Browse Arkansas Code titles and sections
33 U.S.C. § 2213 — Flood control and other purposes
Federal law — U.S. Code and appendices · legal_authorities
Page 704
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2213
(c) Floodgates on the Inland Waterways
(1) Operation and maintenance carried out by
the Secretary
Notwithstanding any other provision of law,
the Secretary shall be responsible for the oper-
ation and maintenance, including repair, of
any flood gate, as well as any pumping station
constructed within the channel as a single
unit with that flood gate, that—
(A) was constructed as of June 10, 2014, as
a feature of an authorized hurricane and
storm damage reduction project; and
(B) crosses an inland or intracoastal wa-
terway described in section 1804 of this title.
(2) Non-Federal cost share
The non-Federal share of the cost of oper-
ation, maintenance, repair, rehabilitation, and
replacement of any structure under this sub-
section shall be 35 percent.
(d) Authorizations from general fund
Any Federal responsibility—
(1) with respect to a project authorized by
title III or section 652(j) of this title, or
(2) with respect to the portion of the project
authorized by section 844 allocated to inland
navigation,
which responsibility is not provided for in sub-
section (a) of this section shall be paid only
from amounts appropriated from the general
fund of the Treasury.
(Pub. L. 99–662, title I, § 102, Nov. 17, 1986, 100
Stat. 4084; Pub. L. 113–121, title II, § 2013, June 10,
2014, 128 Stat. 1271; Pub. L. 117–263, div. H, title
LXXXI, § 8157(a), Dec. 23, 2022, 136 Stat. 3738;
Pub. L. 118–272, div. A, title I, § 1126(a), Jan. 4,
2025, 138 Stat. 3018.)
Editorial Notes
REFERENCES IN TEXT
Title III of this Act, referred to in subsecs. (a)(1) and
(d)(1), is title III of Pub. L. 99–662, Nov. 17, 1986, 100
Stat. 4109, consisting of sections 301 and 302. The
projects authorized by title III probab
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2213
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 6bd60763cbb9a7ae9cdf092a0438bd793097ef12068add2978840faea0945ec3. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-3e2d910c33b5c38feab300bb
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-2213-flood-control-and-other-purposes--7f45524b9a.md
Pages: Not recorded – Not recorded
Passage SHA-256: 6aaef229ef7c49adf645d27d25236c394e4078ac34d706a2b3266e725a2c1a69
Source location: USCODE-2024-title33-chap36-subchapI-sec2213.pdf
Stored source content
Page 704
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2213
(c) Floodgates on the Inland Waterways
(1) Operation and maintenance carried out by
the Secretary
Notwithstanding any other provision of law,
the Secretary shall be responsible for the oper-
ation and maintenance, including repair, of
any flood gate, as well as any pumping station
constructed within the channel as a single
unit with that flood gate, that—
(A) was constructed as of June 10, 2014, as
a feature of an authorized hurricane and
storm damage reduction project; and
(B) crosses an inland or intracoastal wa-
terway described in section 1804 of this title.
(2) Non-Federal cost share
The non-Federal share of the cost of oper-
ation, maintenance, repair, rehabilitation, and
replacement of any structure under this sub-
section shall be 35 percent.
(d) Authorizations from general fund
Any Federal responsibility—
(1) with respect to a project authorized by
title III or section 652(j) of this title, or
(2) with respect to the portion of the project
authorized by section 844 allocated to inland
navigation,
which responsibility is not provided for in sub-
section (a) of this section shall be paid only
from amounts appropriated from the general
fund of the Treasury.
(Pub. L. 99–662, title I, § 102, Nov. 17, 1986, 100
Stat. 4084; Pub. L. 113–121, title II, § 2013, June 10,
2014, 128 Stat. 1271; Pub. L. 117–263, div. H, title
LXXXI, § 8157(a), Dec. 23, 2022, 136 Stat. 3738;
Pub. L. 118–272, div. A, title I, § 1126(a), Jan. 4,
2025, 138 Stat. 3018.)
Editorial Notes
REFERENCES IN TEXT
Title III of this Act, referred to in subsecs. (a)(1) and
(d)(1), is title III of Pub. L. 99–662, Nov. 17, 1986, 100
Stat. 4109, consisting of sections 301 and 302. The
projects authorized by title III probably mean the
projects authorized by section 301 of Pub. L. 99–662,
which is not classified to the Code. Section 302 of Pub.
L. 99–662, which established the Inland Waterways
Users Board, is classified to section 2251 of this title.
Section 844 of this Act, referred to in subsecs. (a)(3)
and (d)(2), is section 844 of Pub. L. 99–662, Nov. 17, 1986,
100 Stat. 4177, which is not classified to the Code.
AMENDMENTS
2025—Subsec. (a). Pub. L. 118–272 substituted ‘‘75 per-
cent of the costs’’ for ‘‘65 percent of the costs’’ in intro-
ductory provisions and ‘‘25 percent of such costs’’ for
‘‘35 percent of such costs’’ in concluding provisions.
2022—Subsec. (a). Pub. L. 117–263 substituted ‘‘65 per-
cent of the costs’’ for ‘‘One-half of the costs’’ in intro-
ductory provisions and ‘‘35 percent of such costs’’ for
‘‘One-half of such costs’’ in concluding provisions.
2014—Subsecs. (c), (d). Pub. L. 113–121 added subsec.
(c) and redesignated former subsec. (c) as (d).
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 2025 AMENDMENT
Pub. L. 118–272, div. A, title I, § 1126(b), Jan. 4, 2025, 138
Stat. 3018, provided that: ‘‘The amendments made by
subsection (a) [amending this section] shall apply be-
ginning on October 1, 2024, to any construction of a
project for navigation on the inland waterways that is
new or ongoing on or after that date.’’
EFFECTIVE DATE OF 2022 AMENDMENT
Pub. L. 117–263, div. H, title LXXXI, § 8157(b), Dec. 23,
2022, 136 Stat. 3738, provided that: ‘‘The amendments
made by subsection (a) [amending this section] shall
apply beginning on October 1, 2022, to any construction
of a project for navigation on the inland waterways
that is new or ongoing on or after that date.’’
INLAND WATERWAY PROJECTS
Pub. L. 116–260, div. AA, title I, § 109, Dec. 27, 2020, 134
Stat. 2624, as amended by Pub. L. 117–263, div. H, title
LXXXI, § 8157(c), Dec. 23, 2022, 136 Stat. 3738, provided
that: ‘‘Notwithstanding section 102 of the Water Re-
sources Development Act of 1986 (33 U.S.C. 2212), for a
project for navigation on the inland waterways receiv-
ing a construction appropriation during any of fiscal
years 2021 through 2022, 35 percent of the costs of con-
struction of the project shall be paid from amounts ap-
propriated from the Inland Waterways Trust Fund
until such construction of the project is complete.’’
ACCEPTANCE OF CONTRIBUTED FUNDS TO INCREASE
LOCK OPERATIONS
Pub. L. 113–121, title I, § 1017, June 10, 2014, 128 Stat.
1223, as amended by Pub. L. 115–270, title I, § 1135, Oct.
23, 2018, 132 Stat. 3783, provided that:
‘‘(a) IN GENERAL.—The Secretary [of the Army], after
providing public notice, shall establish a pilot program
for the acceptance and expenditure of funds contributed
by non-Federal interests to increase the hours of oper-
ation of locks at water resources development projects.
‘‘(b) APPLICABILITY.—The establishment of the pilot
program under this section shall not affect the periodic
review and adjustment of hours of operation of locks
based on increases in commercial traffic carried out by
the Secretary.
‘‘(c) PUBLIC COMMENT.—Not later than 180 days before
a proposed modification to the operation of a lock at a
water resources development project will be carried
out, the Secretary shall—
‘‘(1) publish the proposed modification in the Fed-
eral Register; and
‘‘(2) accept public comment on the proposed modi-
fication.
‘‘(d) REPORTS.—
‘‘(1) IN GENERAL.—Not later than 1 year after the
date of enactment of this Act [June 10, 2014], the Sec-
retary shall submit to the Committee on Environ-
ment and Public Works of the Senate and the Com-
mittee on Transportation and Infrastructure of the
House of Representatives and make publicly avail-
able a report that evaluates the cost-savings result-
ing from reduced lock hours and any economic im-
pacts of modifying lock operations.
‘‘(2) REVIEW
OF
PILOT
PROGRAM.—Not later than
September 30, 2017, and each year thereafter, the Sec-
retary shall submit to the Committee on Environ-
ment and Public Works of the Senate and the Com-
mittee on Transportation and Infrastructure of the
House of Representatives a report that describes the
effectiveness of the pilot program under this section.
‘‘(e) ANNUAL REVIEW.—The Secretary shall carry out
an annual review of the commercial use of locks and
make any necessary adjustments to lock operations
based on that review.
‘‘(f) TERMINATION.—The authority to accept funds
under this section shall terminate 10 years after the
date of enactment of this Act.’’
§ 2213. Flood control and other purposes
(a) Flood control
(1) General rule
The non-Federal interests for a project with
costs assigned to flood control (other than a
nonstructural project) shall—
Page 705
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2213
(A) pay 5 percent of the cost of the project
assigned to flood control during construc-
tion of the project;
(B) provide all lands, easements, rights-of-
way, and dredged material disposal areas re-
quired only for flood control and perform all
related necessary relocations; and
(C) provide that portion of the joint costs
of lands, easements, rights-of-way, dredged
material disposal areas, and relocations
which is assigned to flood control.
(2) 35 percent minimum contribution
If the value of the contributions required
under paragraph (1) of this subsection is less
than 35 percent of the cost of the project as-
signed to flood control, the non-Federal inter-
est shall pay during construction of the
project such additional amounts as are nec-
essary so that the total contribution of the
non-Federal interests under this subsection is
equal to 35 percent of the cost of the project
assigned to flood control.
(3) 50 percent maximum
The non-Federal share under paragraph (1)
shall not exceed 50 percent of the cost of the
project assigned to flood control. The pre-
ceding sentence does not modify the require-
ment of paragraph (1)(A) of this subsection.
(4) Deferred payment of amount exceeding 30
percent
If the total amount of the contribution re-
quired under paragraph (1) of this subsection
exceeds 30 percent of the cost of the project as-
signed to flood control, the non-Federal inter-
ests may pay the amount of the excess to the
Secretary over a 15-year period (or such short-
er period as may be agreed to by the Secretary
and the non-Federal interests) beginning on
the date construction of the project or sepa-
rable element is completed, at an interest rate
determined pursuant to section 2216 of this
title. The preceding sentence does not modify
the requirement of paragraph (1)(A) of this
subsection.
(b) Projects using nonstructural, natural, or na-
ture-based features
(1) In general
The non-Federal share of the cost of a flood
risk management or hurricane and storm dam-
age risk reduction measure using a non-
structural feature, or a natural feature or na-
ture-based feature (as those terms are defined
in section 2289a(a) of this title), shall be 35 per-
cent of the cost of such measures. The non-
Federal interests for any such measures shall
be required to provide all lands, easements,
rights-of-way, dredged material disposal areas,
and relocations necessary for the project, but
shall not be required to contribute any
amount in cash during construction for a non-
structural feature if the costs of land, ease-
ments, rights-of-way, dredged material dis-
posal areas, and relocations for such feature
are estimated to exceed 35 percent.
(2) Non-Federal contribution in excess of 35
percent
At any time during construction of a
project, if the Secretary determines that the
costs
of
land,
easements,
rights-of-way,
dredged material disposal areas, and reloca-
tions for the project, in combination with
other costs contributed by the non-Federal in-
terests, will exceed 35 percent, any additional
costs for the project (not to exceed 65 percent
of the total costs of the project) shall be a
Federal responsibility and shall be contributed
during construction as part of the Federal
share.
(c) Other purposes
The non-Federal share of the cost assigned to
other project purposes shall be as follows:
(1) hydroelectric power: 100 percent, except
that the marketing of such power and the re-
covery of costs of constructing, operating,
maintaining, and rehabilitating such projects
shall be in accordance with existing law: Pro-
vided, That after November 17, 1986, the Sec-
retary shall not submit to Congress any pro-
posal for the authorization of any water re-
sources project that has a hydroelectric power
component unless such proposal contains the
comments of the appropriate Power Marketing
Administrator designated pursuant to section
7152 of title 42 concerning the appropriate
Power Marketing Administration’s ability to
market the hydroelectric power expected to be
generated and not required in the operation of
the project under the applicable Federal power
marketing law, so that, 100 percent of oper-
ation, maintenance and replacement costs, 100
percent of the capital investment allocated to
the purpose of hydroelectric power (with inter-
est at rates established pursuant to or pre-
scribed by applicable law), and any other costs
assigned in accordance with law for return
from power revenues can be returned within
the period set for the return of such costs by
or pursuant to such applicable Federal power
marketing law;
(2) municipal and industrial water supply:
100 percent;
(3) agricultural water supply: 35 percent;
(4) recreation, including recreational naviga-
tion: 50 percent of separable costs and, in the
case of any harbor or inland harbor or channel
project, 50 percent of joint and separable costs
allocated to recreational navigation;
(5) hurricane and storm damage reduction:
35 percent;
(6) aquatic plant control: 50 percent of con-
trol operations; and
(7) environmental protection and restora-
tion: 35 percent; except that nothing in this
paragraph shall affect or limit the applica-
bility of section 2283 of this title.
(d) Certain other costs assigned to project pur-
poses
(1) Construction
Costs of constructing projects or measures
for beach erosion control and water quality
enhancement shall be assigned to appropriate
project purposes listed in subsections (a), (b),
and (c) and shall be shared in the same per-
centage as the purposes to which the costs are
assigned, except that all costs assigned to ben-
efits to privately owned shores (where use of
such shores is limited to private interests) or
Page 706
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2213
to prevention of losses of private lands shall
be borne by non-Federal interests and all costs
assigned to the protection of federally owned
shores shall be borne by the United States.
(2) Periodic nourishment
(A) In general
In the case of a project authorized for con-
struction after December 31, 1999, except for
a project for which a District Engineer’s Re-
port is completed by that date, the non-Fed-
eral cost of the periodic nourishment of the
project, or any measure for shore protection
or beach erosion control for the project, that
is carried out—
(i) after January 1, 2001, shall be 40 per-
cent;
(ii) after January 1, 2002, shall be 45 per-
cent; and
(iii) after January 1, 2003, shall be 50 per-
cent.
(B) Benefits to privately owned shores
All costs assigned to benefits of periodic
nourishment projects or measures to pri-
vately owned shores (where use of such
shores is limited to private interests) or to
prevention of losses of private land shall be
borne by the non-Federal interest.
(C) Benefits to federally owned shores
All costs assigned to the protection of fed-
erally owned shores for periodic nourish-
ment measures shall be borne by the United
States.
(e) Applicability
(1) In general
This section applies to any project (includ-
ing any small project which is not specifically
authorized by Congress and for which the Sec-
retary has not approved funding before No-
vember 17, 1986), or separable element thereof,
on which physical construction is initiated
after April 30, 1986, as determined by the Sec-
retary, except as provided in paragraph (2).
For the purpose of the preceding sentence,
physical construction shall be considered to be
initiated on the date of the award of a con-
struction contract.
(2) Exceptions
This section shall not apply to the Yazoo
Basin, Mississippi, Demonstration Erosion
Control Program, authorized by Public Law
98–8,
or
to
the
Harlan,
Kentucky,
or
Barbourville,
Kentucky,
elements
of
the
project authorized by section 202 of Public
Law 96–367.
(f) ‘‘Separable element’’ defined
For purposes of this Act, the term ‘‘separable
element’’ means a portion of a project—
(1) which is physically separable from other
portions of the project; and
(2) which—
(A) achieves hydrologic effects, or
(B) produces physical or economic bene-
fits,
which are separately identifiable from those
produced by other portions of the project.
(g) Deferral of payment
(1) With respect to the projects listed in para-
graph (2), no amount of the non-Federal share
required under this section shall be required to
be paid during the three-year period beginning
on November 17, 1986.
(2) The projects referred to in paragraph (1)
are the following:
(A) Boeuf and Tensas Rivers, Tensas Basin,
Louisiana and Arkansas, authorized by the
Flood Control Act of 1946;
(B) Eight Mile Creek, Arkansas, authorized
by Public Law 99–88; and
(C) Rocky Bayou Area, Yazoo Backwater
Area, Yazoo Basin, Mississippi, authorized by
the Flood Control Act approved August 18,
1941.
(h) Assigned joint and separable costs
The share of the costs specified under this sec-
tion for each project purpose shall apply to the
joint and separable costs of construction of each
project assigned to that purpose, except as oth-
erwise specified in this Act.
(i) Lands, easements, rights-of-way, dredged ma-
terial disposal areas, and relocations
Except as provided under section 2283(c) of this
title, the non-Federal interests for a project to
which this section applies shall provide all
lands, easements, rights-of-way, and dredged
material disposal areas required for the project
and perform all necessary relocations, except to
the extent limited by any provision of this sec-
tion. The value of any contribution under the
preceding sentence shall be included in the non-
Federal share of the project specified in this sec-
tion.
(j) Agreement
(1) Requirement for agreement
(A) In general
Any project to which this section applies
(other than a project for hydroelectric
power) shall be initiated only after non-Fed-
eral interests have entered into binding
agreements with the Secretary to pay 100
percent of the operation, maintenance, and
replacement and rehabilitation costs of the
project, to pay the non-Federal share of the
costs of construction required by this sec-
tion, and to hold and save the United States
free from damages due to the construction
or operation and maintenance of the project,
except for damages due to the fault or neg-
ligence of the United States or its contrac-
tors.
(B) Inclusion
An agreement under subparagraph (A)
shall include a brief description and esti-
mation of the anticipated operations, main-
tenance, and replacement and rehabilitation
costs of the non-Federal interest for the
project.
(2) Elements of agreement
The agreement required pursuant to para-
graph (1) shall be in accordance with the re-
quirements of section 1962d–5b of title 42 and
shall provide for the rights and duties of the
United States and the non-Federal interest
with respect to the construction, operation,
and maintenance of the project, including, but
not limited to, provisions specifying that, in
Page 707
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2213
the event the non-Federal interest fails to pro-
vide the required non-Federal share of costs
for such work, the Secretary—
(A) shall terminate or suspend work on the
project unless the Secretary determines that
continuation of the work is in the interest of
the United States or is necessary in order to
satisfy agreements with other non-Federal
interests in connection with the project; and
(B) may terminate or adjust the rights and
privileges of the non-Federal interest to
project outputs under the terms of the
agreement.
(k) Payment options
(1) In general
Except as otherwise provided in this section,
the Secretary may permit the full non-Federal
contribution to be made without interest dur-
ing construction of the project or separable
element, or with interest at a rate determined
pursuant to section 2216 of this title over a pe-
riod of not more than thirty years from the
date of completion of the project or separable
element. Repayment contracts shall provide
for recalculation of the interest rate at five-
year intervals.
(2) Renegotiation of terms
(A) In general
At the request of a non-Federal interest,
the Secretary and the non-Federal interest
may renegotiate the terms and conditions of
an eligible deferred payment, including—
(i) permitting the non-Federal contribu-
tion to be made without interest, pursuant
to paragraph (1);
(ii) recalculation of the interest rate;
(iii) full or partial forgiveness of interest
accrued during the period of construction;
and
(iv) a credit against construction inter-
est for a non-Federal investment that ben-
efits the completion or performance of the
project or separable element.
(B) Eligible deferred payment
An eligible deferred payment agreement
under subparagraph (A) is an agreement for
which—
(i) the non-Federal contribution was
made with interest;
(ii) the period of project construction ex-
ceeds 10 years from the execution of a
project partnership agreement or appro-
priation of funds; and
(iii) the construction interest exceeds
$45,000,000.
(3) Credit for non-Federal contribution
(A) In general
The Secretary is authorized to credit any
costs incurred by the non-Federal interest
(including in-kind contributions) to remedy
a design or construction deficiency of a cov-
ered project or separable element toward the
non-Federal share of the cost of the covered
project, if the Secretary determines the rem-
edy to be integral to the completion or per-
formance of the covered project.
(B) Credit of costs
If the non-Federal interest incurs costs or
in-kind contributions for a project to rem-
edy a design or construction deficiency of a
project or separable element which has a 100
percent Federal cost share, and the Sec-
retary determines the remedy to be integral
to the completion or performance of the
project, the Secretary is authorized to credit
such costs to any interest accrued on a de-
ferred non-Federal contribution.
(4) Treatment of pre-payment
(A) In general
Notwithstanding
a
deferred
payment
agreement with a non-Federal interest, the
Secretary shall accept, without interest of
any type, the repayment of a non-Federal
contribution for any eligible deferred pay-
ment described in paragraph (2)(B) for
which—
(i) the non-Federal interest made a pay-
ment of at least $200,000,000 for that eligi-
ble deferred payment agreement on or be-
fore September 30, 2021;
(ii) the non-Federal interest made a pay-
ment of an additional $200,000,000 for that
eligible deferred payment agreement on or
before September 30, 2023; and
(iii) the non-Federal interest repays the
balance of remaining principal by June 1,
2032.
(B) Repayment options
Repayment of a non-Federal interest’s
contribution
under
subparagraph
(A)(iii)
may be satisfied through the provision by
the non-Federal interest of fish and wildlife
mitigation for one or more projects or sepa-
rable elements, if the Secretary determines
that—
(i) the non-Federal interest has incurred
costs for the provision of mitigation that—
(I) equal or exceed the amount of the
required repayment; and
(II) are in excess of any required non-
Federal interest’s contribution for the
project or separable element for which
the mitigation is provided; and
(ii) the mitigation is integral to the
project for which it is provided.
(C) Refund of credit
Any agreement made that applied credits
to satisfy the terms of a pre-payment made
under subsection (k)(4)(A) that resulted in
total payment in excess of the amount now
required under subsection (k)(4)(A) shall be
modified to indicate that the excess credits
continue to apply toward any remaining
principal of the respective project, or at the
request of the non-Federal interest, the
agreement shall be modified to retroactively
transfer back those excess credits to the
non-Federal interest such that those credits
may be applied by the non-Federal interest
to any cost-shared project identified by the
non-Federal interest.
(5) Congressional notification
(A) In general
Upon receipt of a request for a renegoti-
ation of terms by a non-Federal interest
under paragraph (2), the Secretary shall sub-
Page 708
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2213
mit to the Committee on Transportation and
Infrastructure of the House and the Com-
mittee on Environment and Public Works of
the Senate a report 30 days after enactment
and quarterly thereafter regarding the sta-
tus of the request.
(B) Sense of Congress
It is the sense of Congress that the Sec-
retary should respond to any request for a
renegotiation of terms submitted under
paragraph (2) in a timely manner.
(l) Delay of payment
(1) Initial payment
At the request of any non-Federal interest
the Secretary may permit such non-Federal
interest to delay the initial payment of any
non-Federal contribution under this section or
section 2211 of this title for up to one year
after the date when construction is begun on
the project for which such contribution is to
be made. Any such delay in initial payment
shall be subject to interest charges for up to
six months at a rate determined pursuant to
section 2216 of this title.
(2) Interest
(A) In general
At the request of any non-Federal interest,
the Secretary may waive the accrual of in-
terest on any non-Federal cash contribution
under this section or section 2211 of this title
for a project for a period of not more than 1
year if the Secretary determines that—
(i) the waiver will contribute to the abil-
ity of the non-Federal interest to make fu-
ture contributions; and
(ii) the non-Federal interest is in good
standing under terms agreed to under sub-
section (k)(1).
(B) Limitations
The Secretary may grant not more than 1
waiver under subparagraph (A) for the same
project.
(m) Ability to pay
(1) In general
Any cost-sharing agreement under this sec-
tion for a feasibility study, or for construction
of an environmental protection and restora-
tion project, a flood control project, a project
for navigation, storm damage protection,
shoreline erosion, hurricane protection, or
recreation, or an agricultural water supply
project, shall be subject to the ability of the
non-Federal interest to pay.
(2) Criteria
The Secretary shall determine the ability of
a non-Federal interest to pay under this sub-
section by considering—
(A) per capita income data for the county
or counties in which the project is to be lo-
cated;
(B) the per capita non-Federal cost of con-
struction of the project for the county or
counties in which the project is to be lo-
cated;
(C) the financial capabilities of the non-
Federal interest for the project;
(D) the extent to which the non-Federal
interest is an economically disadvantaged
community (as defined pursuant to section
160 of the Water Resources Development Act
of 2020 (33 U.S.C. 2201 note)); and
(E) any additional criteria relating to the
non-Federal interest’s financial ability to
carry out its cost-sharing responsibilities
determined appropriate by the Secretary.
(3) Procedures
For purposes of carrying out paragraph (2),
the Secretary shall develop procedures—
(A) to allow a non-Federal interest to iden-
tify the amount such non-Federal interest
would likely be able to pay; and
(B) for a non-Federal interest to submit a
request to the Secretary to reduce the re-
quired non-Federal share.
(4) Non-Federal share
Notwithstanding subsection (a), the Sec-
retary may reduce the requirement that a
non-Federal interest make a cash contribution
for any project that is determined to be eligi-
ble for a reduction in the non-Federal share
under criteria and procedures in effect under
paragraphs (1), (2), and (3).
(5) Exception
This subsection shall not apply to project
costs greater than the national economic de-
velopment plan.
(6) Report
(A) In general
Not less frequently than annually, the Sec-
retary shall submit to the Committee on
Transportation and Infrastructure of the
House of Representatives and the Committee
on Environment and Public Works of the
Senate a report describing all determina-
tions of the Secretary under this subsection
regarding the ability of a non-Federal inter-
est to pay.
(B) Contents
The Secretary shall include in each report
required under subparagraph (A) a descrip-
tion, for the applicable year, of—
(i) requests by a non-Federal interest to
reduce the non-Federal share required in a
cost-sharing agreement, including—
(I) the name of the non-Federal inter-
est that submitted to the Secretary a re-
quest for a determination under this sub-
section; and
(II) the name and location of the
project;
(ii) the determination of the Secretary
with respect to each such request;
(iii) the basis for each such determina-
tion; and
(iv) the adjusted share of the costs of the
project of the non-Federal interest, if ap-
plicable.
(C) Inclusion in chief’s report
The Secretary may include a determina-
tion to reduce the non-Federal share re-
quired in a cost-sharing agreement for con-
struction of a project in the report of the
Chief of Engineers for the project.
Page 709
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2213
1 See References in Text note below.
(n) Non-Federal contributions
(1) Prohibition on solicitation of excess con-
tributions
The Secretary may not—
(A) solicit contributions from non-Federal
interests for costs of constructing author-
ized water resources projects or measures in
excess of the non-Federal share assigned to
the appropriate project purposes listed in
subsections (a), (b), and (c); or
(B) condition Federal participation in such
projects or measures on the receipt of such
contributions.
(2) Limitation on statutory construction
Nothing in this subsection shall be con-
strued to affect the Secretary’s authority
under section 903(c).1
(Pub. L. 99–662, title I, § 103, Nov. 17, 1986, 100
Stat. 4084; Pub. L. 101–640, title III, § 305(a), Nov.
28, 1990, 104 Stat. 4635; Pub. L. 102–580, title II,
§ 201(a), title III, § 333(b)(2), Oct. 31, 1992, 106 Stat.
4825, 4852; Pub. L. 104–303, title II, §§ 202(a)(1)(A),
(2), (b)(1), 210(a), Oct. 12, 1996, 110 Stat. 3673, 3681;
Pub. L. 106–53, title II, §§ 215(a), 219(c), Aug. 17,
1999, 113 Stat. 292, 295; Pub. L. 106–109, § 5, Nov.
24, 1999, 113 Stat. 1495; Pub. L. 106–541, title II,
§ 204, Dec. 11, 2000, 114 Stat. 2589; Pub. L. 110–114,
title II, §§ 2001, 2019(a), Nov. 8, 2007, 121 Stat. 1067,
1078; Pub. L. 116–260, div. AA, title I, §§ 115(b), 143,
title III, § 351, Dec. 27, 2020, 134 Stat. 2627, 2653,
2717; Pub. L. 117–263, div. H, title LXXXI, §§ 8385,
8386, Dec. 23, 2022, 136 Stat. 3829, 3830; Pub. L.
118–272, div. A, title I, § 1139(a), title III, §§ 1358,
1359, Jan. 4, 2025, 138 Stat. 3026, 3162.)
Editorial Notes
REFERENCES IN TEXT
Public Law 98–8, referred to in subsec. (e)(2), is Pub.
L. 98–8, Mar. 24, 1983, 97 Stat. 13. For complete classi-
fication of this Act to the Code, see Tables.
Section 202 of Public Law 96–367, referred to in sub-
sec. (e)(2), is section 202 of Pub. L. 96–367, title II, Oct.
1, 1980, 94 Stat. 1339, which is not classified to the Code.
This Act, referred to in subsecs. (f) and (h), is Pub. L.
99–662, Nov. 17, 1986, 100 Stat. 4082, known as the Water
Resources Development Act of 1986. For complete clas-
sification of this Act to the Code, see Short Title note
set out under section 2201 of this title and Tables.
The Flood Control Act of 1946, referred to in subsec.
(g)(2)(A), is act July 24, 1946, ch. 596, 60 Stat. 641. For
complete classification of this Act to the Code, see Ta-
bles.
Public Law 99–88, referred to in subsec. (g)(2)(B), is
Pub. L. 99–88, Aug. 15, 1985, 99 Stat. 293, known as the
Supplemental Appropriations Act, 1985. Provisions of
Pub. L. 99–88 authorizing the project for Eight Mile
Creek, Arkansas, are not classified to the Code. For
complete classification of this Act to the Code, see Ta-
bles.
The Flood Control Act approved August 18, 1941, re-
ferred to in subsec. (g)(2)(C), is act Aug. 18, 1941, ch. 377,
55 Stat. 638. For complete classification of this Act to
the Code, see Tables.
Section 160 of the Water Resources Development Act
of 2020, referred to in subsec. (m)(2)(D), is section 160 of
div. AA of Pub. L. 116–260, which is set out as a note
under section 2201 of this title.
Section 903(c), referred to in subsec. (n)(2), is section
903(c) of Pub. L. 99–662, title IX, Nov. 17, 1986, 100 Stat.
4184, which is not classified to the Code.
AMENDMENTS
2025—Subsec. (k)(4)(A)(i). Pub. L. 118–272, § 1358(1)(A),
substituted ‘‘made’’ for ‘‘makes’’.
Subsec. (k)(4)(A)(ii). Pub. L. 118–272, § 1358(1)(B), sub-
stituted ‘‘made a payment of an additional $200,000,000
for that eligible deferred payment agreement on or be-
fore’’ for ‘‘repays an amount equal to 2⁄3 of the remain-
ing principal by’’.
Subsec. (k)(4)(B), (i)(II). Pub. L. 118–272, § 1358(2),
which directed amendment of subpar. (B) by inserting
‘‘interest’s’’ after ‘‘non-Federal’’, was executed by mak-
ing the insertion after ‘‘non-Federal’’ the first and
fourth place appearing, to reflect the probable intent of
Congress.
Subsec. (k)(4)(C). Pub. L. 118–272, § 1358(3), added sub-
par. (C).
Subsec. (k)(5). Pub. L. 118–272, § 1359, added par. (5).
Subsec. (m)(2), (3). Pub. L. 118–272, § 1139(a)(1), added
pars. (2) and (3) and struck out former pars. (2) and (3)
which related to criteria and procedures and revision of
criteria and procedures, respectively.
Subsec. (m)(5), (6). Pub. L. 118–272, § 1139(a)(2), added
pars. (5) and (6).
2022—Subsec. (k)(4). Pub. L. 117–263, § 8386, designated
existing provisions as subpar. (A) and inserted heading,
redesignated former subpars. (A) and (B) as cls. (i) and
(ii), respectively, and realigned margins, substituted
‘‘$200,000,000’’ for ‘‘$200 million’’ in cl. (i), inserted ‘‘an
amount equal to 2⁄3 of’’ after ‘‘repays’’ in cl. (ii), and
added cl. (iii) of subpar. (A) and subpar. (B).
Subsec. (l). Pub. L. 117–263, § 8385, struck out ‘‘initial’’
before ‘‘payment’’ in subsec. heading, designated exist-
ing provisions as par. (1) and inserted par. heading, and
added par. (2).
2020—Subsec. (b). Pub. L. 116–260, § 115(b)(1), sub-
stituted ‘‘Projects using nonstructural, natural, or na-
ture-based features’’ for ‘‘Nonstructural flood control
projects’’ in heading.
Subsec. (b)(1). Pub. L. 116–260, § 115(b)(2), substituted
‘‘a flood risk management or hurricane and storm dam-
age risk reduction measure using a nonstructural fea-
ture, or a natural feature or nature-based feature (as
those terms are defined in section 2289a(a) of this
title),’’ for ‘‘nonstructural flood control measures’’ and
‘‘cash during construction for a nonstructural feature
if the costs of land, easements, rights-of-way, dredged
material disposal areas, and relocations for such fea-
ture are estimated to exceed 35 percent’’ for ‘‘cash dur-
ing construction of the project’’.
Subsec. (j)(1). Pub. L. 116–260, § 143, designated exist-
ing provisions as subpar. (A), inserted heading, and
added subpar. (B).
Subsec. (k). Pub. L. 116–260, § 351, designated existing
provisions as par. (1), inserted heading, and added pars.
(2) to (4).
2007—Subsec. (m)(2). Pub. L. 110–114, § 2019(a), sub-
stituted ‘‘December 31, 2007’’ for ‘‘180 days after Decem-
ber 11, 2000’’.
Subsec. (n). Pub. L. 110–114, § 2001, added subsec. (n).
2000—Subsec. (m)(1), (2). Pub. L. 106–541, § 204(1), added
pars. (1) and (2) and struck out former pars. (1) and (2)
which required any cost-sharing agreement to be sub-
ject to the ability of a non-Federal interest to pay and
required the Secretary to determine ability to pay
using certain criteria and procedures.
Subsec. (m)(3)(B), (C). Pub. L. 106–541, § 204(2), redesig-
nated subpar. (C) as (B) and struck out former subpar.
(B) which read as follows: ‘‘shall not consider criteria
(other than criteria described in subparagraph (A)) in
effect on the day before October 12, 1996; and’’.
1999—Subsec. (b). Pub. L. 106–53, § 219(c)(1), which di-
rected insertion of the par. (1) designation and heading
before ‘‘The non-Federal’’, was executed by making the
insertion before that phrase the first place it appeared
to reflect the probable intent of Congress.
Subsec. (b)(2). Pub. L. 106–53, § 219(c)(2), added par. (2).
Subsec. (d). Pub. L. 106–53, § 215(a), designated exist-
ing provisions as par. (1), inserted heading, and added
par. (2).
Page 710
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2213a
Subsec. (d)(2)(A). Pub. L. 106–109 substituted ‘‘except
for a project for which a District Engineer’s Report is
completed by that date,’’ for ‘‘or for which a feasibility
study is completed after that date,’’.
1996—Subsecs. (a)(2), (b). Pub. L. 104–303, § 202(a)(1)(A),
substituted ‘‘35 percent’’ for ‘‘25 percent’’ wherever ap-
pearing.
Subsec. (c)(7). Pub. L. 104–303, § 210(a), added par. (7).
Subsec. (e)(1). Pub. L. 104–303, § 202(a)(2), inserted at
end ‘‘For the purpose of the preceding sentence, phys-
ical construction shall be considered to be initiated on
the date of the award of a construction contract.’’
Subsec. (m). Pub. L. 104–303, § 202(b)(1), reenacted
heading without change and amended text generally.
Prior to amendment, text read as follows: ‘‘Any cost-
sharing agreement under this section for flood control
or agricultural water supply shall be subject to the
ability of a non-Federal interest to pay. The ability of
any non-Federal interest to pay shall be determined by
the Secretary in accordance with procedures estab-
lished by the Secretary.’’
1992—Subsec. (i). Pub. L. 102–580, § 333(b)(2), sub-
stituted ‘‘Except as provided under section 2283(c) of
this title, the non-Federal’’ for ‘‘The non-Federal’’.
Subsec. (m). Pub. L. 102–580, § 201(a), amended subsec.
(m) generally. Prior to amendment, subsec. (m) read as
follows:
‘‘(1) GENERAL
RULE.—Any cost-sharing agreement
under this section for flood control or agricultural
water supply shall be subject to the ability of a non-
Federal interest to pay.
‘‘(2) PROCEDURES.—
‘‘(A) IN GENERAL.—The ability of any non-Federal
interest to pay shall be determined by the Secretary
in accordance with procedures established by the Sec-
retary.
‘‘(B) LIMITATIONS.—The procedures established pur-
suant to this subsection shall provide for a reduction
in any non-Federal cash contribution required under
subsection (a)(2) of this section. In addition, such pro-
cedures shall provide for determination of the eligi-
bility of the non-Federal interest for a reduction in
the required cash contribution on the basis of local,
not statewide, economic and financial data.
‘‘(C) REGULATIONS.—Not later than 1 year after No-
vember 28, 1990, the Secretary shall issue regulations
establishing the procedures required by this para-
graph.’’
1990—Subsec. (m). Pub. L. 101–640 amended subsec.
(m) generally. Prior to amendment, subsec. (m) read as
follows: ‘‘Any cost-sharing agreement under this sec-
tion for flood control or agricultural water supply shall
be subject to the ability of a non-Federal interest to
pay. The ability of any non-Federal interest to pay
shall be determined by the Secretary in accordance
with procedures established by the Secretary.’’
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 1996 AMENDMENT
Pub. L. 104–303, title II, § 202(a)(1)(B), Oct. 12, 1996, 110
Stat. 3673, provided that: ‘‘The amendments made by
subparagraph (A) [amending this section] shall apply to
any project authorized after the date of the enactment
of this Act [Oct. 12, 1996] and to any flood control
project that is not specifically authorized by Congress
for which a Detailed Project Report is approved after
such date of enactment or, in the case of a project for
which no Detailed Project Report is prepared, construc-
tion is initiated after such date of enactment.’’
Pub. L. 104–303, title II, § 202(b)(2), Oct. 12, 1996, 110
Stat. 3674, provided that:
‘‘(A) GENERALLY.—Subject to subparagraph (C), the
amendment made by paragraph (1) [amending this sec-
tion] shall apply to any project, or separable element
thereof, with respect to which the Secretary and the
non-Federal interest enter into a project cooperation
agreement after December 31, 1997.
‘‘(B) AMENDMENT OF COOPERATION AGREEMENT.—If re-
quested by the non-Federal interest, the Secretary
shall amend a project cooperation agreement executed
on or before the date of the enactment of this Act [Oct.
12, 1996] to reflect the application of the amendment
made by paragraph (1) to any project for which a con-
tract for construction has not been awarded on or be-
fore such date of enactment.
‘‘(C) NON-FEDERAL OPTION.—If requested by the non-
Federal interest, the Secretary shall apply the criteria
and procedures established pursuant to section 103(m)
of the Water Resources Development Act of 1986 [sub-
sec. (m) of this section] as in effect on the day before
the date of the enactment of this Act for projects that
are authorized before the date of the enactment of this
Act.’’
[Reference
to
‘‘project
cooperation
agreement’’
deemed to be reference to ‘‘project partnership agree-
ment’’, see section 2003(f)(2) of Pub. L. 110–114, set out
as a note under section 1962d–5b of Title 42, The Public
Health and Welfare.]
Pub. L. 104–303, title II, § 210(b), Oct. 12, 1996, 110 Stat.
3681, provided that: ‘‘The amendments made by sub-
section (a) [amending this section] apply only to
projects authorized after the date of the enactment of
this Act [Oct. 12, 1996].’’
CONTINUATION OF EXISTING REGULATIONS
Pub. L. 101–640, title III, § 305(b), Nov. 28, 1990, 104
Stat. 4635, provided that: ‘‘Regulations issued to carry
out section 103(m) of the Water Resources Development
Act of 1986 [33 U.S.C. 2213(m)] before the date of the en-
actment of this Act [Nov. 28, 1990] and in effect on such
date shall continue in effect until regulations are
issued pursuant to paragraph (2)(C) of such section, as
added by subsection (a) of this section.’’
UPDATE TO GUIDANCE
Pub. L. 118–272, div. A, title I, § 1139(b), Jan. 4, 2025, 138
Stat. 3027, provided that: ‘‘Not later than 1 year after
the date of enactment of this Act [Jan. 4, 2025], the Sec-
retary [of the Army] shall update any agency guidance
or regulation relating to the ability of a non-Federal
interest to pay as necessary to reflect the amendments
made by this section [amending this section].’’
REPORTS TO CONGRESS
Pub. L. 100–71, title I, July 11, 1987, 101 Stat. 401, pro-
vided that: ‘‘The Secretary of the Army shall file a re-
port with the appropriate committees of the House of
Representatives and the Senate within ninety days
after a written request is made pursuant to the provi-
sions of subsection (m) of section 103 of Public Law
99–662 [33 U.S.C. 2213(m)] indicating the action taken on
the request. In addition, the Secretary of the Army
shall file a report with the appropriate committees of
the House of Representatives and the Senate within
ninety days after enactment of this Act [July 11, 1987]
listing any project or study falling under the provisions
of subsection (e)(1) of section 103 of Public Law 99–662.’’
§ 2213a. Treatment of certain benefits and costs
(a) In general
In the case of a flood risk management or
coastal storm risk management project in a re-
gion of moderate or high seismic hazard, for the
purpose of a benefit-cost analysis for the
project, the Secretary shall not include in that
analysis any additional design and construction
costs resulting from addressing seismic con-
cerns.
(b) Savings provision
Except with respect to the benefit-cost anal-
ysis, the additional costs referred to in sub-
section (a) shall be—
(1) included in the total project cost; and
(2) subject to cost-share requirements other-
wise applicable to the project.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
In any case in which a project under the jurisdiction of the Secretary is budgeted under a different business line than the business line under which the project was originally authorized, the Secretary shall ensure that the project is carried out in accordance with any requirements that apply to the business line under which the project was originally authorized.
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2201
Stored review status: release_metadata_unconfirmed. The source passage cites 33 U.S.C. § 2201. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 688
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2201
Sec.
2326e.
Non-Federal interest dredging authority.
2326f.
Maintenance dredging data.
2326g.
Beneficial use of dredged material; dredged
material management plans.
2326h.
Five-year regional dredged material manage-
ment plans.
2326i.
Beneficial use of dredged material.
2326j.
Transfer of suitable dredged material.
2327.
Definition of rehabilitation for inland water-
way projects.
2327a.
Rehabilitation of Corps of Engineers con-
structed pump stations.
2328.
Challenge cost-sharing program for manage-
ment of recreation facilities.
2328a.
Special use permits.
2329.
International outreach program.
2330.
Aquatic ecosystem restoration.
2330a.
Monitoring ecosystem restoration.
2330b.
Fish hatcheries.
2330c.
Aquatic ecosystem restoration.
2330d.
Public recreational amenities in ecosystem
restoration projects.
2331.
Use of continuing contracts for construction
of certain projects.
2331a.
Initiating work on separable elements.
2332.
Shoreline and riverine protection and res-
toration.
2333.
Irrigation diversion protection and fisheries
enhancement assistance.
2334.
Innovative technologies for watershed res-
toration.
2335.
Coastal aquatic habitat management.
2336.
Abandoned and inactive noncoal mine res-
toration.
2337.
Property protection program.
2338.
Reburial and conveyance authority.
2339.
Assistance programs.
2339a.
Cooperative agreements with Indian tribes.
2340.
Revision of project partnership agreement;
cost sharing.
2341.
Expedited actions for emergency flood dam-
age reduction.
2341a.
Prioritization.
2341b.
Prioritization of certain projects.
2341c.
Criteria for funding environmental infra-
structure projects.
2342.
Access to water resource
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2201
Stored review status: historical_2024_not_currentness_verified. The source passage cites 33 U.S.C. § 2201. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Review of contractual agreements**
(1) **In general** — Not later than 180 days after December 27, 2020, the Secretary shall complete a review of the policies, guidelines, and regulations of the Corps of Engineers for the development of contractual agreements between the Secretary and non-Federal interests and utilities associated with the construction of water resources development projects.
(2) **Report** — Not later than 90 days after completing the review under subsection (a)(1), the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate, and make publicly available, a report that includes—
(A) a summary of the results of the review; and
(B) public guidance on best practices for a non-Federal interest to use when writing or developing contractual agreements with the Secretary and utilities.
(3) **Provision of guidance** — The Secretary shall provide the best practices guidance included under paragraph (2)(A) to non-Federal interests prior to the development of contractual agreements with such non-Federal interests.
**(b) Sense of Congress** It is the sense of Congress that the Secretary should maximize use of nonprice tradeoff procedures in competitive acquisitions for carrying out emergency work in an area with respect to which the President has declared a major disaster under [section 5170 of title 42](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section5170&num=0&edition=prelim).
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2212
Stored review status: release_metadata_unconfirmed. The source passage cites 33 U.S.C. § 2212. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 703
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2212
‘‘(2) any revision of the cost-sharing requirements
would benefit United States domestic and inter-
national trade.
‘‘(b) RECOMMENDATIONS.—
‘‘(1) IN GENERAL.—Not later than May 30, 2001, the
Secretary shall submit to the Committee on Environ-
ment and Public Works of the Senate and the Com-
mittee on Transportation and Infrastructure of the
House of Representatives any recommendations that
the Secretary may have in light of the study under
subsection (a).
‘‘(2)
CONSIDERATIONS.—In
making
recommenda-
tions, the Secretary shall consider—
‘‘(A) the potential economic, environmental, and
budgetary impacts of any proposed revision of the
cost-sharing requirements; and
‘‘(B) the effect that any such revision would have
on regional port competition.’’
AMENDMENT OF COOPERATION AGREEMENT
Pub. L. 104–303, title II, § 201(f), Oct. 12, 1996, 110 Stat.
3673, provided that: ‘‘If requested by the non-Federal in-
terest, the Secretary shall amend a project cooperation
agreement executed on or before the date of the enact-
ment of this Act [Oct. 12, 1996] to reflect the applica-
tion of the amendments made by this section [amend-
ing this section and section 2241 of this title] to any
project for which a contract for construction has not
been awarded on or before that date.’’
INCREASES IN NON-FEDERAL SHARE OF COSTS
Pub. L. 104–303, title II, § 201(g), Oct. 12, 1996, 110 Stat.
3673, provided that: ‘‘Nothing in this section [amending
this section and section 2241 of this title and enacting
provisions set out above] (including the amendments
made by this section) shall increase, or result in the in-
crease of, the non-Federal share of the costs of—
‘‘(1) expanding any confined dredged material dis-
posal facili
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2212
Stored review status: historical_2024_not_currentness_verified. The source passage cites 33 U.S.C. § 2212. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Construction**
(1) **Payments during construction** — The non-Federal interests for a navigation project for a harbor or inland harbor, or any separable element thereof, on which a contract for physical construction has not been awarded before June 10, 2014, shall pay, during the period of construction of the project, the following costs associated with general navigation features:
(A) 10 percent of the cost of construction of the portion of the project which has a depth not in excess of 20 feet; plus
(B) 25 percent of the cost of construction of the portion of the project which has a depth in excess of 20 feet but not in excess of 55 feet; plus
(C) 50 percent of the cost of construction of the portion of the project which has a depth in excess of 55 feet.
(2) **Additional 10 percent payment over 30 years** — The non-Federal interests for a project to which paragraph (1) applies shall pay an additional 10 percent of the cost of the general navigation features of the project in cash over a period not to exceed 30 years, at an interest rate determined pursuant to [section 2216 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2216&num=0&edition=prelim). The value of lands, easements, rights-of-way, and relocations provided under paragraph (3) and the costs of relocations borne by the non-Federal interests under paragraph (4) shall be credited toward the payment required under this paragraph.
(3) **Lands, easements, and rights-of-way** — Except as provided under [section 2283(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2283/c&num=0&edition=prelim), the non-Federal interests for a project to which paragraph (1) applies shall provide the lands, easements, rights-of-wa
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2213
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.