Browse Arkansas Code titles and sections
43 U.S.C. § 1552 — Criteria for long-range operation of res-
Federal law — U.S. Code and appendices · legal_authorities
Page 412
TITLE 43—PUBLIC LANDS
§ 1552
under the jurisdiction and supervision of the
Secretary, and in the operation and mainte-
nance of all works which may be authorized
hereafter for the augmentation of the water sup-
ply of the Colorado River system. In the event of
failure of any such officer or agency to so com-
ply, any affected State may maintain an action
to enforce the provisions of this section in the
Supreme Court of the United States and consent
is given to the joinder of the United States as a
party in such suit or suits, as a defendant or
otherwise.
(Pub. L. 90–537, title VI, § 601, Sept. 30, 1968, 82
Stat. 899.)
Editorial Notes
REFERENCES IN TEXT
This chapter, referred to in subsecs. (a) and (c), was
in the original ‘‘this Act’’, meaning Pub. L. 90–537,
Sept. 30, 1968, 82 Stat. 885, known as the Colorado River
Basin Project Act, which enacted this chapter and sec-
tions 616aa–1, 620a–1, 620a–2, 620c–1, and 620d–1 of this
title, amended sections 616hh, 620, and 620a of this title,
and enacted provisions set out as notes under sections
620, 620k, and 1501 of this title. For complete classifica-
tion of this Act to the Code, see Short Title note set
out under section 1501 of this title and Tables.
The Boulder Canyon Project Act, referred to in sub-
sec. (a), is act Dec. 21, 1928, ch. 42, 45 Stat. 1057, which
is classified generally to subchapter I (§ 617 et seq.) of
chapter 12A of this title. For complete classification of
this Act to the Code, see section 617t of this title and
Tables.
The Boulder Canyon Project Adjustment Act, re-
ferred to in subsec. (a), is act July 19, 1940, ch. 643, 54
Stat. 774, which is classified generally to subchapter II
(§ 618 et seq.) of chapter 12A of this title. For complete
classification of this A
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 1552
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 8587cfe40914bb5afa6c3ba5beac7727d2a022d29c5a164b5f06153bbd6dafdd. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-da8f0b23ef8b2e8ff5d6f02e
Source file: Laws/federal/codes/united-states-code-2024/title-43/section-1552-criteria-for-long-range-operation-of-res--f837df2d31.md
Pages: Not recorded – Not recorded
Passage SHA-256: 1118536fda8cb2d2a0e1912389d2a68c5d66d2ce208f181a0999bb2c5a524b6e
Source location: USCODE-2024-title43-chap32-subchapV-sec1552.pdf
Stored source content
Page 412
TITLE 43—PUBLIC LANDS
§ 1552
under the jurisdiction and supervision of the
Secretary, and in the operation and mainte-
nance of all works which may be authorized
hereafter for the augmentation of the water sup-
ply of the Colorado River system. In the event of
failure of any such officer or agency to so com-
ply, any affected State may maintain an action
to enforce the provisions of this section in the
Supreme Court of the United States and consent
is given to the joinder of the United States as a
party in such suit or suits, as a defendant or
otherwise.
(Pub. L. 90–537, title VI, § 601, Sept. 30, 1968, 82
Stat. 899.)
Editorial Notes
REFERENCES IN TEXT
This chapter, referred to in subsecs. (a) and (c), was
in the original ‘‘this Act’’, meaning Pub. L. 90–537,
Sept. 30, 1968, 82 Stat. 885, known as the Colorado River
Basin Project Act, which enacted this chapter and sec-
tions 616aa–1, 620a–1, 620a–2, 620c–1, and 620d–1 of this
title, amended sections 616hh, 620, and 620a of this title,
and enacted provisions set out as notes under sections
620, 620k, and 1501 of this title. For complete classifica-
tion of this Act to the Code, see Short Title note set
out under section 1501 of this title and Tables.
The Boulder Canyon Project Act, referred to in sub-
sec. (a), is act Dec. 21, 1928, ch. 42, 45 Stat. 1057, which
is classified generally to subchapter I (§ 617 et seq.) of
chapter 12A of this title. For complete classification of
this Act to the Code, see section 617t of this title and
Tables.
The Boulder Canyon Project Adjustment Act, re-
ferred to in subsec. (a), is act July 19, 1940, ch. 643, 54
Stat. 774, which is classified generally to subchapter II
(§ 618 et seq.) of chapter 12A of this title. For complete
classification of this Act to the Code, see section 618o
of this title and Tables.
The Colorado River Storage Project Act, referred to
in subsec. (a), is act Apr. 11, 1956, ch. 203, 70 Stat. 105,
which is classified generally to chapter 12B (§ 620 et
seq.) of this title. For complete classification of this
Act to the Code, see Short Title note set out under sec-
tion 620 of this title and Tables.
TERMINATION OF REPORTING REQUIREMENTS
For termination, effective May 15, 2000, of provisions
in subsec. (b)(1) of this section relating to the require-
ment that the Secretary transmit a report to Congress
every five years, see section 3003 of Pub. L. 104–66, as
amended, set out as a note under section 1113 of Title
31, Money and Finance, and the 9th item on page 114 of
House Document No. 103–7.
§ 1552. Criteria for long-range operation of res-
ervoirs
(a) Promulgation by Secretary; order of prior-
ities
In order to comply with and carry out the pro-
visions of the Colorado River Compact, the
Upper Colorado River Basin Compact, and the
Mexican Water Treaty, the Secretary shall pro-
pose criteria for the coordinated long-range op-
eration of the reservoirs constructed and oper-
ated under the authority of the Colorado River
Storage Project Act [43 U.S.C. 620 et seq.], the
Boulder Canyon Project Act [43 U.S.C. 617 et
seq.], and the Boulder Canyon Project Adjust-
ment Act [43 U.S.C. 618 et seq.]. To effect in part
the purposes expressed in this paragraph, the
criteria shall make provision for the storage of
water in storage units of the Colorado River
storage project and releases of water form Lake
Powell in the following listed order of priority:
(1) releases to supply one-half the deficiency
described in article III(c) of the Colorado
River Compact, if any such deficiency exists
and is chargeable to the States of the Upper
Division, but in any event such releases, if
any, shall not be required in any year that the
Secretary makes the determination and issues
the proclamation specified in section 1512 of
this title;
(2) releases to comply with article III(d) of
the Colorado River Compact, less such quan-
tities of water delivered into the Colorado
River below Lee Ferry to the credit of the
States of the Upper Division from other
sources; and
(3) storage of water not required for the re-
leases specified in clauses (1) and (2) of this
subsection to the extent that the Secretary,
after consultation with the Upper Colorado
River Commission and representatives of the
three Lower Division States and taking into
consideration all relevant factors (including,
but not limited to, historic stream-flows, the
most critical period of record, and prob-
abilities of water supply), shall find this to be
reasonably necessary to assure deliveries
under clauses (1) and (2) without impairment
of annual consumptive uses in the upper basin
pursuant to the Colorado River Compact: Pro-
vided, That water not so required to be stored
shall be released from Lake Powell: (i) to the
extent it can be reasonably applied in the
States of the Lower Division to the uses speci-
fied in article III(e) of the Colorado River
Compact, but no such releases shall be made
when the active storage in Lake Powell is less
than the active storage in Lake Mead, (ii) to
maintain, as nearly as practicable, active stor-
age in Lake Mead equal to the active storage
in Lake Powell, and (iii) to avoid anticipated
spills from Lake Powell.
(b) Submittal of criteria for review and com-
ment; publication; report to Congress
Not later than January 1, 1970, the criteria
proposed in accordance with the foregoing sub-
section (a) of this section shall be submitted to
the Governors of the seven Colorado River Basin
States and to such other parties and agencies as
the Secretary may deem appropriate for their
review and comment. After receipt of comments
on the proposed criteria, but not later than July
1, 1970, the Secretary shall adopt appropriate
criteria in accordance with this section and pub-
lish the same in the Federal Register. Beginning
January 1, 1972, and yearly thereafter, the Sec-
retary shall transmit to the Congress and to the
Governors of the Colorado River Basin States a
report describing the actual operation under the
adopted criteria for the preceding compact
water year and the projected operation for the
current year. As a result of actual operating ex-
perience or unforeseen circumstances, the Sec-
retary may thereafter modify the criteria to
better achieve the purposes specified in sub-
section (a) of this section, but only after cor-
respondence with the Governors of the seven
Colorado River Basin States and appropriate
consultation with such State representatives as
each Governor may designate.
Page 413
TITLE 43—PUBLIC LANDS
§ 1556
(c) Powerplant operations
Section 7 of the Colorado River Storage
Project Act [43 U.S.C. 620f] shall be administered
in accordance with the foregoing criteria.
(Pub. L. 90–537, title VI, § 602, Sept. 30, 1968, 82
Stat. 900.)
Editorial Notes
REFERENCES IN TEXT
The Colorado River Storage Project Act, referred to
in subsec. (a), is act Apr. 11, 1956, ch. 203, 70 Stat. 105,
which is classified generally to chapter 12B (§ 620 et
seq.) of this title. For complete classification of this
Act to the Code, see Short Title note set out under sec-
tion 620 of this title and Tables.
The Boulder Canyon Project Act, referred to in sub-
sec. (a), is act Dec. 21, 1928, ch. 42, 45 Stat. 1057, which
is classified generally to subchapter I (§ 617 et seq.) of
chapter 12A of this title. For complete classification of
this Act to the Code, see section 617t of this title and
Tables.
The Boulder Canyon Project Adjustment Act, re-
ferred to in subsec. (a), is act July 19, 1940, ch. 643, 54
Stat. 774, which is classified generally to subchapter II
(§ 618 et seq.) of chapter 12A of this title. For complete
classification of this Act to the Code, see section 618o
of this title and Tables.
Statutory Notes and Related Subsidiaries
TERMINATION OF REPORTING REQUIREMENTS
For termination, effective May 15, 2000, of provisions
in subsec. (b) of this section relating to the require-
ment that the Secretary transmit an annual report to
Congress, see section 3003 of Pub. L. 104–66, as amended,
set out as a note under section 1113 of Title 31, Money
and Finance, and the 3rd item on page 113 of House
Document No. 103–7.
§ 1553. Upper Colorado River Basin; rights to
consumptive uses not to be reduced or preju-
diced; duties and powers of Commission not
impaired
(a) Rights of the upper basin to the consump-
tive use of water available to that basin from
the Colorado River system under the Colorado
River Compact shall not be reduced or preju-
diced by any use of such water in the lower
basin.
(b) Nothing in this chapter shall be construed
so as to impair, conflict with, or otherwise
change the duties and powers of the Upper Colo-
rado River Commission.
(Pub. L. 90–537, title VI, § 603, Sept. 30, 1968, 82
Stat. 901.)
§ 1554. Federal reclamation laws
Except as otherwise provided in this chapter,
in constructing, operating, and maintaining the
units of the projects herein and hereafter au-
thorized, the Secretary shall be governed by the
Federal reclamation laws (Act of June 17, 1902;
32 Stat. 388, and Acts amendatory thereof or
supplementary thereto) to which laws this chap-
ter shall be deemed a supplement.
(Pub. L. 90–537, title VI, § 604, Sept. 30, 1968, 82
Stat. 901.)
Editorial Notes
REFERENCES IN TEXT
Act of June 17, 1902, referred to in text, is popularly
known as the Reclamation Act, which is classified gen-
erally to chapter 12 (§ 371 et seq.) of this title. For com-
plete classification of this Act to the Code, see Short
Title note set out under section 371 of this title and Ta-
bles.
§ 1555. Federal Power Act inapplicable to Colo-
rado River between Hoover Dam and Glen
Canyon Dam
Part I of the Federal Power Act [16 U.S.C. 791a
et seq.] shall not be applicable to the reaches of
the main stream of the Colorado River between
Hoover Dam and Glen Canyon Dam until and un-
less otherwise provided by Congress.
(Pub. L. 90–537, title VI, § 605, Sept. 30, 1968, 82
Stat. 901.)
Editorial Notes
REFERENCES IN TEXT
The Federal Power Act, referred to in text, is act
June 10, 1920, ch. 285, 41 Stat. 1063. Part I of the Federal
Power Act is classified generally to subchapter I (§ 791a
et seq.) of chapter 12 of Title 16, Conservation. For com-
plete classification of this Act to the Code, see section
791a of Title 16 and Tables.
§ 1556. Definitions
As used in this chapter, (a) all terms which are
defined in the Colorado River Compact shall
have the meanings therein defined;
(b) ‘‘Main stream’’ means the main stream of
the Colorado River downstream from Lee Ferry
within the United States, including the res-
ervoirs thereon;
(c) ‘‘User’’ or ‘‘water user’’ in relation to main
stream water in the lower basin means the
United States or any person or legal entity enti-
tled under the decree of the Supreme Court of
the United States in Arizona against California,
and others (376 U.S. 340), to use main stream
water when available thereunder;
(d) ‘‘Active storage’’ means that amount of
water in reservoir storage, exclusive of bank
storage, which can be released through the ex-
isting reservoir outlet works;
(e) ‘‘Colorado River Basin States’’ means the
States of Arizona, California, Colorado, Nevada,
New Mexico, Utah, and Wyoming;
(f) ‘‘Western United States’’ means those
States lying wholly or in part west of the Conti-
nental Divide; and
(g) ‘‘Augment’’ or ‘‘augmentation’’, when used
herein with reference to water, means to in-
crease the supply of the Colorado River or its
tributaries by the introduction of water into the
Colorado River system, which is in addition to
the natural supply of the system.
(Pub. L. 90–537, title VI, § 606, Sept. 30, 1968, 82
Stat. 901.)
CHAPTER 32A—COLORADO RIVER BASIN
SALINITY CONTROL
SUBCHAPTER I—PROGRAMS DOWNSTREAM FROM
IMPERIAL DAM
Sec.
1571.
Water quality improvement.
1572.
Canal or canal lining.
1573.
Construction and maintenance of well fields;
land acquisition; land replacement; non-
reimbursable costs.
1574.
Modification of projects.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
This chapter may be cited as the “Federal Power Act”.
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 791a
Stored review status: release_metadata_unconfirmed. The source passage cites 16 U.S.C. § 791a. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 1364
TITLE 16—CONSERVATION
§ 791
Sec.
Statutory Notes and Related Subsidiaries
FINDINGS
Pub. L. 113–23, § 2, Aug. 9, 2013, 127 Stat. 493, provided
that: ‘‘Congress finds that—
‘‘(1) the hydropower industry currently employs ap-
proximately 300,000 workers across the United States;
‘‘(2) hydropower is the largest source of clean, re-
newable electricity in the United States;
‘‘(3) as of the date of enactment of this Act [Aug. 9,
2013], hydropower resources, including pumped stor-
age facilities, provide—
‘‘(A) nearly 7 percent of the electricity generated
in the United States; and
‘‘(B) approximately 100,000 megawatts of electric
capacity in the United States;
‘‘(4) only 3 percent of the 80,000 dams in the United
States generate electricity, so there is substantial
potential for adding hydropower generation to non-
powered dams; and
‘‘(5) according to one study, by utilizing currently
untapped resources, the United States could add ap-
proximately 60,000 megawatts of new hydropower ca-
pacity by 2025, which could create 700,000 new jobs
over the next 13 years.’’
SUBCHAPTER I—REGULATION OF THE DE-
VELOPMENT OF WATER POWER AND RE-
SOURCES
Statutory Notes and Related Subsidiaries
CODIFICATION; CONSTRUCTION
Act Aug. 26, 1935, ch. 687, title II, § 212, 49 Stat. 847,
provided that sections 1 to 29 of the Federal Water
Power Act, as amended (sections 792, 793, 794 to 797, 798
to 818, 819, and 820 to 823 of this title) shall constitute
part I of the act. Said section 212 also repealed sections
25 and 30 of the act (sections 819, 791 of this title). It
also contained a proviso as follows: ‘‘That nothing in
that Act, as amended, shall be construed to repeal or
amend the provisions of the amendment to the Federal
Water Power Act approved March 3, 192
Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 791a
Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 791a. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Promulgation by Secretary; order of priorities** In order to comply with and carry out the provisions of the Colorado River Compact, the Upper Colorado River Basin Compact, and the Mexican Water Treaty, the Secretary shall propose criteria for the coordinated long-range operation of the reservoirs constructed and operated under the authority of the Colorado River Storage Project Act [[43 U.S.C. 620](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section620&num=0&edition=prelim) et seq.], the Boulder Canyon Project Act [[43 U.S.C. 617](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section617&num=0&edition=prelim) et seq.], and the Boulder Canyon Project Adjustment Act [[43 U.S.C. 618](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618&num=0&edition=prelim) et seq.]. To effect in part the purposes expressed in this paragraph, the criteria shall make provision for the storage of water in storage units of the Colorado River storage project and releases of water form Lake Powell in the following listed order of priority:
(1) releases to supply one-half the deficiency described in article III(c) of the Colorado River Compact, if any such deficiency exists and is chargeable to the States of the Upper Division, but in any event such releases, if any, shall not be required in any year that the Secretary makes the determination and issues the proclamation specified in [section 1512 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1512&num=0&edition=prelim);
(2) releases to comply with article III(d) of the Colorado River Compact, less such quantities of water delivered into the Colorado River below Lee Ferry to the credit of the States of the Upper Division
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1552
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.
Federal law — U.S. Code and appendices · legal_authorities
For the purpose of controlling the floods, improving navigation, and regulating the flow of the Colorado River, providing for storage and for the delivery of the stored waters thereof for reclamation of public lands and other beneficial uses exclusively within the United States, and for the generation of electrical energy as a means of making the project herein authorized a self-supporting and financially solvent undertaking, the Secretary of the Interior subject to the terms of the Colorado River compact hereinafter mentioned in this chapter, is authorized to construct, operate, and maintain a dam and incidental works in the main stream of the Colorado River at Black Canyon or Boulder Canyon adequate to create a storage reservoir of a capacity of not less than twenty million acre-feet of water and a main canal and appurtenant structures located entirely within the United States connecting the Laguna Dam, or other suitable diversion dam, which the Secretary of the Interior is authorized to construct if deemed necessary or advisable by him upon engineering or economic considerations, with the Imperial and Coachella Valleys in California, the expenditures for said main canal and appurtenant structures to be reimbursable, as provided in the reclamation law, and shall not be paid out of revenues derived from the sale or disposal of water power or electric energy at the dam authorized to be constructed at said Black Canyon or Boulder Canyon, or for water for potable purposes outside of the Imperial and Coachella Valleys: Provided, however, That no charge shall be made for water for the use, storage, or delivery of water for irrigation or water for potable purposes in the Imperial or Coachella Valleys; also to construct and equip, operate, and maintain at or near said dam, or
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 617
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 617. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 209
TITLE 43—PUBLIC LANDS
§ 617
Sec.
618i.
Effective date.
618j.
Effect of refusal to modify existing contracts.
618k.
Definitions.
618l.
Repealed.
618m.
Effect on existing laws and States’ rights.
618n.
Wages of employees.
618o.
Short title.
618p.
Omitted.
SUBCHAPTER III—HOOVER DAM CONTRACTS AND
FACILITIES
619.
Increase in capacity of existing generating
equipment at Hoover Powerplant; construc-
tion of Colorado River bridge crossing.
619a.
Renewal contracts for power.
619b.
Reimbursement of funds advanced by non-
Federal purchasers; uprating program; re-
payment requirement; visitor facilities pro-
gram.
Statutory Notes and Related Subsidiaries
CONSOLIDATION OF CERTAIN PROJECTS; EFFECT ON THIS
CHAPTER
Act May 28, 1954, ch. 241, 68 Stat. 143, provided that:
‘‘For the purposes of effecting economies and in-
creased efficiency in the construction, operation, and
maintenance thereof and of accounting for the return
of reimbursable costs, the Secretary of the Interior is
authorized and directed to consolidate and administer
as a single project to be known as the Parker-Davis
project, Arizona-California-Nevada, the projects known
as the Parker Dam power project, Arizona-California,
and the Davis Dam project, Arizona-Nevada: Provided,
That nothing in this Act shall be construed to alter or
affect in any way the Boulder Canyon Project Act (45
Stat. 1057) [subchapter I of this chapter], the Boulder
Canyon Project Adjustment Act (54 Stat. 774) [sub-
chapter II of this chapter], or the treaty between the
United States of America and the United Mexican
States, signed at Washington on February 3, 1944, relat-
ing to the utilization of the waters of the Colorado and
Tijuana Rivers and of the Rio Grande from Fort
Quitman, Texas, to th
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 617
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 617. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
The Secretary of the Interior is authorized and directed to, and he shall, promulgate charges, or the basis of computation thereof, for electrical energy generated at Hoover Dam beginning June 1, 1937, computed to be sufficient, together with other net revenues from the project, to accomplish the following purposes:
**(a)** To meet the cost of operation and maintenance, and to provide for replacements, of the project beginning June 1, 1937;
**(b)** To repay to the Treasury, with interest, the advances to the Colorado River Dam Fund for the project made prior to June 1, 1937, within fifty years from that date (excluding advances allocated to flood control by [section 617a(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section617a/b&num=0&edition=prelim), which shall be repayable as provided in [section 618f of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618f&num=0&edition=prelim)), and such advances made on and after June 1, 1937, over fifty-year periods;
**(c)** To provide $600,000 for each of the years and for the purposes specified in [section 618a(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618a/c&num=0&edition=prelim);
**(d)** To provide $500,000 for each of the years and for the purposes specified in [section 618a(d) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618a/d&num=0&edition=prelim); and
**(e)** To provide, by application of the increments to rates specified in section 403(c)(2) of the Colorado River Basin Project Act of 1968, as amended and supplemented [[43 U.S.C. 1543(c)(2)](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1543/c/2&num=0&edition=p
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 618
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 618. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 217
TITLE 43—PUBLIC LANDS
§ 618
islature of each of such States and by the Con-
gress of the United States.
(Dec. 21, 1928, ch. 42, § 19, 45 Stat. 1065.)
§ 617s. Recognition of rights of Mexico to Colo-
rado River waters
Nothing in this subchapter shall be construed
as a denial or recognition of any rights, if any,
in Mexico to the use of the waters of the Colo-
rado River system.
(Dec. 21, 1928, ch. 42, § 20, 45 Stat. 1066.)
§ 617t. Short title
The short title of this subchapter shall be
‘‘Boulder Canyon Project Act.’’
(Dec. 21, 1928, ch. 42, § 21, 45 Stat. 1066.)
§ 617u. Lease of reserved lands in Boulder City,
Nevada; disposition of revenues
The Secretary of the Interior is authorized and
empowered, under such rules and regulations as
he may prescribe, to establish rental rates for
the lease of reserved lands of the United States
situate within the exterior boundaries of Boul-
der City, Nevada, and, without prior advertising,
to enter into leases therefor at not less than
rates so established and for periods not exceed-
ing fifty-three years from the date of such
leases: Provided, That all revenues which may
accrue to the United States under the provisions
of such leases shall be deposited in the Treasury
and credited to the Colorado River Dam fund es-
tablished by section 617a of this title.
(June 18, 1940, ch. 395, 54 Stat. 437.)
Editorial Notes
CODIFICATION
Section was not enacted as part of the Boulder Can-
yon Project Act which comprises this subchapter.
Statutory Notes and Related Subsidiaries
BOULDER CITY ACT OF 1958
Public Law 85–900, Sept. 2, 1958, 72 Stat. 1726, provided
for disposal of certain Federal property in Boulder City
for purposes of establishment of a municipal corpora-
tion incorporated under laws of Nevada.
§ 61
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 618
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 618. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
In order to initiate the comprehensive development of the water resources of the Upper Colorado River Basin, for the purposes, among others, of regulating the flow of the Colorado River, storing water for beneficial consumptive use, making it possible for the States of the Upper Basin to utilize, consistently with the provisions of the Colorado River Compact, the apportionments made to and among them in the Colorado River Compact and the Upper Colorado River Basin Compact, respectively, providing for the reclamation of arid and semiarid land, for the control of floods, and for the generation of hydroelectric power, as an incident of the foregoing purposes, the Secretary of the Interior is authorized (1) to construct, operate, and maintain the following initial units of the Colorado River storage project, consisting of dams, reservoirs, powerplants, transmission facilities and appurtenant works: Wayne N. Aspinall, Flaming Gorge, Navajo (dam and reservoir only), and Glen Canyon: Provided, That the Wayne N. Aspinall Dam shall be constructed to a height which will impound not less than nine hundred and forty thousand acre-feet of water or will create a reservoir of such greater capacity as can be obtained by a high waterline located at seven thousand five hundred and twenty feet above mean sea level, and that construction thereof shall not be undertaken until the Secretary has, on the basis of further engineering and economic investigations, reexamined the economic justification of such unit and, accompanied by appropriate documentation in the form of a supplemental report, has certified to the Congress and to the President that, in his judgment, the benefits of such unit will exceed its costs; and (2) to construct, operate, and maintain the following additional reclamation
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 620
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 620. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 228
TITLE 43—PUBLIC LANDS
§ 620
Sec.
620d.
Upper Colorado River Basin Fund.
620d–1.
Reimbursement of Fund from Colorado River
Development Fund; operation of Hoover
Dam.
620e.
Cost allocations; Indian lands; report to Con-
gress.
620f.
Powerplant operations.
620g.
Recreational and fish and wildlife facilities.
620h.
Saving provisions.
620i.
Expenditures; units excepted from soil survey
and land classification requirements.
620j.
Court decree; effectivity and approval.
620k.
Authorization of appropriations.
620l.
Net power revenues.
620m.
Compliance with law required in operation of
facilities; enforcement of provisions.
620n.
Water quality study and reports.
620n–1.
Top water bank.
620o.
Definitions.
§ 620. Upper Colorado River Basin; purpose of
development of water resources; initial units;
construction of Wayne N. Aspinall unit con-
tingent
upon
certification;
participating
projects; Rainbow Bridge National Monu-
ment
In order to initiate the comprehensive devel-
opment of the water resources of the Upper Col-
orado River Basin, for the purposes, among oth-
ers, of regulating the flow of the Colorado River,
storing water for beneficial consumptive use,
making it possible for the States of the Upper
Basin to utilize, consistently with the provi-
sions of the Colorado River Compact, the appor-
tionments made to and among them in the Colo-
rado River Compact and the Upper Colorado
River Basin Compact, respectively, providing for
the reclamation of arid and semiarid land, for
the control of floods, and for the generation of
hydroelectric power, as an incident of the fore-
going purposes, the Secretary of the Interior is
authorized (1) to construct, operate, and main-
tain the following initial units of the Colorado
Rive
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 620
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 620. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
The hydroelectric powerplants and transmission lines authorized by this chapter to be constructed, operated, and maintained by the Secretary shall be operated in conjunction with other Federal powerplants, present and potential, so as to produce the greatest practicable amount of power and energy that can be sold at firm power and energy rates, but in the exercise of the authority hereby granted he shall not affect or interfere with the operation of the provisions of the Colorado River Compact, the Upper Colorado River Basin Compact, the Boulder Canyon Project Act [[43 U.S.C. 617](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section617&num=0&edition=prelim) et seq.], the Boulder Canyon Project Adjustment Act [[43 U.S.C. 618](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618&num=0&edition=prelim) et seq.], and any contract lawfully entered into under said Compacts and Acts. Subject to the provisions of the Colorado River Compact, neither the impounding nor the use of water for the generation of power and energy at the plants of the Colorado River storage project shall preclude or impair the appropriation of water for domestic or agricultural purposes pursuant to applicable State law.
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 620f
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 620f. This identifies an authority to review, not proof of applicability.