Browse Arkansas Code titles and sections
43 U.S.C. § 3203 — Small water storage and groundwater
Federal law — U.S. Code and appendices · legal_authorities
Page 671
TITLE 43—PUBLIC LANDS
§ 3203
(A) for a project authorized by an Act of
Congress shall be determined in accordance
with that Act;
(B) for a project approved by Congress in
accordance with section 4007 of the Water In-
frastructure Improvements for the Nation
Act (43 U.S.C. 390b note; Public Law 114–322)
(including construction resulting from a fea-
sibility study authorized under that Act)
shall be as provided in that Act; and
(C) for a project not described in subpara-
graph (A) or (B)—
(i) in the case of a federally owned
project, shall not exceed 50 percent of the
total cost of the project; and
(ii) in the case of a non-Federal project,
shall not exceed 25 percent of the total
cost of the project.
(2) Federal benefits
Before funding a project under this section,
the Secretary shall determine that, in return
for the Federal investment in the project, at
least a proportionate share of the benefits are
Federal benefits.
(3) Reimbursability
The reimbursability of Federal funding of
projects under this section shall be in accord-
ance with the reclamation laws.
(c) Environmental laws
In providing funding for a project under this
section, the Secretary shall comply with all ap-
plicable environmental laws, including the Na-
tional Environmental Policy Act of 1969 (42
U.S.C. 4321 et seq.).
(Pub. L. 117–58, div. D, title IX, § 40902, Nov. 15,
2021, 135 Stat. 1118.)
Editorial Notes
REFERENCES IN TEXT
The Water Infrastructure Improvements for the Na-
tion Act, referred to in subsec. (b)(1)(B), is Pub. L.
114–322, Dec. 16, 2016, 130 Stat. 1628, also known as the
WIIN Act. For complete classification of this Act to the
Code, see Short Title note set out under section 2201 of
Title 33, Navigation and Navigable Waters, and Tables.
The Nat
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 3203
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 4d3a1f231c64eb8f884ab58745d19b7832b92e3adbf7462c30f69ca360dfe20b. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-7de9b0f8a7f45675834299d1
Source file: Laws/federal/codes/united-states-code-2024/title-43/section-3203-small-water-storage-and-groundwater--14c42035d0.md
Pages: Not recorded – Not recorded
Passage SHA-256: 5169634dca1ce86ff93ee3085a6d299519d2e3e0ba85eff1eb890b9a1c154d7b
Source location: USCODE-2024-title43-chap50-sec3203.pdf
Stored source content
Page 671
TITLE 43—PUBLIC LANDS
§ 3203
(A) for a project authorized by an Act of
Congress shall be determined in accordance
with that Act;
(B) for a project approved by Congress in
accordance with section 4007 of the Water In-
frastructure Improvements for the Nation
Act (43 U.S.C. 390b note; Public Law 114–322)
(including construction resulting from a fea-
sibility study authorized under that Act)
shall be as provided in that Act; and
(C) for a project not described in subpara-
graph (A) or (B)—
(i) in the case of a federally owned
project, shall not exceed 50 percent of the
total cost of the project; and
(ii) in the case of a non-Federal project,
shall not exceed 25 percent of the total
cost of the project.
(2) Federal benefits
Before funding a project under this section,
the Secretary shall determine that, in return
for the Federal investment in the project, at
least a proportionate share of the benefits are
Federal benefits.
(3) Reimbursability
The reimbursability of Federal funding of
projects under this section shall be in accord-
ance with the reclamation laws.
(c) Environmental laws
In providing funding for a project under this
section, the Secretary shall comply with all ap-
plicable environmental laws, including the Na-
tional Environmental Policy Act of 1969 (42
U.S.C. 4321 et seq.).
(Pub. L. 117–58, div. D, title IX, § 40902, Nov. 15,
2021, 135 Stat. 1118.)
Editorial Notes
REFERENCES IN TEXT
The Water Infrastructure Improvements for the Na-
tion Act, referred to in subsec. (b)(1)(B), is Pub. L.
114–322, Dec. 16, 2016, 130 Stat. 1628, also known as the
WIIN Act. For complete classification of this Act to the
Code, see Short Title note set out under section 2201 of
Title 33, Navigation and Navigable Waters, and Tables.
The National Environmental Policy Act of 1969, re-
ferred to in subsec. (c), is Pub. L. 91–190, Jan. 1, 1970, 83
Stat. 852, which is classified generally to chapter 55
(§ 4321 et seq.) of Title 42, The Public Health and Wel-
fare. For complete classification of this Act to the
Code, see Short Title note set out under section 4321 of
Title 42 and Tables.
Statutory Notes and Related Subsidiaries
WAGE RATE REQUIREMENTS
For provisions relating to rates of wages to be paid to
laborers and mechanics on projects for construction,
alteration, or repair work funded under div. D or an
amendment by div. D of Pub. L. 117–58, including au-
thority of Secretary of Labor, see section 18851 of Title
42, The Public Health and Welfare.
§ 3203. Small water storage and groundwater
storage projects
(a) Establishment of a competitive grant pro-
gram for small water storage and ground-
water storage projects
The Secretary shall establish a competitive
grant program, under which the non-Federal
project sponsor of any project in a Reclamation
State, including the State of Alaska or Hawaii,
determined by the Secretary to be feasible under
subsection (b)(2)(B) shall be eligible to apply for
funding for the planning, design, and construc-
tion of the project.
(b) Eligibility and selection
(1) Submission to the Secretary
(A) In general
A non-Federal project sponsor described in
subsection (a) may submit to the Secretary
a proposal for a project eligible to receive a
grant under this section in the form of a
completed feasibility study.
(B) Eligible projects
A project shall be considered eligible for
consideration for a grant under this section
if the project—
(i) has water storage capacity of not less
than 200 acre-feet and not more than 30,000
acre-feet; and
(ii)(I) increases surface water or ground-
water storage; or
(II) conveys water, directly or indirectly,
to or from surface water or groundwater
storage.
(C) Guidelines
Not later than 60 days after November 15,
2021, the Secretary shall issue guidelines for
feasibility studies for small storage projects
to provide sufficient information for the for-
mulation of the studies.
(2) Review by the Secretary
The Secretary shall review each feasibility
study received under paragraph (1)(A) for the
purpose of determining whether—
(A) the feasibility study, and the process
under which the study was developed, each
comply with Federal laws (including regula-
tions) applicable to feasibility studies of
small storage projects;
(B) the project is technically and finan-
cially feasible, in accordance with—
(i) the guidelines developed under para-
graph (1)(C); and
(ii) the reclamation laws; and
(C) the project provides a Federal benefit,
as determined by the Secretary.
(3) Submission to Congress
Not later than 180 days after the date of re-
ceipt of a feasibility study received under
paragraph (1)(A), the Secretary shall submit
to the Committee on Energy and Natural Re-
sources of the Senate and the Committee on
Natural Resources of the House of Representa-
tives a report that describes—
(A) the results of the review of the study
by the Secretary under paragraph (2), in-
cluding a determination of whether the
project is feasible and provides a Federal
benefit;
(B) any recommendations that the Sec-
retary may have concerning the plan or de-
sign of the project; and
(C) any conditions the Secretary may re-
quire for construction of the project.
Page 672
TITLE 43—PUBLIC LANDS
§ 3204
(4) Eligibility for funding
(A) In general
The non-Federal project sponsor of any
project determined by the Secretary to be
feasible under paragraph (3)(A) shall be eligi-
ble to apply to the Secretary for a grant to
cover the Federal share of the costs of plan-
ning, designing, and constructing the project
pursuant to subsection (c).
(B) Required determination
Prior to awarding grants to a small stor-
age project, the Secretary shall determine
whether there is sufficient non-Federal fund-
ing available to complete the project.
(5) Priority
In awarding grants to projects under this
section, the Secretary shall give priority to
projects that meet 1 or more of the following
criteria:
(A) Projects that are likely to provide a
more reliable water supply for States, Indian
Tribes, and local governments, including
subdivisions of those entities.
(B) Projects that are likely to increase
water management flexibility and reduce
impacts on environmental resources from
projects operated by Federal and State agen-
cies.
(C) Projects that are regional in nature.
(D) Projects with multiple stakeholders.
(E) Projects that provide multiple bene-
fits, including water supply reliability, eco-
system benefits, groundwater management
and enhancements, and water quality im-
provements.
(c) Ceiling on Federal share
The Federal share of the costs of each of the
individual projects selected under this section
shall not exceed the lesser of—
(1) 25 percent of the total project cost; or
(2) $30,000,000.
(d) Environmental laws
In providing funding for a grant for a project
under this section, the Secretary shall comply
with all applicable environmental laws, includ-
ing the National Environmental Policy Act of
1969 (42 U.S.C. 4321 et seq.).
(e) Termination of authority
The authority to carry out this section termi-
nates on the date that is 5 years after November
15, 2021.
(Pub. L. 117–58, div. D, title IX, § 40903, Nov. 15,
2021, 135 Stat. 1119; Pub. L. 117–328, div. CC, § 105,
Dec. 29, 2022, 136 Stat. 5574.)
Editorial Notes
REFERENCES IN TEXT
The National Environmental Policy Act of 1969, re-
ferred to in subsec. (d), is Pub. L. 91–190, Jan. 1, 1970, 83
Stat. 852, which is classified generally to chapter 55
(§ 4321 et seq.) of Title 42, The Public Health and Wel-
fare. For complete classification of this Act to the
Code, see Short Title note set out under section 4321 of
Title 42 and Tables.
AMENDMENTS
2022—Subsec. (b)(1)(B)(i). Pub. L. 117–328 substituted
‘‘200’’ for ‘‘2,000’’.
Statutory Notes and Related Subsidiaries
WAGE RATE REQUIREMENTS
For provisions relating to rates of wages to be paid to
laborers and mechanics on projects for construction,
alteration, or repair work funded under div. D or an
amendment by div. D of Pub. L. 117–58, including au-
thority of Secretary of Labor, see section 18851 of Title
42, The Public Health and Welfare.
§ 3204. Critical maintenance and repair
(a) Critical failure at a reserved or transferred
work
(1) In general
A reserved or transferred work shall only be
eligible for funding under section 3201(2)(A) of
this title if—
(A) construction of the reserved or trans-
ferred work began on or before January 1,
1915; and
(B) a unit of the reserved or transferred
work suffered a critical failure in Bureau of
Reclamation infrastructure during the 2-
year period ending on November 15, 2021,
that resulted in the failure to deliver water
to project beneficiaries.
(2) Use of funds
Rehabilitation, repair, and replacement ac-
tivities for a transferred or reserved work
using amounts made available under section
3201(2)(A) of this title may be used for the en-
tire transferred or reserved work, regardless of
whether the critical failure was limited to a
single project of the overall work.
(3) Nonreimbursable funds
Notwithstanding section 510b(b) of this title,
amounts made available to a reserved or
transferred work under section 3201(2)(A) of
this title shall be nonreimbursable to the
United States.
(b) Carey Act projects
The Secretary shall use amounts made avail-
able under section 3201(2)(B) of this title to fund
the rehabilitation, reconstruction, or replace-
ment of a dam—
(1) the construction of which began on or
after January 1, 1905;
(2) that was developed pursuant to section 4
of the Act of August 18, 1894 (commonly known
as the ‘‘Carey Act’’) (43 U.S.C. 641; 28 Stat. 422,
chapter 301);
(3) that the Governor of the State in which
the dam is located has—
(A) determined the dam has reached its
useful life;
(B) determined the dam poses significant
health and safety concerns; and
(C) requested Federal support; and
(4) for which the estimated rehabilitation,
reconstruction, or replacement, engineering,
and permitting costs would exceed $50,000,000.
(Pub. L. 117–58, div. D, title IX, § 40904, Nov. 15,
2021, 135 Stat. 1121.)
Editorial Notes
REFERENCES IN TEXT
The Carey Act, referred to in subsec. (b)(2), is Aug. 18,
1894, ch. 301, § 4, 28 Stat. 422, which is classified to sec-
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
### Statutory Notes
Section, Pub. L. 114–94, div. D, title XLI, § 41013, Dec. 4, 2015, 129 Stat. 1761, provided that this subchapter shall terminate 7 years after Dec. 4, 2015.
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 4321
Stored review status: release_metadata_unconfirmed. The source passage cites 42 U.S.C. § 4321. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 6095
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 4321
Sec.
4368a.
Utilization of talents of older Americans in
projects of pollution prevention, abate-
ment, and control.
4368b.
General assistance program.
4369.
Miscellaneous reports.
4369a.
Reports on environmental research and devel-
opment activities of Agency.
4370.
Reimbursement for use of facilities.
4370a.
Assistant Administrators of Environmental
Protection Agency; appointment; duties.
4370b.
Availability of fees and charges to carry out
Agency programs.
4370c.
Environmental Protection Agency fees.
4370d.
Percentage of Federal funding for organiza-
tions owned by socially and economically
disadvantaged individuals.
4370e.
Working capital fund in Treasury.
4370f.
Availability of funds after expiration of pe-
riod for liquidating obligations.
4370g.
Availability of funds for uniforms and certain
services.
4370h.
Availability of funds for facilities.
4370i.
Regional liaisons for minority, tribal, and
low-income communities.
4370j.
Municipal Ombudsman.
SUBCHAPTER IV—FEDERAL PERMITTING
IMPROVEMENT
4370m.
Definitions.
4370m–1. Federal Permitting Improvement Steering
Council.
4370m–2. Permitting process improvement.
4370m–3. Interstate compacts.
4370m–4. Coordination of required reviews.
4370m–5. Delegated State permitting programs.
4370m–6. Litigation, judicial review, and savings provi-
sion.
4370m–7. Reports.
4370m–8. Funding for governance, oversight, and proc-
essing of environmental reviews and per-
mits.
4370m–9. Application.
4370m–10. GAO report.
4370m–11. Savings provision.
4370m–12. Repealed.
§ 4321. Congressional declaration of purpose
The purposes of this chapter are: To declare a
national policy which will encourage productive
and enjoyable harmony
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 4321
Stored review status: historical_2024_not_currentness_verified. The source passage cites 42 U.S.C. § 4321. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Establishment of a competitive grant program for small water storage and groundwater storage projects** The Secretary shall establish a competitive grant program, under which the non-Federal project sponsor of any project in a Reclamation State, including the State of Alaska or Hawaii, determined by the Secretary to be feasible under subsection (b)(2)(B) shall be eligible to apply for funding for the planning, design, and construction of the project.
**(b) Eligibility and selection**
(1) **Submission to the Secretary**
(A) *In general* — A non-Federal project sponsor described in subsection (a) may submit to the Secretary a proposal for a project eligible to receive a grant under this section in the form of a completed feasibility study.
(B) *Eligible projects* — A project shall be considered eligible for consideration for a grant under this section if the project—
(i) has water storage capacity of not less than 200 acre-feet and not more than 30,000 acre-feet; and
(ii)
(I) increases surface water or groundwater storage; or
(II) conveys water, directly or indirectly, to or from surface water or groundwater storage.
(C) *Guidelines* — Not later than 60 days after November 15, 2021, the Secretary shall issue guidelines for feasibility studies for small storage projects to provide sufficient information for the formulation of the studies.
(2) **Review by the Secretary** — The Secretary shall review each feasibility study received under paragraph (1)(A) for the purpose of determining whether—
(A) the feasibility study, and the process under which the study was developed, each comply with Federal laws (including regulations) applicable to feasibility studies of small storage projects;
(B) the project is technically and financia
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 3203
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Declaration of policy** It is declared to be the policy of the Congress to recognize the primary responsibilities of the States and local interests in developing water supplies for domestic, municipal, industrial, and other purposes and that the Federal Government should participate and cooperate with States and local interests in developing such water supplies in connection with the construction, maintenance, and operation of Federal navigation, flood control, irrigation, or multiple purpose projects.
**(b) Storage in reservoir projects; agreements for payment of cost of construction or modification of projects** In carrying out the policy set forth in this section, it is provided that storage may be included in any reservoir project surveyed, planned, constructed or to be planned, surveyed and/or constructed by the Corps of Engineers or the Bureau of Reclamation to impound water for present or anticipated future demand or need for municipal or industrial water, and the reasonable value thereof may be taken into account in estimating the economic value of the entire project: Provided, That the cost of any construction or modification authorized under the provisions of this section shall be determined on the basis that all authorized purposes served by the project shall share equitably in the benefits of multiple purpose construction, as determined by the Secretary of the Army or the Secretary of the Interior, as the case may be: Provided further, That before construction or modification of any project including water supply provisions for present demand is initiated, State or local interests shall agree to pay for the cost of such provisions in accordance with the provisions of this section: And provided further, That (1) for Corps of Engineers projects, not to
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 390b
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 390b. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 93
TITLE 43—PUBLIC LANDS
§ 390b
ch. 1041, 70A Stat. 641. Section 1 of act Aug. 10, 1956, en-
acted ‘‘Title 10, Armed Forces’’ which in sections 3010
to 3013 continued Department of the Army under ad-
ministrative supervision of Secretary of the Army.
EXTENSION OF VARIABLE PAYMENT PLAN
Authority of Secretary to extend benefits of variable
payment plan to organizations with which he contracts
or has contracted for the repayment of construction
costs allocated to irrigation on any project undertaken
by the United States, including contracts for the stor-
age of water or for the use of stored water under this
section, see section 2 of Pub. L. 85–611, Aug. 8, 1958, 72
Stat. 542, set out as a note under section 485h of this
title.
SECTION AS UNAFFECTED BY SUBMERGED LANDS ACT
Provisions of this section as not amended, modified
or repealed by the Submerged Lands Act, see section
1303 of this title.
Executive Documents
TRANSFER OF FUNCTIONS
For transfer of certain real property and functions re-
lating to real property, insofar as they pertain to Air
Force, from Secretary of the Army and Department of
the Army to Secretary of the Air Force and Depart-
ment of the Air Force, see Secretary of Defense Trans-
fer Order Nos. 14, eff. July 1, 1948, and 40 [App. B(133)],
July 22, 1949.
§ 390a. Repealed. Pub. L. 105–362, title IX,
§ 901(e)(2), Nov. 10, 1998, 112 Stat. 3289
Section, acts July 31, 1953, ch. 298, title I, 67 Stat. 266;
Pub. L. 99–294, § 10, May 12, 1986, 100 Stat. 426, related to
conditions precedent for construction of dams, res-
ervoir, or water supply.
Provisions similar to those in this section were con-
tained in act July 9, 1952, ch. 597, title I, 66 Stat. 451,
prior to repeal by Pub. L. 105–362, title IX, § 901(e)(1),
Nov. 10, 1998, 1
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 390b
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 390b. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
To aid the public-land States in the reclamation of the desert lands therein, and the settlement, cultivation and sale thereof in small tracts to actual settlers, the Secretary of the Interior with the approval of the President is, as of August 18, 1894, authorized and empowered, upon proper application of the State to contract and agree, from time to time, with each of the States in which there may be situated desert lands as defined by the Act approved March 3, 1877, and the Act amendatory thereof, approved March 3, 1891, binding the United States to donate, grant, and patent to the State free of cost for survey or price such desert lands, not exceeding one million acres in each State, as the State may cause to be irrigated, reclaimed, occupied, and not less than twenty acres of each one hundred and sixty acre tract cultivated by actual settlers, as thoroughly as is required of citizens who may enter under the desert-land law within ten years from the date of approval by the Secretary of the Interior of the State’s application for the segregation of such lands; and if actual construction of reclamation works is not begun within three years after the segregation of the lands or within such further period not exceeding three years, as shall be allowed by the Secretary of the Interior, the said Secretary of the Interior, in his discretion, may restore such lands to the public domain; and if the State fails, within ten years from the date of such segregation, to cause the whole or any part of the lands so segregated to be so irrigated and reclaimed, the Secretary of the Interior may, in his discretion, continue said segregation for a period not exceeding five years, or may, in his discretion, restore such lands not irrigated and reclaimed to the public domain upon the exp
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 641
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 641. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 243
TITLE 43—PUBLIC LANDS
§ 641
tain exceptions, to Secretary of the Interior, with
power to delegate, see Reorg. Plan No. 3 of 1950, §§ 1, 2,
eff. May 24, 1950, 15 F.R. 3174, 64 Stat. 1262, set out under
section 1451 of this title.
‘‘Officer designated by the Secretary of the Interior’’
substituted for ‘‘register’’ on authority of section 403 of
Reorg. Plan No. 3 of 1946, which abolished all registers
of district land offices and transferred functions of reg-
ister of district land office to Secretary of the Interior.
See section 403 of Reorg. Plan No. 3 of 1946, set out as
a note under section 1 of this title. Previously, ref-
erence to ‘‘receiver’’ was changed to ‘‘register’’ by acts
Oct. 28, 1921 and Mar. 3, 1925.
§ 630. Disposition by Government of proceeds of
land sold
All moneys derived by the United States from
the sale of public lands referred to in this chap-
ter shall be paid into such funds and applied as
provided by law for the disposal of the proceeds
from the sale of public lands.
(Aug. 11, 1916, ch. 319, § 8, 39 Stat. 509.)
CHAPTER 14—GRANTS OF DESERT LANDS
TO STATES FOR RECLAMATION
Sec.
641.
Grant of desert land to States authorized.
641a.
Issuance of quitclaim deeds; patents for seg-
regated lands.
641b.
Filing of application for quitclaim deeds.
641c.
Requirements of application for quitclaim
deed.
641d.
Effective date of quitclaim; administration of
lands relinquished by States.
642.
Liens for expenses of reclamation.
643.
Repealed.
644.
Preference right to entryman under State
laws.
645.
Additional arid lands available to Colorado,
Idaho, Nevada, and Wyoming for reclama-
tion.
646.
Grant extended to New Mexico and Arizona.
647.
Grant extended to desert lands within part of
former Ute Indian Reservat
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 641
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 641. This identifies an authority to review, not proof of applicability.