall, to the maximum extent prac- ticable, utilize the criteria under paragraph (1) or (2) of section 301(a) of the Public Works and Economic Devel- opment Act of 1965 (42 U.S.C. 3161), to the extent that such criteria are applicable in relation to the develop- ment of water resources development projects. ‘‘(c) PUBLIC COMMENT.—In developing the guidance under subsection (a), the Secretary shall provide notice and an opportunity for public comment.’’ ‘‘SECRETARY’’ DEFINED Pub. L. 118–272, div. A, § 1002, Jan. 4, 2025, 138 Stat. 2996, provided that: ‘‘In this division [div. A of Pub. L. 118–272, see Tables for classification], the term ‘Sec- retary’ means the Secretary of the Army.’’ Pub. L. 117–263, div. H, title LXXXI, § 8002, Dec. 23, 2022, 136 Stat. 3694, provided that: ‘‘In this title [see Ta- bles for classification], the term ‘Secretary’ means the Secretary of the Army.’’ Pub. L. 116–260, div. AA, § 2, Dec. 27, 2020, 134 Stat. 2618, provided that: ‘‘In this Act [div. AA of Pub. L. 116–260, see Tables for classification], the term ‘Sec- retary’ means the Secretary of the Army.’’ Pub. L. 115–270, title I, § 102, Oct. 23, 2018, 132 Stat. 3768, provided that: ‘‘In this title [see Tables for classi- fication], the term ‘Secretary’ means the Secretary of the Army.’’ Pub. L. 114–322, title I, § 1002, Dec. 16, 2016, 130 Stat. 1632, provided that: ‘‘In this title [see Tables for classi- fication], the term ‘Secretary’ means the Secretary of the Army.’’ Pub. L. 113–121, § 2, June 10, 2014, 128 Stat. 1195, pro- vided that: ‘‘In this Act [see Tables for classification], the term ‘Secretary’ means the Secretary of the Army.’’ Pub. L. 110–114, § 2, Nov. 8, 2007, 121 Stat. 1049, pro- vided that: ‘‘In this Act [see Tables for classification], the term ‘Secretary’ means the Secretary of the Army.’’ Page 699 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2202 Pub. L. 106–541, § 2, Dec. 11, 2000, 114 Stat. 2575, pro- vided that: ‘‘In this Act [see Tables for classification], the term ‘Secretary’ means the Secretary of the Army.’’ Pub. L. 106–53, § 2, Aug. 17, 1999, 113 Stat. 273, provided that: ‘‘In this Act [see Tables for classification], the term ‘Secretary’ means the Secretary of the Army.’’ Pub. L. 104–303, § 2, Oct. 12, 1996, 110 Stat. 3662, pro- vided that: ‘‘In this Act [see Tables for classification], the term ‘Secretary’ means the Secretary of the Army.’’ Pub. L. 102–580, § 3, Oct. 31, 1992, 106 Stat. 4801, pro- vided that: ‘‘For purposes of this Act [see Short Title of 1992 Amendment note above], the term ‘Secretary’ means the Secretary of the Army.’’ Pub. L. 101–640, § 2, Nov. 28, 1990, 104 Stat. 4605, pro- vided that: ‘‘For purposes of this Act [see Short Title of 1990 Amendment note above], the term ‘Secretary’ means the Secretary of the Army.’’ Pub. L. 100–676, § 2, Nov. 17, 1988, 102 Stat. 4013, pro- vided that: ‘‘For purposes of this Act [see Short Title of 1988 Amendment note above], the term ‘Secretary’ means the Secretary of the Army.’’ Executive Documents PROMOTING THE RELIABLE SUPPLY AND DELIVERY OF WATER IN THE WEST Memorandum of President of the United States, Oct. 19, 2018, 83 F.R. 53961, which related to water infrastruc- ture throughout the western United States, was re- voked by Ex. Ord. No. 13990, § 7(d), Jan. 20, 2021, 86 F.R. 7042, set out in a note under section 4321 of Title 42, The Public Health and Welfare. § 2202. Non-Federal engagement and review (a) Issuance The Secretary shall expeditiously issue guid- ance to implement each covered provision of law in accordance with this section. (b) Public notice (1) In general Prior to developing and issuing any new or revised implementation guidance for a covered water resources development law, the Sec- retary shall issue a public notice that— (A) informs potentially interested non- Federal stakeholders of the Secretary’s in- tent to develop and issue such guidance; and (B) provides an opportunity for interested non-Federal stakeholders to engage with, and provide input and recommendations to, the Secretary on the development and issuance of such guidance. (2) Issuance of notice The Secretary shall issue the notice under paragraph (1) through a posting on a publicly accessible website dedicated to providing no- tice on the development and issuance of imple- mentation guidance for a covered water re- sources development law. (c) Stakeholder engagement (1) Input The Secretary shall allow a minimum of 60 days after issuance of the public notice under subsection (b) for non-Federal stake- holders to provide input and recommenda- tions to the Secretary, prior to finalizing implementation guidance for a covered water resources development law. (2) Outreach The Secretary may, as appropriate (as de- termined by the Secretary), reach out to non-Federal stakeholders and circulate drafts of implementation guidance for a cov- ered water resources development law for in- formal input and recommendations. (d) Submission The Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a copy of all input and recommendations received pursuant to subsection (c) and a description of any consideration of such input and rec- ommendations. (e) Development of guidance When developing implementation guidance for a covered water resources development law, the Secretary shall take into consideration the input and recommendations received from non- Federal stakeholders, and make the final guid- ance available to the public on the publicly ac- cessible website described in subsection (b)(2). (f) Definitions In this section: (1) Covered provision of law The term ‘‘covered provision of law’’ means a provision of law under the jurisdiction of the Secretary contained in, or amended by, a cov- ered water resources development law, with respect to which— (A) the Secretary determines guidance is necessary in order to implement the provi- sion; and (B) no such guidance has been issued as of October 23, 2018. (2) Covered water resources development law The term ‘‘covered water resources develop- ment law’’ means— (A) the Water Resources Reform and De- velopment Act of 2014; (B) the Water Resources Development Act of 2016; (C) this Act; and (D) any Federal water resources develop- ment law enacted after October 23, 2018. (Pub. L. 115–270, title I, § 1105, Oct. 23, 2018, 132 Stat. 3772.) Editorial Notes REFERENCES IN TEXT The Water Resources Reform and Development Act of 2014, referred to in subsec. (f)(2)(A), is Pub. L. 113–121, June 10, 2014, 128 Stat. 1193. For complete classification of this Act to the Code, see Short Title of 2014 Amend- ment note set out under section 2201 of this title and Tables. The Water Resources Development Act of 2016, re- ferred to in subsec. (f)(2)(B), is title I of Pub. L. 114–322, Dec. 16, 2016, 130 Stat. 1632. For complete classification of this Act to the Code, see Short Title of 2016 Amend- ment note set out under section 2201 of this title and Tables. This Act, referred to in subsec. (f)(2)(C), probably means title I of Pub. L. 115–270, Oct. 23, 2018, 132 Stat. 3768, known as the Water Resources Development Act of 2018. For complete classification of this Act to the Code, see Short Title of 2018 Amendment note set out under section 2201 of this title and Tables. CODIFICATION Section was enacted as part of the Water Resources Development Act of 2018, and also as part of the Amer-

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 2667 — Leases: non-excess property of military departments and Defense Agencies

**(a) Lease Authority.—** Whenever the Secretary concerned considers it advantageous to the United States, the Secretary concerned may lease to such lessee and upon such terms as the Secretary concerned considers will promote the national defense or to be in the public interest, real or personal property that— (1) is under the control of the Secretary concerned; (2) is not for the time needed for public use; and (3) is not excess property, as defined by [section 102 of title 40](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title40-section102&num=0&edition=prelim). **(b) Conditions on Leases.—** A lease under subsection (a)— (1) may not be for more than five years, unless the Secretary concerned determines that a lease for a longer period will promote the national defense or be in the public interest; (2) may give the lessee the first right to buy the property if the lease is revoked to allow the United States to sell the property under any other provision of law; (3) shall permit the Secretary to revoke the lease at any time, unless he determines that the omission of such a provision will promote the national defense or be in the public interest; (4) shall provide for the payment (in cash or in kind) by the lessee of consideration in an amount that is not less than the fair market value of the lease interest, as determined by the Secretary; (5) may provide, notwithstanding [section 1302 of title 40](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title40-section1302&num=0&edition=prelim) or any other provision of law, for the alteration, repair, or improvement, by the lessee, of the property leased as the payment of part or all of the consideration for the lease; (6) except as otherwise provided in subsection (d), shall require the

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 2667

Stored review status: release_metadata_unconfirmed. The source passage cites 10 U.S.C. § 2667. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 2667 — Leases: non-excess property of military

Page 2066 TITLE 10—ARMED FORCES [§ 2666 TRANSFER OF FUNCTIONS For transfer of authorities, functions, personnel, and assets of the Coast Guard, including the authorities and functions of the Secretary of Transportation relat- ing thereto, to the Department of Homeland Security, and for treatment of related references, see sections 468(b), 551(d), 552(d), and 557 of Title 6, Domestic Secu- rity, and the Department of Homeland Security Reor- ganization Plan of November 25, 2002, as modified, set out as a note under section 542 of Title 6. [§ 2666. Repealed. Pub. L. 108–375, div. B, title XXVIII, § 2821(a)(2), Oct. 28, 2004, 118 Stat. 2129] Section, act Aug. 10, 1956, ch. 1041, 70A Stat. 149, re- lated to limitation on commission on a contract for the purchase of land payable from funds appropriated for the Department of Defense. § 2667. Leases: non-excess property of military departments and Defense Agencies (a) LEASE AUTHORITY.—Whenever the Sec- retary concerned considers it advantageous to the United States, the Secretary concerned may lease to such lessee and upon such terms as the Secretary concerned considers will promote the national defense or to be in the public interest, real or personal property that— (1) is under the control of the Secretary con- cerned; (2) is not for the time needed for public use; and (3) is not excess property, as defined by sec- tion 102 of title 40. (b) CONDITIONS ON LEASES.—A lease under sub- section (a)— (1) may not be for more than five years, un- less the Secretary concerned determines that a lease for a longer period will promote the na- tional defense or be in the public interest; (2) may give the lessee the first right to buy the property if the lease is revoked to allow the United States to sell the prop

Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 2667

Stored review status: historical_2024_not_currentness_verified. The source passage cites 10 U.S.C. § 2667. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 7036 — Chiefs of branches: appointment; duties

**(a)** There are in the Army the following officers: (1) Chief of Engineers. (2) Surgeon General. (3) Judge Advocate General. (4) Chief of Chaplains. **(b)** Each officer named in subsection (a), except the Judge Advocate General, shall be appointed by the President, by and with the advice and consent of the Senate, from officers above the grade of major who— (1) have shown by extensive duty in the branch concerned, or by similar duty, that they are qualified for the appointment; and (2) have been recommended by a board under subsection (e). The Surgeon General may be appointed from officers in any corps of the Army Medical Department. The Judge Advocate General shall be appointed as prescribed in [section 7037 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section7037&num=0&edition=prelim). **(c)** An officer appointed under subsection (b) normally holds office for four years. However, the President may terminate or extend the appointment at any time. **(d)** Each officer named in subsection (a) shall perform duties prescribed by the Secretary of the Army and by law. **(e)** (1) Under the supervision of the Secretary, the Chief of Engineers may accept orders to provide services to another department, agency, or instrumentality of the United States or to a State or political subdivision of a State. The Chief of Engineers may provide any part of those services by contract. Services may be provided to a State, or to a political subdivision of a State, only if— (A) the work to be undertaken on behalf of non-Federal interests involves Federal assistance and the head of the department or agency providing Federal assistance for the work does not object to the provision of services by the Chief of Engineers; and (B) the se

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 7036

Stored review status: release_metadata_unconfirmed. The source passage cites 10 U.S.C. § 7036. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 7036 — Chiefs of branches: appointment; duties

Page 2982 TITLE 10—ARMED FORCES § 7035 (1) the Vice Chief of Staff shall perform the duties of the Chief of Staff until a successor is appointed or the absence or disability ceases; or (2) if there is a vacancy in the office of the Vice Chief of Staff or the Vice Chief of Staff is absent or disabled, unless the President di- rects otherwise, the most senior officer of the Army in the Army Staff who is not absent or disabled and who is not restricted in perform- ance of duty shall perform the duties of the Chief of Staff until a successor to the Chief of Staff or the Vice Chief of Staff is appointed or until the absence or disability of the Chief of Staff or Vice Chief of Staff ceases, whichever occurs first. (Aug. 10, 1956, ch. 1041, 70A Stat. 162, § 3035; Pub. L. 85–599, § 6(a), Aug. 6, 1958, 72 Stat. 519; renum- bered § 3034 and amended Pub. L. 99–433, title V, § 502(d), Oct. 1, 1986, 100 Stat. 1041; renumbered § 7034, Pub. L. 115–232, div. A, title VIII, § 808(a), Aug. 13, 2018, 132 Stat. 1838.) HISTORICAL AND REVISION NOTES Revised section Source (U.S. Code) Source (Statutes at Large) 3035(a) ..... 3035(b) ..... 10:21c (1st sentence). 10:21c (less 1st sentence). June 28, 1950, ch. 383, § 203, 64 Stat. 266. In subsection (a), the words ‘‘of the Army’’ are omit- ted as surplusage. In subsection (b), the words ‘‘If the Chief of Staff is absent or disabled or if that office is vacant’’ are sub- stituted for 10:21c (1st 18 words of last sentence). The words ‘‘the officer who is highest on the following list and’’ are inserted for clarity. The words ‘‘until his suc- cessor is appointed’’ are omitted as surplusage. Editorial Notes AMENDMENTS 2018—Pub. L. 115–232 renumbered section 3034 of this title as this section. 1986—Pub. L. 99–433, §

Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 7036

Stored review status: historical_2024_not_currentness_verified. The source passage cites 10 U.S.C. § 7036. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2201 — Prior project authorization

In any case in which a project under the jurisdiction of the Secretary is budgeted under a different business line than the business line under which the project was originally authorized, the Secretary shall ensure that the project is carried out in accordance with any requirements that apply to the business line under which the project was originally authorized.

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2201

Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2281a — Subsurface drain systems research and development

Subject to the availability of appropriations, the Secretary, acting through the Director of the Engineer Research and Development Center and, where appropriate, in consultation with other Federal agencies, shall carry out research and development activities relating to the use of subsurface drain systems as— (1) a flood risk-reduction measure; or (2) a coastal storm risk-reduction measure.

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2281a

Stored review status: release_metadata_unconfirmed. The source passage cites 33 U.S.C. § 2281a. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2281a — Tribal Liaison

Page 759 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2281a § 2281. Matters to be addressed in planning (a) In general Enhancing national economic development (including benefits to particular regions of the Nation not involving the transfer of economic activity to such regions from other regions), the quality of the total environment (including preservation and enhancement of the environ- ment), the well-being of the people of the United States, the prevention of loss of life, and the preservation of cultural and historical values shall be addressed in the formulation and eval- uation of water resources projects to be carried out by the Secretary, and the associated bene- fits and costs, both quantifiable and unquantifiable, and information regarding po- tential loss of human life that may be associ- ated with flooding and coastal storm events, shall be displayed in the benefits and costs of such projects. (b) Assessments For all feasibility reports for water resources projects completed after December 31, 2007, the Secretary shall assess whether— (1) the water resources project and each sep- arable element is cost-effective; and (2) the water resources project complies with Federal, State, and local laws (including regu- lations) and public policies. (Pub. L. 99–662, title IX, § 904, Nov. 17, 1986, 100 Stat. 4185; Pub. L. 101–640, title III, § 315, Nov. 28, 1990, 104 Stat. 4641; Pub. L. 104–303, title II, § 231, Oct. 12, 1996, 110 Stat. 3704; Pub. L. 110–114, title II, § 2033(a), Nov. 8, 2007, 121 Stat. 1084.) Editorial Notes AMENDMENTS 2007—Pub. L. 110–114 designated existing provisions as subsec. (a), inserted heading, and added subsec. (b). 1996—Pub. L. 104–303 inserted ‘‘and information re- garding potential loss of human life that

Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2281a

Stored review status: historical_2024_not_currentness_verified. The source passage cites 33 U.S.C. § 2281a. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2282d — Planning

**(a) Omitted** **(b) Planning process improvements** The Chief of Engineers— (1) shall adopt a risk analysis approach to project cost estimates for water resources projects; and (2) not later than one year after November 8, 2007, shall— (A) issue procedures for risk analysis for cost estimation for water resources projects; and (B) submit to Congress a report that includes any recommended amendments to [section 2280 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2280&num=0&edition=prelim). **(c) Benchmarks** (1) **In general** — Not later than 12 months after November 8, 2007, the Chief of Engineers shall establish benchmarks for determining the length of time it should take to conduct a feasibility study for a water resources project and its associated review process under the National Environmental Policy Act of 1969 ([42 U.S.C. 4321](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section4321&num=0&edition=prelim) et seq.). The Chief of Engineers shall use such benchmarks as a management tool to make the feasibility study process more efficient in all districts of the Corps of Engineers. (2) **Benchmark goals** — The Chief of Engineers shall establish, to the extent practicable, under paragraph (1) benchmark goals for completion of feasibility studies for water resources projects generally within 2 years. In the case of feasibility studies that the Chief of Engineers determines may require additional time based on the project type, size, cost, or complexity, the benchmark goal for completion shall be generally within 4 years. **(d) Calculation of benefits and costs for flood damage reduction projects** A feasibility study for a project for flood damage reduction shall include, as part of t

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2282d

Stored review status: release_metadata_unconfirmed. The source passage cites 33 U.S.C. § 2282d. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2282d — Annual report to Congress

Page 769 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2282d (3) Notification Each time the Secretary makes a determina- tion under this subsection, the Secretary shall provide written notice to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and In- frastructure of the House of Representatives as to the results of that determination, includ- ing an identification of the specific 1 or more factors used in making the determination that the project is complex. (d) Reviews Not later than 90 days after the date of the ini- tiation of a study described in subsection (a) for a project, the Secretary shall— (1) take all steps necessary to initiate the process for completing federally mandated re- views that the Secretary is required to com- plete as part of the study, including the envi- ronmental review process under section 1005; (2) convene a meeting of all Federal, tribal, and State agencies identified under section 2348(e) of this title that may be required by law to conduct or issue a review, analysis, or opinion on or to make a determination con- cerning a permit or license for the study; and (3) take all steps necessary to provide infor- mation that will enable required reviews and analyses related to the project to be conducted by other agencies in a thorough and timely manner. (e) Interim report Not later than 18 months after June 10, 2014, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infra- structure of the House of Representatives and make publicly available a report that de- scribes— (1) the status of the implementation of the planning process under this section, including the number of participating project

Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2282d

Stored review status: historical_2024_not_currentness_verified. The source passage cites 33 U.S.C. § 2282d. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2351b — Corrosion prevention

**(a) In general** To the greatest extent practicable, the Secretary shall encourage and incorporate corrosion prevention activities at water resources development projects. **(b) Activities** In carrying out subsection (a), the Secretary, to the greatest extent practicable, shall ensure that contractors performing work for water resources development projects— (1) use best practices to carry out corrosion prevention activities in the field; (2) use industry-recognized standards and corrosion mitigation and prevention methods when— (A) determining protective coatings; (B) selecting materials; and (C) determining methods of cathodic protection, design, and engineering for corrosion prevention; (3) use certified coating application specialists and cathodic protection technicians and engineers; (4) use best practices in environmental protection to prevent environmental degradation and to ensure careful handling of all hazardous materials; (5) demonstrate a history of employing industry-certified inspectors to ensure adherence to best practices and standards; and (6) demonstrate a history of compliance with applicable requirements of the Occupational Safety and Health Administration. **(c) Corrosion prevention activities defined** In this section, the term “corrosion prevention activities” means— (1) the application and inspection of protective coatings for complex work involving steel and cementitious structures, including structures that will be exposed in immersion; (2) the installation, testing, and inspection of cathodic protection systems; (3) the carrying out of an activity described in paragraph (1) or (2) through a program in corrosion prevention that is— (A) offered or accredited by an organization that sets industry standards for corrosion

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2351b

Stored review status: release_metadata_unconfirmed. The source passage cites 33 U.S.C. § 2351b. This identifies an authority to review, not proof of applicability.