Browse Arkansas Code titles and sections
43 U.S.C. § 1551 — Construction of Colorado River Basin Act
Federal law — U.S. Code and appendices · legal_authorities
Page 411
TITLE 43—PUBLIC LANDS
§ 1551
Subsec. (g). Pub. L. 98–569 inserted ‘‘the costs of
measures to replace incidental fish and wildlife values
foregone, and the costs of on-farm measures’’ before
‘‘payable from’’.
1974—Subsec. (g). Pub. L. 93–320 added cl. (2). Existing
cl. (2), authorizing the use of revenues to assist in the
repayment of reimbursable costs incurred in connec-
tion with units constructed after Sept. 30, 1968, to pro-
vide for the augmentation of water supplies of the Colo-
rado River for use below Lee Ferry, redesignated (3).
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 1984 AMENDMENT
Amendment by Pub. L. 98–569 effective Oct. 30, 1984,
see section 6 of Pub. L. 98–569, set out as a note under
section 1591 of this title.
TERMINATION OF REPORTING REQUIREMENTS
For termination, effective May 15, 2000, of provisions
of law requiring submittal to Congress of any annual,
semiannual, or other regular periodic report listed in
House Document No. 103–7 (in which a report required
under subsec. (i) of this section is listed as the 7th item
on page 114), see section 3003 of Pub. L. 104–66, as
amended, and section 1(a)(4) [div. A, § 1402(1)] of Pub. L.
106–554, set out as notes under section 1113 of Title 31,
Money and Finance.
LIMITATION ON FUNDS
Pub. L. 108–451, title I, § 107(b), Dec. 10, 2004, 118 Stat.
3498, provided that: ‘‘Amounts made available under
the amendment made by subsection (a) [amending this
section]—
‘‘(1) shall be identified and retained in the Lower
Colorado River Basin Development Fund established
by section 403 of the Colorado River Basin Project
Act (43 U.S.C. 1543); and
‘‘(2) shall not be expended or withdrawn from that
fund until the later of—
‘‘(A) the date on which the findings described in
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 1551
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 012ba4da030ef7a6b0238ef0ca89a2614d28ade7066f5de05a062bfae8ad3b34. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-2b5fb792d4497ba2591fd911
Source file: Laws/federal/codes/united-states-code-2024/title-43/section-1551-construction-of-colorado-river-basin-act--69d29d22cb.md
Pages: Not recorded – Not recorded
Passage SHA-256: 45e114f230166047100100a75cc8a6f2af36815d6865bbc39708578167e6263a
Source location: USCODE-2024-title43-chap32-subchapV-sec1551.pdf
Stored source content
Page 411
TITLE 43—PUBLIC LANDS
§ 1551
Subsec. (g). Pub. L. 98–569 inserted ‘‘the costs of
measures to replace incidental fish and wildlife values
foregone, and the costs of on-farm measures’’ before
‘‘payable from’’.
1974—Subsec. (g). Pub. L. 93–320 added cl. (2). Existing
cl. (2), authorizing the use of revenues to assist in the
repayment of reimbursable costs incurred in connec-
tion with units constructed after Sept. 30, 1968, to pro-
vide for the augmentation of water supplies of the Colo-
rado River for use below Lee Ferry, redesignated (3).
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 1984 AMENDMENT
Amendment by Pub. L. 98–569 effective Oct. 30, 1984,
see section 6 of Pub. L. 98–569, set out as a note under
section 1591 of this title.
TERMINATION OF REPORTING REQUIREMENTS
For termination, effective May 15, 2000, of provisions
of law requiring submittal to Congress of any annual,
semiannual, or other regular periodic report listed in
House Document No. 103–7 (in which a report required
under subsec. (i) of this section is listed as the 7th item
on page 114), see section 3003 of Pub. L. 104–66, as
amended, and section 1(a)(4) [div. A, § 1402(1)] of Pub. L.
106–554, set out as notes under section 1113 of Title 31,
Money and Finance.
LIMITATION ON FUNDS
Pub. L. 108–451, title I, § 107(b), Dec. 10, 2004, 118 Stat.
3498, provided that: ‘‘Amounts made available under
the amendment made by subsection (a) [amending this
section]—
‘‘(1) shall be identified and retained in the Lower
Colorado River Basin Development Fund established
by section 403 of the Colorado River Basin Project
Act (43 U.S.C. 1543); and
‘‘(2) shall not be expended or withdrawn from that
fund until the later of—
‘‘(A) the date on which the findings described in
section 207(c) [118 Stat. 3519] are published in the
Federal Register; or
‘‘(B) January 1, 2010.’’
PAYMENT FROM DEVELOPMENT FUND TO GENERAL FUND
OF TREASURY
Pub. L. 108–447, div. C, title II, § 203, Dec. 8, 2004, 118
Stat. 2948, provided that:
‘‘(a) IN GENERAL.—Notwithstanding section 403(f) of
the Colorado River Basin Project Act (43 U.S.C. 1543(f)),
no amount from the Lower Colorado River Basin Devel-
opment Fund shall be paid to the general fund of the
Treasury until each provision of the revised Stipula-
tion Regarding a Stay and for Ultimate Judgment
Upon the Satisfaction of Conditions, filed in United
States District Court on April 24, 2003, in Central Ari-
zona Water Conservation District v. United States (No.
CIV 95–625–TUC–WDB (EHC), No. CIV 95–1720–OHX–EHC
(Consolidated Action)), and any amendment or revision
thereof, is met.
‘‘(b) PAYMENT TO GENERAL FUND.—If any of the provi-
sions of the stipulation referred to in subsection (a) are
not met by the date that is 10 years after the date of
enactment of this Act [Dec. 8, 2004], payments to the
general fund of the Treasury shall resume in accord-
ance with section 403(f) of the Colorado River Basin
Project Act (43 U.S.C. 1543(f)).
‘‘(c) AUTHORIZATION.—Amounts in the Lower Colorado
River Basin Development Fund that but for this sec-
tion would be returned to the general fund of the Treas-
ury shall not be expended until further Act of Con-
gress.’’
Similar provisions were contained in the following
prior appropriation acts:
Pub. L. 108–137, title II, § 205, Dec. 1, 2003, 117 Stat.
1849.
Pub. L. 107–66, title II, § 204, Nov. 12, 2001, 115 Stat. 500.
§ 1544. Annual report to Congress
On January 1 of each year the Secretary shall
report to the Congress, beginning with the fiscal
year ending June 30, 1969, upon the status of the
revenues from and the cost of constructing, op-
erating, and maintaining each lower basin unit
of the project for the preceding fiscal year. The
report of the Secretary shall be prepared to re-
flect accurately the Federal investment allo-
cated at that time to power, to irrigation, and
to other purposes, the progress of return and re-
payment thereon, and the estimated rate of
progress, year by year, in accomplishing full re-
payment.
(Pub. L. 90–537, title IV, § 404, Sept. 30, 1968, 82
Stat. 896.)
SUBCHAPTER V—GENERAL PROVISIONS
§ 1551. Construction of Colorado River Basin Act
(a) Effect on other laws
Nothing in this chapter shall be construed to
alter, amend, repeal, modify, or be in conflict
with the provisions of the Colorado River Com-
pact (45 Stat. 1057), the Upper Colorado River
Basin Compact (63 Stat. 31), the Water Treaty of
1944 with the United Mexican States (Treaty Se-
ries 994; 59 Stat. 1219), the decree entered by the
Supreme Court of the United States in Arizona
against California and others (376 U.S. 340), or,
except as otherwise provided herein, the Boulder
Canyon Project Act (45 Stat. 1057) [43 U.S.C. 617
et seq.], the Boulder Canyon Project Adjustment
Act (54 Stat. 774), [43 U.S.C. 618 et seq.], or the
Colorado River Storage Project Act (70 Stat. 105)
[43 U.S.C. 620 et seq.].
(b) Reports to Congress
The Secretary is directed to—
(1) make reports as to the annual consump-
tive uses and losses of water from the Colo-
rado River system after each successive five-
year period, beginning with the five-year pe-
riod starting on October 1, 1970. Such reports
shall include a detailed breakdown of the ben-
eficial consumptive use of water on a State-
by-State basis. Specific figures on quantities
consumptively used from the major tributary
streams flowing into the Colorado River shall
also be included on a State-by-State basis.
Such reports shall be prepared in consultation
with the States of the lower basin individually
and with the Upper Colorado River Commis-
sion, and shall be transmitted to the Presi-
dent, the Congress, and to the Governors of
each State signatory to the Colorado River
Compact; and
(2) condition all contracts for the delivery of
water originating in the drainage basin of the
Colorado River system upon the availability of
water under the Colorado River Compact.
(c) Compliance of Federal officers and agencies
All Federal officers and agencies are directed
to comply with the applicable provisions of this
chapter, and of the laws, treaty, compacts, and
decree referred to in subsection (a) of this sec-
tion, in the storage and release of water from all
reservoirs and in the operation and maintenance
of all facilities in the Colorado River system
Page 412
TITLE 43—PUBLIC LANDS
§ 1552
under the jurisdiction and supervision of the
Secretary, and in the operation and mainte-
nance of all works which may be authorized
hereafter for the augmentation of the water sup-
ply of the Colorado River system. In the event of
failure of any such officer or agency to so com-
ply, any affected State may maintain an action
to enforce the provisions of this section in the
Supreme Court of the United States and consent
is given to the joinder of the United States as a
party in such suit or suits, as a defendant or
otherwise.
(Pub. L. 90–537, title VI, § 601, Sept. 30, 1968, 82
Stat. 899.)
Editorial Notes
REFERENCES IN TEXT
This chapter, referred to in subsecs. (a) and (c), was
in the original ‘‘this Act’’, meaning Pub. L. 90–537,
Sept. 30, 1968, 82 Stat. 885, known as the Colorado River
Basin Project Act, which enacted this chapter and sec-
tions 616aa–1, 620a–1, 620a–2, 620c–1, and 620d–1 of this
title, amended sections 616hh, 620, and 620a of this title,
and enacted provisions set out as notes under sections
620, 620k, and 1501 of this title. For complete classifica-
tion of this Act to the Code, see Short Title note set
out under section 1501 of this title and Tables.
The Boulder Canyon Project Act, referred to in sub-
sec. (a), is act Dec. 21, 1928, ch. 42, 45 Stat. 1057, which
is classified generally to subchapter I (§ 617 et seq.) of
chapter 12A of this title. For complete classification of
this Act to the Code, see section 617t of this title and
Tables.
The Boulder Canyon Project Adjustment Act, re-
ferred to in subsec. (a), is act July 19, 1940, ch. 643, 54
Stat. 774, which is classified generally to subchapter II
(§ 618 et seq.) of chapter 12A of this title. For complete
classification of this Act to the Code, see section 618o
of this title and Tables.
The Colorado River Storage Project Act, referred to
in subsec. (a), is act Apr. 11, 1956, ch. 203, 70 Stat. 105,
which is classified generally to chapter 12B (§ 620 et
seq.) of this title. For complete classification of this
Act to the Code, see Short Title note set out under sec-
tion 620 of this title and Tables.
TERMINATION OF REPORTING REQUIREMENTS
For termination, effective May 15, 2000, of provisions
in subsec. (b)(1) of this section relating to the require-
ment that the Secretary transmit a report to Congress
every five years, see section 3003 of Pub. L. 104–66, as
amended, set out as a note under section 1113 of Title
31, Money and Finance, and the 9th item on page 114 of
House Document No. 103–7.
§ 1552. Criteria for long-range operation of res-
ervoirs
(a) Promulgation by Secretary; order of prior-
ities
In order to comply with and carry out the pro-
visions of the Colorado River Compact, the
Upper Colorado River Basin Compact, and the
Mexican Water Treaty, the Secretary shall pro-
pose criteria for the coordinated long-range op-
eration of the reservoirs constructed and oper-
ated under the authority of the Colorado River
Storage Project Act [43 U.S.C. 620 et seq.], the
Boulder Canyon Project Act [43 U.S.C. 617 et
seq.], and the Boulder Canyon Project Adjust-
ment Act [43 U.S.C. 618 et seq.]. To effect in part
the purposes expressed in this paragraph, the
criteria shall make provision for the storage of
water in storage units of the Colorado River
storage project and releases of water form Lake
Powell in the following listed order of priority:
(1) releases to supply one-half the deficiency
described in article III(c) of the Colorado
River Compact, if any such deficiency exists
and is chargeable to the States of the Upper
Division, but in any event such releases, if
any, shall not be required in any year that the
Secretary makes the determination and issues
the proclamation specified in section 1512 of
this title;
(2) releases to comply with article III(d) of
the Colorado River Compact, less such quan-
tities of water delivered into the Colorado
River below Lee Ferry to the credit of the
States of the Upper Division from other
sources; and
(3) storage of water not required for the re-
leases specified in clauses (1) and (2) of this
subsection to the extent that the Secretary,
after consultation with the Upper Colorado
River Commission and representatives of the
three Lower Division States and taking into
consideration all relevant factors (including,
but not limited to, historic stream-flows, the
most critical period of record, and prob-
abilities of water supply), shall find this to be
reasonably necessary to assure deliveries
under clauses (1) and (2) without impairment
of annual consumptive uses in the upper basin
pursuant to the Colorado River Compact: Pro-
vided, That water not so required to be stored
shall be released from Lake Powell: (i) to the
extent it can be reasonably applied in the
States of the Lower Division to the uses speci-
fied in article III(e) of the Colorado River
Compact, but no such releases shall be made
when the active storage in Lake Powell is less
than the active storage in Lake Mead, (ii) to
maintain, as nearly as practicable, active stor-
age in Lake Mead equal to the active storage
in Lake Powell, and (iii) to avoid anticipated
spills from Lake Powell.
(b) Submittal of criteria for review and com-
ment; publication; report to Congress
Not later than January 1, 1970, the criteria
proposed in accordance with the foregoing sub-
section (a) of this section shall be submitted to
the Governors of the seven Colorado River Basin
States and to such other parties and agencies as
the Secretary may deem appropriate for their
review and comment. After receipt of comments
on the proposed criteria, but not later than July
1, 1970, the Secretary shall adopt appropriate
criteria in accordance with this section and pub-
lish the same in the Federal Register. Beginning
January 1, 1972, and yearly thereafter, the Sec-
retary shall transmit to the Congress and to the
Governors of the Colorado River Basin States a
report describing the actual operation under the
adopted criteria for the preceding compact
water year and the projected operation for the
current year. As a result of actual operating ex-
perience or unforeseen circumstances, the Sec-
retary may thereafter modify the criteria to
better achieve the purposes specified in sub-
section (a) of this section, but only after cor-
respondence with the Governors of the seven
Colorado River Basin States and appropriate
consultation with such State representatives as
each Governor may designate.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Establishment** There is hereby established a separate fund in the Treasury of the United States to be known as the Lower Colorado River Basin Development Fund (hereafter called the “development fund”), which shall remain available until expended as hereafter provided.
**(b) Appropriations**
(1) All appropriations made for the purpose of carrying out the provisions of subchapter III of this chapter shall be credited to the development fund as advances from the general fund of the Treasury, and shall be available for such purpose.
(2) Except as provided in [section 1528(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1528/b&num=0&edition=prelim), sums advanced by non-Federal entities for the purpose of carrying out the provisions of subchapter III of this chapter shall be credited to the development fund and shall be available without further appropriation for such purpose.
**(c) Revenues credited to fund** There shall also be credited to the development fund—
(1) all revenues collected in connection with the operation of facilities authorized in subchapter III in furtherance of the purposes of this chapter (except entrance, admission, and other recreation fees or charges and proceeds received from recreation concessionaires), until completion of repayment requirements of the Central Arizona project;
(2) any Federal revenues from the Boulder Canyon and Parker-Davis projects which, after completion of repayment requirements of the said Boulder Canyon and Parker-Davis projects, are surplus, as determined by the Secretary, to the operation, maintenance, and replacement requirements of those projects: Provided, however, That for the Boulder Canyon project commencing June 1, 1987, and for the Parker-Davis project comme
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1543
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 1543. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 407
TITLE 43—PUBLIC LANDS
§ 1543
§ 1542. Repayment capability of Indian lands
The Secretary shall determine the repayment
capability of Indian lands within, under, or
served by any unit of the project. Construction
costs allocated to irrigation of Indian lands (in-
cluding provision of water for incidental domes-
tic and stock water uses) and within the repay-
ment capability of such lands shall be subject to
section 386a of title 25, and such costs that are
beyond repayment capability of such lands shall
be nonreimbursable.
(Pub. L. 90–537, title IV, § 402, Sept. 30, 1968, 82
Stat. 894.)
§ 1543. Lower Colorado River Basin Development
Fund
(a) Establishment
There is hereby established a separate fund in
the Treasury of the United States to be known
as the Lower Colorado River Basin Development
Fund (hereafter called the ‘‘development fund’’),
which shall remain available until expended as
hereafter provided.
(b) Appropriations
(1) All appropriations made for the purpose of
carrying out the provisions of subchapter III of
this chapter shall be credited to the develop-
ment fund as advances from the general fund of
the Treasury, and shall be available for such
purpose.
(2) Except as provided in section 1528(b) of this
title, sums advanced by non-Federal entities for
the purpose of carrying out the provisions of
subchapter III of this chapter shall be credited
to the development fund and shall be available
without further appropriation for such purpose.
(c) Revenues credited to fund
There shall also be credited to the develop-
ment fund—
(1) all revenues collected in connection with
the operation of facilities authorized in sub-
chapter III in furtherance of the purposes of
this chapter (except entrance, admission, and
other recreati
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 1543
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 1543. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Effect on other laws** Nothing in this chapter shall be construed to alter, amend, repeal, modify, or be in conflict with the provisions of the Colorado River Compact (45 Stat. 1057), the Upper Colorado River Basin Compact (63 Stat. 31), the Water Treaty of 1944 with the United Mexican States (Treaty Series 994; 59 Stat. 1219), the decree entered by the Supreme Court of the United States in Arizona against California and others (376 U.S. 340), or, except as otherwise provided herein, the Boulder Canyon Project Act (45 Stat. 1057) [[43 U.S.C. 617](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section617&num=0&edition=prelim) et seq.], the Boulder Canyon Project Adjustment Act (54 Stat. 774), [[43 U.S.C. 618](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618&num=0&edition=prelim) et seq.], or the Colorado River Storage Project Act (70 Stat. 105) [[43 U.S.C. 620](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section620&num=0&edition=prelim) et seq.].
**(b) Reports to Congress** The Secretary is directed to—
(1) make reports as to the annual consumptive uses and losses of water from the Colorado River system after each successive five-year period, beginning with the five-year period starting on October 1, 1970. Such reports shall include a detailed breakdown of the beneficial consumptive use of water on a State-by-State basis. Specific figures on quantities consumptively used from the major tributary streams flowing into the Colorado River shall also be included on a State-by-State basis. Such reports shall be prepared in consultation with the States of the lower basin individually and with the Upper Colorado River Commission, and shall be transmitted to the President, the Congress, and to t
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1551
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.
Federal law — U.S. Code and appendices · legal_authorities
For the purpose of controlling the floods, improving navigation, and regulating the flow of the Colorado River, providing for storage and for the delivery of the stored waters thereof for reclamation of public lands and other beneficial uses exclusively within the United States, and for the generation of electrical energy as a means of making the project herein authorized a self-supporting and financially solvent undertaking, the Secretary of the Interior subject to the terms of the Colorado River compact hereinafter mentioned in this chapter, is authorized to construct, operate, and maintain a dam and incidental works in the main stream of the Colorado River at Black Canyon or Boulder Canyon adequate to create a storage reservoir of a capacity of not less than twenty million acre-feet of water and a main canal and appurtenant structures located entirely within the United States connecting the Laguna Dam, or other suitable diversion dam, which the Secretary of the Interior is authorized to construct if deemed necessary or advisable by him upon engineering or economic considerations, with the Imperial and Coachella Valleys in California, the expenditures for said main canal and appurtenant structures to be reimbursable, as provided in the reclamation law, and shall not be paid out of revenues derived from the sale or disposal of water power or electric energy at the dam authorized to be constructed at said Black Canyon or Boulder Canyon, or for water for potable purposes outside of the Imperial and Coachella Valleys: Provided, however, That no charge shall be made for water for the use, storage, or delivery of water for irrigation or water for potable purposes in the Imperial or Coachella Valleys; also to construct and equip, operate, and maintain at or near said dam, or
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 617
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 617. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 209
TITLE 43—PUBLIC LANDS
§ 617
Sec.
618i.
Effective date.
618j.
Effect of refusal to modify existing contracts.
618k.
Definitions.
618l.
Repealed.
618m.
Effect on existing laws and States’ rights.
618n.
Wages of employees.
618o.
Short title.
618p.
Omitted.
SUBCHAPTER III—HOOVER DAM CONTRACTS AND
FACILITIES
619.
Increase in capacity of existing generating
equipment at Hoover Powerplant; construc-
tion of Colorado River bridge crossing.
619a.
Renewal contracts for power.
619b.
Reimbursement of funds advanced by non-
Federal purchasers; uprating program; re-
payment requirement; visitor facilities pro-
gram.
Statutory Notes and Related Subsidiaries
CONSOLIDATION OF CERTAIN PROJECTS; EFFECT ON THIS
CHAPTER
Act May 28, 1954, ch. 241, 68 Stat. 143, provided that:
‘‘For the purposes of effecting economies and in-
creased efficiency in the construction, operation, and
maintenance thereof and of accounting for the return
of reimbursable costs, the Secretary of the Interior is
authorized and directed to consolidate and administer
as a single project to be known as the Parker-Davis
project, Arizona-California-Nevada, the projects known
as the Parker Dam power project, Arizona-California,
and the Davis Dam project, Arizona-Nevada: Provided,
That nothing in this Act shall be construed to alter or
affect in any way the Boulder Canyon Project Act (45
Stat. 1057) [subchapter I of this chapter], the Boulder
Canyon Project Adjustment Act (54 Stat. 774) [sub-
chapter II of this chapter], or the treaty between the
United States of America and the United Mexican
States, signed at Washington on February 3, 1944, relat-
ing to the utilization of the waters of the Colorado and
Tijuana Rivers and of the Rio Grande from Fort
Quitman, Texas, to th
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 617
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 617. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
The Secretary of the Interior is authorized and directed to, and he shall, promulgate charges, or the basis of computation thereof, for electrical energy generated at Hoover Dam beginning June 1, 1937, computed to be sufficient, together with other net revenues from the project, to accomplish the following purposes:
**(a)** To meet the cost of operation and maintenance, and to provide for replacements, of the project beginning June 1, 1937;
**(b)** To repay to the Treasury, with interest, the advances to the Colorado River Dam Fund for the project made prior to June 1, 1937, within fifty years from that date (excluding advances allocated to flood control by [section 617a(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section617a/b&num=0&edition=prelim), which shall be repayable as provided in [section 618f of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618f&num=0&edition=prelim)), and such advances made on and after June 1, 1937, over fifty-year periods;
**(c)** To provide $600,000 for each of the years and for the purposes specified in [section 618a(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618a/c&num=0&edition=prelim);
**(d)** To provide $500,000 for each of the years and for the purposes specified in [section 618a(d) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618a/d&num=0&edition=prelim); and
**(e)** To provide, by application of the increments to rates specified in section 403(c)(2) of the Colorado River Basin Project Act of 1968, as amended and supplemented [[43 U.S.C. 1543(c)(2)](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1543/c/2&num=0&edition=p
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 618
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 618. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 217
TITLE 43—PUBLIC LANDS
§ 618
islature of each of such States and by the Con-
gress of the United States.
(Dec. 21, 1928, ch. 42, § 19, 45 Stat. 1065.)
§ 617s. Recognition of rights of Mexico to Colo-
rado River waters
Nothing in this subchapter shall be construed
as a denial or recognition of any rights, if any,
in Mexico to the use of the waters of the Colo-
rado River system.
(Dec. 21, 1928, ch. 42, § 20, 45 Stat. 1066.)
§ 617t. Short title
The short title of this subchapter shall be
‘‘Boulder Canyon Project Act.’’
(Dec. 21, 1928, ch. 42, § 21, 45 Stat. 1066.)
§ 617u. Lease of reserved lands in Boulder City,
Nevada; disposition of revenues
The Secretary of the Interior is authorized and
empowered, under such rules and regulations as
he may prescribe, to establish rental rates for
the lease of reserved lands of the United States
situate within the exterior boundaries of Boul-
der City, Nevada, and, without prior advertising,
to enter into leases therefor at not less than
rates so established and for periods not exceed-
ing fifty-three years from the date of such
leases: Provided, That all revenues which may
accrue to the United States under the provisions
of such leases shall be deposited in the Treasury
and credited to the Colorado River Dam fund es-
tablished by section 617a of this title.
(June 18, 1940, ch. 395, 54 Stat. 437.)
Editorial Notes
CODIFICATION
Section was not enacted as part of the Boulder Can-
yon Project Act which comprises this subchapter.
Statutory Notes and Related Subsidiaries
BOULDER CITY ACT OF 1958
Public Law 85–900, Sept. 2, 1958, 72 Stat. 1726, provided
for disposal of certain Federal property in Boulder City
for purposes of establishment of a municipal corpora-
tion incorporated under laws of Nevada.
§ 61
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 618
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 618. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
In order to initiate the comprehensive development of the water resources of the Upper Colorado River Basin, for the purposes, among others, of regulating the flow of the Colorado River, storing water for beneficial consumptive use, making it possible for the States of the Upper Basin to utilize, consistently with the provisions of the Colorado River Compact, the apportionments made to and among them in the Colorado River Compact and the Upper Colorado River Basin Compact, respectively, providing for the reclamation of arid and semiarid land, for the control of floods, and for the generation of hydroelectric power, as an incident of the foregoing purposes, the Secretary of the Interior is authorized (1) to construct, operate, and maintain the following initial units of the Colorado River storage project, consisting of dams, reservoirs, powerplants, transmission facilities and appurtenant works: Wayne N. Aspinall, Flaming Gorge, Navajo (dam and reservoir only), and Glen Canyon: Provided, That the Wayne N. Aspinall Dam shall be constructed to a height which will impound not less than nine hundred and forty thousand acre-feet of water or will create a reservoir of such greater capacity as can be obtained by a high waterline located at seven thousand five hundred and twenty feet above mean sea level, and that construction thereof shall not be undertaken until the Secretary has, on the basis of further engineering and economic investigations, reexamined the economic justification of such unit and, accompanied by appropriate documentation in the form of a supplemental report, has certified to the Congress and to the President that, in his judgment, the benefits of such unit will exceed its costs; and (2) to construct, operate, and maintain the following additional reclamation
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 620
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 620. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 228
TITLE 43—PUBLIC LANDS
§ 620
Sec.
620d.
Upper Colorado River Basin Fund.
620d–1.
Reimbursement of Fund from Colorado River
Development Fund; operation of Hoover
Dam.
620e.
Cost allocations; Indian lands; report to Con-
gress.
620f.
Powerplant operations.
620g.
Recreational and fish and wildlife facilities.
620h.
Saving provisions.
620i.
Expenditures; units excepted from soil survey
and land classification requirements.
620j.
Court decree; effectivity and approval.
620k.
Authorization of appropriations.
620l.
Net power revenues.
620m.
Compliance with law required in operation of
facilities; enforcement of provisions.
620n.
Water quality study and reports.
620n–1.
Top water bank.
620o.
Definitions.
§ 620. Upper Colorado River Basin; purpose of
development of water resources; initial units;
construction of Wayne N. Aspinall unit con-
tingent
upon
certification;
participating
projects; Rainbow Bridge National Monu-
ment
In order to initiate the comprehensive devel-
opment of the water resources of the Upper Col-
orado River Basin, for the purposes, among oth-
ers, of regulating the flow of the Colorado River,
storing water for beneficial consumptive use,
making it possible for the States of the Upper
Basin to utilize, consistently with the provi-
sions of the Colorado River Compact, the appor-
tionments made to and among them in the Colo-
rado River Compact and the Upper Colorado
River Basin Compact, respectively, providing for
the reclamation of arid and semiarid land, for
the control of floods, and for the generation of
hydroelectric power, as an incident of the fore-
going purposes, the Secretary of the Interior is
authorized (1) to construct, operate, and main-
tain the following initial units of the Colorado
Rive
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 620
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 620. This identifies an authority to review, not proof of applicability.