Browse Arkansas Code titles and sections
43 U.S.C. § 618 — Promulgation of charges for electrical en-
Federal law — U.S. Code and appendices · legal_authorities
Page 217
TITLE 43—PUBLIC LANDS
§ 618
islature of each of such States and by the Con-
gress of the United States.
(Dec. 21, 1928, ch. 42, § 19, 45 Stat. 1065.)
§ 617s. Recognition of rights of Mexico to Colo-
rado River waters
Nothing in this subchapter shall be construed
as a denial or recognition of any rights, if any,
in Mexico to the use of the waters of the Colo-
rado River system.
(Dec. 21, 1928, ch. 42, § 20, 45 Stat. 1066.)
§ 617t. Short title
The short title of this subchapter shall be
‘‘Boulder Canyon Project Act.’’
(Dec. 21, 1928, ch. 42, § 21, 45 Stat. 1066.)
§ 617u. Lease of reserved lands in Boulder City,
Nevada; disposition of revenues
The Secretary of the Interior is authorized and
empowered, under such rules and regulations as
he may prescribe, to establish rental rates for
the lease of reserved lands of the United States
situate within the exterior boundaries of Boul-
der City, Nevada, and, without prior advertising,
to enter into leases therefor at not less than
rates so established and for periods not exceed-
ing fifty-three years from the date of such
leases: Provided, That all revenues which may
accrue to the United States under the provisions
of such leases shall be deposited in the Treasury
and credited to the Colorado River Dam fund es-
tablished by section 617a of this title.
(June 18, 1940, ch. 395, 54 Stat. 437.)
Editorial Notes
CODIFICATION
Section was not enacted as part of the Boulder Can-
yon Project Act which comprises this subchapter.
Statutory Notes and Related Subsidiaries
BOULDER CITY ACT OF 1958
Public Law 85–900, Sept. 2, 1958, 72 Stat. 1726, provided
for disposal of certain Federal property in Boulder City
for purposes of establishment of a municipal corpora-
tion incorporated under laws of Nevada.
§ 61
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 618
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 9798718e7d83597c025fc6ef8e16161c2775526ad90c85c292fc431a3dc95811. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-84bec13a8bdcb54899968f79
Source file: Laws/federal/codes/united-states-code-2024/title-43/section-618-promulgation-of-charges-for-electrical-en--3b3e3a4f84.md
Pages: Not recorded – Not recorded
Passage SHA-256: a7fde5d49c418181f32936071f885a056e26bdc130f695214f7042fd47caddb6
Source location: USCODE-2024-title43-chap12A-subchapII-sec618.pdf
Stored source content
Page 217
TITLE 43—PUBLIC LANDS
§ 618
islature of each of such States and by the Con-
gress of the United States.
(Dec. 21, 1928, ch. 42, § 19, 45 Stat. 1065.)
§ 617s. Recognition of rights of Mexico to Colo-
rado River waters
Nothing in this subchapter shall be construed
as a denial or recognition of any rights, if any,
in Mexico to the use of the waters of the Colo-
rado River system.
(Dec. 21, 1928, ch. 42, § 20, 45 Stat. 1066.)
§ 617t. Short title
The short title of this subchapter shall be
‘‘Boulder Canyon Project Act.’’
(Dec. 21, 1928, ch. 42, § 21, 45 Stat. 1066.)
§ 617u. Lease of reserved lands in Boulder City,
Nevada; disposition of revenues
The Secretary of the Interior is authorized and
empowered, under such rules and regulations as
he may prescribe, to establish rental rates for
the lease of reserved lands of the United States
situate within the exterior boundaries of Boul-
der City, Nevada, and, without prior advertising,
to enter into leases therefor at not less than
rates so established and for periods not exceed-
ing fifty-three years from the date of such
leases: Provided, That all revenues which may
accrue to the United States under the provisions
of such leases shall be deposited in the Treasury
and credited to the Colorado River Dam fund es-
tablished by section 617a of this title.
(June 18, 1940, ch. 395, 54 Stat. 437.)
Editorial Notes
CODIFICATION
Section was not enacted as part of the Boulder Can-
yon Project Act which comprises this subchapter.
Statutory Notes and Related Subsidiaries
BOULDER CITY ACT OF 1958
Public Law 85–900, Sept. 2, 1958, 72 Stat. 1726, provided
for disposal of certain Federal property in Boulder City
for purposes of establishment of a municipal corpora-
tion incorporated under laws of Nevada.
§ 617v. Repealed. Pub. L. 85–900, § 17, Sept. 2,
1958, 72 Stat. 1735
Section, act July 31, 1953, ch. 296, title II, 67 Stat. 250,
which was not enacted as part of the Boulder Canyon
Project Act (which comprises this subchapter), pro-
vided for taxation of leaseholds lying within Boulder
Canyon Project Reservation and deduction of certain
school taxes in Boulder City Union School District.
SUBCHAPTER II—BOULDER CANYON
PROJECT ADJUSTMENT ACT
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE
Effective date of subchapter, see sections 618i, 620f,
620h, 620m of this title.
CONSOLIDATION OF CERTAIN PROJECTS; EFFECT ON THIS
SUBCHAPTER
Consolidation of Parker and Davis Dam projects as
not affecting this subchapter, see note set out pre-
ceding subchapter I of this chapter.
§ 618. Promulgation of charges for electrical en-
ergy
The Secretary of the Interior is authorized and
directed to, and he shall, promulgate charges, or
the basis of computation thereof, for electrical
energy generated at Hoover Dam beginning June
1, 1937, computed to be sufficient, together with
other net revenues from the project, to accom-
plish the following purposes:
(a) To meet the cost of operation and mainte-
nance, and to provide for replacements, of the
project beginning June 1, 1937;
(b) To repay to the Treasury, with interest,
the advances to the Colorado River Dam Fund
for the project made prior to June 1, 1937, within
fifty years from that date (excluding advances
allocated to flood control by section 617a(b) of
this title, which shall be repayable as provided
in section 618f of this title), and such advances
made on and after June 1, 1937, over fifty-year
periods;
(c) To provide $600,000 for each of the years and
for the purposes specified in section 618a(c) of
this title;
(d) To provide $500,000 for each of the years
and for the purposes specified in section 618a(d)
of this title; and
(e) To provide, by application of the incre-
ments to rates specified in section 403(c)(2) of
the Colorado River Basin Project Act of 1968, as
amended and supplemented [43 U.S.C. 1543(c)(2)],
revenues, from and after June 1, 1987, for appli-
cation to the purposes there specified.
Such charges may be made subject to revi-
sions and adjustments at such times, to such ex-
tent, and in such manner, as by the terms of
their promulgation the Secretary shall pre-
scribe.
(July 19, 1940, ch. 643, § 1, 54 Stat. 774; Apr. 30,
1947, ch. 46, 61 Stat. 56; Pub. L. 98–381, title I,
§ 104(a)(1)–(3), Aug. 17, 1984, 98 Stat. 1334.)
Editorial Notes
AMENDMENTS
1984—Pub. L. 98–381, § 104(a)(1), substituted ‘‘beginning
June 1, 1937’’ for ‘‘during the period beginning June 1,
1937, and ending May 31, 1987’’ in provisions preceding
subsec. (a).
Subsec. (a). Pub. L. 98–381, § 104(a)(1), substituted ‘‘be-
ginning June 1, 1937’’ for ‘‘during the period beginning
June 1, 1937, and ending May 31, 1987’’.
Subsec. (b). Pub. L. 98–381, § 104(a)(2), substituted
‘‘and such advances made on or after June 1, 1937, over
fifty-year periods’’ for ‘‘and such portion of such ad-
vances made on or after June 1, 1937, as (on the basis
of repayment thereof within such fifty-year period or
periods as the Secretary may determine) will be repay-
able prior to June 1, 1987’’.
Subsec. (e). Pub. L. 98–381, § 104(a)(3), added subsec.
(e).
Statutory Notes and Related Subsidiaries
CHANGE OF NAME
Act Apr. 30, 1947, changed name of Boulder Dam back
to Hoover Dam.
CONSTRUCTION WITH OTHER LAWS
Pub. L. 98–381, title I, § 104(b), Aug. 17, 1984, 98 Stat.
1335, provided that: ‘‘Except as amended by this Act
[amending sections 618, 618a, 618e, and 618k of this
Page 218
TITLE 43—PUBLIC LANDS
§ 618a
title], the Boulder Canyon Project Adjustment Act of
1940 (54 Stat. 774, as amended, 43 U.S.C. 618), as amended
and supplemented [this subchapter], shall remain in
full force and effect.’’
§ 618a. Receipts from project; disposition
All receipts from the project shall be paid into
the Colorado River Dam Fund and shall be avail-
able, without further appropriation, for:
(a) Defraying operating expenses
Defraying the costs of operation (including
purchase of supplemental energy to meet tem-
porary deficiencies in firm energy which the
Secretary of Energy is obligated by contract to
supply), maintenance and replacements of, and
emergency expenditures for, all facilities of the
project, within such separate limitations as may
be included in annual appropriations Acts;
(b) Repayment of cost of construction
Repayment to the Treasury, with interest
(after making provision for the payments and
transfers provided in subdivisions (c) and (d)
hereof), of advances to the Colorado River Dam
Fund for the construction of the project (exclud-
ing the amount allocated to flood control by
section 2(b) of the Project Act [43 U.S.C.
617a(b)]), and any readvances made to said fund
under section 618d of this title; and
(c) Commutation payments to Arizona and Ne-
vada
Payment subject to the provisions of section
618b of this title, in commutation of the pay-
ments now provided for the States of Arizona
and Nevada in section 4(b) of the Project Act [43
U.S.C. 617c(b)] to each of said States of the sum
of $300,000 for each year of operation, beginning
with the year of operation ending May 31, 1938,
and continuing annually thereafter until and in-
cluding the year of operation ending May 31,
1987, and such payments for any year of oper-
ation which shall have expired at the time when
this subdivision shall become effective shall be
due immediately, and be paid, without interest,
as expeditiously as administration of this sub-
chapter will permit, and each such payment for
subsequent years of operation shall be made on
or before July 31, following the close of the year
of operation for which it is made. All such pay-
ments shall be made from revenues received on
and after July 19, 1940 in the Colorado River
Dam Fund.
Notwithstanding the foregoing provisions of
this subsection, in the event that there are lev-
ied and collected by or under authority of Ari-
zona or Nevada or by any lawful taxing political
subdivision thereof, taxes upon—
(i) the project as herein defined;
(ii) the electrical energy generated at Hoo-
ver Dam by means of facilities, machinery, or
equipment both owned and operated by the
United States, or owned by the United States
and operated under contract with the United
States;
(iii) the privilege of generating or trans-
forming such electrical energy or of use of
such facilities, machinery, or equipment or of
falling water for such generation or trans-
forming; or
(iv) the transmission or control of such elec-
trical energy so generated or transformed (as
distinguished from the transmission lines and
other physical properties used for such trans-
mission or control) or the use of such trans-
mission lines or other physical properties for
such transmission or control,
payments made hereunder to the State by or
under the authority of which such taxes are col-
lected shall be reduced by an amount equivalent
to such taxes. Nothing herein shall in anywise
impair the right of either the State of Arizona
or the State of Nevada, or any lawful taxing po-
litical subdivision of either of them, to collect
non-discriminatory taxes upon that portion of
the transmission lines and all other physical
properties, situated within such State and such
political subdivision, respectively, and belong-
ing to any of the lessees and/or allottees under
the Project Act [43 U.S.C. 617 et seq.] and/or
under this subchapter, and nothing herein shall
exempt or be construed so as to exempt any such
property from nondiscriminatory taxation, all
in the manner provided by the constitution and
laws of such State. Sums, if any, received by
each State under the provisions of the Project
Act [43 U.S.C. 617 et seq.] shall be deducted from
the first payment or payments to said State au-
thorized by this subchapter. Payments under
this subsection shall be deemed contractual ob-
ligations of the United States, subject to the
provisions of section 618b of this title.
(d) Transfer of sums to Colorado River Develop-
ment Fund; expenditure of fund
Transfer, subject to the provisions of section
618b of this title, from the Colorado River Dam
Fund to a special fund in the Treasury, estab-
lished and designated the ‘‘Colorado River De-
velopment Fund’’, of the sum of $500,000 for the
year of operation ending May 31, 1938, and the
like sum of $500,000 for each year of operation
thereafter, until and including the year of oper-
ation ending May 31, 1987. The transfer of the
said sum of $500,000 for each year of operation
shall be made on or before July 31 next following
the close of the year of operation for which it is
made: Provided, That any such transfer for any
year of operation which shall have ended at the
time this subsection shall become effective,
shall be made, without interest, from revenues
received in the Colorado River Dam Fund, as ex-
peditiously as administration of this subchapter
will permit, and without readvances from the
general funds of the Treasury. Receipts of the
Colorado River Development Fund for the years
of operation ending in 1938, 1939, and 1940 (or in
the event of reduced receipts during any of said
years, due to adjustments under section 618b of
this title, then the first receipts of said fund up
to $1,500,000), are authorized to be appropriated
only for the continuation and extension, under
the direction of the Secretary, of studies and in-
vestigations by the Bureau of Reclamation for
the formulation of a comprehensive plan for the
utilization of waters of the Colorado River sys-
tem for irrigation, electrical power, and other
purposes, in the States of the upper division and
the States of the lower division, including stud-
ies of quantity and quality of water and all
other relevant factors. The next such receipts up
to and including the receipts for the year of op-
eration ending in 1955 are authorized to be ap-
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Establishment** There is hereby established a separate fund in the Treasury of the United States to be known as the Lower Colorado River Basin Development Fund (hereafter called the “development fund”), which shall remain available until expended as hereafter provided.
**(b) Appropriations**
(1) All appropriations made for the purpose of carrying out the provisions of subchapter III of this chapter shall be credited to the development fund as advances from the general fund of the Treasury, and shall be available for such purpose.
(2) Except as provided in [section 1528(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1528/b&num=0&edition=prelim), sums advanced by non-Federal entities for the purpose of carrying out the provisions of subchapter III of this chapter shall be credited to the development fund and shall be available without further appropriation for such purpose.
**(c) Revenues credited to fund** There shall also be credited to the development fund—
(1) all revenues collected in connection with the operation of facilities authorized in subchapter III in furtherance of the purposes of this chapter (except entrance, admission, and other recreation fees or charges and proceeds received from recreation concessionaires), until completion of repayment requirements of the Central Arizona project;
(2) any Federal revenues from the Boulder Canyon and Parker-Davis projects which, after completion of repayment requirements of the said Boulder Canyon and Parker-Davis projects, are surplus, as determined by the Secretary, to the operation, maintenance, and replacement requirements of those projects: Provided, however, That for the Boulder Canyon project commencing June 1, 1987, and for the Parker-Davis project comme
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1543
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 1543. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 407
TITLE 43—PUBLIC LANDS
§ 1543
§ 1542. Repayment capability of Indian lands
The Secretary shall determine the repayment
capability of Indian lands within, under, or
served by any unit of the project. Construction
costs allocated to irrigation of Indian lands (in-
cluding provision of water for incidental domes-
tic and stock water uses) and within the repay-
ment capability of such lands shall be subject to
section 386a of title 25, and such costs that are
beyond repayment capability of such lands shall
be nonreimbursable.
(Pub. L. 90–537, title IV, § 402, Sept. 30, 1968, 82
Stat. 894.)
§ 1543. Lower Colorado River Basin Development
Fund
(a) Establishment
There is hereby established a separate fund in
the Treasury of the United States to be known
as the Lower Colorado River Basin Development
Fund (hereafter called the ‘‘development fund’’),
which shall remain available until expended as
hereafter provided.
(b) Appropriations
(1) All appropriations made for the purpose of
carrying out the provisions of subchapter III of
this chapter shall be credited to the develop-
ment fund as advances from the general fund of
the Treasury, and shall be available for such
purpose.
(2) Except as provided in section 1528(b) of this
title, sums advanced by non-Federal entities for
the purpose of carrying out the provisions of
subchapter III of this chapter shall be credited
to the development fund and shall be available
without further appropriation for such purpose.
(c) Revenues credited to fund
There shall also be credited to the develop-
ment fund—
(1) all revenues collected in connection with
the operation of facilities authorized in sub-
chapter III in furtherance of the purposes of
this chapter (except entrance, admission, and
other recreati
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 1543
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 1543. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
For the purpose of controlling the floods, improving navigation, and regulating the flow of the Colorado River, providing for storage and for the delivery of the stored waters thereof for reclamation of public lands and other beneficial uses exclusively within the United States, and for the generation of electrical energy as a means of making the project herein authorized a self-supporting and financially solvent undertaking, the Secretary of the Interior subject to the terms of the Colorado River compact hereinafter mentioned in this chapter, is authorized to construct, operate, and maintain a dam and incidental works in the main stream of the Colorado River at Black Canyon or Boulder Canyon adequate to create a storage reservoir of a capacity of not less than twenty million acre-feet of water and a main canal and appurtenant structures located entirely within the United States connecting the Laguna Dam, or other suitable diversion dam, which the Secretary of the Interior is authorized to construct if deemed necessary or advisable by him upon engineering or economic considerations, with the Imperial and Coachella Valleys in California, the expenditures for said main canal and appurtenant structures to be reimbursable, as provided in the reclamation law, and shall not be paid out of revenues derived from the sale or disposal of water power or electric energy at the dam authorized to be constructed at said Black Canyon or Boulder Canyon, or for water for potable purposes outside of the Imperial and Coachella Valleys: Provided, however, That no charge shall be made for water for the use, storage, or delivery of water for irrigation or water for potable purposes in the Imperial or Coachella Valleys; also to construct and equip, operate, and maintain at or near said dam, or
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 617
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 617. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 209
TITLE 43—PUBLIC LANDS
§ 617
Sec.
618i.
Effective date.
618j.
Effect of refusal to modify existing contracts.
618k.
Definitions.
618l.
Repealed.
618m.
Effect on existing laws and States’ rights.
618n.
Wages of employees.
618o.
Short title.
618p.
Omitted.
SUBCHAPTER III—HOOVER DAM CONTRACTS AND
FACILITIES
619.
Increase in capacity of existing generating
equipment at Hoover Powerplant; construc-
tion of Colorado River bridge crossing.
619a.
Renewal contracts for power.
619b.
Reimbursement of funds advanced by non-
Federal purchasers; uprating program; re-
payment requirement; visitor facilities pro-
gram.
Statutory Notes and Related Subsidiaries
CONSOLIDATION OF CERTAIN PROJECTS; EFFECT ON THIS
CHAPTER
Act May 28, 1954, ch. 241, 68 Stat. 143, provided that:
‘‘For the purposes of effecting economies and in-
creased efficiency in the construction, operation, and
maintenance thereof and of accounting for the return
of reimbursable costs, the Secretary of the Interior is
authorized and directed to consolidate and administer
as a single project to be known as the Parker-Davis
project, Arizona-California-Nevada, the projects known
as the Parker Dam power project, Arizona-California,
and the Davis Dam project, Arizona-Nevada: Provided,
That nothing in this Act shall be construed to alter or
affect in any way the Boulder Canyon Project Act (45
Stat. 1057) [subchapter I of this chapter], the Boulder
Canyon Project Adjustment Act (54 Stat. 774) [sub-
chapter II of this chapter], or the treaty between the
United States of America and the United Mexican
States, signed at Washington on February 3, 1944, relat-
ing to the utilization of the waters of the Colorado and
Tijuana Rivers and of the Rio Grande from Fort
Quitman, Texas, to th
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 617
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 617. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Creation of fund; purpose; receipts and expenditures under control of Secretary of the Interior** There is established a special fund, to be known as the “Colorado River Dam fund” (hereinafter referred to as the “fund”), and to be available, as hereafter provided for, only for carrying out the provisions of this subchapter. All revenues received in carrying out the provisions of this subchapter shall be paid into and expenditures shall be made out of the fund, under the direction of the Secretary of the Interior.
**(b) Advancements to fund by Secretary of the Treasury; allocation; repayment; interest** The Secretary of the Treasury is authorized to advance to the fund, from time to time and within the appropriations therefor, such amounts as the Secretary of the Interior deems necessary for carrying out the provisions of this subchapter..11 So in original. Of this amount the sum of $25,000,000 shall be allocated to flood control and shall be repaid to the United States out of 62½ per centum of revenues, if any, in excess of the amount necessary to meet periodical payments during the period of amortization, as provided in [section 617c of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section617c&num=0&edition=prelim). If said sum of $25,000,000 is not repaid in full during the period of amortization, then 62½ per centum of all net revenues shall be applied to payment of the remainder. Interest at the rate of 4 per centum per annum accruing during the year upon the amounts so advanced and remaining unpaid shall be paid annually out of the fund, except as herein otherwise provided.
**(c) Limitation on use made of advancements** Moneys in the fund advanced under subdivision (b) shall be available only for expenditures for construc
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 617a
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 617a. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 210
TITLE 43—PUBLIC LANDS
§ 617a
1 So in original.
§ 617a. ‘‘Colorado River Dam Fund’’
(a) Creation of fund; purpose; receipts and ex-
penditures under control of Secretary of the
Interior
There is established a special fund, to be
known as the ‘‘Colorado River Dam fund’’ (here-
inafter referred to as the ‘‘fund’’), and to be
available, as hereafter provided for, only for car-
rying out the provisions of this subchapter. All
revenues received in carrying out the provisions
of this subchapter shall be paid into and expend-
itures shall be made out of the fund, under the
direction of the Secretary of the Interior.
(b) Advancements to fund by Secretary of the
Treasury; allocation; repayment; interest
The Secretary of the Treasury is authorized to
advance to the fund, from time to time and
within
the
appropriations
therefor,
such
amounts as the Secretary of the Interior deems
necessary for carrying out the provisions of this
subchapter..1
Of this amount the sum of
$25,000,000 shall be allocated to flood control and
shall be repaid to the United States out of 621⁄2
per centum of revenues, if any, in excess of the
amount necessary to meet periodical payments
during the period of amortization, as provided in
section 617c of this title. If said sum of
$25,000,000 is not repaid in full during the period
of amortization, then 621⁄2 per centum of all net
revenues shall be applied to payment of the re-
mainder. Interest at the rate of 4 per centum per
annum accruing during the year upon the
amounts so advanced and remaining unpaid
shall be paid annually out of the fund, except as
herein otherwise provided.
(c) Limitation on use made of advancements
Moneys in the fund advanced under subdivi-
sion (b) shall be available only for expenditures
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 617a
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 617a. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Ratification by interested States of Colorado River compact; agreements for apportionment of waters** This subchapter shall not take effect and no authority shall be exercised under this subchapter and no work shall be begun and no moneys expended on or in connection with the works or structures provided for in this subchapter, and no water rights shall be claimed or initiated thereunder, and no steps shall be taken by the United States or by others to initiate or perfect any claims to the use of water pertinent to such works or structures unless and until (1) the States of Arizona, California, Colorado, Nevada, New Mexico, Utah, and Wyoming shall have ratified the Colorado River compact, mentioned in section 617l of this title, and the President by public proclamation shall have so declared, or (2) if said States fail to ratify the said compact within six months from December 21, 1928, then, until six of said States, including the State of California, shall ratify said compact and shall consent to waive the provisions of the first paragraph of Article XI of said compact, which makes the same binding and obligatory only when approved by each of the seven States signatory thereto, and shall have approved said compact without conditions, save that of such six-State approval, and the President by public proclamation shall have so declared, and, further, until the State of California, by act of its legislature, shall agree irrevocably and unconditionally with the United States and for the benefit of the States of Arizona, Colorado, Nevada, New Mexico, Utah, and Wyoming, as an express covenant and in consideration of the passage of this subchapter, that the aggregate annual consumptive use (diversions less returns to the river) of water of and from the Colorado River f
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 617c
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 617c. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 210
TITLE 43—PUBLIC LANDS
§ 617a
1 So in original.
§ 617a. ‘‘Colorado River Dam Fund’’
(a) Creation of fund; purpose; receipts and ex-
penditures under control of Secretary of the
Interior
There is established a special fund, to be
known as the ‘‘Colorado River Dam fund’’ (here-
inafter referred to as the ‘‘fund’’), and to be
available, as hereafter provided for, only for car-
rying out the provisions of this subchapter. All
revenues received in carrying out the provisions
of this subchapter shall be paid into and expend-
itures shall be made out of the fund, under the
direction of the Secretary of the Interior.
(b) Advancements to fund by Secretary of the
Treasury; allocation; repayment; interest
The Secretary of the Treasury is authorized to
advance to the fund, from time to time and
within
the
appropriations
therefor,
such
amounts as the Secretary of the Interior deems
necessary for carrying out the provisions of this
subchapter..1
Of this amount the sum of
$25,000,000 shall be allocated to flood control and
shall be repaid to the United States out of 621⁄2
per centum of revenues, if any, in excess of the
amount necessary to meet periodical payments
during the period of amortization, as provided in
section 617c of this title. If said sum of
$25,000,000 is not repaid in full during the period
of amortization, then 621⁄2 per centum of all net
revenues shall be applied to payment of the re-
mainder. Interest at the rate of 4 per centum per
annum accruing during the year upon the
amounts so advanced and remaining unpaid
shall be paid annually out of the fund, except as
herein otherwise provided.
(c) Limitation on use made of advancements
Moneys in the fund advanced under subdivi-
sion (b) shall be available only for expenditures
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 617c
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 617c. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
The Secretary of the Interior is authorized and directed to, and he shall, promulgate charges, or the basis of computation thereof, for electrical energy generated at Hoover Dam beginning June 1, 1937, computed to be sufficient, together with other net revenues from the project, to accomplish the following purposes:
**(a)** To meet the cost of operation and maintenance, and to provide for replacements, of the project beginning June 1, 1937;
**(b)** To repay to the Treasury, with interest, the advances to the Colorado River Dam Fund for the project made prior to June 1, 1937, within fifty years from that date (excluding advances allocated to flood control by [section 617a(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section617a/b&num=0&edition=prelim), which shall be repayable as provided in [section 618f of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618f&num=0&edition=prelim)), and such advances made on and after June 1, 1937, over fifty-year periods;
**(c)** To provide $600,000 for each of the years and for the purposes specified in [section 618a(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618a/c&num=0&edition=prelim);
**(d)** To provide $500,000 for each of the years and for the purposes specified in [section 618a(d) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618a/d&num=0&edition=prelim); and
**(e)** To provide, by application of the increments to rates specified in section 403(c)(2) of the Colorado River Basin Project Act of 1968, as amended and supplemented [[43 U.S.C. 1543(c)(2)](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1543/c/2&num=0&edition=p
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 618
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.