Arkansas Legal Resource Navigator

43 U.S.C. § 1761 — Grant, issue, or renewal of rights-of-way

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1761 — Grant, issue, or renewal of rights-of-way

**(a) Authorized purposes** The Secretary, with respect to the public lands (including public lands, as defined in [section 1702(e) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1702/e&num=0&edition=prelim), which are reserved from entry pursuant to section 24 of the Federal Power Act ([16 U.S.C. 818](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section818&num=0&edition=prelim))) and, the Secretary of Agriculture, with respect to lands within the National Forest System (except in each case land designated as wilderness), are authorized to grant, issue, or renew rights-of-way over, upon, under, or through such lands for— (1) reservoirs, canals, ditches, flumes, laterals, pipes, pipelines, tunnels, and other facilities and systems for the impoundment, storage, transportation, or distribution of water; (2) pipelines and other systems for the transportation or distribution of liquids and gases, other than water and other than oil, natural gas, synthetic liquid or gaseous fuels, or any refined product produced therefrom, and for storage and terminal facilities in connection therewith; (3) pipelines, slurry and emulsion systems, and conveyor belts for transportation and distribution of solid materials, and facilities for the storage of such materials in connection therewith; (4) systems for generation, transmission, and distribution of electric energy, except that the applicant shall also comply with all applicable requirements of the Federal Energy Regulatory Commission under the Federal Power Act, including part 1 11 So in original. Probably should be part “I”. thereof (41 Stat. 1063, [16 U.S.C. 791a–825r](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section791a–825r&num=0&editi

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1761

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 19941b71706a145ec8e2240b1bb721ed71d9fb069ec0ad60eb1901d446ad7c75. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_d552bedef083318da04e7398
Source file: Laws/federal/codes/united-states-code/title-43/section-1761-grant-issue-or-renewal-of-rights-of-way--210fc43e7e.md
Pages: Not recorded – Not recorded
Passage SHA-256: fd5445742076139e5a47db3283f285d2693dfff66b18b35a424dd32d492c32b5

Source location: Title 43, Chapter 35, § 1761; chapter-035-federal-land-policy-and-management.md

Stored source content

**(a) Authorized purposes** The Secretary, with respect to the public lands (including public lands, as defined in [section 1702(e) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1702/e&num=0&edition=prelim), which are reserved from entry pursuant to section 24 of the Federal Power Act ([16 U.S.C. 818](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section818&num=0&edition=prelim))) and, the Secretary of Agriculture, with respect to lands within the National Forest System (except in each case land designated as wilderness), are authorized to grant, issue, or renew rights-of-way over, upon, under, or through such lands for— (1) reservoirs, canals, ditches, flumes, laterals, pipes, pipelines, tunnels, and other facilities and systems for the impoundment, storage, transportation, or distribution of water; (2) pipelines and other systems for the transportation or distribution of liquids and gases, other than water and other than oil, natural gas, synthetic liquid or gaseous fuels, or any refined product produced therefrom, and for storage and terminal facilities in connection therewith; (3) pipelines, slurry and emulsion systems, and conveyor belts for transportation and distribution of solid materials, and facilities for the storage of such materials in connection therewith; (4) systems for generation, transmission, and distribution of electric energy, except that the applicant shall also comply with all applicable requirements of the Federal Energy Regulatory Commission under the Federal Power Act, including part 1 11 So in original. Probably should be part “I”. thereof (41 Stat. 1063, [16 U.S.C. 791a–825r](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section791a–825r&num=0&edition=prelim)).; 22 So in original. The period preceding the semicolon probably should not appear. (5) systems for transmission or reception of radio, television, telephone, telegraph, and other electronic signals, and other means of communication; (6) roads, trails, highways, railroads, canals, tunnels, tramways, airways, livestock driveways, or other means of transportation except where such facilities are constructed and maintained in connection with commercial recreation facilities on lands in the National Forest System; or (7) such other necessary transportation or other systems or facilities which are in the public interest and which require rights-of-way over, upon, under, or through such lands. **(b) Procedures applicable; administration** (1) The Secretary concerned shall require, prior to granting, issuing, or renewing a right-of-way, that the applicant submit and disclose those plans, contracts, agreements, or other information reasonably related to the use, or intended use, of the right-of-way, including its effect on competition, which he deems necessary to a determination, in accordance with the provisions of this Act, as to whether a right-of-way shall be granted, issued, or renewed and the terms and conditions which should be included in the right-of-way. (2) If the applicant is a partnership, corporation, association, or other business entity, the Secretary concerned, prior to granting a right-to-way 33 So in original. Probably should be “right-of-way”. pursuant to this subchapter, shall require the applicant to disclose the identity of the participants in the entity, when he deems it necessary to a determination, in accordance with the provisions of this subchapter, as to whether a right-of-way shall be granted, issued, or renewed and the terms and conditions which should be included in the right-of-way. Such disclosures shall include, where applicable: (A) the name and address of each partner; (B) the name and address of each shareholder owning 3 per centum or more of the shares, together with the number and percentage of any class of voting shares of the entity which such shareholder is authorized to vote; and (C) the name and address of each affiliate of the entity together with, in the case of an affiliate controlled by the entity, the number of shares and the percentage of any class of voting stock of that affiliate owned, directly or indirectly, by that entity, and, in the case of an affiliate which controls that entity, the number of shares and the percentage of any class of voting stock of that entity owned, directly or indirectly, by the affiliate. (3) The Secretary of Agriculture shall have the authority to administer all rights-of-way granted or issued under authority of previous Acts with respect to lands under the jurisdiction of the Secretary of Agriculture, including rights-of-way granted or issued pursuant to authority given to the Secretary of the Interior by such previous Acts. **(c) Permanent easement for water systems; issuance, preconditions, etc.** (1) Upon receipt of a written application pursuant to paragraph (2) of this subsection from an applicant meeting the requirements of this subsection, the Secretary of Agriculture shall issue a permanent easement, without a requirement for reimbursement, for a water system as described in subsection (a)(1) of this section, traversing Federal lands within the National Forest System (“National Forest Lands”), constructed and in operation or placed into operation prior to October 21, 1976, if— (A) the traversed National Forest lands are in a State where the appropriation doctrine governs the ownership of water rights; (B) at the time of submission of the application the water system is used solely for agricultural irrigation or livestock watering purposes; (C) the use served by the water system is not located solely on Federal lands; (D) the originally constructed facilities comprising such system have been in substantially continuous operation without abandonment; (E) the applicant has a valid existing right, established under applicable State law, for water to be conveyed by the water system; (F) a recordable survey and other information concerning the location and characteristics of the system as necessary for proper management of National Forest lands is provided to the Secretary of Agriculture by the applicant for the easement; and (G) the applicant submits such application on or before December 31, 1996. (2) (A) Nothing in this subsection shall be construed as affecting any grants made by any previous Act. To the extent any such previous grant of right-of-way is a valid existing right, it shall remain in full force and effect unless an owner thereof notifies the Secretary of Agriculture that such owner elects to have a water system on such right-of-way governed by the provisions of this subsection and submits a written application for issuance of an easement pursuant to this subsection, in which case upon the issuance of an easement pursuant to this subsection such previous grant shall be deemed to have been relinquished and shall terminate. (B) Easements issued under the authority of this subsection shall be fully transferable with all existing conditions and without the imposition of fees or new conditions or stipulations at the time of transfer. The holder shall notify the Secretary of Agriculture within sixty days of any address change of the holder or change in ownership of the facilities. (C) Easements issued under the authority of this subsection shall include all changes or modifications to the original facilities in existence as of October 21, 1976, the date of enactment of this Act. (D) Any future extension or enlargement of facilities after October 21, 1976, shall require the issuance of a separate authorization, not authorized under this subsection. (3) (A) Except as otherwise provided in this subsection, the Secretary of Agriculture may terminate or suspend an easement issued pursuant to this subsection in accordance with the procedural and other provisions of [section 1766 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1766&num=0&edition=prelim). An easement issued pursuant to this subsection shall terminate if the water system for which such easement was issued is used for any purpose other than agricultural irrigation or livestock watering use. For purposes of subparagraph (D) of paragraph (1) of this subsection, non-use of a water system for agricultural irrigation or livestock watering purposes for any continuous five-year period shall constitute a rebuttable presumption of abandonment of the facilities comprising such system. (B) Nothing in this subsection shall be deemed to be an assertion by the United States of any right or claim with regard to the reservation, acquisition, or use of water. Nothing in this subsection shall be deemed to confer on the Secretary of Agriculture any power or authority to regulate or control in any manner the appropriation, diversion, or use of water for any purpose (nor to diminish any such power or authority of such Secretary under applicable law) or to require the conveyance or transfer to the United States of any right or claim to the appropriation, diversion, or use of water. (C) Except as otherwise provided in this subsection, all rights-of-way issued pursuant to this subsection are subject to all conditions and requirements of this Act. (D) In the event a right-of-way issued pursuant to this subsection is allowed to deteriorate to the point of threatening persons or property and the holder of the right-of-way, after consultation with the Secretary of Agriculture, refuses to perform the repair and maintenance necessary to remove the threat to persons or property, the Secretary shall have the right to undertake such repair and maintenance on the right-of-way and to assess the holder for the costs of such repair and maintenance, regardless of whether the Secretary had required the holder to furnish a bond or other security pursuant to subsection (i) of this section. **(d) Rights-of-way on certain Federal lands** With respect to any project or portion thereof that was licensed pursuant to, or granted an exemption from, part I of the Federal Power Act [[16 U.S.C. 791a](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section791a&num=0&edition=prelim) et seq.] which is located on lands subject to a reservation under section 24 of the Federal Power Act [[16 U.S.C. 818](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section818&num=0&edition=prelim)] and which did not receive a permit, right-of-way or other approval under this section prior to October 24, 1992, no such permit, right-of-way, or other approval shall be required for continued operation, including continued operation pursuant to section 15 of the Federal Power Act [[16 U.S.C. 808](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section808&num=0&edition=prelim)], of such project unless the Commission determines that such project involves the use of any additional public lands or National Forest lands not subject to such reservation.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 791a — Short title

This chapter may be cited as the “Federal Power Act”.

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 791a

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 808 — New licenses and renewals

**(a) Relicensing procedures; terms and conditions; issuance to applicant with proposal best adapted to serve public interest; factors considered** (1) If the United States does not, at the expiration of the existing license, exercise its right to take over, maintain, and operate any project or projects of the licensee, as provided in [section 807 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section807&num=0&edition=prelim), the commission is authorized to issue a new license to the existing licensee upon such terms and conditions as may be authorized or required under the then existing laws and regulations, or to issue a new license under said terms and conditions to a new licensee, which license may cover any project or projects covered by the existing license, and shall be issued on the condition that the new licensee shall, before taking possession of such project or projects, pay such amount, and assume such contracts as the United States is required to do in the manner specified in [section 807 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section807&num=0&edition=prelim): Provided, That in the event the United States does not exercise the right to take over or does not issue a license to a new licensee, or issue a new license to the existing licensee, upon reasonable terms, then the commission shall issue from year to year an annual license to the then licensee under the terms and conditions of the existing license until the property is taken over or a new license is issued as aforesaid. (2) Any new license issued under this section shall be issued to the applicant having the final proposal which the Commission determines is best adapted to serve the public interest, except that in mak

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 808

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1766 — Suspension or termination; grounds; procedures applicable

Abandonment of a right-of-way or noncompliance with any provision of this subchapter condition of the right-of-way, or applicable rule or regulation of the Secretary concerned may be grounds for suspension or termination of the right-of-way if, after due notice to the holder of the right-of-way and, and 11 So in original. with respect to easements, an appropriate administrative proceeding pursuant to [section 554 of title 5](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section554&num=0&edition=prelim), the Secretary concerned determines that any such ground exists and that suspension or termination is justified. No administrative proceeding shall be required where the right-of-way by its terms provides that it terminates on the occurrence of a fixed or agreed-upon condition, event, or time. If the Secretary concerned determines that an immediate temporary suspension of activities within a right-of-way for violation of its terms and conditions is necessary to protect public health or safety or the environment, he may abate such activities prior to an administrative proceeding. Prior to commencing any proceeding to suspend or terminate a right-of-way the Secretary concerned shall give written notice to the holder of the grounds for such action and shall give the holder a reasonable time to resume use of the right-of-way or to comply with this subchapter condition, rule, or regulation as the case may be. Failure of the holder of the right-of-way to use the right-of-way for the purpose for which it was granted, issued, or renewed, for any continuous five-year period, shall constitute a rebuttable presumption of abandonment of the right-of-way except that where the failure of the holder to use the right-of-way for the purpose for which it was granted,

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1766

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 818 — Public lands included in project; reservation of lands from entry

Any lands of the United States included in any proposed project under the provisions of this subchapter shall from the date of filing of application therefor be reserved from entry, location, or other disposal under the laws of the United States until otherwise directed by the Commission or by Congress. Notice that such application has been made, together with the date of filing thereof and a description of the lands of the United States affected thereby, shall be filed in the local land office for the district in which such lands are located. Whenever the Commission shall determine that the value of any lands of the United States so applied for, or heretofore or hereafter reserved or classified as power sites, will not be injured or destroyed for the purposes of power development by location, entry, or selection under the public-land laws, the Secretary of the Interior, upon notice of such determination, shall declare such lands open to location, entry, or selection, for such purpose or purposes and under such restrictions as the Commission may determine, subject to and with a reservation of the right of the United States or its permittees or licensees to enter upon, occupy, and use any part or all of said lands necessary, in the judgment of the Commission, for the purposes of this subchapter, which right shall be expressly reserved in every patent issued for such lands; and no claim or right to compensation shall accrue from the occupation or use of any of said lands for said purposes. The United States or any licensee for any such lands hereunder may enter thereupon for the purposes of this subchapter, upon payment of any damages to crops, buildings, or other improvements caused thereby to the owner thereof, or upon giving a good and sufficient bond to the United Sta

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 818

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

15 U.S.C. § 719e — Presidential decision and report

**(a) Dateline for decision; transmission to Congress, delay: notice to Congress; contents of decision; chairman, appointment; Federal inspector of construction: duties, including establishment of joint surveillance and monitoring agreement** (1) As soon as practicable after July 1, 1977, but not later than September 1, 1977, the President shall issue a decision as to whether a transportation system for delivery of Alaska natural gas should be approved under this chapter. If he determines such a system should be so approved, his decision shall designate such a system for approval pursuant to [section 719f of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section719f&num=0&edition=prelim) and shall be consistent with [section 719c(b)(1)(C) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section719c/b/1/C&num=0&edition=prelim) to assure delivery of Alaska natural gas to points both east and west of the Rocky Mountains in the continental United States. The President in making his decision shall take into consideration the Commission’s recommendation pursuant to [section 719c of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section719c&num=0&edition=prelim), the report under [section 719c(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section719c/c&num=0&edition=prelim), and any comments submitted under [section 719d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section719d&num=0&edition=prelim); and his decision to designate a system for approval shall be based on his determination as to which system, if any, best serves the national interest. (2) The President, for a period of up to 90 addi

Source: Supplied U.S. Code snapshot — release unconfirmed · 15 U.S.C. § 719e

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 791 — Repealed. Aug. 26, 1935, ch. 687, title II, § 212, 49 Stat. 847

### Statutory Notes Section, act June 10, 1920, ch. 285, § 30, 41 Stat. 1077, designated the act as The Federal Water Power Act.

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 791

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 3166 — Agency, Presidential, and Congressional actions

**(a) Agency action in cases other than those involving section 3165 or wilderness areas** (1) In the case of any application for the approval of any transportation or utility system to which [section 3165 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section3165&num=0&edition=prelim) does not apply or that does not occupy, use, or traverse any area within the National Wilderness Preservation System, if, in compliance with [section 3164 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section3164&num=0&edition=prelim)— (A) each Federal agency concerned decides to approve each authorization within its jurisdiction with respect to that system, then the system shall be deemed to be approved and each such agency shall promptly issue, in accordance with applicable law, such rights-of-way, permits, licenses, leases, certificates, or other authorizations as are necessary with respect to the establishment of the system; or (B) one or more Federal agencies decide to disapprove any authorization within its jurisdiction with respect, to that system, then the system shall be deemed to be disapproved and the applicant for the system may appeal the disapproval to the President. (2) If an applicant appeals under paragraph (1)(B), the President, within four months after receiving the appeal, shall decide whether to approve or deny the application. The President shall approve the application if he finds, after consideration of the factors set forth in [section 3164(g)(2) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section3164/g/2&num=0&edition=prelim), that such approval would be in the public interest and that (1) such system would be compatible with the purposes for

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 3166

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

30 U.S.C. § 201 — Leases and exploration

**(a) Leases** (1) The Secretary of the Interior is authorized to divide any lands subject to this chapter which have been classified for coal leasing into leasing tracts of such size as he finds appropriate and in the public interest and which will permit the mining of all coal which can be economically extracted in such tract and thereafter he shall, in his discretion, upon the request of any qualified applicant or on his own motion, from time to time, offer such lands for leasing and shall award leases thereon by competitive bidding: Provided, That notwithstanding the competitive bidding requirement of this section, the Secretary may, subject to such conditions which he deems appropriate, negotiate the sale at fair market value of coal the removal of which is necessary and incidental to the exercise of a right-of-way permit issued pursuant to title V of the Federal Land Policy and Management Act of 1976 [[43 U.S.C. 1761](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1761&num=0&edition=prelim) et seq.]. No less than 50 per centum of the total acreage offered for lease by the Secretary in any one year shall be leased under a system of deferred bonus payment. Upon default or cancellation of any coal lease for which bonus payments are due, any unpaid remainder of the bid shall be immediately payable to the United States. A reasonable number of leasing tracts shall be reserved and offered for lease in accordance with this section to public bodies, including Federal agencies, rural electric cooperatives, or nonprofit corporations controlled by any of such entities: Provided, That the coal so offered for lease shall be for use by such entity or entities in implementing a definite plan to produce energy for their own use or for sale to their me

Source: Supplied U.S. Code snapshot — release unconfirmed · 30 U.S.C. § 201

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 15926 — Fair market value determinations for linear rights-of-way across public lands and national forests

**(a) Update of fee schedule** Not later than 1 year after August 8, 2005— (1) the Secretary of the Interior shall update section 2806.20 of title 43, Code of Federal Regulations, as in effect on August 8, 2005, to revise the per acre rental fee zone value schedule by State, county, and type of linear right-of-way use to reflect current values of land in each zone; and (2) the Secretary of Agriculture shall make the same revision for linear rights-of-way granted, issued, or renewed under title V of the Federal Lands Policy and Management Act of 1976 ([43 U.S.C. 1761](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1761&num=0&edition=prelim) et seq.) on National Forest System land. **(b) Fair market value rental determination for linear rights-of-way** The fair market value rent of a linear right-of-way across public lands or National Forest System lands issued under section 504 of the Federal Land Policy and Management Act of 1976 ([43 U.S.C. 1764](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1764&num=0&edition=prelim)) or [section 185 of title 30](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section185&num=0&edition=prelim) shall be determined in accordance with subpart 2806 of title 43, Code of Federal Regulations, as in effect on August 8, 2005 (including the annual or periodic updates specified in the regulations), and as updated in accordance with subsection (a).

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 15926

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 6502 — Designation of National Petroleum Reserve in Alaska; reservation of lands; disposition and conveyance of mineral materials, lands, etc., pre­existing property rights

The area known as Naval Petroleum Reserve Numbered 4, Alaska, established by Executive order of the President, dated February 27, 1923, except for tract Numbered 1 as described in Public Land Order 2344, dated April 24, 1961, shall be transferred to and administered by the Secretary of the Interior in accordance with the provisions of this Act. Effective on the date of transfer all lands within such area shall be redesignated as the “National Petroleum Reserve in Alaska” (hereinafter in this chapter referred to as the “reserve”). Subject to valid existing rights, all lands within the exterior boundaries of such reserve are hereby reserved and withdrawn from all forms of entry and disposition under the public land laws, including the mining and mineral leasing laws, and all other Acts; but the Secretary is authorized to (1) make dispositions of mineral materials pursuant to the Act of July 31, 1947 (61 Stat. 681), as amended [[30 U.S.C. 601](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title30-section601&num=0&edition=prelim) et seq.], for appropriate use by Alaska Natives and the North Slope Borough, (2) make such dispositions of mineral materials and grant such rights-of-way, licenses, and permits as may be necessary to carry out his responsibilities under this Act, (3) convey the surface of lands properly selected on or before December 18, 1975, by Native village corporations pursuant to the Alaska Native Claims Settlement Act [[43 U.S.C. 1601](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1601&num=0&edition=prelim) et seq.], and (4) grant such rights-of-way to the North Slope Borough, under the provisions of title V of the Federal Land Policy and Management Act of 1976 [[43 U.S.C. 1761](https://uscode.house.gov/view.xhtml

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 6502

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.