Browse Arkansas Code titles and sections
16 U.S.C. § 824d — Rates and charges; schedules; suspension of new rates; automatic adjustment clauses
Federal law — U.S. Code and appendices · legal_authorities
**(a) Just and reasonable rates** All rates and charges made, demanded, or received by any public utility for or in connection with the transmission or sale of electric energy subject to the jurisdiction of the Commission, and all rules and regulations affecting or pertaining to such rates or charges shall be just and reasonable, and any such rate or charge that is not just and reasonable is hereby declared to be unlawful.
**(b) Preference or advantage unlawful** No public utility shall, with respect to any transmission or sale subject to the jurisdiction of the Commission, (1) make or grant any undue preference or advantage to any person or subject any person to any undue prejudice or disadvantage, or (2) maintain any unreasonable difference in rates, charges, service, facilities, or in any other respect, either as between localities or as between classes of service.
**(c) Schedules** Under such rules and regulations as the Commission may prescribe, every public utility shall file with the Commission, within such time and in such form as the Commission may designate, and shall keep open in convenient form and place for public inspection schedules showing all rates and charges for any transmission or sale subject to the jurisdiction of the Commission, and the classifications, practices, and regulations affecting such rates and charges, together with all contracts which in any manner affect or relate to such rates, charges, classifications, and services.
**(d) Notice required for rate changes** Unless the Commission otherwise orders, no change shall be made by any public utility in any such rate, charge, classification, or service, or in any rule, regulation, or contract relating thereto, except after sixty days’ notice to the Commission and to the public. Such notice
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 824d
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: a82010bdce7d08c328b932456c78bc38fa073021094951184220f13e84918fd5. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_3b8588ed414e766942619ccc
Source file: Laws/federal/codes/united-states-code/title-16/section-824d-rates-and-charges-schedules-suspension-of-new-rates-automatic-adjustment--87d196f958.md
Pages: Not recorded – Not recorded
Passage SHA-256: f29095642a3bc6ac9ad143b021d5738d530ced5b9dd9b323b52d4d3c4a2b5f7c
Source location: Title 16, Chapter 12, § 824d; chapter-012-federal-regulation-and-development-of-power.md
Stored source content
**(a) Just and reasonable rates** All rates and charges made, demanded, or received by any public utility for or in connection with the transmission or sale of electric energy subject to the jurisdiction of the Commission, and all rules and regulations affecting or pertaining to such rates or charges shall be just and reasonable, and any such rate or charge that is not just and reasonable is hereby declared to be unlawful.
**(b) Preference or advantage unlawful** No public utility shall, with respect to any transmission or sale subject to the jurisdiction of the Commission, (1) make or grant any undue preference or advantage to any person or subject any person to any undue prejudice or disadvantage, or (2) maintain any unreasonable difference in rates, charges, service, facilities, or in any other respect, either as between localities or as between classes of service.
**(c) Schedules** Under such rules and regulations as the Commission may prescribe, every public utility shall file with the Commission, within such time and in such form as the Commission may designate, and shall keep open in convenient form and place for public inspection schedules showing all rates and charges for any transmission or sale subject to the jurisdiction of the Commission, and the classifications, practices, and regulations affecting such rates and charges, together with all contracts which in any manner affect or relate to such rates, charges, classifications, and services.
**(d) Notice required for rate changes** Unless the Commission otherwise orders, no change shall be made by any public utility in any such rate, charge, classification, or service, or in any rule, regulation, or contract relating thereto, except after sixty days’ notice to the Commission and to the public. Such notice shall be given by filing with the Commission and keeping open for public inspection new schedules stating plainly the change or changes to be made in the schedule or schedules then in force and the time when the change or changes will go into effect. The Commission, for good cause shown, may allow changes to take effect without requiring the sixty days’ notice herein provided for by an order specifying the changes so to be made and the time when they shall take effect and the manner in which they shall be filed and published.
**(e) Suspension of new rates; hearings; five-month period** Whenever any such new schedule is filed the Commission shall have authority, either upon complaint or upon its own initiative without complaint, at once, and, if it so orders, without answer or formal pleading by the public utility, but upon reasonable notice, to enter upon a hearing concerning the lawfulness of such rate, charge, classification, or service; and, pending such hearing and the decision thereon, the Commission, upon filing with such schedules and delivering to the public utility affected thereby a statement in writing of its reasons for such suspension, may suspend the operation of such schedule and defer the use of such rate, charge, classification, or service, but not for a longer period than five months beyond the time when it would otherwise go into effect; and after full hearings, either completed before or after the rate, charge, classification, or service goes into effect, the Commission may make such orders with reference thereto as would be proper in a proceeding initiated after it had become effective. If the proceeding has not been concluded and an order made at the expiration of such five months, the proposed change of rate, charge, classification, or service shall go into effect at the end of such period, but in case of a proposed increased rate or charge, the Commission may by order require the interested public utility or public utilities to keep accurate account in detail of all amounts received by reason of such increase, specifying by whom and in whose behalf such amounts are paid, and upon completion of the hearing and decision may by further order require such public utility or public utilities to refund, with interest, to the persons in whose behalf such amounts were paid, such portion of such increased rates or charges as by its decision shall be found not justified. At any hearing involving a rate or charge sought to be increased, the burden of proof to show that the increased rate or charge is just and reasonable shall be upon the public utility, and the Commission shall give to the hearing and decision of such questions preference over other questions pending before it and decide the same as speedily as possible.
**(f) Review of automatic adjustment clauses and public utility practices; action by Commission; “automatic adjustment clause” defined**
(1) Not later than 2 years after November 9, 1978, and not less often than every 4 years thereafter, the Commission shall make a thorough review of automatic adjustment clauses in public utility rate schedules to examine—
(A) whether or not each such clause effectively provides incentives for efficient use of resources (including economical purchase and use of fuel and electric energy), and
(B) whether any such clause reflects any costs other than costs which are—
(i) subject to periodic fluctuations and
(ii) not susceptible to precise determinations in rate cases prior to the time such costs are incurred.
Such review may take place in individual rate proceedings or in generic or other separate proceedings applicable to one or more utilities.
(2) Not less frequently than every 2 years, in rate proceedings or in generic or other separate proceedings, the Commission shall review, with respect to each public utility, practices under any automatic adjustment clauses of such utility to insure efficient use of resources (including economical purchase and use of fuel and electric energy) under such clauses.
(3) The Commission may, on its own motion or upon complaint, after an opportunity for an evidentiary hearing, order a public utility to—
(A) modify the terms and provisions of any automatic adjustment clause, or
(B) cease any practice in connection with the clause,
if such clause or practice does not result in the economical purchase and use of fuel, electric energy, or other items, the cost of which is included in any rate schedule under an automatic adjustment clause.
(4) As used in this subsection, the term “automatic adjustment clause” means a provision of a rate schedule which provides for increases or decreases (or both), without prior hearing, in rates reflecting increases or decreases (or both) in costs incurred by an electric utility. Such term does not include any rate which takes effect subject to refund and subject to a later determination of the appropriate amount of such rate.
**(g) Inaction of Commissioners**
(1) **In general** — With respect to a change described in subsection (d), if the Commission permits the 60-day period established therein to expire without issuing an order accepting or denying the change because the Commissioners are divided two against two as to the lawfulness of the change, as a result of vacancy, incapacity, or recusal on the Commission, or if the Commission lacks a quorum—
(A) the failure to issue an order accepting or denying the change by the Commission shall be considered to be an order issued by the Commission accepting the change for purposes of section 825l(a) of this title; and
(B) each Commissioner shall add to the record of the Commission a written statement explaining the views of the Commissioner with respect to the change.
(2) **Appeal** — If, pursuant to this subsection, a person seeks a rehearing under section 825l(a) of this title, and the Commission fails to act on the merits of the rehearing request by the date that is 30 days after the date of the rehearing request because the Commissioners are divided two against two, as a result of vacancy, incapacity, or recusal on the Commission, or if the Commission lacks a quorum, such person may appeal under section 825l(b) of this title.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Relicensing procedures; terms and conditions; issuance to applicant with proposal best adapted to serve public interest; factors considered**
(1) If the United States does not, at the expiration of the existing license, exercise its right to take over, maintain, and operate any project or projects of the licensee, as provided in [section 807 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section807&num=0&edition=prelim), the commission is authorized to issue a new license to the existing licensee upon such terms and conditions as may be authorized or required under the then existing laws and regulations, or to issue a new license under said terms and conditions to a new licensee, which license may cover any project or projects covered by the existing license, and shall be issued on the condition that the new licensee shall, before taking possession of such project or projects, pay such amount, and assume such contracts as the United States is required to do in the manner specified in [section 807 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section807&num=0&edition=prelim): Provided, That in the event the United States does not exercise the right to take over or does not issue a license to a new licensee, or issue a new license to the existing licensee, upon reasonable terms, then the commission shall issue from year to year an annual license to the then licensee under the terms and conditions of the existing license until the property is taken over or a new license is issued as aforesaid.
(2) Any new license issued under this section shall be issued to the applicant having the final proposal which the Commission determines is best adapted to serve the public interest, except that in mak
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 808
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Unjust or preferential rates, etc.; statement of reasons for changes; hearing; specification of issues** Whenever the Commission, after a hearing held upon its own motion or upon complaint, shall find that any rate, charge, or classification, demanded, observed, charged, or collected by any public utility for any transmission or sale subject to the jurisdiction of the Commission, or that any rule, regulation, practice, or contract affecting such rate, charge, or classification is unjust, unreasonable, unduly discriminatory or preferential, the Commission shall determine the just and reasonable rate, charge, classification, rule, regulation, practice, or contract to be thereafter observed and in force, and shall fix the same by order. Any complaint or motion of the Commission to initiate a proceeding under this section shall state the change or changes to be made in the rate, charge, classification, rule, regulation, practice, or contract then in force, and the reasons for any proposed change or changes therein. If, after review of any motion or complaint and answer, the Commission shall decide to hold a hearing, it shall fix by order the time and place of such hearing and shall specify the issues to be adjudicated.
**(b) Refund effective date; preferential proceedings; statement of reasons for delay; burden of proof; scope of refund order; refund orders in cases of dilatory behavior; interest** Whenever the Commission institutes a proceeding under this section, the Commission shall establish a refund effective date. In the case of a proceeding instituted on complaint, the refund effective date shall not be earlier than the date of the filing of such complaint nor later than 5 months after the filing of such complaint. In the case of a proceeding instituted by the
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 824e
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Definition of unregulated transmitting utility** In this section, the term “unregulated transmitting utility” means an entity that—
(1) owns or operates facilities used for the transmission of electric energy in interstate commerce; and
(2) is an entity described in [section 824(f) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section824/f&num=0&edition=prelim).
**(b) Transmission operation services** Subject to [section 824k(h) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section824k/h&num=0&edition=prelim), the Commission may, by rule or order, require an unregulated transmitting utility to provide transmission services—
(1) at rates that are comparable to those that the unregulated transmitting utility charges itself; and
(2) on terms and conditions (not relating to rates) that are comparable to those under which the unregulated transmitting utility provides transmission services to itself and that are not unduly discriminatory or preferential.
**(c) Exemption** The Commission shall exempt from any rule or order under this section any unregulated transmitting utility that—
(1) sells not more than 4,000,000 megawatt hours of electricity per year;
(2) does not own or operate any transmission facilities that are necessary for operating an interconnected transmission system (or any portion of the system); or
(3) meets other criteria the Commission determines to be in the public interest.
**(d) Local distribution facilities** The requirements of subsection (b) shall not apply to facilities used in local distribution.
**(e) Exemption termination** If the Commission, after an evidentiary hearing held on a complaint and after giving consideration to reliability standards established
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 824j–1
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
No rate or charge received by an exempt wholesale generator for the sale of electric energy shall be lawful under [section 824d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section824d&num=0&edition=prelim) if, after notice and opportunity for hearing, the Commission finds that such rate or charge results from the receipt of any undue preference or advantage from an electric utility which is an associate company or an affiliate of the exempt wholesale generator. For purposes of this section, the terms “associate company” and “affiliate” shall have the same meaning as provided in [section 16451 of title 42](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section16451&num=0&edition=prelim).11 See References in Text note below.
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 824m
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Definitions** For purposes of this section:
(1) **Bulk-power system; Electric Reliability Organization; regional entity** — The terms “bulk-power system”, “Electric Reliability Organization”, and “regional entity” have the meanings given such terms in paragraphs (1), (2), and (7) of section 824o(a) of this title, respectively.
(2) **Critical electric infrastructure** — The term “critical electric infrastructure” means a system or asset of the bulk-power system, whether physical or virtual, the incapacity or destruction of which would negatively affect national security, economic security, public health or safety, or any combination of such matters.
(3) **Critical electric infrastructure information** — The term “critical electric infrastructure information” means information related to critical electric infrastructure, or proposed critical electrical infrastructure, generated by or provided to the Commission or other Federal agency, other than classified national security information, that is designated as critical electric infrastructure information by the Commission or the Secretary pursuant to subsection (d). Such term includes information that qualifies as critical energy infrastructure information under the Commission’s regulations.
(4) **Defense critical electric infrastructure** — The term “defense critical electric infrastructure” means any electric infrastructure located in any of the 48 contiguous States or the District of Columbia that serves a facility designated by the Secretary pursuant to subsection (c), but is not owned or operated by the owner or operator of such facility.
(5) **Electromagnetic pulse** — The term “electromagnetic pulse” means 1 or more pulses of electromagnetic energy emitted by a device capable of disabling or disrupting ope
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 824o–1
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Definitions** In this section:
(1) **Advanced cybersecurity technology** — The term “advanced cybersecurity technology” means any technology, operational capability, or service, including computer hardware, software, or a related asset, that enhances the security posture of public utilities through improvements in the ability to protect against, detect, respond to, or recover from a cybersecurity threat (as defined in [section 650 of title 6](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title6-section650&num=0&edition=prelim)).
(2) **Advanced cybersecurity technology information** — The term “advanced cybersecurity technology information” means information relating to advanced cybersecurity technology or proposed advanced cybersecurity technology that is generated by or provided to the Commission or another Federal agency.
**(b) Study** Not later than 180 days after November 15, 2021, the Commission, in consultation with the Secretary of Energy, the North American Electric Reliability Corporation, the Electricity Subsector Coordinating Council, and the National Association of Regulatory Utility Commissioners, shall conduct a study to identify incentive-based, including performance-based, rate treatments for the transmission and sale of electric energy subject to the jurisdiction of the Commission that could be used to encourage—
(1) investment by public utilities in advanced cybersecurity technology; and
(2) participation by public utilities in cybersecurity threat information sharing programs.
**(c) Incentive-based rate treatment** Not later than 1 year after the completion of the study under subsection (b), the Commission shall establish, by rule, incentive-based, including performance-based, rate treatments for the transmission of electric
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 824s–1
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Natural gas motor vehicles** The Federal Energy Regulatory Commission may, under [section 717c of title 15](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section717c&num=0&edition=prelim), allow recovery of expenses in advance by natural-gas companies for research, development, and demonstration activities by the Gas Research Institute for projects on the use of natural gas, including fuels derived from natural gas, for transportation, and projects on the use of natural gas to control pollutants and to control emissions from the combustion of other fuels, if the Commission finds that the benefits, including environmental benefits, to existing and future ratepayers resulting from such activities exceed all direct costs to existing and future ratepayers. To the maximum extent practicable, through the establishment of cofunding requirements applicable to such projects, the Commission shall ensure that the costs of such activities shall be provided in part, through contributions of cash, personnel, services, equipment, and other resources, by sources other than the recovery of expenses pursuant to this section.
**(b) Electric motor vehicles** The Federal Energy Regulatory Commission may, under [section 824d of title 16](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section824d&num=0&edition=prelim), allow recovery of expenses in advance by electric utilities for research, development, and demonstration activities by the Electric Power Research Institute for projects on electric motor vehicles, if the Commission finds that the benefits, including environmental benefits, to existing and future ratepayers resulting from such activities exceed all direct costs to existing and future ratepayers. To the maximum extent practicab
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 13235
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 1412
TITLE 16—CONSERVATION
§ 824d
mental orders in the premises as it may find
necessary or appropriate, and may by any such
supplemental order modify the provisions of any
previous order as to the particular purposes,
uses, and extent to which, or the conditions
under which, any security so theretofore author-
ized or the proceeds thereof may be applied, sub-
ject always to the requirements of subsection (a)
of this section.
(c) Compliance with order of Commission
No public utility shall, without the consent of
the Commission, apply any security or any pro-
ceeds thereof to any purpose not specified in the
Commission’s order, or supplemental order, or
to any purpose in excess of the amount allowed
for such purpose in such order, or otherwise in
contravention of such order.
(d) Authorization of capitalization not to exceed
amount paid
The Commission shall not authorize the cap-
italization of the right to be a corporation or of
any franchise, permit, or contract for consolida-
tion, merger, or lease in excess of the amount
(exclusive of any tax or annual charge) actually
paid as the consideration for such right, fran-
chise, permit, or contract.
(e) Notes or drafts maturing less than one year
after issuance
Subsection (a) shall not apply to the issue or
renewal of, or assumption of liability on, a note
or draft maturing not more than one year after
the date of such issue, renewal, or assumption of
liability, and aggregating (together with all
other then outstanding notes and drafts of a ma-
turity of one year or less on which such public
utility is primarily or secondarily liable) not
more than 5 per centum of the par value of the
other securities of the public utility then out-
standing. In the case of securities having no par
value
Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 824d
Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.