Arkansas Legal Resource Navigator

43 U.S.C. § 390b — Development of water supplies for domestic, municipal, industrial, and other purposes

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 390b — Development of water supplies for domestic, municipal, industrial, and other purposes

**(a) Declaration of policy** It is declared to be the policy of the Congress to recognize the primary responsibilities of the States and local interests in developing water supplies for domestic, municipal, industrial, and other purposes and that the Federal Government should participate and cooperate with States and local interests in developing such water supplies in connection with the construction, maintenance, and operation of Federal navigation, flood control, irrigation, or multiple purpose projects. **(b) Storage in reservoir projects; agreements for payment of cost of construction or modification of projects** In carrying out the policy set forth in this section, it is provided that storage may be included in any reservoir project surveyed, planned, constructed or to be planned, surveyed and/or constructed by the Corps of Engineers or the Bureau of Reclamation to impound water for present or anticipated future demand or need for municipal or industrial water, and the reasonable value thereof may be taken into account in estimating the economic value of the entire project: Provided, That the cost of any construction or modification authorized under the provisions of this section shall be determined on the basis that all authorized purposes served by the project shall share equitably in the benefits of multiple purpose construction, as determined by the Secretary of the Army or the Secretary of the Interior, as the case may be: Provided further, That before construction or modification of any project including water supply provisions for present demand is initiated, State or local interests shall agree to pay for the cost of such provisions in accordance with the provisions of this section: And provided further, That (1) for Corps of Engineers projects, not to

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 390b

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: c370226841dc0b7a075110a857b69b7fa720aa7e1fac56ed30ecaf916b338ac3. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_3840cf907ea08ccf03e37d20
Source file: Laws/federal/codes/united-states-code/title-43/section-390b-development-of-water-supplies-for-domestic-municipal-industrial-and-othe--f4fadcf43b.md
Pages: Not recorded – Not recorded
Passage SHA-256: fb2aad6f69949b882699fa7b5961169f43c2cf9ab84dc766a2d62504b8ffefb9

Source location: Title 43, Chapter 12, § 390b; chapter-012-reclamation-and-irrigation-of-lands-by-federal-government.md

Stored source content

**(a) Declaration of policy** It is declared to be the policy of the Congress to recognize the primary responsibilities of the States and local interests in developing water supplies for domestic, municipal, industrial, and other purposes and that the Federal Government should participate and cooperate with States and local interests in developing such water supplies in connection with the construction, maintenance, and operation of Federal navigation, flood control, irrigation, or multiple purpose projects. **(b) Storage in reservoir projects; agreements for payment of cost of construction or modification of projects** In carrying out the policy set forth in this section, it is provided that storage may be included in any reservoir project surveyed, planned, constructed or to be planned, surveyed and/or constructed by the Corps of Engineers or the Bureau of Reclamation to impound water for present or anticipated future demand or need for municipal or industrial water, and the reasonable value thereof may be taken into account in estimating the economic value of the entire project: Provided, That the cost of any construction or modification authorized under the provisions of this section shall be determined on the basis that all authorized purposes served by the project shall share equitably in the benefits of multiple purpose construction, as determined by the Secretary of the Army or the Secretary of the Interior, as the case may be: Provided further, That before construction or modification of any project including water supply provisions for present demand is initiated, State or local interests shall agree to pay for the cost of such provisions in accordance with the provisions of this section: And provided further, That (1) for Corps of Engineers projects, not to exceed 30 percent of the total estimated cost of any project may be allocated to anticipated future demands, and, (2) for Bureau of Reclamation projects, not to exceed 30 per centum of the total estimated cost of any project may be allocated to anticipated future demands where State or local interests give reasonable assurances, and there is reasonable evidence, that such demands for the use of such storage will be made within a period of time which will permit paying out the costs allocated to water supply within the life of the project: And provided further, That for Corps of Engineers projects, the Secretary of the Army may permit the full non-Federal contribution to be made, without interest, during construction of the project, or, with interest, over a period of not more than thirty years from the date of completion, with repayment contracts providing for recalculation of the interest rate at, five-year intervals, and for Bureau of Reclamation projects, the entire amount of the construction costs, including interest during construction, allocated to water supply shall be repaid within the life of the project but in no event to exceed fifty years after the project is first used for the storage of water for water supply purposes, except that (1) no payment need be made with respect to storage for future water supply until such supply is first used, and (2) no interest shall be charged on such cost until such supply is first used, but in no case shall the interest-free period exceed ten years. For Corps of Engineers projects, all annual operation and maintenance costs for municipal and industrial water supply storage under this section shall be reimbursed from State or local interests on an annual basis, and all repair, rehabilitation, and replacement costs for municipal and industrial water supply storage under this section shall be reimbursed from State or local interests (1) without interest, during construction of the repair, rehabilitation, or replacement, (2) with interest, in lump sum on the completion of the repair, rehabilitation, or replacement, or (3) at the request of the State or local interest, with interest, over a period of not more than 25 years beginning on the date of completion of the repair, rehabilitation, or replacement, with repayment contracts providing for recalculation of the interest rate at 5-year intervals. At the request of the State or local interest, the Secretary of the Army shall amend a repayment contract entered into under this section on or before December 23, 2022, for the purpose of incorporating the terms and conditions described in paragraph (3) of the preceding sentence. For Corps of Engineers projects, any repayment by a State or local interest shall be made with interest at a rate to be determined by the Secretary of the Treasury, taking into consideration the average market yields on outstanding marketable obligations of the United States with remaining periods to maturity comparable to the reimbursement period, during the month preceding the fiscal year in which costs for the construction of the project are first incurred (or, when a recalculation is made), plus a premium of one-eighth of one percentage point for transaction costs. For Bureau of Reclamation projects, the interest rate used for purposes of computing interest during construction and interest on the unpaid balance shall be determined by the Secretary of the Treasury, as of the beginning of the fiscal year in which construction is initiated, on the basis of the computed average interest rate payable by the Treasury upon its outstanding marketable public obligations, which are neither due nor callable for redemption for fifteen years from date of issue. The provisions of this subsection insofar as they relate to the Bureau of Reclamation and the Secretary of the Interior shall be alternative to and not a substitute for the provisions of the Reclamation Projects Act of 1939 (53 Stat. 1187) [[43 U.S.C. 485](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section485&num=0&edition=prelim) et seq.] relating to the same subject. **(c) Release of future water storage** (1) **Establishment of 10-year plans for the utilization of future storage** (A) *In general* — For the period beginning 180 days after June 10, 2014, and ending on January 1, 2016, the Secretary may accept from a State or local interest a plan for the utilization of allocated water storage for future use under this Act. (B) *Contents* — A plan submitted under subparagraph (A) shall include— (i) a 10-year timetable for the conversion of future use storage to present use; and (ii) a schedule of actions that the State or local interest agrees to carry out over a 10-year period, in cooperation with the Secretary, to seek new and alternative users of future water storage that is contracted to the State or local interest on June 10, 2014. (2) **Future water storage** — For water resource development projects managed by the Secretary, a State or local interest that the Secretary determines has complied with paragraph (1) may request from the Secretary a release to the United States of any right of the State or local interest to future water storage under this Act that was allocated for future use water supply prior to November 17, 1986. (3) **Administration** (A) *In general* — Not later than 180 days after receiving a request under paragraph (2), the Secretary shall provide to the applicable State or local interest a written decision on whether the Secretary recommends releasing future water storage rights. (B) *Recommendation* — If the Secretary recommends releasing future water storage rights, the Secretary shall include that recommendation in the annual plan submitted under [section 2282d of title 33](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2282d&num=0&edition=prelim). (4) **Savings clause** — Nothing in this subsection authorizes the Secretary to release a State or local interest from a contractual obligation unless specifically authorized by Congress. **(d) Application to other laws** The provisions of this section shall not be construed to modify the provisions of [section 701–1 of title 33](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section701–1&num=0&edition=prelim) and [section 390 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section390&num=0&edition=prelim), as amended and extended, or the provisions of sections 372 and 383 of this title. **(e) Approval of Congress of modifications of reservoir projects** Modifications of a reservoir project heretofore authorized, surveyed, planned, or constructed to include storage as provided in subsection (b) which would seriously affect the purposes for which the project was authorized, surveyed, planned, or constructed, or which would involve major structural or operational changes shall be made only upon the approval of Congress as now provided by law.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 485k — Short title

This subchapter may be cited as the “Reclamation Project Act of 1939.”

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 485k

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 10301 — Congressional findings and declarations

The Congress finds and declares that— (1) the existence of an adequate supply of water of good quality for the production of materials and energy for the Nation’s needs and for the efficient use of the Nation’s energy and water resources is essential to national economic stability and growth, and to the well-being of the people; (2) the management of water resources is closely related to maintaining environmental quality, productivity of natural resources and agricultural systems, and social well-being; (3) there is an increasing threat of impairment to the quantity and quality of surface and groundwater resources; (4) the Nation’s capabilities for technological assessment and planning and for policy formulation for water resources must be strengthened at the Federal, State, and local governmental levels; (5) there should be a continuing national investment in water and related research and technology commensurate with growing national needs; (6) it is necessary to provide for the research and development of technology for the conversion of saline and other impaired waters to a quality suitable for municipal, industrial, agricultural, recreational, and other beneficial uses; (7) the Nation must provide programs to strengthen research and associated graduate education because the pool of scientists, engineers, and technicians trained in fields related to water resources constitutes an invaluable natural resource which should be increased, fully utilized, and regularly replenished; and 11 So in original. The word “and” probably should not appear. (8) long-term planning and policy development are essential to ensure the availability of an abundant supply of high quality water for domestic and other uses; and (9) the States must have the research and problem-solvin

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 10301

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 1531 — Congressional findings and declaration of purposes and policy

**(a) Findings** The Congress finds and declares that— (1) various species of fish, wildlife, and plants in the United States have been rendered extinct as a consequence of economic growth and development untempered by adequate concern and conservation; (2) other species of fish, wildlife, and plants have been so depleted in numbers that they are in danger of or threatened with extinction; (3) these species of fish, wildlife, and plants are of esthetic, ecological, educational, historical, recreational, and scientific value to the Nation and its people; (4) the United States has pledged itself as a sovereign state in the international community to conserve to the extent practicable the various species of fish or wildlife and plants facing extinction, pursuant to— (A) migratory bird treaties with Canada and Mexico; (B) the Migratory and Endangered Bird Treaty with Japan; (C) the Convention on Nature Protection and Wildlife Preservation in the Western Hemisphere; (D) the International Convention for the Northwest Atlantic Fisheries; (E) the International Convention for the High Seas Fisheries of the North Pacific Ocean; (F) the Convention on International Trade in Endangered Species of Wild Fauna and Flora; and (G) other international agreements; and (5) encouraging the States and other interested parties, through Federal financial assistance and a system of incentives, to develop and maintain conservation programs which meet national and international standards is a key to meeting the Nation’s international commitments and to better safeguarding, for the benefit of all citizens, the Nation’s herit­age in fish, wildlife, and plants. **(b) Purposes** The purposes of this chapter are to provide a means whereby the ecosystems upon which endangered

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 1531

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 4321 — Repealed. Pub. L. 117–58, div. G, title VIII, § 70801(h), Nov. 15, 2021, 135 Stat. 1294

### Statutory Notes Section, Pub. L. 114–94, div. D, title XLI, § 41013, Dec. 4, 2015, 129 Stat. 1761, provided that this subchapter shall terminate 7 years after Dec. 4, 2015.

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 4321

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 701–1 — Declaration of policy of 1944 act

In connection with the exercise of jurisdiction over the rivers of the Nation through the construction of works of improvement, for navigation or flood control, as herein authorized, it is declared to be the policy of the Congress to recognize the interests and rights of the States in determining the development of the watersheds within their borders and likewise their interests and rights in water utilization and control, as herein authorized to preserve and protect to the fullest possible extent established and potential uses, for all purposes, of the waters of the Nation’s rivers; to facilitate the consideration of projects on a basis of comprehensive and coordinated development; and to limit the authorization and construction of navigation works to those in which a substantial benefit to navigation will be realized therefrom and which can be operated consistently with appropriate and economic use of the waters of such rivers by other users.

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 701–1

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 390h — Program to investigate reclamation and reuse of wastewater and groundwater; general authority

**(a) Program established** The Secretary of the Interior (hereafter “Secretary”), acting pursuant to the Reclamation Act of 1902 (Act of June 17, 1902, 32 Stat. 388) and Acts amendatory thereof and supplementary thereto (hereafter “Federal reclamation laws”), is directed to undertake a program to investigate and identify opportunities for reclamation and reuse of municipal, industrial, domestic, and agricultural wastewater, and naturally impaired ground and surface waters, for the design and construction of demonstration and permanent facilities to reclaim and reuse wastewater, and to conduct research, including desalting, for the reclamation of wastewater and naturally impaired ground and surface waters. **(b) States included** Such program shall be limited to the States and areas referred to in section 1 of the Reclamation Act of 1902 (Act of June 17, 1902, 32 Stat. 388) [[43 U.S.C. 391](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section391&num=0&edition=prelim)] as amended, and the State of Hawaii. **(c) Agreements and regulations** The Secretary is authorized to enter into such agreements and promulgate such regulations as may be necessary to carry out the purposes and provisions of sections 390h to 390h–39 of this title. **(d) San Luis Unit of Central Valley Project, California** The Secretary shall not investigate, promote or implement, pursuant to sections 390h to 390h–39 of this title, any project intended to reclaim and reuse agricultural wastewater generated in the service area of the San Luis Unit of the Central Valley Project, California, except those measures recommended for action by the San Joaquin Valley Drainage Program in the report entitled A Management Plan for Agricultural Subsurface Drainage and Related Problems on the

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 390h

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 390 — Utilization of dams and reservoir projects for irrigation purposes; additional construction; necessity of authorization; apportionment of cost; limitation

On and after December 22, 1944, whenever the Secretary of the Army determines, upon recommendation by the Secretary of the Interior that any dam and reservoir project operated under the direction of the Secretary of the Army may be utilized for irrigation purposes, the Secretary of the Interior is authorized to construct, operate, and maintain, under the provisions of the Federal reclamation laws (Act of June 17, 1902, 32 Stat. 388, and Acts amendatory thereof or supplementary thereto), such additional works in connection therewith as he may deem necessary for irrigation purposes. Such irrigation works may be undertaken only after a report and findings thereon have been made by the Secretary of the Interior as provided in said Federal reclamation laws and after subsequent specific authorization of the Congress by an authorization Act; and, within the limits of the water users’ repayment ability such report may be predicated on the allocation to irrigation of an appropriate portion of the cost of structures and facilities used for irrigation and other purposes. Dams and reservoirs operated under the direction of the Secretary of the Army may be utilized after December 22, 1944, for irrigation purposes only in conformity with the provisions of this section, but the foregoing requirement shall not prejudice lawful uses now existing: Provided, That this section shall not apply to any dam or reservoir heretofore constructed in whole or in part by the Army engineers, which provides conservation storage of water for irrigation purposes. In the case of any reservoir project constructed and operated by the Corps of Engineers, the Secretary of the Army is authorized to allocate water which was allocated in the project purpose for municipal and industrial water supply and which is

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 390

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2282d — Planning

**(a) Omitted** **(b) Planning process improvements** The Chief of Engineers— (1) shall adopt a risk analysis approach to project cost estimates for water resources projects; and (2) not later than one year after November 8, 2007, shall— (A) issue procedures for risk analysis for cost estimation for water resources projects; and (B) submit to Congress a report that includes any recommended amendments to [section 2280 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2280&num=0&edition=prelim). **(c) Benchmarks** (1) **In general** — Not later than 12 months after November 8, 2007, the Chief of Engineers shall establish benchmarks for determining the length of time it should take to conduct a feasibility study for a water resources project and its associated review process under the National Environmental Policy Act of 1969 ([42 U.S.C. 4321](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section4321&num=0&edition=prelim) et seq.). The Chief of Engineers shall use such benchmarks as a management tool to make the feasibility study process more efficient in all districts of the Corps of Engineers. (2) **Benchmark goals** — The Chief of Engineers shall establish, to the extent practicable, under paragraph (1) benchmark goals for completion of feasibility studies for water resources projects generally within 2 years. In the case of feasibility studies that the Chief of Engineers determines may require additional time based on the project type, size, cost, or complexity, the benchmark goal for completion shall be generally within 4 years. **(d) Calculation of benefits and costs for flood damage reduction projects** A feasibility study for a project for flood damage reduction shall include, as part of t

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2282d

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 1801 — Findings, purposes and policy

**(a) Findings** The Congress finds and declares the following: (1) The fish off the coasts of the United States, the highly migratory species of the high seas, the species which dwell on or in the Continental Shelf appertaining to the United States, and the anadromous species which spawn in United States rivers or estuaries, constitute valuable and renewable natural resources. These fishery resources contribute to the food supply, economy, and health of the Nation and provide recreational opportunities. (2) Certain stocks of fish have declined to the point where their survival is threatened, and other stocks of fish have been so substantially reduced in number that they could become similarly threatened as a consequence of (A) increased fishing pressure, (B) the inadequacy of fishery resource conservation and management practices and controls, or (C) direct and indirect habitat losses which have resulted in a diminished capacity to support existing fishing levels. (3) Commercial and recreational fishing constitutes a major source of employment and contributes significantly to the economy of the Nation. Many coastal areas are dependent upon fishing and related activities, and their economies have been badly damaged by the overfishing of fishery resources at an ever-increasing rate over the past decade. The activities of massive foreign fishing fleets in waters adjacent to such coastal areas have contributed to such damage, interfered with domestic fishing efforts, and caused destruction of the fishing gear of United States fishermen. (4) International fishery agreements have not been effective in preventing or terminating the overfishing of these valuable fishery resources. There is danger that irreversible effects from overfishing will take place before an effectiv

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 1801

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 485 — Declaration of policy

For the purpose of providing for United States reclamation projects a feasible and comprehensive plan for an economical and equitable treatment of repayment problems and for variable payments of construction charges which can be met regularly and fully from year to year during periods of decline in agricultural income and unsatisfactory conditions of agriculture as well as during periods of prosperity and good prices for agricultural products, and which will protect adequately the financial interest of the United States in said projects, obligations to pay construction charges may be revised or undertaken pursuant to the provisions of this subchapter.

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 485

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.