Arkansas Legal Resource Navigator

33 U.S.C. § 2213 — Harbors

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2213 — Harbors

**(a) Construction** (1) **Payments during construction** — The non-Federal interests for a navigation project for a harbor or inland harbor, or any separable element thereof, on which a contract for physical construction has not been awarded before June 10, 2014, shall pay, during the period of construction of the project, the following costs associated with general navigation features: (A) 10 percent of the cost of construction of the portion of the project which has a depth not in excess of 20 feet; plus (B) 25 percent of the cost of construction of the portion of the project which has a depth in excess of 20 feet but not in excess of 55 feet; plus (C) 50 percent of the cost of construction of the portion of the project which has a depth in excess of 55 feet. (2) **Additional 10 percent payment over 30 years** — The non-Federal interests for a project to which paragraph (1) applies shall pay an additional 10 percent of the cost of the general navigation features of the project in cash over a period not to exceed 30 years, at an interest rate determined pursuant to [section 2216 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2216&num=0&edition=prelim). The value of lands, easements, rights-of-way, and relocations provided under paragraph (3) and the costs of relocations borne by the non-Federal interests under paragraph (4) shall be credited toward the payment required under this paragraph. (3) **Lands, easements, and rights-of-way** — Except as provided under [section 2283(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2283/c&num=0&edition=prelim), the non-Federal interests for a project to which paragraph (1) applies shall provide the lands, easements, rights-of-wa

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2213

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 92c71281896dffbc3025690e229f28b245f86ed82d77a8b762f0d541dead89f3. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_bd9754c826ca2be030741f82
Source file: Laws/federal/codes/united-states-code/title-33/section-2213-harbors--c326f2e963.md
Pages: Not recorded – Not recorded
Passage SHA-256: a507db60a9459b17b0810119f4f172247a9a4927d3da699e3f7d91a9a1b09d9d

Source location: Title 33, Chapter 36, § 2213; chapter-036-water-resources-development.md

Stored source content

**(a) Construction** (1) **Payments during construction** — The non-Federal interests for a navigation project for a harbor or inland harbor, or any separable element thereof, on which a contract for physical construction has not been awarded before June 10, 2014, shall pay, during the period of construction of the project, the following costs associated with general navigation features: (A) 10 percent of the cost of construction of the portion of the project which has a depth not in excess of 20 feet; plus (B) 25 percent of the cost of construction of the portion of the project which has a depth in excess of 20 feet but not in excess of 55 feet; plus (C) 50 percent of the cost of construction of the portion of the project which has a depth in excess of 55 feet. (2) **Additional 10 percent payment over 30 years** — The non-Federal interests for a project to which paragraph (1) applies shall pay an additional 10 percent of the cost of the general navigation features of the project in cash over a period not to exceed 30 years, at an interest rate determined pursuant to [section 2216 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2216&num=0&edition=prelim). The value of lands, easements, rights-of-way, and relocations provided under paragraph (3) and the costs of relocations borne by the non-Federal interests under paragraph (4) shall be credited toward the payment required under this paragraph. (3) **Lands, easements, and rights-of-way** — Except as provided under [section 2283(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2283/c&num=0&edition=prelim), the non-Federal interests for a project to which paragraph (1) applies shall provide the lands, easements, rights-of-way, and relocations (other than utility relocations under paragraph (4)) necessary for the project, including any lands, easements, rights-of-way, and relocations (other than utility relocations accomplished under paragraph (4)) that are necessary for dredged material disposal facilities. (4) **Utility relocations** — The non-Federal interests for a project to which paragraph (1) applies shall perform or assure the performance of all relocations of utilities necessary to carry out the project, except that in the case of a project for a deep-draft harbor and in the case of a project constructed by non-Federal interests under [section 2232 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2232&num=0&edition=prelim), one-half of the cost of each such relocation shall be borne by the owner of the facility being relocated and one-half of the cost of each such relocation shall be borne by the non-Federal interests. (5) **Dredged material disposal facilities for project construction** — In this subsection, the term “general navigation features” includes constructed land-based and aquatic dredged material disposal facilities that are necessary for the disposal of dredged material required for project construction and for which a contract for construction has not been awarded on or before October 12, 1996. **(b) Operation and maintenance** (1) **In general** — The Federal share of the cost of operation and maintenance of each navigation project for a harbor or inland harbor constructed by the Secretary pursuant to this Act or any other law approved after November 17, 1986, shall be 100 percent, except that in the case of a deep-draft harbor, the non-Federal interests shall be responsible for an amount equal to 50 percent of the excess of the cost of the operation and maintenance of such project over the cost which the Secretary determines would be incurred for operation and maintenance of such project if such project had a depth of 55 feet. (2) **Dredged material disposal facilities** — The Federal share of the cost of constructing land-based and aquatic dredged material disposal facilities that are necessary for the disposal of dredged material required for the operation and maintenance of a project and for which a contract for construction has not been awarded on or before October 12, 1996, shall be determined in accordance with subsection (a). The Federal share of operating and maintaining such facilities shall be determined in accordance with paragraph (1). **(c) Erosion or shoaling attributable to Federal navigation works** Costs of constructing projects or measures for the prevention or mitigation of erosion or shoaling damages attributable to Federal navigation works shall be shared in the same proportion as the cost sharing provisions applicable to the project causing such erosion or shoaling. The non-Federal interests for the project causing the erosion or shoaling shall agree to operate and maintain such measures. **(d) Non-Federal payments during construction** The amount of any non-Federal share of the cost of any navigation project for a harbor or inland harbor shall be paid to the Secretary. Amounts required to be paid during construction shall be paid on an annual basis during the period of construction, beginning not later than one year after construction is initiated. **(e) Agreement** Before initiation of construction of a project to which this section applies, the Secretary and the non-Federal interests shall enter into a cooperative agreement according to the provisions of [section 1962d–5b of title 42](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section1962d–5b&num=0&edition=prelim). The non-Federal interests shall agree to— (1) provide to the Federal Government lands, easements, and rights-of-way, including those necessary for dredged material disposal facilities, and perform the necessary relocations required for construction, operation, and maintenance of such project; (2) hold and save the United States free from damages due to the construction or operation and maintenance of the project, except for damages due to the fault or negligence of the United States or its contractors; (3) provide to the Federal Government the non-Federal share of all other costs of construction of such project; and (4) in the case of a deep-draft harbor, be responsible for the non-Federal share of operation and maintenance required by subsection (b) of this section. **(f) Consideration of funding requirements and equitable apportionment** The Secretary shall ensure, to the extent practicable, that— (1) funding requirements for operation and maintenance dredging of commercial navigation harbors are considered before Federal funds are obligated for payment of the Federal share of costs associated with the construction of dredged material disposal facilities in accordance with subsections (a) and (b); (2) funds expended for such construction are apportioned equitably in accordance with regional needs; and (3) use of a dredged material disposal facility designed, constructed, managed, or operated by a private entity is not precluded if, consistent with economic and environmental considerations, the facility is the least-cost alternative.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2216 — Treatment of certain benefits and costs

**(a) In general** In the case of a flood risk management or coastal storm risk management project in a region of moderate or high seismic hazard, for the purpose of a benefit-cost analysis for the project, the Secretary shall not include in that analysis any additional design and construction costs resulting from addressing seismic concerns. **(b) Savings provision** Except with respect to the benefit-cost analysis, the additional costs referred to in subsection (a) shall be— (1) included in the total project cost; and (2) subject to cost-share requirements otherwise applicable to the project.

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2216

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2201 — Prior project authorization

In any case in which a project under the jurisdiction of the Secretary is budgeted under a different business line than the business line under which the project was originally authorized, the Secretary shall ensure that the project is carried out in accordance with any requirements that apply to the business line under which the project was originally authorized.

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2201

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 1293a — Contained spoil disposal facilities

**(a) Construction, operation, and maintenance; period; conditions; requirements** The Secretary of the Army, acting through the Chief of Engineers, is authorized to construct, operate, and maintain, subject to the provisions of subsection (c), contained spoil disposal facilities of sufficient capacity for a period not to exceed ten years, to meet the requirements of this section. Before establishing each such facility, the Secretary of the Army shall obtain the concurrence of appropriate local governments and shall consider the views and recommendations of the Administrator of the Environmental Protection Agency and shall comply with requirements of [section 1171 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1171&num=0&edition=prelim), and of the National Environmental Policy Act of 1969 [[42 U.S.C. 4321](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section4321&num=0&edition=prelim) et seq.]. [Section 401 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section401&num=0&edition=prelim) shall not apply to any facility authorized by this section. **(b) Time for establishment; consideration of area needs; requirements** The Secretary of the Army, acting through the Chief of Engineers, shall establish the contained spoil disposal facilities authorized in subsection (a) at the earliest practicable date, taking into consideration the views and recommendations of the Administrator of the Environmental Protection Agency as to those areas which, in the Administrator’s judgment, are most urgently in need of such facilities and pursuant to the requirements of the National Environmental Policy Act of 1969 [[42 U.S.C. 4321](https://uscode.house.gov/view.xhtml?req=granuleid:USC-p

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 1293a

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2241 — Additional projects for underserved community harbors

**(a) In general** Subject to the availability of appropriations designated by statute as being for the purpose of carrying out this section, the Secretary may carry out projects for underserved community harbors for purposes of sustaining water-dependent commercial and recreational activities at such harbors and for purposes of contributing to ecosystem restoration. **(b) Beneficial use** (1) **Justification** — The Secretary may carry out a project under this section involving a disposal option for the beneficial use of dredged material that is not the least cost disposal option if the Secretary determines that the incremental cost of the disposal option is reasonable pursuant to the standard described in [section 2326(d)(1) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2326/d/1&num=0&edition=prelim). (2) **Cost share** — The non-Federal share of the incremental cost of a project carried out under this section involving a disposal option for the beneficial use of dredged material that is not the least cost disposal option shall be determined as provided under subsections (a) through (d) of [section 2213 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2213&num=0&edition=prelim). **(c) Prioritization** The Secretary shall prioritize carrying out projects using funds made available under this section based on an assessment of— (1) the local or regional economic benefits of the project; (2) the environmental benefits of the project, including the benefits to the aquatic environment to be derived from the creation of wetland and control of shoreline erosion; and (3) other social effects of the project, including protection against loss of life and contributions to local or region

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2241

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 1962d–5b — Delegation of functions

The Council is authorized to delegate to any member or employee of the Council its administrative functions under [section 1962a–4 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section1962a-4&num=0&edition=prelim) and the detailed administration of the grant program under subchapter III.

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 1962d–5b

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2232 — Water resources projects on Federal land

**(a) In general** Subject to subsection (b), the Secretary may carry out an authorized water resources development project on Federal land that is under the administrative jurisdiction of another Federal agency where the cost of the acquisition of such Federal land has been paid for by the non-Federal interest for the project. **(b) MOU required** The Secretary may carry out a project pursuant to subsection (a) only after the non-Federal interest has entered into a memorandum of understanding with the Federal agency that includes such terms and conditions as the Secretary determines to be necessary. **(c) Applicability** Nothing in this section alters any non-Federal cost-sharing requirements for the project.

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2232

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2203 — Managed aquifer recharge study and working group

**(a) Assessment** (1) **In general** — The Secretary shall, in consultation with applicable non-Federal interests, conduct a national assessment of carrying out managed aquifer recharge projects to address drought, water resiliency, and aquifer depletion at authorized water resources development projects. (2) **Requirements** — In carrying out paragraph (1), the Secretary shall— (A) assess and identify opportunities to support non-Federal interests, including Tribal communities, in carrying out managed aquifer recharge projects; and (B) assess preliminarily local hydrogeologic conditions relevant to carrying out managed aquifer recharge projects. (3) **Coordination** — In carrying out paragraph (1), the Secretary shall coordinate, as appropriate, with the heads of other Federal agencies, States, regional governmental agencies, units of local government, experts in managed aquifer recharge, and Tribes. **(b) Feasibility studies** (1) **Authorization** — The Secretary is authorized to carry out feasibility studies, at the request of a non-Federal interest, of managed aquifer recharge projects in areas that are experiencing, or have recently experienced, prolonged drought conditions, aquifer depletion, or water supply scarcity. (2) **Limitation** — The Secretary may carry out not more than 10 feasibility studies under this subsection. (3) **Use of information** — The Secretary shall, to the maximum extent practicable, use information gathered from the assessment conducted under subsection (a) in identifying and selecting feasibility studies to carry out under this subsection. (4) **Cost share** — The Federal share of the cost of a feasibility study carried out under this subsection shall be 90 percent. **(c) Working group** (1) **In general** — Not later t

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2203

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2309a — Control of ice

**(a) Program authority** The Secretary shall undertake a program of research for the control of ice, and to assist communities in breaking up ice, which otherwise is likely to cause or aggravate flood damage or severe streambank erosion. **(b) Assistance to units of local government** The Secretary is further authorized to provide technical assistance to units of local government to implement local plans to control or break up such ice. As part of such authority, the Secretary shall acquire necessary ice-control or ice-breaking equipment, which shall be loaned to units of local government together with operating assistance, where appropriate. **(c) Authorization of appropriations** There is authorized to be appropriated $5,000,000 per fiscal year for each of the fiscal years 1988, 1989, 1990, 1991, and 1992 for purposes of carrying out subsections (a) and (b) of this section, such sums to remain available until expended. **(d) Hardwick, Vermont, demonstration program** To implement further the purposes of this section, the Secretary, in consultation and cooperation with local officials, is authorized and directed to undertake a demonstration program for the control of ice at Hardwick, Vermont. The work authorized by this subsection shall be designed to minimize the danger of flooding due to ice problems in the vicinity of such community. In the design, construction, and location of ice-control structures for this project, full consideration will be given to the recreational, scenic, and environmental values of the reach of river affected by the project, in order to minimize project impacts on these values. Full opportunity shall be given to interested environmental and recreational organizations to participate in such planning. There is authorized to be appropriated

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2309a

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2326c — Regional sediment management

**(a) In general** (1) **Sediment use** (A) *Sediment from Federal water resources projects* — For sediment obtained through or used in the construction, operation, or maintenance of an authorized Federal water resources project, including a project authorized for flood control, the Secretary shall develop, at Federal expense, regional sediment management plans and carry out projects at locations identified in plans developed under this section, or identified jointly by the non-Federal interest and the Secretary, for use in the construction, repair, modification, or rehabilitation of projects, including projects for the beneficial use of dredged materials described in section 1122 of the Water Resources Development Act of 2016 ([33 U.S.C. 2326](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section2326&num=0&edition=prelim) note),11 See References in Text note below. associated with Federal water resources projects for purposes listed in paragraph (3). (B) *Sediment from other Federal sources and non-Federal sources* — For purposes of projects carried out under this section, the Secretary may include sediment from other Federal sources and non-Federal sources, subject to the requirement that any sediment obtained from a non-Federal source shall not be obtained at Federal expense. (2) **Cooperation** — The Secretary shall develop plans under this subsection in cooperation with the appropriate Federal, State, regional, and local agencies. (3) **Purposes for sediment use in projects** — The purposes of using sediment for the construction, repair, modification, or rehabilitation of Federal water resources projects are— (A) to reduce storm damage to property; (B) to protect, restore, and create aquatic and ecologically related habitats, i

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2326c

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2326d — Dredged material disposal facility partnerships

**(a) Additional capacity or replacement capacity** (1) **Provided by Secretary** (A) *In general* — Subject to subparagraph (B), at the request of a non-Federal interest with respect to a project, the Secretary may— (i) provide additional capacity at a dredged material disposal facility constructed by the Secretary beyond the capacity that would be required for project purposes; or (ii) permit the use of dredged material disposal facility capacity required for project purposes by the non-Federal interest if the Secretary determines that replacement capacity can be constructed at the facility or another facility or site before such capacity is needed for project purposes. (B) *Agreement* — Before the Secretary takes an action under subparagraph (A), the non-Federal interest shall agree to pay— (i) all costs associated with the construction of the additional capacity or replacement capacity in advance of construction of such capacity; and (ii) in the case of use by a non-Federal interest of dredged material disposal capacity required for project purposes under subparagraph (A)(ii), any increase in the cost of operation and maintenance of the project that the Secretary determines results from the use of the project capacity by the non-Federal interest in advance of each cycle of dredging. (C) *Credit* — In the event the Secretary determines that the cost to operate or maintain the project decreases as a result of use by the non-Federal interest of dredged material disposal capacity required for project purposes under subparagraph (A)(ii), the Secretary, at the request of the non-Federal interest, shall credit the amount of the decrease toward any cash contribution of the non-Federal interest required thereafter for construction, operation, or

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2326d

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.