Browse Arkansas Code titles and sections
33 U.S.C. § 2215 — Feasibility studies; planning, engineering,
Federal law — U.S. Code and appendices · legal_authorities
Page 711
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2215
(Pub. L. 116–260, div. AA, title I, § 152, Dec. 27,
2020, 134 Stat. 2658; Pub. L. 117–263, div. H, title
LXXXI, § 8380, Dec. 23, 2022, 136 Stat. 3828.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 2020, and not as part of the Water
Resources Development Act of 1986 which comprises
this chapter.
AMENDMENTS
2022—Subsec. (a). Pub. L. 117–263 substituted ‘‘a flood
risk management or coastal storm risk management
project in a region’’ for ‘‘flood risk management
project that incidentally generates seismic safety bene-
fits in regions’’.
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of div. AA of Pub. L. 116–260, set out as a note
under section 2201 of this title.
§ 2214. General credit for flood control
(a) Guidelines
Within one year after November 17, 1986, the
Secretary shall issue guidelines to carry out
this section, consistent with the principles and
guidelines on project formulation. The guide-
lines shall include criteria for determining
whether work carried out by non-Federal inter-
ests is compatible with a project for flood con-
trol and procedures for making such determina-
tions. The guidelines under this section shall be
promulgated after notice in the Federal Register
and opportunity for comment.
(b) Analysis of costs and benefits
The guidelines established under subsection
(a) shall provide for the Secretary to consider,
in analyzing the costs and benefits of a proposed
project for flood control, the costs and benefits
produced by any flood control work carried out
by non-Federal interests that the Secretary de-
termines to be compatible with the
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2215
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 53acaea110a0ee0ca7ddf40f526f777242625d61fb9bb0c20db2dd4dcf6b2414. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-72717ccb536c3b7d9d98215a
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-2215-feasibility-studies-planning-engineering--39e3c87340.md
Pages: Not recorded – Not recorded
Passage SHA-256: 0e49deb6bfa5d715c39ef793a7ea839fecdc49dcc0744c5dda64fa0e893a07b3
Source location: USCODE-2024-title33-chap36-subchapI-sec2215.pdf
Stored source content
Page 711
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2215
(Pub. L. 116–260, div. AA, title I, § 152, Dec. 27,
2020, 134 Stat. 2658; Pub. L. 117–263, div. H, title
LXXXI, § 8380, Dec. 23, 2022, 136 Stat. 3828.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 2020, and not as part of the Water
Resources Development Act of 1986 which comprises
this chapter.
AMENDMENTS
2022—Subsec. (a). Pub. L. 117–263 substituted ‘‘a flood
risk management or coastal storm risk management
project in a region’’ for ‘‘flood risk management
project that incidentally generates seismic safety bene-
fits in regions’’.
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of div. AA of Pub. L. 116–260, set out as a note
under section 2201 of this title.
§ 2214. General credit for flood control
(a) Guidelines
Within one year after November 17, 1986, the
Secretary shall issue guidelines to carry out
this section, consistent with the principles and
guidelines on project formulation. The guide-
lines shall include criteria for determining
whether work carried out by non-Federal inter-
ests is compatible with a project for flood con-
trol and procedures for making such determina-
tions. The guidelines under this section shall be
promulgated after notice in the Federal Register
and opportunity for comment.
(b) Analysis of costs and benefits
The guidelines established under subsection
(a) shall provide for the Secretary to consider,
in analyzing the costs and benefits of a proposed
project for flood control, the costs and benefits
produced by any flood control work carried out
by non-Federal interests that the Secretary de-
termines to be compatible with the project. For
purposes of the preceding sentence the Sec-
retary may consider only work carried out after
the date which is 5 years before the first obliga-
tion of funds for the reconnaissance study for
such project. In no case may work which was
carried out more than 5 years before November
17, 1986, be considered under this subsection, un-
less otherwise provided in this Act.
(c) Crediting of non-Federal share
The guidelines established under subsection
(a) shall provide for crediting the cost of work
carried out by the non-Federal interests against
the non-Federal share of the cost of an author-
ized project for flood control as follows:
(1) Work which is carried out after the end of
the reconnaissance study and before the sub-
mission to Congress of the final report of the
Chief of Engineers on the project and which is
determined by the Secretary to be compatible
with the project shall be included as part of
the project and shall be recommended by the
Secretary in the final report for credit against
the non-Federal share of the cost of the
project.
(2) Work which is carried out after submis-
sion of the final report of the Chief of Engi-
neers to Congress and which is determined by
the Secretary to be compatible with the
project shall be considered as part of the
project and shall be credited by the Secretary
against the non-Federal share of the cost of
the project in accordance with the guidelines
promulgated pursuant to subsection (a).
In no event may work which was carried out
more than 5 years before November 17, 1986, be
considered under this subsection, unless other-
wise provided in this Act.
(d) Procedure for work done before November
17, 1986
The Secretary shall consider, under sub-
sections (b) and (c), work carried out before No-
vember 17, 1986, by non-Federal interests on a
project for flood control, if the non-Federal in-
terests apply to the Secretary for consideration
of such work not later than March 31, 1987. The
Secretary shall make determinations under sub-
sections (b) and (c) with respect to such work
not later than 6 months after guidelines are
issued under subsection (a).
(e) Procedure for work done after November 17,
1986
The Secretary shall consider work carried out
after November 17, 1986, by non-Federal interests
on a project for flood control under subsections
(b) and (c) in accordance with the guidelines
issued under subsection (a). The guidelines shall
require prior approval by the Secretary of any
flood control work carried out after November
17, 1986, in order to be considered under this sec-
tion, taking into account the economic and en-
vironmental feasibility of the project.
(f) Limitation not applicable
Any flood control work included as part of the
non-Federal share of the cost of a project under
this section shall not be subject to the limita-
tion contained in the last sentence of section
1962d–5a(a) of title 42.
(g) Cash contribution not affected
Nothing in this section affects the require-
ment of section 2213(a)(1)(A) of this title.
(Pub. L. 99–662, title I, § 104, Nov. 17, 1986, 100
Stat. 4087.)
Editorial Notes
REFERENCES IN TEXT
This Act, referred to in subsecs. (b) and (c), is Pub. L.
99–662, Nov. 17, 1986, 100 Stat. 4082, known as the Water
Resources Development Act of 1986. For complete clas-
sification of this Act to the Code, see Short Title note
set out under section 2201 of this title and Tables.
§ 2215. Feasibility studies; planning, engineering,
and design
(a) Feasibility studies
(1) Cost sharing
(A) In general
The Secretary shall not initiate any feasi-
bility study for a water resources project
after November 17, 1986, until appropriate
non-Federal interests agree, by contract, to
Page 712
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2215
contribute 50 percent of the cost of the
study.
(B) Payment of cost share during period of
study
During the period of the study, the non-
Federal share of the cost of the study pay-
able under subparagraph (A) shall be 50 per-
cent of the sum of—
(i) the cost estimate for the study as
contained in the feasibility cost-sharing
agreement; and
(ii) any excess of the cost of the study
over the cost estimate if the excess results
from—
(I) a change in Federal law; or
(II) a change in the scope of the study
requested by the non-Federal interests.
(C) Payment of cost share on authorization
of project or termination of study
(i) Project timely authorized
Except as otherwise agreed to by the
Secretary and the non-Federal interests
and subject to clause (ii), the non-Federal
share of any excess of the cost of the study
over the cost estimate (excluding any ex-
cess cost described in subparagraph (B)(ii))
shall be payable on the date on which the
Secretary and the non-Federal interests
enter into an agreement pursuant to sec-
tion 2211(e) or 2213(j) of this title with re-
spect to the project.
(ii) Project not timely authorized
If the project that is the subject of the
study is not authorized by the date that is
5 years after the completion of the final
report of the Chief of Engineers concerning
the study or the date that is 2 years after
the termination of the study, the non-Fed-
eral share of any excess of the cost of the
study over the cost estimate (excluding
any excess cost described in subparagraph
(B)(ii)) shall be payable to the United
States on that date.
(D) Amendment of cost estimate
The cost estimate referred to in subpara-
graph (B)(i) may be amended only by agree-
ment of the Secretary and the non-Federal
interests.
(E) In-kind contributions
The non-Federal share required under this
paragraph may be satisfied by the provision
of services, materials, supplies, or other in-
kind services necessary to prepare the feasi-
bility report.
(2) Applicability
This subsection shall not apply to any water
resources study primarily designed for the
purposes of navigational improvements in the
nature of dams, locks, and channels on the Na-
tion’s system of inland waterways.
(3) Detailed project reports
The requirements of this subsection that
apply to a feasibility study also shall apply to
a study that results in a detailed project re-
port, except that—
(A) the first $100,000 of the costs of a study
that results in a detailed project report shall
be a Federal expense; and
(B) paragraph (1)(C)(ii) shall not apply to
such a study.
(b) Planning and engineering
The Secretary shall not initiate any planning
or engineering for a water resources project
until appropriate non-Federal interests agree,
by contract, to contribute 50 percent of the cost
of the planning and engineering during the pe-
riod of the planning and engineering. Costs of
planning and engineering of projects for which
non-Federal interests contributed 50 percent of
the cost of the feasibility study shall be treated
as costs of construction.
(c) Design
Costs of design of a water resources project
shall be shared in the same percentage as the
purposes of such project.
(d) Definitions
In this section, the following definitions
apply:
(1) Detailed project report
The term ‘‘detailed project report’’ means a
report for a project not specifically authorized
by Congress in law or otherwise that deter-
mines the feasibility of the project with a
level of detail appropriate to the scope and
complexity of the recommended solution and
sufficient to proceed directly to the prepara-
tion of contract plans and specifications. The
term includes any associated environmental
impact statement and mitigation plan. For a
project for which the Federal cost does not ex-
ceed $1,000,000, the term includes a planning
and design analysis document.
(2) Feasibility study
The term ‘‘feasibility study’’ means a study
that results in a feasibility report under sec-
tion 2282 of this title, and any associated envi-
ronmental impact statement and mitigation
plan, prepared by the Corps of Engineers for a
water resources project. The term includes a
study that results in a project implementation
report prepared under title VI of the Water
Resources Development Act of 2000 (114 Stat.
2680–2694), a general reevaluation report, and a
limited reevaluation report.
(Pub. L. 99–662, title I, § 105, Nov. 17, 1986, 100
Stat. 4088; Pub. L. 101–640, title III, § 301, Nov. 28,
1990, 104 Stat. 4633; Pub. L. 104–303, title II,
§ 203(a), Oct. 12, 1996, 110 Stat. 3677; Pub. L.
106–541, title II, § 225, Dec. 11, 2000, 114 Stat. 2598;
Pub. L. 110–114, title II, § 2043(a), Nov. 8, 2007, 121
Stat. 1101.)
Editorial Notes
REFERENCES IN TEXT
The Water Resources Development Act of 2000, re-
ferred to in subsec. (d)(2), is Pub. L. 106–541, Dec. 11,
2000, 114 Stat. 2572. Title VI of the Act is not classified
to the Code. For complete classification of this Act to
the Code, see Short Title of 2000 Amendment note set
out under section 2201 of this title and Tables.
AMENDMENTS
2007—Subsec. (a)(3). Pub. L. 110–114, § 2043(a)(1), added
par. (3).
Subsec. (b). Pub. L. 110–114, § 2043(a)(2), struck out
‘‘authorized by this Act’’ before ‘‘for a water resources
project’’.
Page 713
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2220
Subsec. (d). Pub. L. 110–114, § 2043(a)(3), added subsec.
(d).
2000—Subsec. (a)(1)(E). Pub. L. 106–541 substituted
‘‘The’’ for ‘‘Not more than 1⁄2 of the’’.
1996—Subsec. (a)(1). Pub. L. 104–303, § 203(a)(1), in-
serted heading and amended text of par. (1) generally.
Prior to amendment text read as follows: ‘‘The Sec-
retary shall not initiate any feasibility study for a
water resources project after November 17, 1986, until
appropriate non-Federal interests agree, by contract,
to contribute 50 percent of the cost for such study dur-
ing the period of such study. Not more than one-half of
such non-Federal contribution may be made by the pro-
vision of services, materials, supplies, or other in-kind
services necessary to prepare the feasibility report.’’
Subsec. (a)(2). Pub. L. 104–303, § 203(a)(2), inserted
heading.
1990—Subsec. (b). Pub. L. 101–640 inserted at end
‘‘Costs of planning and engineering of projects for
which non-Federal interests contributed 50 percent of
the cost of the feasibility study shall be treated as
costs of construction.’’
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 1996 AMENDMENT
Pub. L. 104–303, title II, § 203(b), Oct. 12, 1996, 110 Stat.
3678, provided that: ‘‘The amendments made by sub-
section (a) [amending this section] shall apply notwith-
standing any feasibility cost-sharing agreement en-
tered into by the Secretary and the non-Federal inter-
ests. On request of the non-Federal interest, the Sec-
retary shall amend any feasibility cost-sharing agree-
ments in effect on the date of the enactment of this Act
[Oct. 12, 1996] so as to conform the agreements with the
amendments.’’
NO REQUIREMENT OF REIMBURSEMENT
Pub. L. 104–303, title II, § 203(c), Oct. 12, 1996, 110 Stat.
3678, provided that: ‘‘Nothing in this section [amending
this section and enacting provisions set out above] or
any amendment made by this section requires the Sec-
retary to reimburse the non-Federal interests for funds
previously contributed for a study.’’
§ 2216. Rate of interest
Whenever a non-Federal interest is required or
elects to repay an amount under this Act over a
period of time, the amount to be repaid shall in-
clude interest at a rate determined by the Sec-
retary of the Treasury, taking into consider-
ation the average market yields on outstanding
marketable obligations of the United States
with remaining periods to maturity comparable
to the reimbursement period, during the month
preceding the fiscal year in which costs for the
construction of the project are first incurred (or
in the case of recalculation the fiscal year in
which the recalculation is made), plus a pre-
mium of one-eighth of one percentage point for
transaction costs; except that such rates for hy-
droelectric power shall be in accordance with ex-
isting law.
(Pub. L. 99–662, title I, § 106, Nov. 17, 1986, 100
Stat. 4089.)
Editorial Notes
REFERENCES IN TEXT
This Act, referred to in text, is Pub. L. 99–662, Nov. 17,
1986, 100 Stat. 4082, known as the Water Resources De-
velopment Act of 1986. For complete classification of
this Act to the Code, see Short Title note set out under
section 2201 of this title and Tables.
§ 2217. Limitation on applicability of certain pro-
visions in reports
If any provision in any report designated by
this Act recommends that a State contribute in
cash 5 percent of the construction costs allo-
cated to non-vendible project purposes and 10
percent of the construction costs allocated to
vendible project purposes, such provision shall
not apply to the project recommended in such
report.
(Pub. L. 99–662, title I, § 107, Nov. 17, 1986, 100
Stat. 4089.)
Editorial Notes
REFERENCES IN TEXT
This Act, referred to in text, is Pub. L. 99–662, Nov. 17,
1986, 100 Stat. 4082, known as the Water Resources De-
velopment Act of 1986. For complete classification of
this Act to the Code, see Short Title note set out under
section 2201 of this title and Tables.
§ 2218. General applicability of cost sharing
Unless otherwise specified, the cost sharing
provisions of this subchapter shall apply to all
projects in this Act. The Federal share of any
cost of a project authorized by this Act for
which cost a Federal share is not established in
this subchapter, shall be the share of such cost
otherwise provided by law.
(Pub. L. 99–662, title I, § 108, Nov. 17, 1986, 100
Stat. 4089.)
Editorial Notes
REFERENCES IN TEXT
This Act, referred to in text, is Pub. L. 99–662, Nov. 17,
1986, 100 Stat. 4082, known as the Water Resources De-
velopment Act of 1986. For complete classification of
this Act to the Code, see Short Title note set out under
section 2201 of this title and Tables.
§ 2219. Definitions
For purposes of this subchapter, terms shall
have the meanings given by section 2241 of this
title.
(Pub. L. 99–662, title I, § 109, Nov. 17, 1986, 100
Stat. 4089.)
§ 2220. Rivers and harbors and other waterways
projects for benefit of navigation, flood con-
trol, hurricane protection, beach erosion
control, and other purposes
(a) Congressional declaration of policy; purchase
of indebtedness and loans to local interests
to meet contribution requirements
In the prosecution of projects for rivers and
harbors and other waterways for the benefit of
navigation, the control of destructive flood wa-
ters, hurricane protection, beach erosion con-
trol, and for other purposes, authorized to be
prosecuted under the direction of the Secretary
of the Army under the supervision of the Chief
of Engineers in accordance with plans adopted
and authorized by the Congress, it is hereby de-
clared to be the policy of the Congress, that
whenever such projects are located wholly or
partially within an area which is eligible for fi-
nancial assistance under the Public Works and
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Flood control**
(1) **General rule** — The non-Federal interests for a project with costs assigned to flood control (other than a nonstructural project) shall—
(A) pay 5 percent of the cost of the project assigned to flood control during construction of the project;
(B) provide all lands, easements, rights-of-way, and dredged material disposal areas required only for flood control and perform all related necessary relocations; and
(C) provide that portion of the joint costs of lands, easements, rights-of-way, dredged material disposal areas, and relocations which is assigned to flood control.
(2) **35 percent minimum contribution** — If the value of the contributions required under paragraph (1) of this subsection is less than 35 percent of the cost of the project assigned to flood control, the non-Federal interest shall pay during construction of the project such additional amounts as are necessary so that the total contribution of the non-Federal interests under this subsection is equal to 35 percent of the cost of the project assigned to flood control.
(3) **50 percent maximum** — The non-Federal share under paragraph (1) shall not exceed 50 percent of the cost of the project assigned to flood control. The preceding sentence does not modify the requirement of paragraph (1)(A) of this subsection.
(4) **Deferred payment of amount exceeding 30 percent** — If the total amount of the contribution required under paragraph (1) of this subsection exceeds 30 percent of the cost of the project assigned to flood control, the non-Federal interests may pay the amount of the excess to the Secretary over a 15-year period (or such shorter period as may be agreed to by the Secretary and the non-Federal interests) beginning on the date construction of the project or
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2215
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.