16 U.S.C. § 808 — New licenses and renewals

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 808 — New licenses and renewals

**(a) Relicensing procedures; terms and conditions; issuance to applicant with proposal best adapted to serve public interest; factors considered** (1) If the United States does not, at the expiration of the existing license, exercise its right to take over, maintain, and operate any project or projects of the licensee, as provided in [section 807 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section807&num=0&edition=prelim), the commission is authorized to issue a new license to the existing licensee upon such terms and conditions as may be authorized or required under the then existing laws and regulations, or to issue a new license under said terms and conditions to a new licensee, which license may cover any project or projects covered by the existing license, and shall be issued on the condition that the new licensee shall, before taking possession of such project or projects, pay such amount, and assume such contracts as the United States is required to do in the manner specified in [section 807 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section807&num=0&edition=prelim): Provided, That in the event the United States does not exercise the right to take over or does not issue a license to a new licensee, or issue a new license to the existing licensee, upon reasonable terms, then the commission shall issue from year to year an annual license to the then licensee under the terms and conditions of the existing license until the property is taken over or a new license is issued as aforesaid. (2) Any new license issued under this section shall be issued to the applicant having the final proposal which the Commission determines is best adapted to serve the public interest, except that in mak

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 808

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: aedf917155fd5bd3f1e40f77e4d6fb90c07f3f062eded741a1fdf2de99c67e2f. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_a358cb4d576c338af2e0742d
Source file: Laws/federal/codes/united-states-code/title-16/section-808-new-licenses-and-renewals--a65cfdbe49.md
Pages: Not recorded – Not recorded
Passage SHA-256: 07f35b381f1944dbee69b4db2785c30130f6c83a007d3de5fefe91119660113d

Source location: Title 16, Chapter 12, § 808; chapter-012-federal-regulation-and-development-of-power.md

Stored source content

**(a) Relicensing procedures; terms and conditions; issuance to applicant with proposal best adapted to serve public interest; factors considered** (1) If the United States does not, at the expiration of the existing license, exercise its right to take over, maintain, and operate any project or projects of the licensee, as provided in [section 807 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section807&num=0&edition=prelim), the commission is authorized to issue a new license to the existing licensee upon such terms and conditions as may be authorized or required under the then existing laws and regulations, or to issue a new license under said terms and conditions to a new licensee, which license may cover any project or projects covered by the existing license, and shall be issued on the condition that the new licensee shall, before taking possession of such project or projects, pay such amount, and assume such contracts as the United States is required to do in the manner specified in [section 807 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section807&num=0&edition=prelim): Provided, That in the event the United States does not exercise the right to take over or does not issue a license to a new licensee, or issue a new license to the existing licensee, upon reasonable terms, then the commission shall issue from year to year an annual license to the then licensee under the terms and conditions of the existing license until the property is taken over or a new license is issued as aforesaid. (2) Any new license issued under this section shall be issued to the applicant having the final proposal which the Commission determines is best adapted to serve the public interest, except that in making this determination the Commission shall ensure that insignificant differences with regard to subparagraphs (A) through (G) of this paragraph between competing applications are not determinative and shall not result in the transfer of a project. In making a determination under this section (whether or not more than one application is submitted for the project), the Commission shall, in addition to the requirements of [section 803 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section803&num=0&edition=prelim), consider (and explain such consideration in writing) each of the following: (A) The plans and abilities of the applicant to comply with (i) the articles, terms, and conditions of any license issued to it and (ii) other applicable provisions of this subchapter. (B) The plans of the applicant to manage, operate, and maintain the project safely. (C) The plans and abilities of the applicant to operate and maintain the project in a manner most likely to provide efficient and reliable electric service. (D) The need of the applicant over the short and long term for the electricity generated by the project or projects to serve its customers, including, among other relevant considerations, the reasonable costs and reasonable availability of alternative sources of power, taking into consideration conservation and other relevant factors and taking into consideration the effect on the provider (including its customers) of the alternative source of power, the effect on the applicant’s operating and load characteristics, the effect on communities served or to be served by the project, and in the case of an applicant using power for the applicant’s own industrial facility and related operations, the effect on the operation and efficiency of such facility or related operations, its workers, and the related community. In the case of an applicant that is an Indian tribe applying for a license for a project located on the tribal reservation, a statement of the need of such tribe for electricity generated by the project to foster the purposes of the reservation may be included. (E) The existing and planned transmission services of the applicant, taking into consideration system reliability, costs, and other applicable economic and technical factors. (F) Whether the plans of the applicant will be achieved, to the greatest extent possible, in a cost effective manner. (G) Such other factors as the Commission may deem relevant, except that the terms and conditions in the license for the protection, mitigation, or enhancement of fish and wildlife resources affected by the development, operation, and management of the project shall be determined in accordance with [section 803 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section803&num=0&edition=prelim), and the plans of an applicant concerning fish and wildlife shall not be subject to a comparative evaluation under this subsection. (3) In the case of an application by the existing licensee, the Commission shall also take into consideration each of the following: (A) The existing licensee’s record of compliance with the terms and conditions of the existing license. (B) The actions taken by the existing licensee related to the project which affect the public. **(b) Notification of intention regarding renewal; public availability of documents; notice to public and Federal agencies; identification of Federal or Indian lands included; additional information required** (1) Each existing licensee shall notify the Commission whether the licensee intends to file an application for a new license or not. Such notice shall be submitted at least 5 years before the expiration of the existing license. (2) At the time notice is provided under paragraph (1), the existing licensee shall make each of the following reasonably available to the public for inspection at the offices of such licensee: current maps, drawings, data, and such other information as the Commission shall, by rule, require regarding the construction and operation of the licensed project. Such information shall include, to the greatest extent practicable pertinent energy conservation, recreation, fish and wildlife, and other environmental information. Copies of the information shall be made available at reasonable costs of reproduction. Within 180 days after October 16, 1986, the Commission shall promulgate regulations regarding the information to be provided under this paragraph. (3) Promptly following receipt of notice under paragraph (1), the Commission shall provide public notice of whether an existing licensee intends to file or not to file an application for a new license. The Commission shall also promptly notify the National Marine Fisheries Service and the United States Fish and Wildlife Service, and the appropriate State fish and wildlife agencies. (4) The Commission shall require the applicant to identify any Federal or Indian lands included in the project boundary, together with a statement of the annual fees paid as required by this subchapter for such lands, and to provide such additional information as the Commission deems appropriate to carry out the Commission’s responsibilities under this section. **(c) Time of filing application; consultation and participation in studies with fish and wildlife agencies; notice to applicants; adjustment of time periods** (1) Each application for a new license pursuant to this section shall be filed with the Commission at least 24 months before the expiration of the term of the existing license. Each applicant shall consult with the fish and wildlife agencies referred to in subsection (b) and, as appropriate, conduct studies with such agencies. Within 60 days after the statutory deadline for the submission of applications, the Commission shall issue a notice establishing expeditious procedures for relicensing and a deadline for submission of final amendments, if any, to the application. (2) The time periods specified in this subsection and in subsection (b) shall be adjusted, in a manner that achieves the objectives of this section, by the Commission by rule or order with respect to existing licensees who, by reason of the expiration dates of their licenses, are unable to comply with a specified time period. **(d) Adequacy of transmission facilities; provision of services to successor by existing licensee; tariff; final order; modification, extension or termination of order** (1) In evaluating applications for new licenses pursuant to this section, the Commission shall not consider whether an applicant has adequate transmission facilities with regard to the project. (2) When the Commission issues a new license (pursuant to this section) to an applicant which is not the existing licensee of the project and finds that it is not feasible for the new licensee to utilize the energy from such project without provision by the existing licensee of reasonable services, including transmission services, the Commission shall give notice to the existing licensee and the new licensee to immediately enter into negotiations for such services and the costs demonstrated by the existing licensee as being related to the provision of such services. It is the intent of the Congress that such negotiations be carried out in good faith and that a timely agreement be reached between the parties in order to facilitate the transfer of the license by the date established when the Commission issued the new license. If such parties do not notify the Commission that within the time established by the Commission in such notice (and if appropriate, in the judgment of the Commission, one 45-day extension thereof), a mutually satisfactory arrangement for such services that is consistent with the provisions of this chapter has been executed, the Commission shall order the existing licensee to file (pursuant to [section 824d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section824d&num=0&edition=prelim)) with the Commission a tariff, subject to refund, ensuring such services beginning on the date of transfer of the project and including just and reasonable rates and reasonable terms and conditions. After notice and opportunity for a hearing, the Commission shall issue a final order adopting or modifying such tariff for such services at just and reasonable rates in accordance with [section 824d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section824d&num=0&edition=prelim) and in accordance with reasonable terms and conditions. The Commission, in issuing such order, shall ensure the services necessary for the full and efficient utilization and benefits for the license term of the electric energy from the project by the new licensee in accordance with the license and this subchapter, except that in issuing such order the Commission— (A) shall not compel the existing licensee to enlarge generating facilities, transmit electric energy other than to the distribution system (providing service to customers) of the new licensee identified as of the date one day preceding the date of license award, or require the acquisition of new facilities, including the upgrading of existing facilities other than any reasonable enhancement or improvement of existing facilities controlled by the existing licensee (including any acquisition related to such enhancement or improvement) necessary to carry out the purposes of this paragraph; (B) shall not adversely affect the continuity and reliability of service to the customers of the existing licensee; (C) shall not adversely affect the operational integrity of the transmission and electric systems of the existing licensee; (D) shall not cause any reasonably quantifiable increase in the jurisdictional rates of the existing licensee; and (E) shall not order any entity other than the existing licensee to provide transmission or other services. Such order shall be for such period as the Commission deems appropriate, not to exceed the term of the license. At any time, the Commission, upon its own motion or upon a petition by the existing or new licensee and after notice and opportunity for a hearing, may modify, extend, or terminate such order. **(e) License term on relicensing** Except for an annual license, any license issued by the Commission under this section shall be for a term which the Commission determines to be in the public interest but not less than 30 years, nor more than 50 years, from the date on which the license is issued. **(f) Nonpower use licenses; recordkeeping** In issuing any licenses under this section except an annual license, the Commission, on its own motion or upon application of any licensee, person, State, municipality, or State commission, after notice to each State commission and licensee affected, and after opportunity for hearing, whenever it finds that in conformity with a comprehensive plan for improving or developing a waterway or waterways for beneficial public uses all or part of any licensed project should no longer be used or adapted for use for power purposes, may license all or part of the project works for nonpower use. A license for nonpower use shall be issued to a new licensee only on the condition that the new licensee shall, before taking possession of the facilities encompassed thereunder, pay such amount and assume such contracts as the United States is required to do, in the manner specified in [section 807 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section807&num=0&edition=prelim). Any license for nonpower use shall be a temporary license. Whenever, in the judgment of the Commission, a State, municipality, interstate agency, or another Federal agency is authorized and willing to assume regulatory supervision of the lands and facilities included under the nonpower license and does so, the Commission shall thereupon terminate the license. Consistent with the provisions of subchapter IV of this chapter, every licensee for nonpower use shall keep such accounts and file such annual and other periodic or special reports concerning the removal, alteration, nonpower use, or other disposition of any project works or parts thereof covered by the nonpower use license as the Commission may by rules and regulations or order prescribe as necessary or appropriate.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 824d — Rates and charges; schedules; suspension of new rates; automatic adjustment clauses

**(a) Just and reasonable rates** All rates and charges made, demanded, or received by any public utility for or in connection with the transmission or sale of electric energy subject to the jurisdiction of the Commission, and all rules and regulations affecting or pertaining to such rates or charges shall be just and reasonable, and any such rate or charge that is not just and reasonable is hereby declared to be unlawful. **(b) Preference or advantage unlawful** No public utility shall, with respect to any transmission or sale subject to the jurisdiction of the Commission, (1) make or grant any undue preference or advantage to any person or subject any person to any undue prejudice or disadvantage, or (2) maintain any unreasonable difference in rates, charges, service, facilities, or in any other respect, either as between localities or as between classes of service. **(c) Schedules** Under such rules and regulations as the Commission may prescribe, every public utility shall file with the Commission, within such time and in such form as the Commission may designate, and shall keep open in convenient form and place for public inspection schedules showing all rates and charges for any transmission or sale subject to the jurisdiction of the Commission, and the classifications, practices, and regulations affecting such rates and charges, together with all contracts which in any manner affect or relate to such rates, charges, classifications, and services. **(d) Notice required for rate changes** Unless the Commission otherwise orders, no change shall be made by any public utility in any such rate, charge, classification, or service, or in any rule, regulation, or contract relating thereto, except after sixty days’ notice to the Commission and to the public. Such notice

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 824d

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 803 — Conditions of license generally

All licenses issued under this subchapter shall be on the following conditions: **(a) Modification of plans; factors considered to secure adaptability of project; recommendations for proposed terms and conditions** (1) That the project adopted, including the maps, plans, and specifications, shall be such as in the judgment of the Commission will be best adapted to a comprehensive plan for improving or developing a waterway or waterways for the use or benefit of interstate or foreign commerce, for the improvement and utilization of water-power development, for the adequate protection, mitigation, and enhancement of fish and wildlife (including related spawning grounds and habitat), and for other beneficial public uses, including irrigation, flood control, water supply, and recreational and other purposes referred to in [section 797(e) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section797/e&num=0&edition=prelim) 11 So in original. Probably should be followed by “; and”. if necessary in order to secure such plan the Commission shall have authority to require the modification of any project and of the plans and specifications of the project works before approval. (2) In order to ensure that the project adopted will be best adapted to the comprehensive plan described in paragraph (1), the Commission shall consider each of the following: (A) The extent to which the project is consistent with a comprehensive plan (where one exists) for improving, developing, or conserving a waterway or waterways affected by the project that is prepared by— (i) an agency established pursuant to Federal law that has the authority to prepare such a plan; or (ii) the State in which the facility is or will be located. (B) The recommendatio

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 803

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 807 — Right of Government to take over project works

**(a) Compensation; condemnation by Federal or State Government** Upon not less than two years’ notice in writing from the commission the United States shall have the right upon or after the expiration of any license to take over and thereafter to maintain and operate any project or projects as defined in [section 796 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section796&num=0&edition=prelim), and covered in whole or in part by the license, or the right to take over upon mutual agreement with the licensee all property owned and held by the licensee then valuable and serviceable in the development, transmission, or distribution of power and which is then dependent for its usefulness upon the continuance of the license, together with any lock or locks or other aids to navigation constructed at the expense of the licensee, upon the condition that before taking possession it shall pay the net investment of the licensee in the project or projects taken, not to exceed the fair value of the property taken, plus such reasonable damages, if any, to property of the licensee valuable, serviceable, and dependent as above set forth but not taken, as may be caused by the severance therefrom of property taken, and shall assume all contracts entered into by the licensee with the approval of the Commission. The net investment of the licensee in the project or projects so taken and the amount of such severance damages, if any, shall be determined by the Commission after notice and opportunity for hearing. Such net investment shall not include or be affected by the value of any lands, rights-of-way, or other property of the United States licensed by the Commission under this chapter, by the license or by good will, going value, or prospective reven

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 807

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 797 — General powers of Commission

The Commission is authorized and empowered— **(a) Investigations and data** To make investigations and to collect and record data concerning the utilization of the water resources of any region to be developed, the water-power industry and its relation to other industries and to interstate or foreign commerce, and concerning the location, capacity, development costs, and relation to markets of power sites, and whether the power from Government dams can be advantageously used by the United States for its public purposes, and what is a fair value of such power, to the extent the Commission may deem necessary or useful for the purposes of this chapter. **(b) Statements as to investment of licensees in projects; access to projects, maps, etc.** To determine the actual legitimate original cost of and the net investment in a licensed project, and to aid the Commission in such determinations, each licensee shall, upon oath, within a reasonable period of time to be fixed by the Commission, after the construction of the original project or any addition thereto or betterment thereof, file with the Commission in such detail as the Commission may require, a statement in duplicate showing the actual legitimate original cost of construction of such project addition, or betterment, and of the price paid for water rights, rights-of-way, lands, or interest in lands. The licensee shall grant to the Commission or to its duly authorized agent or agents, at all reasonable times, free access to such project, addition, or betterment, and to all maps, profiles, contracts, reports of engineers, accounts, books, records, and all other papers and documents relating thereto. The statement of actual legitimate original cost of said project, and revisions thereof as determined by the Commission, s

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 797

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 800 — Issuance of preliminary permits or licenses

**(a) Preference** In issuing preliminary permits hereunder or original licenses where no preliminary permit has been issued, the Commission shall give preference to applications therefor by States, Indian tribes, and municipalities, provided the plans for the same are deemed by the Commission equally well adapted, or shall within a reasonable time to be fixed by the Commission be made equally well adapted, to conserve and utilize in the public interest the water resources of the region; and as between other applicants, the Commission may give preference to the applicant the plans of which it finds and determines are best adapted to develop, conserve, and utilize in the public interest the water resources of the region, if it be satisfied as to the ability of the applicant to carry out such plans. **(b) Development of water resources by United States; reports** Whenever, in the judgment of the Commission, the development of any water resources for public purposes should be undertaken by the United States itself, the Commission shall not approve any application for any project affecting such development, but shall cause to be made such examinations, surveys, reports, plans, and estimates of the cost of the proposed development as it may find necessary, and shall submit its findings to Congress with such recommendations as it may find appropriate concerning such development. **(c) Assumption of project by United States after expiration of license** Whenever, after notice and opportunity for hearing, the Commission determines that the United States should exercise its right upon or after the expiration of any license to take over any project or projects for public purposes, the Commission shall not issue a new license to the original licensee or to a new licensee but sha

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 800

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 802 — Information to accompany application for license; landowner notification

**(a)** Each applicant for a license under this chapter shall submit to the commission— (1) Such maps, plans, specifications, and estimates of cost as may be required for a full understanding of the proposed project. Such maps, plans, and specifications when approved by the commission shall be made a part of the license; and thereafter no change shall be made in said maps, plans, or specifications until such changes shall have been approved and made a part of such license by the commission. (2) Satisfactory evidence that the applicant has complied with the requirements of the laws of the State or States within which the proposed project is to be located with respect to bed and banks and to the appropriation, diversion, and use of water for power purposes and with respect to the right to engage in the business of developing, transmitting and distributing power, and in any other business necessary to effect the purposes of a license under this chapter. (3) 11 See Codification note below. Such additional information as the commission may require. **(b)** Upon the filing of any application for a license (other than a license under [section 808 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section808&num=0&edition=prelim)) the applicant shall make a good faith effort to notify each of the following by certified mail: (1) Any person who is an owner of record of any interest in the property within the bounds of the project. (2) Any Federal, State, municipal or other local governmental agency likely to be interested in or affected by such application.

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 802

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1761 — Grant, issue, or renewal of rights-of-way

**(a) Authorized purposes** The Secretary, with respect to the public lands (including public lands, as defined in [section 1702(e) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1702/e&num=0&edition=prelim), which are reserved from entry pursuant to section 24 of the Federal Power Act ([16 U.S.C. 818](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section818&num=0&edition=prelim))) and, the Secretary of Agriculture, with respect to lands within the National Forest System (except in each case land designated as wilderness), are authorized to grant, issue, or renew rights-of-way over, upon, under, or through such lands for— (1) reservoirs, canals, ditches, flumes, laterals, pipes, pipelines, tunnels, and other facilities and systems for the impoundment, storage, transportation, or distribution of water; (2) pipelines and other systems for the transportation or distribution of liquids and gases, other than water and other than oil, natural gas, synthetic liquid or gaseous fuels, or any refined product produced therefrom, and for storage and terminal facilities in connection therewith; (3) pipelines, slurry and emulsion systems, and conveyor belts for transportation and distribution of solid materials, and facilities for the storage of such materials in connection therewith; (4) systems for generation, transmission, and distribution of electric energy, except that the applicant shall also comply with all applicable requirements of the Federal Energy Regulatory Commission under the Federal Power Act, including part 1 11 So in original. Probably should be part “I”. thereof (41 Stat. 1063, [16 U.S.C. 791a–825r](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section791a–825r&num=0&editi

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1761

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 808 — New licenses and renewals

Page 1382 TITLE 16—CONSERVATION § 808 § 808. New licenses and renewals (a) Relicensing procedures; terms and condi- tions; issuance to applicant with proposal best adapted to serve public interest; factors considered (1) If the United States does not, at the expira- tion of the existing license, exercise its right to take over, maintain, and operate any project or projects of the licensee, as provided in section 807 of this title, the commission is authorized to issue a new license to the existing licensee upon such terms and conditions as may be authorized or required under the then existing laws and reg- ulations, or to issue a new license under said terms and conditions to a new licensee, which li- cense may cover any project or projects covered by the existing license, and shall be issued on the condition that the new licensee shall, before taking possession of such project or projects, pay such amount, and assume such contracts as the United States is required to do in the man- ner specified in section 807 of this title: Provided, That in the event the United States does not ex- ercise the right to take over or does not issue a license to a new licensee, or issue a new license to the existing licensee, upon reasonable terms, then the commission shall issue from year to year an annual license to the then licensee under the terms and conditions of the existing license until the property is taken over or a new license is issued as aforesaid. (2) Any new license issued under this section shall be issued to the applicant having the final proposal which the Commission determines is best adapted to serve the public interest, except that in making this determination the Commis- sion shall ensure that insignificant differences with regard to su

Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 808

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.