Browse Arkansas Code titles and sections
33 U.S.C. § 2201 — ‘‘Secretary’’ defined
Federal law — U.S. Code and appendices · legal_authorities
Page 688
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2201
Sec.
2326e.
Non-Federal interest dredging authority.
2326f.
Maintenance dredging data.
2326g.
Beneficial use of dredged material; dredged
material management plans.
2326h.
Five-year regional dredged material manage-
ment plans.
2326i.
Beneficial use of dredged material.
2326j.
Transfer of suitable dredged material.
2327.
Definition of rehabilitation for inland water-
way projects.
2327a.
Rehabilitation of Corps of Engineers con-
structed pump stations.
2328.
Challenge cost-sharing program for manage-
ment of recreation facilities.
2328a.
Special use permits.
2329.
International outreach program.
2330.
Aquatic ecosystem restoration.
2330a.
Monitoring ecosystem restoration.
2330b.
Fish hatcheries.
2330c.
Aquatic ecosystem restoration.
2330d.
Public recreational amenities in ecosystem
restoration projects.
2331.
Use of continuing contracts for construction
of certain projects.
2331a.
Initiating work on separable elements.
2332.
Shoreline and riverine protection and res-
toration.
2333.
Irrigation diversion protection and fisheries
enhancement assistance.
2334.
Innovative technologies for watershed res-
toration.
2335.
Coastal aquatic habitat management.
2336.
Abandoned and inactive noncoal mine res-
toration.
2337.
Property protection program.
2338.
Reburial and conveyance authority.
2339.
Assistance programs.
2339a.
Cooperative agreements with Indian tribes.
2340.
Revision of project partnership agreement;
cost sharing.
2341.
Expedited actions for emergency flood dam-
age reduction.
2341a.
Prioritization.
2341b.
Prioritization of certain projects.
2341c.
Criteria for funding environmental infra-
structure projects.
2342.
Access to water resource
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2201
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: c15a966741276103a38c5b8c9a68b53ecc83f43028bc377d45b057ff8bbc83bb. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-e206e17172977f13f32ed98a
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-2201-secretary-defined--da9ac694f2.md
Pages: Not recorded – Not recorded
Passage SHA-256: 6db19f87481ef5e9fecf704ca57a50725d9df50100bfef2c8eb22e2b47560e9c
Source location: USCODE-2024-title33-chap36-sec2201.pdf
Stored source content
Page 688
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2201
Sec.
2326e.
Non-Federal interest dredging authority.
2326f.
Maintenance dredging data.
2326g.
Beneficial use of dredged material; dredged
material management plans.
2326h.
Five-year regional dredged material manage-
ment plans.
2326i.
Beneficial use of dredged material.
2326j.
Transfer of suitable dredged material.
2327.
Definition of rehabilitation for inland water-
way projects.
2327a.
Rehabilitation of Corps of Engineers con-
structed pump stations.
2328.
Challenge cost-sharing program for manage-
ment of recreation facilities.
2328a.
Special use permits.
2329.
International outreach program.
2330.
Aquatic ecosystem restoration.
2330a.
Monitoring ecosystem restoration.
2330b.
Fish hatcheries.
2330c.
Aquatic ecosystem restoration.
2330d.
Public recreational amenities in ecosystem
restoration projects.
2331.
Use of continuing contracts for construction
of certain projects.
2331a.
Initiating work on separable elements.
2332.
Shoreline and riverine protection and res-
toration.
2333.
Irrigation diversion protection and fisheries
enhancement assistance.
2334.
Innovative technologies for watershed res-
toration.
2335.
Coastal aquatic habitat management.
2336.
Abandoned and inactive noncoal mine res-
toration.
2337.
Property protection program.
2338.
Reburial and conveyance authority.
2339.
Assistance programs.
2339a.
Cooperative agreements with Indian tribes.
2340.
Revision of project partnership agreement;
cost sharing.
2341.
Expedited actions for emergency flood dam-
age reduction.
2341a.
Prioritization.
2341b.
Prioritization of certain projects.
2341c.
Criteria for funding environmental infra-
structure projects.
2342.
Access to water resource data.
2343.
Independent peer review.
2344.
Safety assurance review.
2345.
Electronic submission and tracking of permit
applications.
2346.
Project administration.
2346a.
Real estate administrative fees.
2347.
Coordination
and
scheduling
of
Federal,
State, and local actions.
2347a.
Determination of project completion.
2347b.
Purpose and need.
2347c.
Small water storage projects.
2348.
Project acceleration.
2348a.
NEPA reporting.
2349.
Categorical exclusions in emergencies.
2350.
Corrosion prevention.
2351.
Durability, sustainability, and resilience.
2351a.
Operation and maintenance of existing infra-
structure.
2351b.
Federal breakwaters and jetties.
2352.
Funding to process permits.
2353.
Structural health monitoring.
2353a.
Aging infrastructure.
2354.
Easements
for
electric,
telephone,
or
broadband service facilities.
2355.
Prior project authorization.
2356.
Project consultation.
2357.
Managed aquifer recharge study and working
group.
§ 2201. ‘‘Secretary’’ defined
For purposes of this Act, the term ‘‘Sec-
retary’’ means the Secretary of the Army.
(Pub. L. 99–662, § 2, Nov. 17, 1986, 100 Stat. 4082.)
Editorial Notes
REFERENCES IN TEXT
This Act, referred to in text, is Pub. L. 99–662, Nov. 17,
1986, 100 Stat. 4082, as amended, known as the Water Re-
sources Development Act of 1986. For complete classi-
fication of this Act to the Code, see Short Title note
set out below and Tables.
Statutory Notes and Related Subsidiaries
SHORT TITLE OF 2025 AMENDMENT
Pub. L. 118–272, § 101(a), Jan. 4, 2025, 138 Stat. 2992, pro-
vided that: ‘‘This Act [see Tables for classification]
may be cited as the ‘Thomas R. Carper Water Re-
sources Development Act of 2024’.’’
Pub. L. 118–272, div. A, § 1001, Jan. 4, 2025, 138 Stat.
2996, provided that: ‘‘This division [see Tables for clas-
sification] may be cited as the ‘Water Resources Devel-
opment Act of 2024’.’’
Pub. L. 118–272, div. A, title I, § 1160, Jan. 4, 2025, 138
Stat. 3046, provided that: ‘‘This subtitle [subtitle B
(§§ 1160–1165) of title I of div. A of Pub. L. 118–272, enact-
ing section 2281d of this title, amending section 390b–2
of Title 43, Public Lands, and enacting provisions set
out as notes under section 2319 of this title] may be
cited as the ‘Grace F. Napolitano Priority for Water
Supply, Water Conservation, and Drought Resiliency
Act of 2024’.’’
SHORT TITLE OF 2022 AMENDMENT
Pub. L. 117–263, div. H, title LXXXI, § 8001(a), Dec. 23,
2022, 136 Stat. 3691, provided that: ‘‘This title [see Ta-
bles for classification] may be cited as the ‘Water Re-
sources Development Act of 2022’.’’
SHORT TITLE OF 2020 AMENDMENT
Pub. L. 116–260, div. AA, § 1(a), Dec. 27, 2020, 134 Stat.
2615, provided that: ‘‘This division [see Tables for clas-
sification] may be cited as the ‘Water Resources Devel-
opment Act of 2020’.’’
SHORT TITLE OF 2018 AMENDMENT
Pub. L. 115–270, § 1(a), Oct. 23, 2018, 132 Stat. 3765, pro-
vided that: ‘‘This Act [see Tables for classification]
may be cited as ‘America’s Water Infrastructure Act of
2018’.’’
Pub. L. 115–270, title I, § 101, Oct. 23, 2018, 132 Stat.
3768, provided that: ‘‘This title [see Tables for classi-
fication] may be cited as the ‘Water Resources Develop-
ment Act of 2018’.’’
SHORT TITLE OF 2016 AMENDMENT
Pub. L. 114–322, § 1(a), Dec. 16, 2016, 130 Stat. 1628, pro-
vided that: ‘‘This Act [see Tables for classification]
may be cited as the ‘Water Infrastructure Improve-
ments for the Nation Act’ or the ‘WIIN Act’.’’
Pub. L. 114–322, title I, § 1001, Dec. 16, 2016, 130 Stat.
1632, provided that: ‘‘This title [see Tables for classi-
fication] may be cited as the ‘Water Resources Develop-
ment Act of 2016’.’’
SHORT TITLE OF 2014 AMENDMENT
Pub. L. 113–121, § 1(a), June 10, 2014, 128 Stat. 1193, pro-
vided that: ‘‘This Act [see Tables for classification]
may be cited as the ‘Water Resources Reform and De-
velopment Act of 2014’.’’
SHORT TITLE OF 2007 AMENDMENT
Pub. L. 110–114, § 1(a), Nov. 8, 2007, 121 Stat. 1041, pro-
vided that: ‘‘This Act [see Tables for classification]
may be cited as the ‘Water Resources Development Act
of 2007’.’’
SHORT TITLE OF 2000 AMENDMENT
Pub. L. 106–541, § 1(a), Dec. 11, 2000, 114 Stat. 2572, pro-
vided that: ‘‘This Act [see Tables for classification]
Page 689
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2201
may be cited as the ‘Water Resources Development Act
of 2000’.’’
SHORT TITLE OF 1999 AMENDMENT
Pub. L. 106–53, § 1(a), Aug. 17, 1999, 113 Stat. 269, pro-
vided that: ‘‘This Act [see Tables for classification]
may be cited as the ‘Water Resources Development Act
of 1999’.’’
SHORT TITLE OF 1996 AMENDMENT
Pub. L. 104–303, § 1(a), Oct. 12, 1996, 110 Stat. 3658, pro-
vided that: ‘‘This Act [see Tables for classification]
may be cited as the ‘Water Resources Development Act
of 1996’.’’
SHORT TITLE OF 1992 AMENDMENT
Pub. L. 102–580, § 1(a), Oct. 31, 1992, 106 Stat. 4797, pro-
vided that: ‘‘This Act [enacting sections 59gg, 426i–1,
569d to 569f, 653, 1271, 2268, and 2325 to 2329 of this title,
amending sections 426j, 467f, 467j to 467l, 562, 652, 1342,
1412, 1413, 1414, 1415, 1416, 1420, 1421, 2211, 2213, 2283, and
2309a of this title, section 3036 of Title 10, Armed
Forces, sections 460tt, 4702, and 4711 of Title 16, Con-
servation, and section 1962d–16 of Title 42, The Public
Health and Welfare, and enacting provisions set out as
notes under this section and sections 541, 1271, 2211,
2239, 2267, and 2281 of this title, section 9505 of Title 26,
Internal Revenue Code, and sections 390h–4 and 390h–5
of Title 43, Public Lands] may be cited as the ‘Water
Resources Development Act of 1992’.’’
SHORT TITLE OF 1990 AMENDMENT
Pub. L. 101–640, § 1(a), Nov. 28, 1990, 104 Stat. 4604, pro-
vided that: ‘‘This Act [enacting sections 59bb and 2316
to 2324 of this title, amending sections 579a, 652, 701n,
709a, 2213, 2215, 2232, 2238, 2281, 2309a, and 2314a of this
title, section 460tt of Title 16, Conservation, and sec-
tion 1962d–16 of Title 42, The Public Health and Welfare,
repealing sections 579 and 2239 of this title, enacting
provisions set out as notes under this section, sections
426e, 1252, 1268, 2213, 2232, 2239, 2313, and 2317 of this
title, and section 1405c of Title 48, Territories and Insu-
lar Possessions, and amending provisions set out as
notes under sections 2294 and 2314 of this title and sec-
tion 460d of Title 16] may be cited as the ‘Water Re-
sources Development Act of 1990’.’’
SHORT TITLE OF 1988 AMENDMENT
Pub. L. 100–676, § 1(a), Nov. 17, 1988, 102 Stat. 4012, pro-
vided that: ‘‘This Act [enacting sections 59j–1, 59y, 59z,
and 2312 to 2315 of this title, amending sections 426j,
701b–12, 1293a, 2211, 2239, 2280, and 2291 of this title and
section 1962d–5a of Title 42, The Public Health and Wel-
fare, enacting provisions set out as notes under this
section, sections 579a, 988, 2211, 2294, 2300, and 2314 of
this title, and section 1962d–5g of Title 42, and amend-
ing provisions set out as a note under section 2294 of
this title] may be cited as the ‘Water Resources Devel-
opment Act of 1988’.’’
SHORT TITLE
Pub. L. 99–662, § 1(a), Nov. 17, 1986, 100 Stat. 4082, pro-
vided that: ‘‘This Act [enacting this chapter and sec-
tions 59n–1, 59v, 59w, 403b, 426n, 426o, 467f to 467n, 555a,
579a, 652, 701b–12, 709b, 988a, and 1414a of this title, sec-
tions 460tt of Title 16, Conservation, sections 4461, 4462,
9505, and 9506 of Title 26, Internal Revenue Code, sec-
tion 483d of former Title 40, Public Buildings, Property,
and Works, and sections 1962d–11b and 1962d–20 of Title
42, The Public Health and Welfare, amending sections
409, 414, 415, 426g, 426i, 426j, 426m, 467, 467b, 555, 557, 603a,
610, 701a–1, 701g, 701n, 701r, 701s, 984, and 1804 of this
title, section 3036 of Title 10, Armed Forces, sections
460ee and 1002 of Title 16, section 4042 of Title 26, sec-
tions 1962d–5a, 1962d–5b, 1962d–5d, 1962d–5f, and 1962d–16
of Title 42, sections 390 and 390b of Title 43, Public
Lands, and section 1121–1 of Title 46, Appendix, Ship-
ping, repealing sections 1801 and 1802 of this title, en-
acting provisions set out as notes under this section,
sections 426, 426g, 467, 661, 984, 988, 1414a, and 2294 of this
title, sections 460d and 1004 of Title 16, sections 1, 4042,
4461, 9505, and 9506 of Title 26, sections 1962d–5b,
1962d–20, and 10301 of Title 42, and section 390b of Title
43, and amending provisions set out as a note under sec-
tion 1962b–3 of Title 42] may be cited as the ‘Water Re-
sources Development Act of 1986’.’’
Pub. L. 99–662, title II, § 215, Nov. 17, 1986, 100 Stat.
4109, provided that: ‘‘This title [enacting subchapter II
of this chapter] may be cited as the ‘Harbor Develop-
ment and Navigation Improvement Act of 1986’.’’
NOTICE TO CONGRESS REGARDING WRDA
IMPLEMENTATION
Pub. L. 118–272, div. A, title I, § 1102, Jan. 4, 2025, 138
Stat. 2997, provided that:
‘‘(a) PLAN OF IMPLEMENTATION.—
‘‘(1) IN GENERAL.—Not later than 90 days after the
date of enactment of this Act [Jan. 4, 2025], the Sec-
retary [of the Army] shall develop a plan for imple-
menting this division [div. A of Pub. L. 118–272, see
Tables for classification] and the amendments made
by this division.
‘‘(2) REQUIREMENTS.—In developing the plan under
paragraph (1), the Secretary shall—
‘‘(A) identify each provision of this division (or an
amendment made by this division) that will re-
quire—
‘‘(i) the development and issuance of guidance,
including whether that guidance will be signifi-
cant guidance;
‘‘(ii) the development and issuance of a rule; or
‘‘(iii) appropriations;
‘‘(B) develop timelines for the issuance of—
‘‘(i) any guidance described in subparagraph
(A)(i); and
‘‘(ii) each rule described in subparagraph (A)(ii);
and
‘‘(C) establish a process to disseminate informa-
tion about this division and the amendments made
by this division to each District and Division Office
of the Corps of Engineers.
‘‘(3) TRANSMITTAL.—On completion of the plan
under paragraph (1), the Secretary shall transmit the
plan to—
‘‘(A) the Committee on Environment and Public
Works of the Senate; and
‘‘(B) the Committee on Transportation and Infra-
structure of the House of Representatives.
‘‘(b) IMPLEMENTATION OF PRIOR WATER RESOURCES DE-
VELOPMENT LAWS.—
‘‘(1) DEFINITION OF PRIOR WATER RESOURCES DEVEL-
OPMENT
LAW.—In this subsection, the term ‘‘prior
water resources development law’’ means each of the
following (including the amendments made by any of
the following):
‘‘(A) The Water Resources Development Act of
2000 (Public Law 106–541).
‘‘(B) The Water Resources Development Act of
2007 (Public Law 110–114).
‘‘(C) The Water Resources Reform and Develop-
ment Act of 2014 (Public Law 113–121).
‘‘(D) The Water Resources Development Act of
2016 (Public Law 114–322).
‘‘(E) The Water Resources Development Act of
2018 (Public Law 115–270).
‘‘(F) The Water Resources Development Act of
2020 ([div. AA of] Public Law 116–260).
‘‘(G) The Water Resources Development Act of
2022 ([title LXXXI of div. H of] Public Law 117–263).
‘‘(2) NOTICE.—
‘‘(A) IN GENERAL.—Not later than 60 days after the
date of enactment of this Act, the Secretary shall
submit to the Committee on Environment and Pub-
lic Works of the Senate and the Committee on
Transportation and Infrastructure of the House of
Representatives a written notice of the status of ef-
forts by the Secretary to implement the prior water
resources development laws.
Page 690
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2201
‘‘(B) CONTENTS.—
‘‘(i) IN GENERAL.—As part of the notice under
subparagraph (A), the Secretary shall include a
list describing each provision of a prior water re-
sources development law that has not been fully
implemented as of the date of submission of the
notice.
‘‘(ii) ADDITIONAL INFORMATION.—For each provi-
sion included on the list under clause (i), the Sec-
retary shall—
‘‘(I) establish a timeline for implementing the
provision;
‘‘(II) provide a description of the status of the
provision in the implementation process; and
‘‘(III) provide an explanation for the delay in
implementing the provision.
‘‘(3) BRIEFINGS.—
‘‘(A) IN GENERAL.—Not later than 180 days after
the date of enactment of this Act, and every 90 days
thereafter until the Chairs of the Committee on En-
vironment and Public Works of the Senate and the
Committee on Transportation and Infrastructure of
the House of Representatives determine that this
division, the amendments made by this division,
and prior water resources development laws are
fully implemented, the Secretary shall provide to
relevant congressional committees a briefing on
the implementation of this division, the amend-
ments made by this division, and prior water re-
sources development laws.
‘‘(B) INCLUSIONS.—A briefing under subparagraph
(A) shall include—
‘‘(i) updates to the implementation plan under
subsection (a); and
‘‘(ii) updates to the written notice under para-
graph (2).
‘‘(c) ADDITIONAL NOTICE PENDING ISSUANCE.—Not later
than 30 days before issuing any guidance, rule, notice
in the Federal Register, or other documentation re-
quired to implement this division, an amendment made
by this division, or a prior water resources development
law (as defined in subsection (b)(1)), the Secretary shall
submit to the Committee on Environment and Public
Works of the Senate and the Committee on Transpor-
tation and Infrastructure of the House of Representa-
tives a written notice regarding the pending issuance.
‘‘(d) WRDA IMPLEMENTATION TEAM.—
‘‘(1) DEFINITIONS.—In this subsection:
‘‘(A)
PRIOR
WATER
RESOURCES
DEVELOPMENT
LAW.—The term ‘‘prior water resources develop-
ment law’’ has the meaning given the term in sub-
section (b)(1).
‘‘(B) TEAM.—The term ‘‘team’’ means the Water
Resources Development Act implementation team
established under paragraph (2).
‘‘(2) ESTABLISHMENT.—The Secretary shall establish
a Water Resources Development Act implementation
team that shall consist of current employees of the
Federal Government, including—
‘‘(A) not fewer than 2 employees in the Office of
the Assistant Secretary of the Army for Civil
Works;
‘‘(B) not fewer than 2 employees at the head-
quarters of the Corps of Engineers; and
‘‘(C) a representative of each district and division
of the Corps of Engineers.
‘‘(3) DUTIES.—The team shall be responsible for as-
sisting with the implementation of this division, the
amendments made by this division, and prior water
resources development laws, including—
‘‘(A) performing ongoing outreach to—
‘‘(i) Congress; and
‘‘(ii) employees and servicemembers stationed
in districts and divisions of the Corps of Engi-
neers to ensure that all Corps of Engineers em-
ployees are aware of and implementing provisions
of this division, the amendments made by this di-
vision, and prior water resources development
laws, in a manner consistent with congressional
intent;
‘‘(B) identifying any issues with implementation
of a provision of this division, the amendments
made by this division, and prior water resources de-
velopment laws at the district, division, or national
level;
‘‘(C) resolving the issues identified under subpara-
graph (B), in consultation with Corps of Engineers
leadership and the Secretary; and
‘‘(D) ensuring that any interpretation developed
as a result of the process under subparagraph (C) is
consistent with congressional intent for this divi-
sion, the amendments made by this division, and
prior water resources development laws.’’
CONTINUING AUTHORITY PROGRAMS
Pub. L. 118–272, div. A, title I, § 1107(a), Jan. 4, 2025, 138
Stat. 3002, provided that:
‘‘(a) PILOT PROGRAM FOR ALTERNATIVE PROJECT DE-
LIVERY
FOR
CONTINUING
AUTHORITY
PROGRAM
PROJECTS.—
‘‘(1) IN GENERAL.—Not later than 180 days after the
date of enactment of this Act [Jan. 4, 2025], the Sec-
retary [of the Army] shall implement a pilot pro-
gram, in accordance with this subsection, allowing a
non-Federal interest or the Secretary, at the request
of the non-Federal interest, to carry out a project
under a continuing authority program through the
use of an alternative delivery method.
‘‘(2) PARTICIPATION IN PILOT PROGRAM.—In carrying
out paragraph (1), the Secretary shall—
‘‘(A) solicit project proposals from non-Federal
interests by posting program information on a pub-
lic-facing website and reaching out to non-Federal
interests that have previously submitted project re-
quests to the Secretary;
‘‘(B) review such proposals and select projects,
taking into consideration geographic diversity
among the selected projects and the alternative de-
livery methods used for the selected projects; and
‘‘(C) notify the Committee on Transportation and
Infrastructure of the House of Representatives and
the Committee on Environment and Public Works
of the Senate of each project selected under sub-
paragraph (B), including—
‘‘(i) identification of the project name, type,
and location, and the associated non-Federal in-
terest;
‘‘(ii) a description of the type of alternative de-
livery method being used to carry out the project;
and
‘‘(iii) a description of how the project meets the
authorized purposes and requirements of the ap-
plicable continuing authority program.
‘‘(3) COST
SHARE.—The Federal and non-Federal
shares of the cost of a project carried out pursuant to
this subsection shall be consistent with the cost
share requirements of the applicable continuing au-
thority program.
‘‘(4) MODIFICATIONS TO PROCESSES.—With respect to
a project selected under paragraph (3), the Secretary,
at the request of the non-federal interest, shall to the
maximum extent practicable—
‘‘(A) allow the non-Federal interest to contribute
more than the non-Federal share of the project re-
quired under the applicable continuing authority
program;
‘‘(B) allow the use of return on Federal invest-
ment as an alternative to benefit-cost analysis;
‘‘(C) allow the use of a real estate acquisition
audit process to replace existing crediting, over-
sight, and review processes and procedures; and
‘‘(D) allow the use of a single contract with the
non-Federal interest that incorporates the feasi-
bility and construction phases.
‘‘(5) REIMBURSEMENT.—
‘‘(A) IN GENERAL.—A project selected under para-
graph (3) that is carried out by a non-Federal inter-
est pursuant to this subsection shall be eligible for
reimbursement for the Federal share of the cost of
the project if, before initiation of construction of
the project—
Page 691
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2201
‘‘(i) the non-Federal interest enters into a writ-
ten agreement with the Secretary under section
221 of the Flood Control Act of 1970 (42 U.S.C.
1962d–5b) consistent with the applicable con-
tinuing authority program; and
‘‘(ii) the Secretary—
‘‘(I) reviews the plans for construction of the
project developed by the non-Federal interest;
‘‘(II) determines that the project meets the
requirements of the applicable continuing au-
thority program;
‘‘(III) determines that the project outputs are
consistent with the project scope;
‘‘(IV) determines that the plans comply with
applicable Federal laws and regulations; and
‘‘(V) verifies that the construction docu-
ments, including supporting information, have
been signed by an Engineer of Record.
‘‘(B) APPLICATION OF REIMBURSEMENT.—The Sec-
retary may only provide reimbursement under sub-
paragraph (A) if the Secretary certifies that—
‘‘(i) the non-Federal interest has obligated
funds for the cost of the project selected under
paragraph (3) and has requested reimbursement of
the Federal share of the cost of the project; and
‘‘(ii) the project has been constructed in accord-
ance with—
‘‘(I) all applicable permits or approvals; and
‘‘(II) the requirements of this subsection.
‘‘(C) MONITORING.—The Secretary shall regularly
monitor and audit any project being constructed by
a non-Federal interest pursuant to this subsection
to ensure that the construction is carried out in
compliance with the requirements of—
‘‘(i) this subsection; and
‘‘(ii) the relevant continuing authorities pro-
gram.
‘‘(6) EVALUATIONS
AND
REPORTING.—The Secretary
shall annually submit to the Committee on Transpor-
tation and Infrastructure of the House of Representa-
tives and the Committee on Environment and Public
Works of the Senate a report on the progress and out-
comes of projects carried out pursuant to this sub-
section, including—
‘‘(A) an assessment of whether the use of alter-
native delivery methods has resulted in cost sav-
ings or time efficiencies; and
‘‘(B) identification of changes to laws or policies
needed in order to implement more projects using
alternative delivery methods.
‘‘(7) DEFINITIONS.—In this subsection:
‘‘(A) ALTERNATIVE DELIVERY METHOD.—The term
‘alternative delivery method’ means a project deliv-
ery method that is not the traditional design-bid-
build method, including progressive design-build,
public-private partnerships, and construction man-
ager at risk.
‘‘(B) CONTINUING AUTHORITY PROGRAM.—The term
‘continuing authority program’ has the meaning
given that term in the section 7001(c)(1)(D) of Water
Resources Reform and Development Act of 2014 (33
U.S.C. 2282d [(c)(1)(D)]).
‘‘(C) RETURN ON FEDERAL INVESTMENT.—The term
‘return on Federal investment’ means, with respect
to Federal investment in a water resources develop-
ment project, the economic return on the invest-
ment for the Federal Government, taking into con-
sideration qualitative returns for any anticipated
life safety, risk reduction, economic growth, envi-
ronmental, and social benefits accruing as a result
of the investment.
‘‘(8) MAXIMUM PROJECTS.—Not more than 25 projects
may be carried out under this subsection.
‘‘(9) SUNSET.—The authority to commence pursuant
to this subsection a project selected under paragraph
(3) shall terminate on the date that is 10 years after
the date of enactment of this Act [Jan. 4, 2025].
‘‘(10) AUTHORIZATION OF APPROPRIATIONS.—There is
authorized to be appropriated to carry out this sub-
section $50,000,000 for each of fiscal years 2025 through
2032.’’
PRIOR GUIDANCE
Pub. L. 118–272, div. A, title I, § 1150(c), Jan. 4, 2025, 138
Stat. 3042, provided that: ‘‘Not later than 180 days after
the date of enactment of this Act [Jan. 4, 2025], the Sec-
retary [of the Army] shall issue the guidance required
pursuant to each of the following provisions:
‘‘(1) Section 1043(b)(9) of the Water Resources Re-
form and Development Act of 2014 [Pub. L. 113–121] (33
U.S.C. 2201 note).
‘‘(2) Section 8101 of the Water Resources Develop-
ment Act of 2022 (33 U.S.C. 2351b).
‘‘(3) Section 8107 of the Water Resources Develop-
ment Act of 2022 [title LXXXI of div. H of Pub. L.
117–263] (42 U.S.C. 1962d–5b note).
‘‘(4) Section 8112 of the Water Resources Develop-
ment Act of 2022 (33 U.S.C. 2281a).
‘‘(5) Section 8116 of the Water Resources Develop-
ment Act of 2022 [title LXXXI of div. H of Pub. L.
117–263] (10 U.S.C. 7036 note).
‘‘(6) Section 8136 of the Water Resources Develop-
ment Act of 2022 [title LXXXI of div. H of Pub. L.
117–263] (10 U.S.C. 2667 note).’’
PUBLIC-PRIVATE PARTNERSHIP USER’S GUIDE
Pub. L. 118–272, div. A, title II, § 1241, Jan. 4, 2025, 138
Stat. 3090, provided that:
‘‘(a) IN GENERAL.—Not later than 1 year after the
date of enactment of this Act [Jan. 4, 2025], the Sec-
retary [of the Army] shall develop and make publicly
available on an existing website of the Corps of Engi-
neers a guide on the use of public-private partnerships
for water resources development projects.
‘‘(b) INCLUSIONS.—In developing the guide under sub-
section (a), the Secretary shall include—
‘‘(1) a description of—
‘‘(A) applicable authorities and programs of the
Secretary that allow for the use of public-private
partnerships to carry out water resources develop-
ment projects; and
‘‘(B) opportunities across the civil works program
of the Corps of Engineers for the use of public-pri-
vate partnerships, including at recreational facili-
ties;
‘‘(2) a summary of prior public-private partnerships
for water resources development projects, including
lessons learned and best practices from those partner-
ships and projects;
‘‘(3) a discussion of—
‘‘(A) the roles and responsibilities of the Corps of
Engineers and non-Federal interests when using a
public-private partnership for a water resources de-
velopment project, including the opportunities for
risk-sharing; and
‘‘(B) the potential benefits associated with using
a public-private partnership for a water resources
development project, including the opportunities to
accelerate funding as compared to the annual ap-
propriations process; and
‘‘(4) a description of the process for executing a
project partnership agreement for a water resources
development project, including any unique consider-
ations when using a public-private partnership.
‘‘(c) FLEXIBILITY.—The Secretary may satisfy the re-
quirements of this section by modifying an existing
partnership handbook in accordance with this section.’’
ENVIRONMENTAL INFRASTRUCTURE PILOT PROGRAM
Pub. L. 118–272, div. A, title III, § 1305, Jan. 4, 2025, 138
Stat. 3134, provided that:
‘‘(a) IN GENERAL.—Notwithstanding subsection (b) of
section 219 of the Water Resources Development Act of
1992 [Pub. L. 102–580] (106 Stat. 4835) and subject to the
availability of appropriations, in carrying out projects
under that section benefitting an economically dis-
advantaged community (as defined by the Secretary [of
the Army] under section 160 of the Water Resources De-
velopment Act of 2020 [div. AA of Pub. L. 116–260] (33
U.S.C. 2201 note)), the Secretary may increase the Fed-
eral share of the cost of those projects to not more
than 90 percent.
Page 692
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2201
‘‘(b) LIMITATION.—The total amount expended for an
increased Federal share for all projects under sub-
section (a) shall not exceed $10,000,000 for each fiscal
year.
‘‘(c) TERMINATION.—The authority provided by this
section expires on the date that is 7 years after the
date of enactment of this Act [Jan. 4, 2025].’’
PILOT PROGRAMS
ON
THE FORMULATION
OF CORPS
OF
ENGINEERS
PROJECTS
IN
RURAL
COMMUNITIES
AND
ECONOMICALLY DISADVANTAGED COMMUNITIES
Pub. L. 116–260, div. AA, title I, § 118, Dec. 27, 2020, 134
Stat. 2629, as amended by Pub. L. 117–263, div. H, title
LXXXI, § 8118(a), Dec. 23, 2022, 136 Stat. 3710; Pub. L.
118–272, div. A, title III, § 1303(h), Jan. 4, 2025, 138 Stat.
3115, provided that:
‘‘(a) IN GENERAL.—The Secretary [of the Army] shall
establish and implement pilot programs, in accordance
with this section, to evaluate opportunities to address
the flood risk management and hurricane and storm
damage risk reduction needs of rural communities and
economically disadvantaged communities.
‘‘(b)
ECONOMICALLY
DISADVANTAGED
COMMUNITY
FLOOD PROTECTION AND HURRICANE AND STORM DAMAGE
REDUCTION STUDY PILOT PROGRAM.—
‘‘(1) IN GENERAL.—Not later than 180 days after the
date of enactment of this Act [Dec. 27, 2020], the Sec-
retary shall establish and implement a pilot program
to carry out feasibility studies, in accordance with
this subsection, for flood risk management and hurri-
cane and storm damage risk reduction projects for
economically disadvantaged communities, in coordi-
nation with non-Federal interests.
‘‘(2) PARTICIPATION IN PILOT PROGRAM.—In carrying
out paragraph (1), the Secretary shall—
‘‘(A) annually publish a notice in the Federal
Register that requests from non-Federal interests
proposals for the potential feasibility study of a
flood risk management project or hurricane and
storm damage risk reduction project for an eco-
nomically disadvantaged community;
‘‘(B) upon request of a non-Federal interest for
such a project, provide technical assistance to such
non-Federal interest in the formulation of a pro-
posal for a potential feasibility study to be sub-
mitted to the Secretary under the pilot program;
and
‘‘(C) review such proposals and, subject to the
availability of appropriations, annually select 10
feasibility studies for such projects to be carried
out by the Secretary, in coordination with the non-
Federal interest, under this pilot program.
‘‘(3) SELECTION CRITERIA.—In selecting a feasibility
study under paragraph (2)(C), the Secretary shall con-
sider whether—
‘‘(A) the percentage of people living in poverty in
the county or counties (or county-equivalent entity
or entities) in which the project is located is great-
er than the percentage of people living in poverty
in the State, based on census bureau data;
‘‘(B) the percentage of families with income above
the poverty threshold but below the average house-
hold income in the county or counties (or county-
equivalent entity or entities) in which the project
is located is greater than such percentage for the
State, based on census bureau data;
‘‘(C) the percentage of the population that identi-
fies as belonging to a minority or indigenous group
in the county or counties (or county-equivalent en-
tity or entities) in which the project is located is
greater than the average such percentage in the
State, based on census bureau data; and
‘‘(D) the project is addressing flooding or hurri-
cane or storm damage effects that have a dispropor-
tionate impact on a rural community, a minority
community, or an Indian Tribe.
‘‘(4)
ADMINISTRATION.—Notwithstanding
the
re-
quirements of section 105(a)(1)(A) of the Water Re-
sources Development Act of 1986 (33 U.S.C. 2215), the
Federal share of the cost of a feasibility study carried
out under the pilot program shall be 100 percent.
‘‘(5) STUDY REQUIREMENTS.—Feasibility studies car-
ried out under this subsection shall, to the maximum
extent practicable, incorporate natural features or
nature-based features (as such terms are defined in
section 1184 of the Water Resources Development Act
of 2016 (33 U.S.C. 2289a)), or a combination of such fea-
tures and nonstructural features, that avoid or re-
duce at least 50 percent of flood or storm damages in
one or more of the alternatives included in the final
alternatives evaluated.
‘‘(6) NOTIFICATION.—The Secretary shall notify the
Committee on Transportation and Infrastructure of
the House of Representatives and the Committee on
Environment and Public Works of the Senate of the
selection of each feasibility study under the pilot
program.
‘‘(7) COMPLETION.—Upon completion of a feasibility
report for a feasibility study selected to be carried
out under this subsection, the Secretary shall trans-
mit the report to Congress for authorization, and
shall include the report in the next annual report
submitted under section 7001 of the Water Resources
Reform and Development Act of 2014 (33 U.S.C. 2282d).
‘‘(c) PILOT PROGRAM
FOR
THE RECOMMENDATION
OF
FLOOD PROTECTION AND HURRICANE AND STORM DAMAGE
REDUCTION PROJECTS IN RURAL COMMUNITIES AND ECO-
NOMICALLY DISADVANTAGED COMMUNITIES.—
‘‘(1) IN GENERAL.—Not later than 180 days after the
date of enactment of this Act, the Secretary shall es-
tablish and implement a pilot program to evaluate,
and make recommendations to Congress on, flood
risk management projects and hurricane and storm
damage risk reduction projects in rural communities
or economically disadvantaged communities, without
demonstrating that each project is justified solely by
national economic development benefits.
‘‘(2) CONSIDERATIONS.—In carrying out this sub-
section, the Secretary may make a recommendation
to Congress on up to 10 projects annually, without
demonstrating that the project is justified solely by
national economic development benefits, if the Sec-
retary determines that—
‘‘(A) the community to be served by the project is
an economically disadvantaged community or a
rural community;
‘‘(B) the long-term life safety, economic viability,
and environmental sustainability of the community
would be threatened without the project; and
‘‘(C) the project is consistent with the require-
ments of section 1 of the Flood Control Act of 1936
(33 U.S.C. 701a).
‘‘(3) CONSISTENCY.—In carrying out this subsection,
the Secretary shall ensure that project recommenda-
tions are consistent with the principles and require-
ments and the interagency guidelines, as such terms
are defined in section 110 of this Act [42 U.S.C. 1962–4],
including the consideration of quantifiable monetary
and nonmonetary benefits of the project.
‘‘(4)
PRIORITIZATION.—The
Secretary
may
give
equivalent budgetary consideration and priority to
projects recommended under this subsection.
‘‘(d) GEOGRAPHIC DIVERSITY.—In selecting feasibility
studies under subsection (b)(2)(C) or in making project
recommendations under subsection (c), the Secretary
shall consider the geographic diversity among proposed
projects.
‘‘(e) REPORT.—Not later than 5 years, 10 years, and 15
years after the date of enactment of this Act, the Sec-
retary shall submit to the Committee on Transpor-
tation and Infrastructure of the House of Representa-
tives and the Committee on Environment and Public
Works of the Senate, and make publicly available, a re-
port detailing the results of the pilot programs carried
out under this section, including—
‘‘(1) a description of proposals received from non-
Federal interests pursuant to subsection (b)(2)(A);
‘‘(2) a description of technical assistance provided
to non-Federal interests under subsection (b)(2)(B);
‘‘(3) a description of proposals selected under sub-
section (b)(2)(C) and criteria used to select such pro-
posals;
Page 693
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2201
‘‘(4) a description of the projects evaluated or rec-
ommended by the Secretary under subsection (c);
‘‘(5) a description of the quantifiable monetary and
nonmonetary benefits associated with the projects
recommended under subsection (c); and
‘‘(6) any recommendations to Congress on how the
Secretary can address the flood risk management and
hurricane and storm damage risk reduction needs of
economically disadvantaged communities.
‘‘(f) STATE DEFINED.—In this section, the term ‘State’
means each of the several States, the District of Co-
lumbia, and each of the commonwealths, territories,
and possessions of the United States.
‘‘(g) SUNSET.—The authority to commence a feasi-
bility study under subsection (b), and the authority
make a recommendation under subsection (c), shall ter-
minate on the date that is 15 years after the date of en-
actment of this Act.
‘‘(h) PRIORITY PROJECTS.—In carrying out this sec-
tion, the Secretary shall prioritize the following
projects:
‘‘(1) The project for flood risk management, city of
Rialto, California, authorized by section 1201 of the
Water Resources Development Act of 2024 [Pub. L.
118–272, 138 Stat. 3050].
‘‘(2) The project for ecosystem restoration and
recreation, Santa Ana River, Jurupa Valley, Cali-
fornia, authorized by section 1201 of the Water Re-
sources Development Act of 2024 [Pub. L. 118–272, 138
Stat. 3051].
‘‘(3) The project for flood control and other pur-
poses, Kentucky River and its tributaries, Kentucky,
authorized by section 6 of the Act of August 11, 1939
(chapter 699, 53 Stat. 1416) [33 U.S.C. 701f note].
‘‘(4) The project for flood risk management, Ken-
tucky
River,
Kentucky,
authorized
by
section
8201(a)(31) of the Water Resources Development Act of
2022 [title LXXXI of div. H of Pub. L. 117–263] (136
Stat. 3746).
‘‘(5) The project for navigation, Hagaman Chute,
Lake Providence, Louisiana, authorized by section
1201 of the Water Resources Development Act of 2024
[Pub. L. 118–272, 138 Stat. 3053].
‘‘(6) The project for flood risk management, Otero
County, New Mexico, authorized by section 1201 of
the Water Resources Development Act of 2024 [Pub.
L. 118–272, 138 Stat. 3055].
‘‘(7) The project for flood control and other pur-
poses, Susquehanna River Basin, Williamsport, Penn-
sylvania, authorized by section 5 of the Act of June
22, 1936 (chapter 688, 49 Stat. 1573).
‘‘(8) The project for flood risk management and eco-
system restoration, Winooski River basin, Vermont,
authorized by section 1201 of the Water Resources De-
velopment Act of 2024 [Pub. L. 118–272, 138 Stat. 3058].
‘‘(9) The project for flood risk management and
sediment management, Grays River, Wahkiakum
County, Washington, authorized by section 1201 of the
Water Resources Development Act of 2024 [Pub. L.
118–272, 138 Stat. 3058].’’
[For definition of ‘‘economically disadvantaged com-
munity’’ as used in section 118 of div. AA of Pub. L.
116–260, set out above, see section 160 of div. AA of Pub.
L. 116–260, set out as a note below.]
NON-FEDERAL
PROJECT
IMPLEMENTATION
FOR
COM-
PREHENSIVE
EVERGLADES
RESTORATION
PLAN
PROJECTS
Pub. L. 116–260, div. AA, title I, § 134(b), Dec. 27, 2020,
134 Stat. 2649, provided that:
‘‘(1) IN GENERAL.—In carrying out the pilot program
authorized under section 1043(b) of the Water Resources
Reform and Development Act of 2014 [Pub. L. 113–121]
(33 U.S.C. 2201 note), the Secretary [of the Army] is au-
thorized to include a project authorized to be imple-
mented by, or in accordance with, section 601 of the
Water Resources Development Act of 2000 [Pub. L.
106–541, 114 Stat. 2680], in accordance with such section
1043(b).
‘‘(2) ELIGIBILITY.—In the case of a project described in
paragraph (1) for which the non-Federal interest has
initiated construction in compliance with authorities
governing the provision of in-kind contributions for
such project, the Secretary shall take into account the
value of any in-kind contributions carried out by the
non-Federal interest for such project prior to the date
of execution of the project partnership agreement
under section 1043(b) of the Water Resources Reform
and Development Act of 2014 when determining the
non-Federal share of the costs to complete construc-
tion of the project.
‘‘(3) GUIDANCE.—Not later than 180 days after the date
of enactment of this subsection [Dec. 27, 2020], and in
accordance with the guidance issued under section
1043(b)(9) of the Water Resources Reform and Develop-
ment Act of 2014 (as added by this section), the Sec-
retary shall issue any additional guidance that the Sec-
retary determines necessary for the implementation of
this subsection.’’
UNIFORMITY OF NOTIFICATION SYSTEMS
Pub. L. 116–260, div. AA, title I, § 139, Dec. 27, 2020, 134
Stat. 2651, provided that:
‘‘(a) INVENTORY.—Not later than 180 days after the
date of enactment of this Act [Dec. 27, 2020], the Sec-
retary [of the Army] shall complete an inventory of all
systems used by the Corps of Engineers for external
communication
and
notification
with
respect
to
projects, initiatives, and facilities of the Corps of Engi-
neers.
‘‘(b) UNIFORM PLAN.—
‘‘(1) IN GENERAL.—Not later than 1 year after the
date of enactment of this Act, the Secretary shall de-
velop a plan for the uniformity of such communica-
tion and notification systems for projects, initia-
tives, and facilities of the Corps of Engineers.
‘‘(2) INCLUSIONS.—The plan developed under para-
graph (1) shall—
‘‘(A) provide access to information in all forms
practicable, including through email, text mes-
sages, news programs and websites, radio, and other
forms of notification;
‘‘(B) establish a notification system for any
projects, initiatives, or facilities of the Corps of En-
gineers that do not have a notification system;
‘‘(C) streamline existing communication and noti-
fication systems to improve the strength and uni-
formity of those systems; and
‘‘(D) emphasize the necessity of timeliness in no-
tification systems and ensure that the methods of
notification can transmit information in a timely
manner.
‘‘(3) IMPLEMENTATION.—
‘‘(A) IN GENERAL.—Except as provided in subpara-
graph (B), not later than 2 years after the date of
enactment of this Act, the Secretary shall complete
the implementation of the plan developed under
paragraph (1).
‘‘(B) EMERGENCY MANAGEMENT NOTIFICATION.—Not
later than 18 months after the date of enactment of
this Act, the Secretary shall implement the provi-
sions of the plan developed under paragraph (1) re-
lating to emergency management notifications.
‘‘(4) SAVINGS
PROVISION.—Nothing in this section
authorizes the elimination of any existing commu-
nication or notification system used by the Corps of
Engineers.’’
CONTINUING AUTHORITY PROGRAMS
Pub. L. 116–260, div. AA, title I, § 165, Dec. 27, 2020, 134
Stat. 2668, as amended by Pub. L. 117–263, div. H, title
LXXXI, § 8118(b), Dec. 23, 2022, 136 Stat. 3711, which re-
lated to continuing authority programs, was trans-
ferred to section 2281c of this title.
REPORTS TO CONGRESS
Pub. L. 113–121, title I, § 1042, June 10, 2014, 128 Stat.
1243, provided that:
‘‘(a) IN GENERAL.—Subject to the availability of ap-
propriations, the Secretary [of the Army] shall com-
Page 694
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2201
plete and submit to Congress by the applicable date re-
quired the reports that address public safety and en-
hanced local participation in project delivery described
in subsection (b).
‘‘(b) REPORTS.—The reports referred to in subsection
(a) are the reports required under—
‘‘(1) subparagraphs (A) and (B) of section 1043(a)(5)
[33 U.S.C. 2201 note];
‘‘(2) section 1046(a)(2)(B) [33 U.S.C. 2319 note];
‘‘(3) section 210(e)(3) of the Water Resources Devel-
opment Act of 1986 ([former] 33 U.S.C. 2238(e)(3)) (as
amended by section 2102(a)); and
‘‘(4) section 7001 [33 U.S.C. 2282d].
‘‘(c) FAILURE TO PROVIDE A COMPLETED REPORT.—
‘‘(1) IN GENERAL.—Subject to subsection (d), if the
Secretary fails to provide a report listed under sub-
section (b) by the date that is 180 days after the appli-
cable date required for that report, $5,000 shall be re-
programmed from the General Expenses account of
the civil works program of the Army Corps of Engi-
neers into the account of the division of the Army
Corps of Engineers with responsibility for completing
that report.
‘‘(2) SUBSEQUENT REPROGRAMMING.—Subject to sub-
section (d), for each additional week after the date
described in paragraph (1) in which a report described
in
that
paragraph
remains
uncompleted
and
unsubmitted to Congress, $5,000 shall be repro-
grammed from the General Expenses account of the
civil works program of the Army Corps of Engineers
into the account of the division of the Secretary of
the Army with responsibility for completing that re-
port.
‘‘(d) LIMITATIONS.—
‘‘(1) IN
GENERAL.—For each report, the total
amounts reprogrammed under subsection (c) shall not
exceed, in any fiscal year, $50,000.
‘‘(2) AGGREGATE LIMITATION.—The total amount re-
programmed under subsection (c) in a fiscal year
shall not exceed $200,000.
‘‘(e) NO FAULT
OF
THE SECRETARY.—Amounts shall
not be reprogrammed under subsection (c) if the Sec-
retary certifies in a letter to the applicable committees
of Congress that—
‘‘(1) a major modification has been made to the con-
tent of the report that requires additional analysis
for the Secretary to make a final decision on the re-
port;
‘‘(2) amounts have not been appropriated to the
agency under this Act or any other Act to carry out
the report; or
‘‘(3) additional information is required from an en-
tity other than the Corps of Engineers and is not
available in a timely manner to complete the report
by the deadline.
‘‘(f) LIMITATION.—The Secretary shall not reprogram
funds to the General Expenses account of the civil
works program of the Corps of Engineers for the loss of
the funds.’’
NON-FEDERAL IMPLEMENTATION PILOT PROGRAM
Pub. L. 113–121, title I, § 1043, June 10, 2014, 128 Stat.
1244, as amended by Pub. L. 115–270, title I, § 1137, Oct.
23, 2018, 132 Stat. 3783; Pub. L. 116–260, div. AA, title I,
§ 134(a), Dec. 27, 2020, 134 Stat. 2648; Pub. L. 118–272, div.
A, title III, § 1303(e), Jan. 4, 2025, 138 Stat. 3114, provided
that:
‘‘(a) NON-FEDERAL IMPLEMENTATION
OF FEASIBILITY
STUDIES.—
‘‘(1) IN GENERAL.—Not later than 180 days after the
date of enactment of this Act [June 10, 2014], the Sec-
retary [of the Army] shall establish and implement a
pilot program to evaluate the cost-effectiveness and
project delivery efficiency of allowing non-Federal
interests to carry out feasibility studies for flood risk
management, hurricane and storm damage reduction,
aquatic ecosystem restoration, and coastal harbor
and channel and inland navigation.
‘‘(2) PURPOSES.—The purposes of the pilot program
are—
‘‘(A) to identify project delivery and cost-saving
alternatives to the existing feasibility study proc-
ess;
‘‘(B) to evaluate the technical, financial, and or-
ganizational efficiencies of a non-Federal interest
carrying out a feasibility study of 1 or more
projects; and
‘‘(C) to evaluate alternatives for the decentraliza-
tion of the project planning, management, and
operational decisionmaking process of the Corps of
Engineers.
‘‘(3) ADMINISTRATION.—
‘‘(A) IN GENERAL.—On the request of a non-Fed-
eral interest, the Secretary may enter into an
agreement with the non-Federal interest for the
non-Federal interest to provide full project man-
agement control of a feasibility study for a project
for—
‘‘(i) flood risk management;
‘‘(ii) hurricane and storm damage reduction, in-
cluding levees, floodwalls, flood control channels,
and water control structures;
‘‘(iii) coastal harbor and channel and inland
navigation; and
‘‘(iv) aquatic ecosystem restoration.
‘‘(B) USE OF NON-FEDERAL FUNDS.—
‘‘(i) IN GENERAL.—A non-Federal interest that
has entered into an agreement with the Secretary
pursuant to subparagraph (A) may use non-Fed-
eral funds to carry out the feasibility study.
‘‘(ii) CREDIT.—The Secretary shall credit to-
wards the non-Federal share of the cost of con-
struction of a project for which a feasibility study
is carried out under this subsection an amount
equal to the portion of the cost of developing the
study that would have been the responsibility of
the Secretary, if the study were carried out by
the Secretary, subject to the conditions that—
‘‘(I) non-Federal funds were used to carry out
the activities that would have been the respon-
sibility of the Secretary;
‘‘(II) the Secretary determines that the feasi-
bility study complies with all applicable Fed-
eral laws and regulations; and
‘‘(III) the project is authorized by any provi-
sion of Federal law enacted after the date on
which an agreement is entered into under sub-
paragraph (A).
‘‘(C) TRANSFER OF FUNDS.—
‘‘(i) IN GENERAL.—After the date on which an
agreement is executed pursuant to subparagraph
(A), the Secretary may transfer to the non-Fed-
eral interest to carry out the feasibility study—
‘‘(I) if applicable, the balance of any unobli-
gated amounts appropriated for the study, ex-
cept that the Secretary shall retain sufficient
amounts for the Corps of Engineers to carry out
any responsibilities of the Corps of Engineers
relating to the project and pilot program; and
‘‘(II) additional amounts, as determined by
the Secretary, from amounts made available
under paragraph (8), except that the total
amount transferred to the non-Federal interest
shall not exceed the updated estimate of the
Federal share of the cost of the feasibility
study.
‘‘(ii) ADMINISTRATION.—The Secretary shall in-
clude such provisions as the Secretary determines
to be necessary in an agreement under subpara-
graph (A) to ensure that a non-Federal interest
receiving Federal funds under this paragraph—
‘‘(I) has the necessary qualifications to ad-
minister those funds; and
‘‘(II) will comply with all applicable Federal
laws (including regulations) relating to the use
of those funds.
‘‘(D) NOTIFICATION.—The Secretary shall notify
the Committee on Environment and Public Works
of the Senate and the Committee on Transportation
and Infrastructure of the House of Representatives
Page 695
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2201
on the initiation of each feasibility study under the
pilot program.
‘‘(E) AUDITING.—The Secretary shall regularly
monitor and audit each feasibility study carried
out by a non-Federal interest under this section to
ensure that the use of any funds transferred under
subparagraph (C) are used in compliance with the
agreement signed under subparagraph (A).
‘‘(F) TECHNICAL ASSISTANCE.—On the request of a
non-Federal interest, the Secretary may provide
technical assistance to the non-Federal interest re-
lating to any aspect of the feasibility study, if the
non-Federal interest contracts with the Secretary
for the technical assistance and compensates the
Secretary for the technical assistance.
‘‘(G) DETAILED
PROJECT
SCHEDULE.—Not later
than 180 days after entering into an agreement
under subparagraph (A), each non-Federal interest,
to the maximum extent practicable, shall submit to
the Secretary a detailed project schedule, based on
full funding capability, that lists all deadlines for
milestones relating to the feasibility study.
‘‘(4) COST SHARE.—Nothing in this subsection affects
the cost-sharing requirement applicable on the day
before the date of enactment of this Act to a feasi-
bility study carried out under this subsection.
‘‘(5) REPORT.—
‘‘(A) IN GENERAL.—Not later than 2 years after the
date of enactment of this Act, the Secretary shall
submit to the Committee on Environment and Pub-
lic Works of the Senate and the Committee on
Transportation and Infrastructure of the House of
Representatives and make publicly available a re-
port detailing the results of the pilot program car-
ried out under this section, including—
‘‘(i) a description of the progress of the non-
Federal interests in meeting milestones in de-
tailed project schedules developed pursuant to
paragraph (3)(G); and
‘‘(ii) any recommendations of the Secretary
concerning whether the program or any compo-
nent of the program should be implemented on a
national basis.
‘‘(B) UPDATE.—Not later than 5 years after the
date of enactment of this Act, the Secretary shall
submit to the Committee on Environment and Pub-
lic Works of the Senate and the Committee on
Transportation and Infrastructure of the House of
Representatives an update of the report described
in subparagraph (A).
‘‘(C) FAILURE TO MEET DEADLINE.—If the Secretary
fails to submit a report by the required deadline
under this paragraph, the Secretary shall submit to
the Committee on Environment and Public Works
of the Senate and the Committee on Transportation
and Infrastructure of the House of Representatives
a detailed explanation of why the deadline was
missed and a projected date for submission of the
report.
‘‘(6) ADMINISTRATION.—All laws and regulations
that would apply to the Secretary if the Secretary
were carrying out the feasibility study shall apply to
a non-Federal interest carrying out a feasibility
study under this subsection.
‘‘(7) TERMINATION OF AUTHORITY.—The authority to
commence a feasibility study under this subsection
terminates on the date that is 5 years after the date
of enactment of this Act.
‘‘(8) AUTHORIZATION
OF
APPROPRIATIONS.—In addi-
tion to any amounts appropriated for a specific
project, there is authorized to be appropriated to the
Secretary to carry out the pilot program under this
subsection, including the costs of administration of
the Secretary, $25,000,000 for each of fiscal years 2015
through 2019.
‘‘(b) NON-FEDERAL PROJECT IMPLEMENTATION PILOT
PROGRAM.—
‘‘(1) IN GENERAL.—Not later than 180 days after the
date of enactment of this Act, the Secretary shall es-
tablish and implement a pilot program to evaluate
the cost-effectiveness and project delivery efficiency
of allowing non-Federal interests to carry out flood
risk management, hurricane and storm damage re-
duction, coastal harbor and channel inland naviga-
tion, and aquatic ecosystem restoration projects.
‘‘(2) PURPOSES.—The purposes of the pilot program
are—
‘‘(A) to identify project delivery and cost-saving
alternatives that reduce the backlog of authorized
Corps of Engineers projects;
‘‘(B) to evaluate the technical, financial, and or-
ganizational efficiencies of a non-Federal interest
carrying out the design, execution, management,
and construction of 1 or more projects; and
‘‘(C) to evaluate alternatives for the decentraliza-
tion of the project management, design, and con-
struction for authorized Corps of Engineers water
resources projects.
‘‘(3) ADMINISTRATION.—
‘‘(A) IN GENERAL.—In carrying out the pilot pro-
gram, the Secretary shall—
‘‘(i) identify a total of not more than 20 projects
for flood risk management, hurricane and storm
damage reduction (including levees, floodwalls,
flood control channels, and water control struc-
tures), coastal harbor and channels, inland navi-
gation, and aquatic ecosystem restoration that
have been authorized for construction, includ-
ing—
‘‘(I) not more than 12 projects that have been
authorized for construction prior to the date of
enactment of this Act and that—
‘‘(aa)(AA) have received Federal funds prior
to the date of enactment of this Act; or
‘‘(BB) for more than 2 consecutive fiscal
years, have an unobligated funding balance
for that project in the Corps of Engineers con-
struction account; and
‘‘(bb) to the maximum extent practicable,
are located in each of the divisions of the
Corps of Engineers;
‘‘(II) not more than 3 projects that have been
authorized for construction prior to the date of
enactment of this Act and that have not re-
ceived Federal funds in the period beginning on
the date on which the project was authorized
and ending on the date of enactment of this
Act; and
‘‘(III) not more than 5 projects that have been
authorized for construction, but did not receive
the authorization prior to the date of enact-
ment of this Act;
‘‘(ii) notify the Committee on Environment and
Public Works of the Senate and the Committee on
Transportation and Infrastructure of the House of
Representatives on the identification of each
project under the pilot program;
‘‘(iii) in collaboration with the non-Federal in-
terest, develop a detailed project management
plan for each identified project that outlines the
scope, budget, design, and construction resource
requirements necessary for the non-Federal inter-
est to execute the project, or a separable element
of the project;
‘‘(iv) on the request of the non-Federal interest,
enter into a project partnership agreement with
the non-Federal interest for the non-Federal in-
terest to provide full project management control
for construction of the project, or a separable ele-
ment of the project, in accordance with plans ap-
proved by the Secretary;
‘‘(v) following execution of the project partner-
ship agreement, transfer to the non-Federal inter-
est to carry out construction of the project, or a
separable element of the project—
‘‘(I) if applicable, the balance of the unobli-
gated amounts appropriated for the project, ex-
cept that the Secretary shall retain sufficient
amounts for the Corps of Engineers to carry out
any responsibilities of the Corps of Engineers
relating to the project and pilot program; and
Page 696
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2201
‘‘(II) additional amounts, as determined by
the Secretary, from amounts made available
under paragraph (8), except that the total
amount transferred to the non-Federal interest
shall not exceed the updated estimate of the
Federal share of the cost of construction, in-
cluding any required design; and
‘‘(vi) regularly monitor and audit each project
being constructed by a non-Federal interest under
this section to ensure that the construction ac-
tivities are carried out in compliance with the
plans approved by the Secretary and that the con-
struction costs are reasonable.
‘‘(B) DETAILED PROJECT SCHEDULE.—Not later than
180 days after entering into an agreement under
subparagraph (A)(iv), each non-Federal interest, to
the maximum extent practicable, shall submit to
the Secretary a detailed project schedule, based on
estimated funding levels, that lists all deadlines for
each milestone in the construction of the project.
‘‘(C) TECHNICAL ASSISTANCE.—On the request of a
non-Federal interest, the Secretary may provide
technical assistance to the non-Federal interest, if
the non-Federal interest contracts with and com-
pensates the Secretary for the technical assistance
relating to—
‘‘(i) any study, engineering activity, and design
activity for construction carried out by the non-
Federal interest under this subsection; and
‘‘(ii) expeditiously obtaining any permits nec-
essary for the project.
‘‘(4) COST SHARE.—Nothing in this subsection affects
the cost-sharing requirement applicable on the day
before the date of enactment of this Act to a project
carried out under this subsection.
‘‘(5) REPORT.—
‘‘(A) IN GENERAL.—Not later than 3 years after the
date of enactment of this Act, the Secretary shall
submit to the Committee on Environment and Pub-
lic Works of the Senate and the Committee on
Transportation and Infrastructure of the House of
Representatives and make publicly available a re-
port detailing the results of the pilot program car-
ried out under this subsection, including—
‘‘(i) a description of the progress of non-Federal
interests in meeting milestones in detailed
project schedules developed pursuant to para-
graph (2)(B); and
‘‘(ii) any recommendations of the Secretary
concerning whether the program or any compo-
nent of the program should be implemented on a
national basis.
‘‘(B) UPDATE.—Not later than 5 years after the
date of enactment of this Act, the Secretary shall
submit to the Committee on Environment and Pub-
lic Works of the Senate and the Committee on
Transportation and Infrastructure of the House of
Representatives an update of the report described
in subparagraph (A).
‘‘(C) FAILURE TO MEET DEADLINE.—If the Secretary
fails to submit a report by the required deadline
under this paragraph, the Secretary shall submit to
the Committee on Environment and Public Works
of the Senate and the Committee on Transportation
and Infrastructure of the House of Representatives
a detailed explanation of why the deadline was
missed and a projected date for submission of the
report.
‘‘(6) ADMINISTRATION.—All laws and regulations
that would apply to the Secretary if the Secretary
were carrying out the project shall apply to a non-
Federal interest carrying out a project under this
subsection.
‘‘(7) TERMINATION OF AUTHORITY.—The authority to
commence a project under this subsection terminates
on September 30, 2030.
‘‘(8) AUTHORIZATION
OF
APPROPRIATIONS.—In addi-
tion to any amounts appropriated for a specific
project, there is authorized to be appropriated to the
Secretary to carry out the pilot program under this
subsection, including the costs of administration of
the Secretary, $25,000,000 for each of fiscal years 2019
through 2030.
‘‘(9) IMPLEMENTATION GUIDANCE.—
‘‘(A) IN GENERAL.—Not later than 120 days after
the date of enactment of this paragraph [Dec. 27,
2020], the Secretary shall issue guidance for the im-
plementation of the pilot program that, to the ex-
tent practicable, identifies—
‘‘(i) the metrics for measuring the success of
the pilot program;
‘‘(ii) a process for identifying future projects to
participate in the pilot program;
‘‘(iii) measures to address the risks of a non-
Federal interest constructing projects under the
pilot program, including which entity bears the
risk for projects that fail to meet the Corps of En-
gineers standards for design or quality;
‘‘(iv) the laws and regulations that a non-Fed-
eral interest must follow in carrying out a project
under the pilot program; and
‘‘(v) which entity bears the risk in the event
that a project carried out under the pilot program
fails to be carried out in accordance with the
project authorization or this subsection.
‘‘(B) NEW
PROJECT
PARTNERSHIP
AGREEMENTS.—
The Secretary may not enter into a project part-
nership agreement under this subsection during the
period beginning on the date of enactment of this
paragraph and ending on the date on which the Sec-
retary issues the guidance under subparagraph
(A).’’
WATER INFRASTRUCTURE PUBLIC-PRIVATE PARTNERSHIP
PILOT PROGRAM
Pub. L. 113–121, title V, § 5014, June 10, 2014, 128 Stat.
1329, as amended by Pub. L. 117–263, div. H, title LXXXI,
§ 8147, Dec. 23, 2022, 136 Stat. 3730, provided that:
‘‘(a) IN GENERAL.—The Secretary [of the Army] shall
establish a pilot program to evaluate the cost effective-
ness and project delivery efficiency of allowing non-
Federal pilot applicants to carry out authorized water
resources development projects for coastal harbor im-
provement, channel improvement, inland navigation,
flood damage reduction, ecosystem restoration, and
hurricane and storm damage reduction.
‘‘(b) PURPOSES.—The purposes of the pilot program
established under subsection (a) are—
‘‘(1) to identify cost-saving project delivery alter-
natives that reduce the backlog of authorized Corps
of Engineers projects; and
‘‘(2) to evaluate the technical, financial, and orga-
nizational benefits of allowing a non-Federal pilot ap-
plicant to carry out and manage the design or con-
struction (or both) of 1 or more of such projects.
‘‘(c) SUBSEQUENT APPROPRIATIONS.—Any activity un-
dertaken under this section is authorized only to the
extent specifically provided for in subsequent appro-
priations Acts.
‘‘(d) ADMINISTRATION.—In carrying out the pilot pro-
gram established under subsection (a), the Secretary
shall—
‘‘(1) identify for inclusion in the program at least 15
projects that are authorized for construction for
coastal harbor improvement, channel improvement,
inland navigation, flood damage reduction, eco-
system restoration, or hurricane and storm damage
reduction;
‘‘(2) notify in writing the Committee on Environ-
ment and Public Works of the Senate and the Com-
mittee on Transportation and Infrastructure of the
House of Representatives of each project identified
under paragraph (1);
‘‘(3) in consultation with the non-Federal pilot ap-
plicant associated with each project identified under
paragraph (1), develop a detailed project management
plan for the project that outlines the scope, financ-
ing, budget, design, and construction resource re-
quirements necessary for the non-Federal pilot appli-
cant to execute the project, or a separable element of
the project;
Page 697
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2201
‘‘(4) at the request of the non-Federal pilot appli-
cant associated with each project identified under
paragraph (1), enter into a project partnership agree-
ment with the non-Federal pilot applicant under
which the non-Federal pilot applicant is provided full
project management control for the financing, de-
sign, or construction (or any combination thereof) of
the project, or a separable element of the project, in
accordance with plans approved by the Secretary;
‘‘(5) following execution of a project partnership
agreement under paragraph (4) and completion of all
work under the agreement, issue payment, in accord-
ance with subsection (g), to the relevant non-Federal
pilot applicant for that work; and
‘‘(6) regularly monitor and audit each project car-
ried out under the program to ensure that all activi-
ties related to the project are carried out in compli-
ance with plans approved by the Secretary and that
construction costs are reasonable.
‘‘(e) SELECTION
CRITERIA.—In identifying projects
under subsection (d)(1), the Secretary shall consider
the extent to which the project—
‘‘(1) is significant to the economy of the United
States;
‘‘(2) leverages Federal investment by encouraging
non-Federal contributions to the project;
‘‘(3) employs innovative project delivery and cost-
saving methods;
‘‘(4) received Federal funds in the past and experi-
enced delays or missed scheduled deadlines;
‘‘(5) has unobligated Corps of Engineers funding bal-
ances; and
‘‘(6) has not received Federal funding for recapital-
ization and modernization since the project was au-
thorized.
‘‘(f) DETAILED PROJECT SCHEDULE.—Not later than 180
days after entering into a project partnership agree-
ment under subsection (d)(4), a non-Federal pilot appli-
cant, to the maximum extent practicable, shall submit
to the Secretary a detailed project schedule for the rel-
evant project, based on estimated funding levels, that
specifies deadlines for each milestone with respect to
the project.
‘‘(g) PAYMENT.—Payment to the non-Federal pilot ap-
plicant for work completed pursuant to a project part-
nership agreement under subsection (d)(4) may be made
from—
‘‘(1) if applicable, the balance of the unobligated
amounts appropriated for the project; and
‘‘(2) other amounts appropriated to the Corps of En-
gineers, subject to the condition that the total
amount transferred to the non-Federal pilot appli-
cant may not exceed the estimate of the Federal
share of the cost of construction, including any re-
quired design.
‘‘(h) TECHNICAL ASSISTANCE.—At the request of a non-
Federal pilot applicant participating in the pilot pro-
gram established under subsection (a), the Secretary
may provide to the non-Federal pilot applicant, if the
non-Federal pilot applicant contracts with and com-
pensates the Secretary, technical assistance with re-
spect to—
‘‘(1) a study, engineering activity, or design activ-
ity related to a project carried out by the non-Fed-
eral pilot applicant under the program; and
‘‘(2) obtaining permits necessary for such a project.
‘‘(i) IDENTIFICATION OF IMPEDIMENTS.—
‘‘(1) IN GENERAL.—The Secretary shall—
‘‘(A) except as provided in paragraph (2), identify
any procedural requirements under the authority of
the Secretary that impede greater use of public-pri-
vate partnerships and private investment in water
resources development projects;
‘‘(B) develop and implement, on a project-by-
project basis, procedures and approaches that—
‘‘(i) address such impediments; and
‘‘(ii) protect the public interest and any public
investment
in
water
resources
development
projects that involve public-private partnerships
or private investment in water resources develop-
ment projects; and
‘‘(C) not later than 1 year after the date of enact-
ment of this section [June 10, 2014], issue rules to
carry out the procedures and approaches developed
under subparagraph (B).
‘‘(2) RULE OF CONSTRUCTION.—Nothing in this sec-
tion allows the Secretary to waive any requirement
under—
‘‘(A) sections 3141 through 3148 and sections 3701
through 3708 of title 40, United States Code;
‘‘(B) the National Environmental Policy Act of
1969 (42 U.S.C. 4321 et seq.); or
‘‘(C) any other provision of Federal law.
‘‘(j) PUBLIC BENEFIT STUDIES.—
‘‘(1) IN
GENERAL.—Before entering into a project
partnership agreement under subsection (d)(4), the
Secretary shall conduct an assessment of whether,
and provide justification in writing to the Committee
on Environment and Public Works of the Senate and
the Committee on Transportation and Infrastructure
of the House of Representatives that, the proposed
agreement provides better public and financial bene-
fits than a similar transaction using public funding
or financing.
‘‘(2) REQUIREMENTS.—An assessment under para-
graph (1) shall—
‘‘(A) be completed in a period of not more than 90
days;
‘‘(B) take into consideration any supporting ma-
terials and data submitted by the relevant non-Fed-
eral pilot applicant and other stakeholders; and
‘‘(C) determine whether the proposed project part-
nership agreement is in the public interest by de-
termining whether the agreement will provide pub-
lic and financial benefits, including expedited
project delivery and savings for taxpayers.
‘‘(k) NON-FEDERAL FUNDING.—The non-Federal pilot
applicant may finance the non-Federal share of a
project carried out under the pilot program established
under subsection (a).
‘‘(l) APPLICABILITY OF FEDERAL LAW.—Any provision
of Federal law that would apply to the Secretary if the
Secretary were carrying out a project shall apply to a
non-Federal pilot applicant carrying out a project
under this section.
‘‘(m) COST SHARE.—Nothing in this section affects a
cost-sharing requirement under Federal law that is ap-
plicable to a project carried out under the pilot pro-
gram established under subsection (a).
‘‘(n) REPORT.—Not later than 3 years after the date of
enactment of this Act, the Secretary shall submit to
the Committee on Environment and Public Works of
the Senate and the Committee on Transportation and
Infrastructure of the House of Representatives and
make publicly available a report describing the results
of the pilot program established under subsection (a),
including any recommendations of the Secretary con-
cerning whether the program or any component of the
program should be implemented on a national basis.
‘‘(o) NON-FEDERAL PILOT APPLICANT DEFINED.—In this
section, the term ‘non-Federal pilot applicant’ means—
‘‘(1) the non-Federal sponsor of the water resources
development project;
‘‘(2) a non-Federal interest, as defined in section 221
of the Flood Control Act of 1970 (42 U.S.C. 1982d–5b
[1962d–5b]); or
‘‘(3) a private entity with the consent of the local
government in which the project is located or that is
otherwise affected by the project.’’
FUNDING TO PROCESS PERMITS
Pub. L. 106–541, title II, § 214, Dec. 11, 2000, 114 Stat.
2594, as amended by Pub. L. 108–137, title I, § 114, Dec. 1,
2003, 117 Stat. 1836; Pub. L. 109–99, § 1, Nov. 11, 2005, 119
Stat. 2169; Pub. L. 109–209, § 1, Mar. 24, 2006, 120 Stat. 318;
Pub. L. 109–434, § 1, Dec. 20, 2006, 120 Stat. 3197; Pub. L.
110–114, title II, § 2002, Nov. 8, 2007, 121 Stat. 1067; Pub.
L. 111–120, § 1, Dec. 22, 2009, 123 Stat. 3478; Pub. L.
111–315, § 1, Dec. 18, 2010, 124 Stat. 3450; Pub. L. 113–121,
title I, § 1006, June 10, 2014, 128 Stat. 1212, which related
to funding to process permits and was formerly set out
Page 698
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2201
as a note under this section, was transferred to section
2352 of this title.
MONITORING
Pub. L. 106–541, title II, § 223, Dec. 11, 2000, 114 Stat.
2597, provided that:
‘‘(a) IN GENERAL.—The Secretary shall conduct a
monitoring program of the economic and environ-
mental results of up to 5 eligible projects selected by
the Secretary.
‘‘(b) DURATION.—The monitoring of a project selected
by the Secretary under this section shall be for a period
of not less than 12 years beginning on the date of its se-
lection.
‘‘(c) REPORTS.—The Secretary shall transmit to Con-
gress every 3 years a report on the performance of each
project selected under this section.
‘‘(d) ELIGIBLE PROJECT DEFINED.—In this section, the
term ‘eligible project’ means a water resources project,
or separable element thereof—
‘‘(1) for which a contract for physical construction
has not been awarded before the date of enactment of
this Act [Dec. 11, 2000];
‘‘(2) that has a total cost of more than $25,000,000;
and
‘‘(3)(A) that has as a benefit-to-cost ratio of less
than 1.5 to 1; or
‘‘(B) that has significant environmental benefits or
significant environmental mitigation components.
‘‘(e) COSTS.—The cost of conducting monitoring under
this section shall be a Federal expense.’’
WATER CONTROL MANAGEMENT
Pub. L. 106–53, title V, § 511, Aug. 17, 1999, 113 Stat. 341,
provided that:
‘‘(a) IN GENERAL.—In evaluating potential improve-
ments for water control management activities and
consolidation of water control management centers,
the Secretary may consider a regionalized water con-
trol management plan but may not implement such a
plan until the date on which a report is submitted
under subsection (b).
‘‘(b) REPORT.—Not later than 180 days after the date
of enactment of this Act [Aug. 17, 1999], the Secretary
shall submit to the Committee on Transportation and
Infrastructure and the Committee on Appropriations of
the House of Representatives and the Committee on
Environment and Public Works and the Committee on
Appropriations of the Senate a report containing—
‘‘(1) a description of the primary objectives of
streamlining water control management activities;
‘‘(2) a description of the benefits provided by
streamlining water control management activities
through consolidation of centers for those activities;
‘‘(3) a determination whether the benefits to users
of establishing regional water control management
centers will be retained in each district office of the
Corps of Engineers that does not have a regional cen-
ter;
‘‘(4) a determination whether users of regional cen-
ters will receive a higher level of benefits from
streamlining water control management activities;
and
‘‘(5) a list of the members of Congress who rep-
resent a district that includes a water control man-
agement center that is to be eliminated under a pro-
posed regionalized plan.’’
BUY AMERICAN; SENSE OF CONGRESS; REQUIREMENT
REGARDING NOTICE
Pub. L. 106–53, title II, § 222, Aug. 17, 1999, 113 Stat.
295, provided that:
‘‘(a) IN GENERAL.—It is the sense of Congress that, to
the extent practicable, all equipment and products pur-
chased with funds made available under this Act [see
Tables for classification] should be American made.
‘‘(b) NOTICE TO RECIPIENTS OF ASSISTANCE.—In pro-
viding financial assistance under this Act, the Sec-
retary, to the greatest extent practicable, shall provide
to each recipient of the assistance a notice describing
the statement made in subsection (a).’’
Pub. L. 104–303, title II, § 235, Oct. 12, 1996, 110 Stat.
3704, provided that:
‘‘(a) PURCHASE
OF AMERICAN-MADE EQUIPMENT
AND
PRODUCTS.—It is the sense of Congress that, to the
greatest extent practicable, all equipment and products
purchased with funds made available under this Act
[see Tables for classification] should be American-
made.
‘‘(b) NOTICE TO RECIPIENTS OF ASSISTANCE.—In pro-
viding financial assistance under this Act, the Sec-
retary, to the greatest extent practicable, shall provide
to each recipient of the assistance a notice describing
the statement made in subsection (a).’’
BUDGET ACT REQUIREMENTS
Pub. L. 99–662, title IX, § 948, Nov. 17, 1986, 100 Stat.
4201, provided that: ‘‘Any spending authority under this
Act [see Short Title note above] shall be effective only
to such extent and in such amounts as are provided in
appropriation Acts. For purposes of this Act, the term
‘spending authority’ has the meaning provided in sec-
tion 401(c)(2) of the Congressional Budget Act of 1974 [2
U.S.C. 651(c)(2)], except that such term does not include
spending authority for which an exception is made
under section 401(d) of such Act.’’
DEFINITION OF ECONOMICALLY DISADVANTAGED
COMMUNITY
Pub. L. 116–260, div. AA, title I, § 160, Dec. 27, 2020, 134
Stat. 2665, provided that:
‘‘(a) IN GENERAL.—Not later than 180 days after the
date of enactment of this Act [Dec. 27, 2020], the Sec-
retary [of the Army] shall issue guidance defining the
term ‘economically disadvantaged community’ for the
purposes of this Act [div. AA of Pub. L. 116–260, see
Short Title of 2020 Amendment note above] and the
amendments made by this Act.
‘‘(b) CONSIDERATIONS.—In defining the term ‘economi-
cally disadvantaged community’ under subsection (a),
the Secretary shall, to the maximum extent prac-
ticable, utilize the criteria under paragraph (1) or (2) of
section 301(a) of the Public Works and Economic Devel-
opment Act of 1965 (42 U.S.C. 3161), to the extent that
such criteria are applicable in relation to the develop-
ment of water resources development projects.
‘‘(c) PUBLIC COMMENT.—In developing the guidance
under subsection (a), the Secretary shall provide notice
and an opportunity for public comment.’’
‘‘SECRETARY’’ DEFINED
Pub. L. 118–272, div. A, § 1002, Jan. 4, 2025, 138 Stat.
2996, provided that: ‘‘In this division [div. A of Pub. L.
118–272, see Tables for classification], the term ‘Sec-
retary’ means the Secretary of the Army.’’
Pub. L. 117–263, div. H, title LXXXI, § 8002, Dec. 23,
2022, 136 Stat. 3694, provided that: ‘‘In this title [see Ta-
bles for classification], the term ‘Secretary’ means the
Secretary of the Army.’’
Pub. L. 116–260, div. AA, § 2, Dec. 27, 2020, 134 Stat.
2618, provided that: ‘‘In this Act [div. AA of Pub. L.
116–260, see Tables for classification], the term ‘Sec-
retary’ means the Secretary of the Army.’’
Pub. L. 115–270, title I, § 102, Oct. 23, 2018, 132 Stat.
3768, provided that: ‘‘In this title [see Tables for classi-
fication], the term ‘Secretary’ means the Secretary of
the Army.’’
Pub. L. 114–322, title I, § 1002, Dec. 16, 2016, 130 Stat.
1632, provided that: ‘‘In this title [see Tables for classi-
fication], the term ‘Secretary’ means the Secretary of
the Army.’’
Pub. L. 113–121, § 2, June 10, 2014, 128 Stat. 1195, pro-
vided that: ‘‘In this Act [see Tables for classification],
the term ‘Secretary’ means the Secretary of the
Army.’’
Pub. L. 110–114, § 2, Nov. 8, 2007, 121 Stat. 1049, pro-
vided that: ‘‘In this Act [see Tables for classification],
the term ‘Secretary’ means the Secretary of the
Army.’’
Page 699
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2202
Pub. L. 106–541, § 2, Dec. 11, 2000, 114 Stat. 2575, pro-
vided that: ‘‘In this Act [see Tables for classification],
the term ‘Secretary’ means the Secretary of the
Army.’’
Pub. L. 106–53, § 2, Aug. 17, 1999, 113 Stat. 273, provided
that: ‘‘In this Act [see Tables for classification], the
term ‘Secretary’ means the Secretary of the Army.’’
Pub. L. 104–303, § 2, Oct. 12, 1996, 110 Stat. 3662, pro-
vided that: ‘‘In this Act [see Tables for classification],
the term ‘Secretary’ means the Secretary of the
Army.’’
Pub. L. 102–580, § 3, Oct. 31, 1992, 106 Stat. 4801, pro-
vided that: ‘‘For purposes of this Act [see Short Title
of 1992 Amendment note above], the term ‘Secretary’
means the Secretary of the Army.’’
Pub. L. 101–640, § 2, Nov. 28, 1990, 104 Stat. 4605, pro-
vided that: ‘‘For purposes of this Act [see Short Title
of 1990 Amendment note above], the term ‘Secretary’
means the Secretary of the Army.’’
Pub. L. 100–676, § 2, Nov. 17, 1988, 102 Stat. 4013, pro-
vided that: ‘‘For purposes of this Act [see Short Title
of 1988 Amendment note above], the term ‘Secretary’
means the Secretary of the Army.’’
Executive Documents
PROMOTING THE RELIABLE SUPPLY AND DELIVERY OF
WATER IN THE WEST
Memorandum of President of the United States, Oct.
19, 2018, 83 F.R. 53961, which related to water infrastruc-
ture throughout the western United States, was re-
voked by Ex. Ord. No. 13990, § 7(d), Jan. 20, 2021, 86 F.R.
7042, set out in a note under section 4321 of Title 42, The
Public Health and Welfare.
§ 2202. Non-Federal engagement and review
(a) Issuance
The Secretary shall expeditiously issue guid-
ance to implement each covered provision of law
in accordance with this section.
(b) Public notice
(1) In general
Prior to developing and issuing any new or
revised implementation guidance for a covered
water resources development law, the Sec-
retary shall issue a public notice that—
(A) informs potentially interested non-
Federal stakeholders of the Secretary’s in-
tent to develop and issue such guidance; and
(B) provides an opportunity for interested
non-Federal stakeholders to engage with,
and provide input and recommendations to,
the Secretary on the development and
issuance of such guidance.
(2) Issuance of notice
The Secretary shall issue the notice under
paragraph (1) through a posting on a publicly
accessible website dedicated to providing no-
tice on the development and issuance of imple-
mentation guidance for a covered water re-
sources development law.
(c) Stakeholder engagement
(1) Input
The Secretary shall allow a minimum of 60
days after issuance of the public notice
under subsection (b) for non-Federal stake-
holders to provide input and recommenda-
tions to the Secretary, prior to finalizing
implementation guidance for a covered
water resources development law.
(2) Outreach
The Secretary may, as appropriate (as de-
termined by the Secretary), reach out to
non-Federal
stakeholders
and
circulate
drafts of implementation guidance for a cov-
ered water resources development law for in-
formal input and recommendations.
(d) Submission
The Secretary shall submit to the Committee
on Transportation and Infrastructure of the
House of Representatives and the Committee on
Environment and Public Works of the Senate a
copy of all input and recommendations received
pursuant to subsection (c) and a description of
any consideration of such input and rec-
ommendations.
(e) Development of guidance
When developing implementation guidance for
a covered water resources development law, the
Secretary shall take into consideration the
input and recommendations received from non-
Federal stakeholders, and make the final guid-
ance available to the public on the publicly ac-
cessible website described in subsection (b)(2).
(f) Definitions
In this section:
(1) Covered provision of law
The term ‘‘covered provision of law’’ means
a provision of law under the jurisdiction of the
Secretary contained in, or amended by, a cov-
ered water resources development law, with
respect to which—
(A) the Secretary determines guidance is
necessary in order to implement the provi-
sion; and
(B) no such guidance has been issued as of
October 23, 2018.
(2) Covered water resources development law
The term ‘‘covered water resources develop-
ment law’’ means—
(A) the Water Resources Reform and De-
velopment Act of 2014;
(B) the Water Resources Development Act
of 2016;
(C) this Act; and
(D) any Federal water resources develop-
ment law enacted after October 23, 2018.
(Pub. L. 115–270, title I, § 1105, Oct. 23, 2018, 132
Stat. 3772.)
Editorial Notes
REFERENCES IN TEXT
The Water Resources Reform and Development Act of
2014, referred to in subsec. (f)(2)(A), is Pub. L. 113–121,
June 10, 2014, 128 Stat. 1193. For complete classification
of this Act to the Code, see Short Title of 2014 Amend-
ment note set out under section 2201 of this title and
Tables.
The Water Resources Development Act of 2016, re-
ferred to in subsec. (f)(2)(B), is title I of Pub. L. 114–322,
Dec. 16, 2016, 130 Stat. 1632. For complete classification
of this Act to the Code, see Short Title of 2016 Amend-
ment note set out under section 2201 of this title and
Tables.
This Act, referred to in subsec. (f)(2)(C), probably
means title I of Pub. L. 115–270, Oct. 23, 2018, 132 Stat.
3768, known as the Water Resources Development Act
of 2018. For complete classification of this Act to the
Code, see Short Title of 2018 Amendment note set out
under section 2201 of this title and Tables.
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 2018, and also as part of the Amer-
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Lease Authority.—** Whenever the Secretary concerned considers it advantageous to the United States, the Secretary concerned may lease to such lessee and upon such terms as the Secretary concerned considers will promote the national defense or to be in the public interest, real or personal property that—
(1) is under the control of the Secretary concerned;
(2) is not for the time needed for public use; and
(3) is not excess property, as defined by [section 102 of title 40](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title40-section102&num=0&edition=prelim).
**(b) Conditions on Leases.—** A lease under subsection (a)—
(1) may not be for more than five years, unless the Secretary concerned determines that a lease for a longer period will promote the national defense or be in the public interest;
(2) may give the lessee the first right to buy the property if the lease is revoked to allow the United States to sell the property under any other provision of law;
(3) shall permit the Secretary to revoke the lease at any time, unless he determines that the omission of such a provision will promote the national defense or be in the public interest;
(4) shall provide for the payment (in cash or in kind) by the lessee of consideration in an amount that is not less than the fair market value of the lease interest, as determined by the Secretary;
(5) may provide, notwithstanding [section 1302 of title 40](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title40-section1302&num=0&edition=prelim) or any other provision of law, for the alteration, repair, or improvement, by the lessee, of the property leased as the payment of part or all of the consideration for the lease;
(6) except as otherwise provided in subsection (d), shall require the
Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 2667
Stored review status: release_metadata_unconfirmed. The source passage cites 10 U.S.C. § 2667. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 2066
TITLE 10—ARMED FORCES
[§ 2666
TRANSFER OF FUNCTIONS
For transfer of authorities, functions, personnel, and
assets of the Coast Guard, including the authorities
and functions of the Secretary of Transportation relat-
ing thereto, to the Department of Homeland Security,
and for treatment of related references, see sections
468(b), 551(d), 552(d), and 557 of Title 6, Domestic Secu-
rity, and the Department of Homeland Security Reor-
ganization Plan of November 25, 2002, as modified, set
out as a note under section 542 of Title 6.
[§ 2666. Repealed. Pub. L. 108–375, div. B, title
XXVIII, § 2821(a)(2), Oct. 28, 2004, 118 Stat.
2129]
Section, act Aug. 10, 1956, ch. 1041, 70A Stat. 149, re-
lated to limitation on commission on a contract for the
purchase of land payable from funds appropriated for
the Department of Defense.
§ 2667. Leases: non-excess property of military
departments and Defense Agencies
(a) LEASE
AUTHORITY.—Whenever the Sec-
retary concerned considers it advantageous to
the United States, the Secretary concerned may
lease to such lessee and upon such terms as the
Secretary concerned considers will promote the
national defense or to be in the public interest,
real or personal property that—
(1) is under the control of the Secretary con-
cerned;
(2) is not for the time needed for public use;
and
(3) is not excess property, as defined by sec-
tion 102 of title 40.
(b) CONDITIONS ON LEASES.—A lease under sub-
section (a)—
(1) may not be for more than five years, un-
less the Secretary concerned determines that
a lease for a longer period will promote the na-
tional defense or be in the public interest;
(2) may give the lessee the first right to buy
the property if the lease is revoked to allow
the United States to sell the prop
Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 2667
Stored review status: historical_2024_not_currentness_verified. The source passage cites 10 U.S.C. § 2667. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a)** There are in the Army the following officers:
(1) Chief of Engineers.
(2) Surgeon General.
(3) Judge Advocate General.
(4) Chief of Chaplains.
**(b)** Each officer named in subsection (a), except the Judge Advocate General, shall be appointed by the President, by and with the advice and consent of the Senate, from officers above the grade of major who—
(1) have shown by extensive duty in the branch concerned, or by similar duty, that they are qualified for the appointment; and
(2) have been recommended by a board under subsection (e).
The Surgeon General may be appointed from officers in any corps of the Army Medical Department. The Judge Advocate General shall be appointed as prescribed in [section 7037 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section7037&num=0&edition=prelim).
**(c)** An officer appointed under subsection (b) normally holds office for four years. However, the President may terminate or extend the appointment at any time.
**(d)** Each officer named in subsection (a) shall perform duties prescribed by the Secretary of the Army and by law.
**(e)**
(1) Under the supervision of the Secretary, the Chief of Engineers may accept orders to provide services to another department, agency, or instrumentality of the United States or to a State or political subdivision of a State. The Chief of Engineers may provide any part of those services by contract. Services may be provided to a State, or to a political subdivision of a State, only if—
(A) the work to be undertaken on behalf of non-Federal interests involves Federal assistance and the head of the department or agency providing Federal assistance for the work does not object to the provision of services by the Chief of Engineers; and
(B) the se
Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 7036
Stored review status: release_metadata_unconfirmed. The source passage cites 10 U.S.C. § 7036. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 2982
TITLE 10—ARMED FORCES
§ 7035
(1) the Vice Chief of Staff shall perform the
duties of the Chief of Staff until a successor is
appointed or the absence or disability ceases;
or
(2) if there is a vacancy in the office of the
Vice Chief of Staff or the Vice Chief of Staff is
absent or disabled, unless the President di-
rects otherwise, the most senior officer of the
Army in the Army Staff who is not absent or
disabled and who is not restricted in perform-
ance of duty shall perform the duties of the
Chief of Staff until a successor to the Chief of
Staff or the Vice Chief of Staff is appointed or
until the absence or disability of the Chief of
Staff or Vice Chief of Staff ceases, whichever
occurs first.
(Aug. 10, 1956, ch. 1041, 70A Stat. 162, § 3035; Pub.
L. 85–599, § 6(a), Aug. 6, 1958, 72 Stat. 519; renum-
bered § 3034 and amended Pub. L. 99–433, title V,
§ 502(d), Oct. 1, 1986, 100 Stat. 1041; renumbered
§ 7034, Pub. L. 115–232, div. A, title VIII, § 808(a),
Aug. 13, 2018, 132 Stat. 1838.)
HISTORICAL AND REVISION NOTES
Revised
section
Source (U.S. Code)
Source (Statutes at Large)
3035(a) .....
3035(b) .....
10:21c (1st sentence).
10:21c (less 1st sentence).
June 28, 1950, ch. 383,
§ 203, 64 Stat. 266.
In subsection (a), the words ‘‘of the Army’’ are omit-
ted as surplusage.
In subsection (b), the words ‘‘If the Chief of Staff is
absent or disabled or if that office is vacant’’ are sub-
stituted for 10:21c (1st 18 words of last sentence). The
words ‘‘the officer who is highest on the following list
and’’ are inserted for clarity. The words ‘‘until his suc-
cessor is appointed’’ are omitted as surplusage.
Editorial Notes
AMENDMENTS
2018—Pub. L. 115–232 renumbered section 3034 of this
title as this section.
1986—Pub. L. 99–433, §
Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 7036
Stored review status: historical_2024_not_currentness_verified. The source passage cites 10 U.S.C. § 7036. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
In any case in which a project under the jurisdiction of the Secretary is budgeted under a different business line than the business line under which the project was originally authorized, the Secretary shall ensure that the project is carried out in accordance with any requirements that apply to the business line under which the project was originally authorized.
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2201
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.
Federal law — U.S. Code and appendices · legal_authorities
Subject to the availability of appropriations, the Secretary, acting through the Director of the Engineer Research and Development Center and, where appropriate, in consultation with other Federal agencies, shall carry out research and development activities relating to the use of subsurface drain systems as—
(1) a flood risk-reduction measure; or
(2) a coastal storm risk-reduction measure.
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2281a
Stored review status: release_metadata_unconfirmed. The source passage cites 33 U.S.C. § 2281a. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 759
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2281a
§ 2281. Matters to be addressed in planning
(a) In general
Enhancing national economic development
(including benefits to particular regions of the
Nation not involving the transfer of economic
activity to such regions from other regions), the
quality of the total environment (including
preservation and enhancement of the environ-
ment), the well-being of the people of the United
States, the prevention of loss of life, and the
preservation of cultural and historical values
shall be addressed in the formulation and eval-
uation of water resources projects to be carried
out by the Secretary, and the associated bene-
fits
and
costs,
both
quantifiable
and
unquantifiable, and information regarding po-
tential loss of human life that may be associ-
ated with flooding and coastal storm events,
shall be displayed in the benefits and costs of
such projects.
(b) Assessments
For all feasibility reports for water resources
projects completed after December 31, 2007, the
Secretary shall assess whether—
(1) the water resources project and each sep-
arable element is cost-effective; and
(2) the water resources project complies with
Federal, State, and local laws (including regu-
lations) and public policies.
(Pub. L. 99–662, title IX, § 904, Nov. 17, 1986, 100
Stat. 4185; Pub. L. 101–640, title III, § 315, Nov. 28,
1990, 104 Stat. 4641; Pub. L. 104–303, title II, § 231,
Oct. 12, 1996, 110 Stat. 3704; Pub. L. 110–114, title
II, § 2033(a), Nov. 8, 2007, 121 Stat. 1084.)
Editorial Notes
AMENDMENTS
2007—Pub. L. 110–114 designated existing provisions as
subsec. (a), inserted heading, and added subsec. (b).
1996—Pub. L. 104–303 inserted ‘‘and information re-
garding potential loss of human life that
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2281a
Stored review status: historical_2024_not_currentness_verified. The source passage cites 33 U.S.C. § 2281a. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Omitted**
**(b) Planning process improvements** The Chief of Engineers—
(1) shall adopt a risk analysis approach to project cost estimates for water resources projects; and
(2) not later than one year after November 8, 2007, shall—
(A) issue procedures for risk analysis for cost estimation for water resources projects; and
(B) submit to Congress a report that includes any recommended amendments to [section 2280 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2280&num=0&edition=prelim).
**(c) Benchmarks**
(1) **In general** — Not later than 12 months after November 8, 2007, the Chief of Engineers shall establish benchmarks for determining the length of time it should take to conduct a feasibility study for a water resources project and its associated review process under the National Environmental Policy Act of 1969 ([42 U.S.C. 4321](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section4321&num=0&edition=prelim) et seq.). The Chief of Engineers shall use such benchmarks as a management tool to make the feasibility study process more efficient in all districts of the Corps of Engineers.
(2) **Benchmark goals** — The Chief of Engineers shall establish, to the extent practicable, under paragraph (1) benchmark goals for completion of feasibility studies for water resources projects generally within 2 years. In the case of feasibility studies that the Chief of Engineers determines may require additional time based on the project type, size, cost, or complexity, the benchmark goal for completion shall be generally within 4 years.
**(d) Calculation of benefits and costs for flood damage reduction projects** A feasibility study for a project for flood damage reduction shall include, as part of t
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2282d
Stored review status: release_metadata_unconfirmed. The source passage cites 33 U.S.C. § 2282d. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 769
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2282d
(3) Notification
Each time the Secretary makes a determina-
tion under this subsection, the Secretary shall
provide written notice to the Committee on
Environment and Public Works of the Senate
and the Committee on Transportation and In-
frastructure of the House of Representatives
as to the results of that determination, includ-
ing an identification of the specific 1 or more
factors used in making the determination that
the project is complex.
(d) Reviews
Not later than 90 days after the date of the ini-
tiation of a study described in subsection (a) for
a project, the Secretary shall—
(1) take all steps necessary to initiate the
process for completing federally mandated re-
views that the Secretary is required to com-
plete as part of the study, including the envi-
ronmental review process under section 1005;
(2) convene a meeting of all Federal, tribal,
and State agencies identified under section
2348(e) of this title that may be required by
law to conduct or issue a review, analysis, or
opinion on or to make a determination con-
cerning a permit or license for the study; and
(3) take all steps necessary to provide infor-
mation that will enable required reviews and
analyses related to the project to be conducted
by other agencies in a thorough and timely
manner.
(e) Interim report
Not later than 18 months after June 10, 2014,
the Secretary shall submit to the Committee on
Environment and Public Works of the Senate
and the Committee on Transportation and Infra-
structure of the House of Representatives and
make publicly available a report that de-
scribes—
(1) the status of the implementation of the
planning process under this section, including
the number of participating project
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2282d
Stored review status: historical_2024_not_currentness_verified. The source passage cites 33 U.S.C. § 2282d. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) In general** To the greatest extent practicable, the Secretary shall encourage and incorporate corrosion prevention activities at water resources development projects.
**(b) Activities** In carrying out subsection (a), the Secretary, to the greatest extent practicable, shall ensure that contractors performing work for water resources development projects—
(1) use best practices to carry out corrosion prevention activities in the field;
(2) use industry-recognized standards and corrosion mitigation and prevention methods when—
(A) determining protective coatings;
(B) selecting materials; and
(C) determining methods of cathodic protection, design, and engineering for corrosion prevention;
(3) use certified coating application specialists and cathodic protection technicians and engineers;
(4) use best practices in environmental protection to prevent environmental degradation and to ensure careful handling of all hazardous materials;
(5) demonstrate a history of employing industry-certified inspectors to ensure adherence to best practices and standards; and
(6) demonstrate a history of compliance with applicable requirements of the Occupational Safety and Health Administration.
**(c) Corrosion prevention activities defined** In this section, the term “corrosion prevention activities” means—
(1) the application and inspection of protective coatings for complex work involving steel and cementitious structures, including structures that will be exposed in immersion;
(2) the installation, testing, and inspection of cathodic protection systems;
(3) the carrying out of an activity described in paragraph (1) or (2) through a program in corrosion prevention that is—
(A) offered or accredited by an organization that sets industry standards for corrosion
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2351b
Stored review status: release_metadata_unconfirmed. The source passage cites 33 U.S.C. § 2351b. This identifies an authority to review, not proof of applicability.