33 U.S.C. § 2282d — Annual report to Congress
Federal law — U.S. Code and appendices · legal_authorities
Page 769
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2282d
(3) Notification
Each time the Secretary makes a determina-
tion under this subsection, the Secretary shall
provide written notice to the Committee on
Environment and Public Works of the Senate
and the Committee on Transportation and In-
frastructure of the House of Representatives
as to the results of that determination, includ-
ing an identification of the specific 1 or more
factors used in making the determination that
the project is complex.
(d) Reviews
Not later than 90 days after the date of the ini-
tiation of a study described in subsection (a) for
a project, the Secretary shall—
(1) take all steps necessary to initiate the
process for completing federally mandated re-
views that the Secretary is required to com-
plete as part of the study, including the envi-
ronmental review process under section 1005;
(2) convene a meeting of all Federal, tribal,
and State agencies identified under section
2348(e) of this title that may be required by
law to conduct or issue a review, analysis, or
opinion on or to make a determination con-
cerning a permit or license for the study; and
(3) take all steps necessary to provide infor-
mation that will enable required reviews and
analyses related to the project to be conducted
by other agencies in a thorough and timely
manner.
(e) Interim report
Not later than 18 months after June 10, 2014,
the Secretary shall submit to the Committee on
Environment and Public Works of the Senate
and the Committee on Transportation and Infra-
structure of the House of Representatives and
make publicly available a report that de-
scribes—
(1) the status of the implementation of the
planning process under this section, including
the number of participating project
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2282d
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: bbbf22802f523b9952defa387df3de6ff285fbcba76ee9c4c5aa6da1d82e000a. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-10633c68b19f6a47ffc26571
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-2282d-annual-report-to-congress--1a53ceeeb8.md
Pages: Not recorded – Not recorded
Passage SHA-256: 260e694164154f3f67c37419d30591f73385749f95aecaeb998d0ffeecd531cb
Source location: USCODE-2024-title33-chap36-subchapV-sec2282d.pdf
Stored source content
Page 769
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2282d
(3) Notification
Each time the Secretary makes a determina-
tion under this subsection, the Secretary shall
provide written notice to the Committee on
Environment and Public Works of the Senate
and the Committee on Transportation and In-
frastructure of the House of Representatives
as to the results of that determination, includ-
ing an identification of the specific 1 or more
factors used in making the determination that
the project is complex.
(d) Reviews
Not later than 90 days after the date of the ini-
tiation of a study described in subsection (a) for
a project, the Secretary shall—
(1) take all steps necessary to initiate the
process for completing federally mandated re-
views that the Secretary is required to com-
plete as part of the study, including the envi-
ronmental review process under section 1005;
(2) convene a meeting of all Federal, tribal,
and State agencies identified under section
2348(e) of this title that may be required by
law to conduct or issue a review, analysis, or
opinion on or to make a determination con-
cerning a permit or license for the study; and
(3) take all steps necessary to provide infor-
mation that will enable required reviews and
analyses related to the project to be conducted
by other agencies in a thorough and timely
manner.
(e) Interim report
Not later than 18 months after June 10, 2014,
the Secretary shall submit to the Committee on
Environment and Public Works of the Senate
and the Committee on Transportation and Infra-
structure of the House of Representatives and
make publicly available a report that de-
scribes—
(1) the status of the implementation of the
planning process under this section, including
the number of participating projects;
(2) a review of project delivery schedules, in-
cluding a description of any delays on those
studies participating in the planning process
under this section; and
(3) any recommendations for additional au-
thority necessary to support efforts to expe-
dite the feasibility study process for water re-
source projects.
(f) Final report
Not later than 4 years after June 10, 2014, the
Secretary shall submit to the Committee on En-
vironment and Public Works of the Senate and
the Committee on Transportation and Infra-
structure of the House of Representatives and
make publicly available a report that de-
scribes—
(1) the status of the implementation of this
section, including a description of each feasi-
bility study subject to the requirements of
this section;
(2) the amount of time taken to complete
each feasibility study; and
(3) any recommendations for additional au-
thority necessary to support efforts to expe-
dite the feasibility study process, including an
analysis of whether the limitation established
by subsection (a)(2) needs to be adjusted to ad-
dress the impacts of inflation.
(Pub. L. 113–121, title I, § 1001, June 10, 2014, 128
Stat. 1196; Pub. L. 115–270, title I, § 1330(b), Oct.
23, 2018, 132 Stat. 3827; Pub. L. 116–260, div. AA,
title III, § 360(c), Dec. 27, 2020, 134 Stat. 2733; Pub.
L. 118–272, div. A, title I, § 1103(a), Jan. 4, 2025, 138
Stat. 3000.)
Editorial Notes
REFERENCES IN TEXT
Section 1005, referred to in subsec. (d)(1), is section
1005 of Pub. L. 113–121, which enacted section 2349 of
this title and amended generally section 2348 of this
title.
CODIFICATION
Section was enacted as part of the Water Resources
Reform and Development Act of 2014, and not as part of
the Water Resources Development Act of 1986 which
comprises this chapter.
AMENDMENTS
2025—Subsec. (a)(1). Pub. L. 118–272, § 1103(a)(1), sub-
stituted ‘‘4 years after the date on which the Secretary
determines the Federal interest for purposes of the re-
port pursuant to section 2282(b) of this title’’ for ‘‘3
years after the date of initiation’’.
Subsec. (a)(2). Pub. L. 118–272, § 1103(a)(2), added par.
(2) and struck out former par. (2) which read as follows:
‘‘have a maximum Federal cost of $3,000,000; and’’.
2020—Subsec. (c). Pub. L. 116–260, § 360(c)(2), redesig-
nated subsec. (d) as (c) and struck out former subsec.
(c). Prior to amendment, text of subsec. (c) read as fol-
lows: ‘‘A feasibility study for which the Secretary has
issued a determination under subsection (b) is not au-
thorized after the last day of the 1-year period begin-
ning on the date of the determination if the Secretary
has not completed the study on or before such last
day.’’
Subsec. (d). Pub. L. 116–260, § 360(c)(2), redesignated
subsec. (e) as (d). Former subsec. (d) redesignated (c).
Subsec. (d)(1). Pub. L. 116–260, § 360(c)(1)(A), (B), sub-
stituted ‘‘The Secretary’’ for ‘‘Notwithstanding the re-
quirements of subsection (c), the Secretary’’ and ‘‘sub-
section (a)’’ for ‘‘subsections (a) and (c)’’.
Subsec. (d)(2). Pub. L. 116–260, § 360(c)(1)(B), sub-
stituted ‘‘subsection (a)’’ for ‘‘subsections (a) and (c)’’
in introductory provisions.
Subsec. (d)(4). Pub. L. 116–260, § 360(c)(1)(C), struck out
par. (4). Text read as follows: ‘‘The Secretary shall not
extend the timeline for a feasibility study for a period
of more than 10 years, and any feasibility study that is
not completed before that date shall no longer be au-
thorized.’’.
Subsecs. (e) to (g). Pub. L. 116–260, § 360(c)(2), redesig-
nated subsecs. (f) and (g) as (e) and (f), respectively.
Former subsec. (e) redesignated (d).
2018—Subsec. (d)(4). Pub. L. 115–270 substituted ‘‘10
years’’ for ‘‘7 years’’.
Statutory Notes and Related Subsidiaries
SAVINGS CLAUSE
Pub. L. 118–272, div. A, title I, § 1103(b), Jan. 4, 2025, 138
Stat. 3000, provided that: ‘‘Nothing in the amendments
made by subsection (a) [amending this section] shall be
construed to affect a feasibility study that was initi-
ated prior to the date of the enactment of this Act
[Jan. 4, 2025].’’
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of Pub. L. 113–121, set out as a note under section
2201 of this title.
§ 2282d. Annual report to Congress
(a) In general
Not later than February 1 of each year, the
Secretary shall develop and submit to the Com-
Page 770
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2282d
mittee on Environment and Public Works of the
Senate and the Committee on Transportation
and Infrastructure of the House of Representa-
tives an annual report, to be entitled ‘‘Report to
Congress on Future Water Resources Develop-
ment’’, that identifies the following:
(1) Feasibility reports
Each feasibility report that meets the cri-
teria established in subsection (c)(1)(A).
(2) Proposed feasibility studies
Any proposed feasibility study submitted to
the Secretary by a non-Federal interest pursu-
ant to subsection (b) that meets the criteria
established in subsection (c)(1)(A).
(3) Proposed modifications
Any proposed modification to an authorized
water resources development project or feasi-
bility study that meets the criteria estab-
lished in subsection (c)(1)(A) that—
(A) is submitted to the Secretary by a non-
Federal interest pursuant to subsection (b);
or
(B) is identified by the Secretary for au-
thorization.
(4) Programmatic modifications
Any programmatic modification for an envi-
ronmental infrastructure assistance program.
(b) Requests for proposals
(1) Publication
Not later than May 1 of each year, the Sec-
retary shall publish in the Federal Register a
notice requesting proposals from non-Federal
interests for proposed feasibility studies, pro-
posed modifications to authorized water re-
sources development projects and feasibility
studies, and proposed modifications for an en-
vironmental infrastructure program to be in-
cluded in the annual report.
(2) Deadline for requests
The Secretary shall include in each notice
required by this subsection a requirement that
non-Federal interests submit to the Secretary
any proposals described in paragraph (1) by
not later than 120 days after the date of publi-
cation of the notice in the Federal Register in
order for the proposals to be considered for in-
clusion in the annual report.
(3) Notification
On the date of publication of each notice re-
quired by this subsection, the Secretary
shall—
(A) make the notice publicly available, in-
cluding on the Internet; and
(B) provide written notification of the pub-
lication to the Committee on Environment
and Public Works of the Senate and the
Committee on Transportation and Infra-
structure of the House of Representatives.
(c) Contents
(1) Feasibility reports, proposed feasibility
studies, and proposed modifications
(A) Criteria for inclusion in report
The Secretary shall include in the annual
report only those feasibility reports, pro-
posed feasibility studies, and proposed modi-
fications to authorized water resources de-
velopment projects and feasibility studies
that—
(i) are related to the missions and au-
thorities of the Corps of Engineers;
(ii) require specific congressional author-
ization, including by an Act of Congress;
(iii) have not been congressionally au-
thorized;
(iv) have not been included in any pre-
vious annual report; and
(v) if authorized, could be carried out by
the Corps of Engineers.
(B) Description of benefits
(i) Description
The Secretary shall describe in the an-
nual report, to the extent applicable and
practicable, for each proposed feasibility
study and proposed modification to an au-
thorized
water
resources
development
project or feasibility study included in the
annual report, the benefits, as described in
clause (ii), of each such study or proposed
modification (including the water re-
sources development project that is the
subject of the proposed feasibility study or
the proposed modification to an authorized
feasibility study).
(ii) Benefits
The benefits (or expected benefits, in the
case of a proposed feasibility study) de-
scribed in this clause are benefits to—
(I) the protection of human life and
property;
(II) improvement to transportation;
(III) the national, regional, or local
economy;
(IV) the environment; or
(V) the national security interests of
the United States.
(C) Identification of other factors
The Secretary shall identify in the annual
report, to the extent practicable—
(i) for each proposed feasibility study in-
cluded in the annual report, the non-Fed-
eral interest that submitted the proposed
feasibility study pursuant to subsection
(b); and
(ii) for each proposed feasibility study
and proposed modification to an author-
ized water resources development project
or feasibility study included in the annual
report, whether the non-Federal interest
has demonstrated—
(I) that local support exists for the pro-
posed feasibility study or proposed modi-
fication to an authorized water resources
development project or feasibility study
(including the water resources develop-
ment project that is the subject of the
proposed feasibility study or the pro-
posed modification to an authorized fea-
sibility study); and
(II) the financial ability to provide the
required non-Federal cost share.
(D) Modifications of projects carried out pur-
suant to continuing authority programs
(i) In general
With respect to a project being carried
out pursuant to a continuing authority
Page 771
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2282d
1 So in original. Probably should be preceded by ‘‘of’’.
program for which a proposed modification
is necessary because the project is pro-
jected to exceed, in the coming fiscal year,
the maximum Federal cost of the project,
the Secretary shall include a proposed
modification in the annual report if the
proposed modification will result in com-
pletion of construction the 1 project and
the justification for the modification is
not the result of a change in the scope of
the project.
(ii) Inclusion
For each proposed modification included
in an annual report under clause (i), the
Secretary shall include in the annual re-
port—
(I) a justification of why the modifica-
tion is necessary;
(II) an estimate of the total cost and
timeline required to complete construc-
tion of the project; and
(III) an indication of continued support
by the non-Federal interest and the fi-
nancial ability of the non-Federal inter-
est to provide the required cost-share.
(iii) Definition
For the purposes of this subparagraph,
the term ‘‘continuing authority program’’
means any of—
(I) section 701r of this title;
(II) section 426g of this title;
(III) section 577 of this title;
(IV) section 426i of this title;
(V) section 2326 of this title;
(VI) section 701s of this title;
(VII) section 2330 of this title;
(VIII) section 701g of this title;
(IX) section 2309a of this title; and
(X) section 2289b of this title.
(2) Transparency
The Secretary shall include in the annual re-
port, for each feasibility report, proposed fea-
sibility study, and proposed modification to an
authorized
water
resources
development
project or feasibility study included under
paragraph (1)(A)—
(A) the name of the associated non-Federal
interest, including the name of any non-Fed-
eral interest that has contributed, or is ex-
pected to contribute, a non-Federal share of
the cost of—
(i) the feasibility report;
(ii) the proposed feasibility study;
(iii) the authorized feasibility study for
which the modification is proposed; or
(iv) construction of—
(I) the water resources development
project that is the subject of—
(aa) the feasibility report;
(bb) the proposed feasibility study; or
(cc) the authorized feasibility study
for which a modification is proposed;
or
(II) the proposed modification to an
authorized water resources development
project;
(B) a letter or statement of support for the
feasibility report, proposed feasibility study,
or proposed modification to an authorized
water resources development project or fea-
sibility study from each associated non-Fed-
eral interest;
(C) the purpose of the feasibility report,
proposed feasibility study, or proposed modi-
fication to an authorized water resources de-
velopment project or feasibility study;
(D) an estimate, to the extent practicable,
of the Federal, non-Federal, and total costs
of—
(i) the proposed modification to an au-
thorized feasibility study; and
(ii) construction of—
(I) the water resources development
project that is the subject of—
(aa) the feasibility report; or
(bb) the authorized feasibility study
for which a modification is proposed,
with respect to the change in costs re-
sulting from such modification; or
(II) the proposed modification to an
authorized water resources development
project; and
(E) an estimate, to the extent practicable,
of the monetary and nonmonetary benefits
of—
(i) the water resources development
project that is the subject of—
(I) the feasibility report; or
(II) the authorized feasibility study for
which a modification is proposed, with
respect to the benefits of such modifica-
tion; or
(ii) the proposed modification to an au-
thorized
water
resources
development
project.
(3) Certification
The Secretary shall include in the annual re-
port a certification stating that each feasi-
bility report, proposed feasibility study, and
proposed modification to an authorized water
resources development project or feasibility
study included in the annual report meets the
criteria established in paragraph (1)(A).
(4) Appendix
(A) In general
The Secretary shall include in the annual
report an appendix listing the proposals sub-
mitted under subsection (b) that were not in-
cluded in the annual report under paragraph
(1)(A) and a description of why the Secretary
determined that those proposals did not
meet the criteria for inclusion under such
paragraph.
(B) Limitation
In carrying out the activities described in
this section—
(i) the Secretary shall not include pro-
posals in the appendix of the annual report
that otherwise meet the criteria for inclu-
sion in the annual report solely on the
basis of the Secretary’s determination
that the proposal requires legislative
changes to an authorized water resources
Page 772
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2282d
development project, feasibility study, or
environmental infrastructure program;
(ii) the Secretary shall not include pro-
posals in the appendix of the annual report
that otherwise meet the criteria for inclu-
sion in the annual report solely on the
basis that the proposals are for the pur-
poses of navigation, flood risk manage-
ment, ecosystem restoration, or municipal
or agricultural water supply; and
(iii) the Secretary shall not include pro-
posals in the appendix of the annual report
that otherwise meet the criteria for inclu-
sion in the annual report solely on the
basis of a policy of the Secretary.
(d) Programmatic modifications in annual report
The Secretary shall include in the annual re-
port only proposed modifications for an environ-
mental infrastructure assistance program that
have not been included in any previous annual
report. For each proposed modification, the Sec-
retary shall include a letter or statement of sup-
port for the proposed modification from each as-
sociated non-Federal interest, description of as-
sistance provided, and total Federal cost of as-
sistance provided.
(e) Special rule for initial annual report
Notwithstanding any other deadlines required
by this section, the Secretary shall—
(1) not later than 60 days after June 10, 2014,
publish in the Federal Register a notice re-
quired by subsection (b)(1); and
(2) include in such notice a requirement that
non-Federal interests submit to the Secretary
any proposals described in subsection (b)(1) by
not later than 120 days after the date of publi-
cation of such notice in the Federal Register
in order for such proposals to be considered for
inclusion in the first annual report developed
by the Secretary under this section.
(f) Publication
Upon submission of an annual report to Con-
gress, the Secretary shall make the annual re-
port publicly available, including through publi-
cation on the Internet.
(g) Non-Federal interest notification
After the publication of the annual report
under subsection (f), if the proposal of a non-
Federal interest submitted under subsection (b)
was included by the Secretary in the appendix
under subsection (c)(4), the Secretary shall pro-
vide written notification to the non-Federal in-
terest of such inclusion.
(h) Congressional notification
Not later than 30 days after the publication of
the annual report under subsection (f), for each
proposal included in that annual report or ap-
pendix, the Secretary shall notify each Member
of Congress that represents the State in which
that proposal will be located that the proposal
was included the annual report or the appendix.
(i) Definitions
In this section:
(1) Annual report
The term ‘‘annual report’’ means a report re-
quired by subsection (a).
(2) Feasibility report
(A) In general
The term ‘‘feasibility report’’ means a
final feasibility report developed under sec-
tion 2282 of this title.
(B) Inclusions
The term ‘‘feasibility report’’ includes—
(i) a report described in section 2215(d)(2)
of this title; and
(ii) where applicable, any associated re-
port of the Chief of Engineers.
(3) Feasibility study
The term ‘‘feasibility study’’ has the mean-
ing given that term in section 2215 of this
title.
(4) Non-Federal interest
The term ‘‘non-Federal interest’’ has the
meaning given that term in section 1962d–5b of
title 42.
(5) Water resources development project
The term ‘‘water resources development
project’’ includes a project under an environ-
mental infrastructure assistance program.
(Pub. L. 113–121, title VII, § 7001, June 10, 2014, 128
Stat. 1360; Pub. L. 114–322, title I, § 1157(b), Dec.
16, 2016, 130 Stat. 1666; Pub. L. 115–270, title I,
§ 1332(a), Oct. 23, 2018, 132 Stat. 3834; Pub. L.
116–260, div. AA, title I, § 127(a), Dec. 27, 2020, 134
Stat. 2640; Pub. L. 118–272, div. A, title I, § 1111,
Jan. 4, 2025, 138 Stat. 3010.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Reform and Development Act of 2014, and not as part of
the Water Resources Development Act of 1986 which
comprises this chapter.
AMENDMENTS
2025—Subsec. (c)(1)(D)(iii)(X). Pub. L. 118–272, § 1111(1),
added subcl. (X).
Subsecs. (g) to (i). Pub. L. 118–272, § 1111(2), (3), added
subsecs. (g) and (h) and redesignated former subsec. (g)
as (i).
2020—Subsec.
(c)(1)(B)(ii)(III).
Pub.
L.
116–260,
§ 127(a)(1)(A)(i), inserted ‘‘, regional, or local’’ after
‘‘national’’.
Subsec. (c)(1)(D). Pub. L. 116–260, § 127(a)(1)(A)(ii),
added subpar. (D).
Subsec. (c)(4)(B)(ii), (iii). Pub. L. 116–260, § 127(a)(1)(B),
added cl. (ii) and redesignated former cl. (ii) as (iii).
Subsec. (g)(5). Pub. L. 116–260, § 127(a)(2), struck out
‘‘if authorized before December 16, 2016’’ before period
at end.
2018—Subsec. (a)(4). Pub. L. 115–270, § 1332(a)(1), added
par. (4).
Subsec. (b)(1). Pub. L. 115–270, § 1332(a)(2), substituted
‘‘studies, proposed modifications to authorized water
resources development projects and feasibility studies,
and proposed modifications for an environmental infra-
structure program’’ for ‘‘studies and proposed modifica-
tions to authorized water resources development
projects and feasibility studies’’.
Subsec. (c)(4). Pub. L. 115–270, § 1332(a)(5), added par.
(4) and struck out former par. (4). Prior to amendment,
text read as follows: ‘‘The Secretary shall include in
the annual report an appendix listing the proposals
submitted under subsection (b) that were not included
in the annual report under paragraph (1)(A) and a de-
scription of why the Secretary determined that those
Page 773
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2282d–1
proposals did not meet the criteria for inclusion under
such paragraph.’’
Subsecs. (d) to (g). Pub. L. 115–270, § 1332(a)(3), (4),
added subsec. (d) and redesignated former subsecs. (d)
to (f) as (e) to (g), respectively.
2016—Subsec. (f)(5). Pub. L. 114–322 added par. (5).
Statutory Notes and Related Subsidiaries
OVER-BUDGET CAP PROGRAMS
Pub. L. 116–260, div. AA, title I, § 127(b), Dec. 27, 2020,
134 Stat. 2642, provided that: ‘‘For any project carried
out under a continuing authority program, as such
term is defined in section 7001(c)(1)(D) of the Water Re-
sources Reform and Development Act of 2014 (33 U.S.C.
2282d[(c)(1)(D)])), [sic] for which the Secretary [of the
Army] is required to include a proposed modification in
an annual report under such section 7001(c)(1)(D), the
Secretary shall, to the extent practicable, inform the
non-Federal interest of the process for carrying out the
project pursuant to section 105 of the Water Resources
Development Act of 1986 (33 U.S.C. 2215) and whether
the Secretary has the authority to complete a feasi-
bility study for the project.’’
ANNUAL REPORT ON STATUS OF FEASIBILITY STUDIES
Pub. L. 116–260, div. AA, title I, § 127(c), Dec. 27, 2020,
134 Stat. 2642, provided that: ‘‘Concurrent with each re-
port submitted under section 7001 of the Water Re-
sources Reform and Development Act of 2014 (33 U.S.C.
2282d), the Secretary [of the Army] shall submit to the
Committee on Transportation and Infrastructure of the
House of Representatives and the Committee on Envi-
ronment and Public Works of the Senate a report that
provides for an accounting of all outstanding feasi-
bility studies being conducted by the Secretary, includ-
ing, for each such study, its length, cost, and expected
completion date.’’
DISSEMINATION OF INFORMATION
Pub. L. 115–270, title I, § 1104, Oct. 23, 2018, 132 Stat.
3771, as amended by Pub. L. 116–260, div. AA, title II,
§ 229, Dec. 27, 2020, 134 Stat. 2698, provided that:
‘‘(a) FINDINGS.—Congress finds the following:
‘‘(1) Congress plays a central role in identifying,
prioritizing, and authorizing vital water resources in-
frastructure activities throughout the United States.
‘‘(2) The Water Resources Reform and Development
Act of 2014 (Public Law 113–121) established a new and
transparent process to review and prioritize the
water resources development activities of the Corps
of Engineers with strong congressional oversight.
‘‘(3) Section 7001 of the Water Resources Reform
and Development Act of 2014 (33 U.S.C. 2282d) requires
the Secretary [of the Army] to develop and submit to
Congress each year a Report to Congress on Future
Water Resources Development and, as part of the an-
nual report process, to—
‘‘(A) publish a notice in the Federal Register that
requests from non-Federal interests proposed feasi-
bility studies and proposed modifications to author-
ized water resources development projects and fea-
sibility studies for inclusion in the report; and
‘‘(B) review the proposals submitted and include
in the report those proposed feasibility studies and
proposed modifications that meet the criteria for
inclusion established under such section 7001.
‘‘(4) Congress will use the information provided in
the annual Report to Congress on Future Water Re-
sources Development to determine authorization
needs and priorities for purposes of water resources
development legislation.
‘‘(5) To ensure that Congress can gain a thorough
understanding of the water resources development
needs and priorities of the United States, it is impor-
tant that the Secretary take sufficient steps to en-
sure that non-Federal interests are made aware of the
new annual report process, including the need for
non-Federal interests to submit proposals during the
Secretary’s annual request for proposals in order for
such proposals to be eligible for consideration by
Congress.
‘‘(b) DISSEMINATION OF PROCESS INFORMATION.—
‘‘(1) IN GENERAL.—The Secretary shall develop, sup-
port, and implement education and awareness efforts
for non-Federal interests with respect to the annual
Report to Congress on Future Water Resources Devel-
opment required under section 7001 of the Water Re-
sources Reform and Development Act of 2014 (33
U.S.C. 2282d), including efforts to—
‘‘(A) develop and disseminate technical assistance
materials, seminars, and guidance on the annual
process as it relates to non-Federal interests;
‘‘(B) provide written notice to local elected offi-
cials and previous and potential non-Federal inter-
ests on the annual process and on opportunities to
address local water resources challenges through
the missions and authorities of the Corps of Engi-
neers;
‘‘(C) issue guidance for non-Federal interests to
assist such interests in developing proposals for
water resources development projects that satisfy
the requirements of such section 7001; and
‘‘(D) provide, at the request of a non-Federal in-
terest, assistance with researching and identifying
existing project authorizations and Corps of Engi-
neers decision documents.
‘‘(2) ANNUAL REPORTING.—Not less frequently than
annually, the Secretary shall provide to the Com-
mittee on Environment and Public Works of the Sen-
ate and the Committee on Transportation and Infra-
structure of the House of Representatives a written
update on the progress of the implementation of
paragraph (1), including a description of each edu-
cation and outreach action the Secretary is taking to
implement that paragraph.
‘‘(3) GUIDANCE; COMPLIANCE.—The Secretary shall—
‘‘(A) issue guidance on the uniform implementa-
tion by each district of the Corps of Engineers of
the process for submitting proposals under section
7001 of the Water Resources Reform and Develop-
ment Act of 2014 (33 U.S.C. 2282d); and
‘‘(B) each year, ensure compliance with the guid-
ance issued under subparagraph (A).’’
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of Pub. L. 113–121, set out as a note under section
2201 of this title.
§ 2282d–1. Report to Congress on authorized
studies and projects
(a) In general
Not later than February 1 of each year, the
Secretary shall develop and submit to Congress
an annual report, to be entitled ‘‘Report to Con-
gress on Authorized Water Resources Develop-
ment Projects and Studies’’, that identifies—
(1) ongoing or new feasibility studies, au-
thorized within the previous 20 years, for
which a Report of the Chief of Engineers has
not been issued;
(2) authorized feasibility studies for projects
in the preconstruction, engineering and design
phase;
(3) ongoing or new water resources develop-
ment projects authorized for construction
within the previous 20 years; and
(4) authorized and constructed water re-
sources development projects the Secretary
has the responsibility to operate or maintain.
(b) Contents
(1) Inclusions
(A) Criteria
The Secretary shall include in each report
submitted under this section only a feasi-
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Flood control**
(1) **General rule** — The non-Federal interests for a project with costs assigned to flood control (other than a nonstructural project) shall—
(A) pay 5 percent of the cost of the project assigned to flood control during construction of the project;
(B) provide all lands, easements, rights-of-way, and dredged material disposal areas required only for flood control and perform all related necessary relocations; and
(C) provide that portion of the joint costs of lands, easements, rights-of-way, dredged material disposal areas, and relocations which is assigned to flood control.
(2) **35 percent minimum contribution** — If the value of the contributions required under paragraph (1) of this subsection is less than 35 percent of the cost of the project assigned to flood control, the non-Federal interest shall pay during construction of the project such additional amounts as are necessary so that the total contribution of the non-Federal interests under this subsection is equal to 35 percent of the cost of the project assigned to flood control.
(3) **50 percent maximum** — The non-Federal share under paragraph (1) shall not exceed 50 percent of the cost of the project assigned to flood control. The preceding sentence does not modify the requirement of paragraph (1)(A) of this subsection.
(4) **Deferred payment of amount exceeding 30 percent** — If the total amount of the contribution required under paragraph (1) of this subsection exceeds 30 percent of the cost of the project assigned to flood control, the non-Federal interests may pay the amount of the excess to the Secretary over a 15-year period (or such shorter period as may be agreed to by the Secretary and the non-Federal interests) beginning on the date construction of the project or
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2215
Stored review status: release_metadata_unconfirmed. The source passage cites 33 U.S.C. § 2215. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 711
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2215
(Pub. L. 116–260, div. AA, title I, § 152, Dec. 27,
2020, 134 Stat. 2658; Pub. L. 117–263, div. H, title
LXXXI, § 8380, Dec. 23, 2022, 136 Stat. 3828.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 2020, and not as part of the Water
Resources Development Act of 1986 which comprises
this chapter.
AMENDMENTS
2022—Subsec. (a). Pub. L. 117–263 substituted ‘‘a flood
risk management or coastal storm risk management
project in a region’’ for ‘‘flood risk management
project that incidentally generates seismic safety bene-
fits in regions’’.
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of div. AA of Pub. L. 116–260, set out as a note
under section 2201 of this title.
§ 2214. General credit for flood control
(a) Guidelines
Within one year after November 17, 1986, the
Secretary shall issue guidelines to carry out
this section, consistent with the principles and
guidelines on project formulation. The guide-
lines shall include criteria for determining
whether work carried out by non-Federal inter-
ests is compatible with a project for flood con-
trol and procedures for making such determina-
tions. The guidelines under this section shall be
promulgated after notice in the Federal Register
and opportunity for comment.
(b) Analysis of costs and benefits
The guidelines established under subsection
(a) shall provide for the Secretary to consider,
in analyzing the costs and benefits of a proposed
project for flood control, the costs and benefits
produced by any flood control work carried out
by non-Federal interests that the Secretary de-
termines to be compatible with the
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2215
Stored review status: historical_2024_not_currentness_verified. The source passage cites 33 U.S.C. § 2215. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Omitted**
**(b) Planning process improvements** The Chief of Engineers—
(1) shall adopt a risk analysis approach to project cost estimates for water resources projects; and
(2) not later than one year after November 8, 2007, shall—
(A) issue procedures for risk analysis for cost estimation for water resources projects; and
(B) submit to Congress a report that includes any recommended amendments to [section 2280 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2280&num=0&edition=prelim).
**(c) Benchmarks**
(1) **In general** — Not later than 12 months after November 8, 2007, the Chief of Engineers shall establish benchmarks for determining the length of time it should take to conduct a feasibility study for a water resources project and its associated review process under the National Environmental Policy Act of 1969 ([42 U.S.C. 4321](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section4321&num=0&edition=prelim) et seq.). The Chief of Engineers shall use such benchmarks as a management tool to make the feasibility study process more efficient in all districts of the Corps of Engineers.
(2) **Benchmark goals** — The Chief of Engineers shall establish, to the extent practicable, under paragraph (1) benchmark goals for completion of feasibility studies for water resources projects generally within 2 years. In the case of feasibility studies that the Chief of Engineers determines may require additional time based on the project type, size, cost, or complexity, the benchmark goal for completion shall be generally within 4 years.
**(d) Calculation of benefits and costs for flood damage reduction projects** A feasibility study for a project for flood damage reduction shall include, as part of t
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2282d
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.