Browse Arkansas Code titles and sections
43 U.S.C. § 485k — Short title
Federal law — U.S. Code and appendices · legal_authorities
This subchapter may be cited as the “Reclamation Project Act of 1939.”
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 485k
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: a5cee6e666e4fff37b3ab4505f0c5ce840600079cb4f4de8775726a4143382c1. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_06acd35c7fdb994f6269de02
Source file: Laws/federal/codes/united-states-code/title-43/section-485k-short-title--656d12a195.md
Pages: Not recorded – Not recorded
Passage SHA-256: e2d4528e0fd1265e31d2d41e45b3054ff91c69478b8f45c18a2034a324d349ed
Source location: Title 43, Chapter 12, § 485k; chapter-012-reclamation-and-irrigation-of-lands-by-federal-government.md
Stored source content
This subchapter may be cited as the “Reclamation Project Act of 1939.”
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Findings of Secretary** No expenditures for the construction of any new project, new division of a project, or new supplemental works on a project shall be made, nor shall estimates be submitted therefor, by the Secretary until after he has made an investigation thereof and has submitted to the President and to the Congress his report and findings on—
(1) the engineering feasibility of the proposed construction;
(2) the estimated cost of the proposed construction;
(3) the part of the estimated cost which can properly be allocated to irrigation and probably be repaid by the water users;
(4) the part of the estimated cost which can properly be allocated to power and probably be returned to the United States in net power revenues;
(5) the part of the estimated cost which can properly be allocated to municipal water supply or other miscellaneous purposes and probably be returned to the United States.
If the proposed construction is found by the Secretary to have engineering feasibility and if the repayable and returnable allocations to irrigation, power, and municipal water supply or other miscellaneous purposes found by the Secretary to be proper, together with any allocation to flood control or navigation made under subsection (b) of this section, equal the total estimated cost of construction as determined by the Secretary, then the new project, new division of a project, or supplemental works on a project, covered by his findings, shall be deemed authorized and may be undertaken by the Secretary. If all such allocations do not equal said total estimated cost, then said new project, new division, or new supplemental works may be undertaken by the Secretary only after provision therefor has been made by Act of Congress enacted after the Secretary has submitted
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 485h
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
The provisions of previous Acts of Congress not inconsistent with the provisions of this subchapter shall remain in full force and effect.
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 485j
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
In addition to the primary purposes for which the Grand Coulee Dam project (hereafter to be known as the Columbia Basin project and herein called the “project”) was authorized under the provisions of the Act of August 30, 1935 (49 Stat. 1028), the project is authorized and reauthorized as a project subject to the Reclamation Project Act of 1939; and the provisions of each of those two Acts together with the provisions of this Act shall govern the repayment of expenditures and the construction, operation, and maintenance of the works constructed as a part of the project.
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 835
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
In aid of the construction, operation and maintenance of the Columbia Basin project (formerly the Grand Coulee Dam project), authorized by the Act of August 30, 1935 (49 Stat. 1028), the Act of August 4, 1939 (53 Stat. 1187), and the Columbia Basin Project Act (Public, Numbered 8, Seventy-eighth Congress, first session, 57 Stat. 14), there is hereby granted to the United States, subject to the provisions of this section and sections 835e to 835h of this title, (a) all the right, title, and interest of the Indians in and to the tribal and allotted lands within the Spokane and Colville Reservations, including sites of agency and school buildings and related structures and unsold lands in the Klaxta town site, as may be designated therefor by the Secretary of the Interior from time to time: Provided, That no lands shall be taken for reservoir purposes above the elevation of one thousand three hundred and ten feet above sea level as shown by Bureau of Land Management surveys, except in Klaxta town site and except where in the judgment of the Secretary of the Interior, special circumstances concerning the reservoir or its operation and maintenance require the taking of land above that elevation; and (b) such other interests in or to any such lands and property within these reservations as may be required and as may be designated by the Secretary of the Interior from time to time for the construction of pipe lines, highways, railroads, telegraph, telephone, and electric-transmission lines in connection with the project, or for the relocation or reconstruction of such facilities made necessary by the construction of the project.
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 835d
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Declaration of policy** It is declared to be the policy of the Congress to recognize the primary responsibilities of the States and local interests in developing water supplies for domestic, municipal, industrial, and other purposes and that the Federal Government should participate and cooperate with States and local interests in developing such water supplies in connection with the construction, maintenance, and operation of Federal navigation, flood control, irrigation, or multiple purpose projects.
**(b) Storage in reservoir projects; agreements for payment of cost of construction or modification of projects** In carrying out the policy set forth in this section, it is provided that storage may be included in any reservoir project surveyed, planned, constructed or to be planned, surveyed and/or constructed by the Corps of Engineers or the Bureau of Reclamation to impound water for present or anticipated future demand or need for municipal or industrial water, and the reasonable value thereof may be taken into account in estimating the economic value of the entire project: Provided, That the cost of any construction or modification authorized under the provisions of this section shall be determined on the basis that all authorized purposes served by the project shall share equitably in the benefits of multiple purpose construction, as determined by the Secretary of the Army or the Secretary of the Interior, as the case may be: Provided further, That before construction or modification of any project including water supply provisions for present demand is initiated, State or local interests shall agree to pay for the cost of such provisions in accordance with the provisions of this section: And provided further, That (1) for Corps of Engineers projects, not to
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 390b
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Irrigation water temporarily made available from reclamation facilities in excess of ordinary quantities not otherwise storable for project purposes or at times when such irrigation water would not have been available without the operations of those facilities, may be used for irrigation, municipal, or industrial purposes only to the extent covered by a contract requiring payment for the use of such irrigation water, executed in accordance with the Reclamation Project Act of 1939 [[43 U.S.C. 485](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section485&num=0&edition=prelim) et seq.], or other applicable provisions of Federal reclamation law.
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 390tt
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
For the purpose of providing for United States reclamation projects a feasible and comprehensive plan for an economical and equitable treatment of repayment problems and for variable payments of construction charges which can be met regularly and fully from year to year during periods of decline in agricultural income and unsatisfactory conditions of agriculture as well as during periods of prosperity and good prices for agricultural products, and which will protect adequately the financial interest of the United States in said projects, obligations to pay construction charges may be revised or undertaken pursuant to the provisions of this subchapter.
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 485
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
As used in this subchapter—
**(a)** The term “Federal reclamation laws” shall mean the Act of June 17, 1902 (32 Stat. 388), and all Acts amendatory thereof or supplementary thereto.
**(b)** The term “Secretary” shall mean the Secretary of the Interior.
**(c)** The term “project” shall mean any reclamation or irrigation project, including incidental features thereof, authorized by the Federal reclamation laws, or constructed by the United States pursuant to said laws, or in connection with which there is a repayment contract executed by the United States, pursuant to said laws, or any project constructed or operated and maintained by the Secretary through the Bureau of Reclamation for the reclamation of arid lands or other purposes.
**(d)** The term “construction charges” shall mean the amounts of principal obligations payable to the United States under water-right applications, repayment contracts, orders of the Secretary, or other forms of obligation entered into pursuant to the Federal reclamation laws, excepting amounts payable for water rental or power charges, operation and maintenance and other yearly service charges, and excepting also any other operation and maintenance, interest, or other charges which are not covered into the principal sums of the construction accounts of the Bureau of Reclamation.
**(e)** The term “repayment contract” shall mean any contract providing for payment of construction charges to the United States.
**(f)** The term “project contract unit” shall mean a project or any substantial area of a project which is covered or is proposed to be covered by a repayment contract. On any project where two or more repayment contracts in part cover the same area and in part different areas, the area covered by each such repayment contract shall
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 485a
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
After the execution of a contract pursuant to the authority of section 9(d)(1) of the Reclamation Project Act of 1939 [[43 U.S.C. 485h(d)(1)](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section485h/d/1&num=0&edition=prelim)] and prior to the commencement of the development period provided thereunder, the Secretary of the Interior is authorized to amend such contract to provide for irrigation blocks, or if such are already provided, to add to or modify such irrigation blocks, as he shall deem desirable to carry out the purposes of that Act.
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 485h–6
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
For the purpose of avoiding an unduly high operation and maintenance assessment in any one year and to keep the operation and maintenance charges in connection with the Arrowrock Division of the Boise reclamation project within the ability of the water users to pay, the Secretary of the Interior is authorized to allow the irrigation districts of the said Arrowrock Division and the irrigation districts ditch companies, and water users who have assumed obligations to pay proportionate parts of the estimated cost of the operation and maintenance of the Arrowrock Reservoir, to pay the costs, as determined conclusively by said Secretary, incurred in the repair, resurfacing, and improvement of the Arrowrock Dam and in increasing the height thereof (to provide additional capacity to offset past and, to some extent, future losses of capacity resulting from the deposit of silt in the said reservoir) in twenty annual installments instead of requiring the payment of all of such operation and maintenance costs in one year as provided in [section 492 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section492&num=0&edition=prelim): Provided, That such costs, for the purpose of any amendatory contracts affecting the construction charges of Arrowrock Dam that may be entered into as authorized by subchapter X of this chapter, may, in the discretion of the Secretary, be treated as part of the construction charges of said dam, and as payable in the same manner as such charges.
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 591a
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.