Browse Arkansas Code titles and sections
16 U.S.C. § 824p — Siting of interstate electric transmission facilities
Federal law — U.S. Code and appendices · legal_authorities
**(a) Designation of national interest electric transmission corridors**
(1) Not later than 1 year after August 8, 2005, and every 3 years thereafter, the Secretary of Energy (referred to in this section as the “Secretary”), in consultation with affected States and Indian Tribes, shall conduct a study of electric transmission capacity constraints and congestion.
(2) Not less frequently than once every 3 years, the Secretary, after considering alternatives and recommendations from interested parties (including an opportunity for comment from affected States and Indian Tribes), shall issue a report, based on the study under paragraph (1) or other information relating to electric transmission capacity constraints and congestion, which may designate as a national interest electric transmission corridor any geographic area that—
(i) 11 So in original. Probably should be “(A)”. is experiencing electric energy transmission capacity constraints or congestion that adversely affects consumers; or
(ii) 22 So in original. Probably should be “(B)”. is expected to experience such energy transmission capacity constraints or congestion.
(3) Not less frequently than once every 3 years, the Secretary, in conducting the study under paragraph (1) and issuing the report under paragraph (2), shall consult with any appropriate regional entity referred to in section 824o of this title.
(4) In determining whether to designate a national interest electric transmission corridor under paragraph (2), the Secretary may consider whether—
(A) the economic vitality and development of the corridor, or the end markets served by the corridor, may be constrained by lack of adequate or reasonably priced electricity;
(B)
(i) economic growth in the corridor, or the end markets served by t
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 824p
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 187a97af11418cb2740fbb1e3d31c626a075642a9d2c91d173a1e4f6a22043b9. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_8130597451c93debefd05997
Source file: Laws/federal/codes/united-states-code/title-16/section-824p-siting-of-interstate-electric-transmission-facilities--0d24507ead.md
Pages: Not recorded – Not recorded
Passage SHA-256: d8426ba4c03f6492193bc0ed86a07d1ac997ed0e988d3d56236424b905a1f4b4
Source location: Title 16, Chapter 12, § 824p; chapter-012-federal-regulation-and-development-of-power.md
Stored source content
**(a) Designation of national interest electric transmission corridors**
(1) Not later than 1 year after August 8, 2005, and every 3 years thereafter, the Secretary of Energy (referred to in this section as the “Secretary”), in consultation with affected States and Indian Tribes, shall conduct a study of electric transmission capacity constraints and congestion.
(2) Not less frequently than once every 3 years, the Secretary, after considering alternatives and recommendations from interested parties (including an opportunity for comment from affected States and Indian Tribes), shall issue a report, based on the study under paragraph (1) or other information relating to electric transmission capacity constraints and congestion, which may designate as a national interest electric transmission corridor any geographic area that—
(i) 11 So in original. Probably should be “(A)”. is experiencing electric energy transmission capacity constraints or congestion that adversely affects consumers; or
(ii) 22 So in original. Probably should be “(B)”. is expected to experience such energy transmission capacity constraints or congestion.
(3) Not less frequently than once every 3 years, the Secretary, in conducting the study under paragraph (1) and issuing the report under paragraph (2), shall consult with any appropriate regional entity referred to in section 824o of this title.
(4) In determining whether to designate a national interest electric transmission corridor under paragraph (2), the Secretary may consider whether—
(A) the economic vitality and development of the corridor, or the end markets served by the corridor, may be constrained by lack of adequate or reasonably priced electricity;
(B)
(i) economic growth in the corridor, or the end markets served by the corridor, may be jeopardized by reliance on limited sources of energy; and
(ii) a diversification of supply is warranted;
(C) the energy independence or energy security of the United States would be served by the designation;
(D) the designation would be in the interest of national energy policy;
(E) the designation would enhance national defense and homeland security;
(F) the designation would enhance the ability of facilities that generate or transmit firm or intermittent energy to connect to the electric grid;
(G) the designation—
(i) maximizes existing rights-of-way; and
(ii) avoids and minimizes, to the maximum extent practicable, and offsets to the extent appropriate and practicable, sensitive environmental areas and cultural heritage sites; and
(H) the designation would result in a reduction in the cost to purchase electric energy for consumers.
**(b) Construction permit** Except as provided in subsection (i), the Commission may, after notice and an opportunity for hearing, issue one or more permits for the construction or modification of electric transmission facilities in a national interest electric transmission corridor designated by the Secretary under subsection (a) if the Commission finds that—
(1)
(A) a State in which the transmission facilities are to be constructed or modified does not have authority to—
(i) approve the siting of the facilities; or
(ii) consider the interstate benefits or interregional benefits expected to be achieved by the proposed construction or modification of transmission facilities in the State;
(B) the applicant for a permit is a transmitting utility under this chapter but does not qualify to apply for a permit or siting approval for the proposed project in a State because the applicant does not serve end-use customers in the State; or
(C) a State commission or other entity that has authority to approve the siting of the facilities—
(i) has not made a determination on an application seeking approval pursuant to applicable law by the date that is 1 year after the later of—
(I) the date on which the application was filed; and
(II) the date on which the relevant national interest electric transmission corridor was designated by the Secretary under subsection (a);
(ii) has conditioned its approval in such a manner that the proposed construction or modification will not significantly reduce transmission capacity constraints or congestion in interstate commerce or is not economically feasible; or
(iii) has denied an application seeking approval pursuant to applicable law;
(2) the facilities to be authorized by the permit will be used for the transmission of electric energy in interstate commerce;
(3) the proposed construction or modification is consistent with the public interest;
(4) the proposed construction or modification will significantly reduce transmission congestion in interstate commerce and protects or benefits consumers;
(5) the proposed construction or modification is consistent with sound national energy policy and will enhance energy independence; and
(6) the proposed modification will maximize, to the extent reasonable and economical, the transmission capabilities of existing towers or structures.
**(c) Permit applications**
(1) Permit applications under subsection (b) shall be made in writing to the Commission.
(2) The Commission shall issue rules specifying—
(A) the form of the application;
(B) the information to be contained in the application; and
(C) the manner of service of notice of the permit application on interested persons.
**(d) Comments** In any proceeding before the Commission under subsection (b), the Commission shall afford each State in which a transmission facility covered by the permit is or will be located, each affected Federal agency and Indian tribe, private property owners, and other interested persons, a reasonable opportunity to present their views and recommendations with respect to the need for and impact of a facility covered by the permit.
**(e) Rights-of-way**
(1) In the case of a permit under subsection (b) for electric transmission facilities to be located on property other than property owned by the United States or a State, if the permit holder cannot acquire by contract, or is unable to agree with the owner of the property to the compensation to be paid for, the necessary right-of-way to construct or modify, and operate and maintain, the transmission facilities and, in the determination of the Commission, the permit holder has made good faith efforts to engage with landowners and other stakeholders early in the applicable permitting process, the permit holder may acquire the right-of-way by the exercise of the right of eminent domain in the district court of the United States for the district in which the property concerned is located, or in the appropriate court of the State in which the property is located.
(2) Any right-of-way acquired under paragraph (1) shall be used exclusively for the construction or modification of electric transmission facilities within a reasonable period of time after the acquisition.
(3) The practice and procedure in any action or proceeding under this subsection in the district court of the United States shall conform as nearly as practicable to the practice and procedure in a similar action or proceeding in the courts of the State in which the property is located.
(4) Nothing in this subsection shall be construed to authorize the use of eminent domain to acquire a right-of-way for any purpose other than the construction, modification, operation, or maintenance of electric transmission facilities and related facilities. The right-of-way cannot be used for any other purpose, and the right-of-way shall terminate upon the termination of the use for which the right-of-way was acquired.
**(f) Compensation**
(1) Any right-of-way acquired pursuant to subsection (e) shall be considered a taking of private property for which just compensation is due.
(2) Just compensation shall be an amount equal to the fair market value (including applicable severance damages) of the property taken on the date of the exercise of eminent domain authority.
**(g) State law** Nothing in this section precludes any person from constructing or modifying any transmission facility in accordance with State law.
**(h) Coordination of Federal authorizations for transmission facilities**
(1) In this subsection:
(A) The term “Federal authorization” means any authorization required under Federal law in order to site a transmission facility.
(B) The term “Federal authorization” includes such permits, special use authorizations, certifications, opinions, or other approvals as may be required under Federal law in order to site a transmission facility.
(2) The Department of Energy shall act as the lead agency for purposes of coordinating all applicable Federal authorizations and related environmental reviews of the facility.
(3) To the maximum extent practicable under applicable Federal law, the Secretary shall coordinate the Federal authorization and review process under this subsection with any Indian tribes, multistate entities, and State agencies that are responsible for conducting any separate permitting and environmental reviews of the facility, to ensure timely and efficient review and permit decisions.
(4)
(A) As head of the lead agency, the Secretary, in consultation with agencies responsible for Federal authorizations and, as appropriate, with Indian tribes, multistate entities, and State agencies that are willing to coordinate their own separate permitting and environmental reviews with the Federal authorization and environmental reviews, shall establish prompt and binding intermediate milestones and ultimate deadlines for the review of, and Federal authorization decisions relating to, the proposed facility.
(B) The Secretary shall ensure that, once an application has been submitted with such data as the Secretary considers necessary, all permit decisions and related environmental reviews under all applicable Federal laws shall be completed—
(i) within 1 year; or
(ii) if a requirement of another provision of Federal law does not permit compliance with clause (i), as soon thereafter as is practicable.
(C) The Secretary shall provide an expeditious pre-application mechanism for prospective applicants to confer with the agencies involved to have each such agency determine and communicate to the prospective applicant not later than 60 days after the prospective applicant submits a request for such information concerning—
(i) the likelihood of approval for a potential facility; and
(ii) key issues of concern to the agencies and public.
(5)
(A) As lead agency head, the Secretary, in consultation with the affected agencies, shall prepare a single environmental review document, which shall be used as the basis for all decisions on the proposed project under Federal law.
(B) The Secretary and the heads of other agencies shall streamline the review and permitting of transmission within corridors designated under section 503 of the Federal Land Policy and Management Act 33 So in original. Probably should be followed by “of 1976”. ([43 U.S.C. 1763](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1763&num=0&edition=prelim)) by fully taking into account prior analyses and decisions relating to the corridors.
(C) The document shall include consideration by the relevant agencies of any applicable criteria or other matters as required under applicable law.
(6)
(A) If any agency has denied a Federal authorization required for a transmission facility, or has failed to act by the deadline established by the Secretary pursuant to this section for deciding whether to issue the authorization, the applicant or any State in which the facility would be located may file an appeal with the President, who shall, in consultation with the affected agency, review the denial or failure to take action on the pending application.
(B) Based on the overall record and in consultation with the affected agency, the President may—
(i) issue the necessary authorization with any appropriate conditions; or
(ii) deny the application.
(C) The President shall issue a decision not later than 90 days after the date of the filing of the appeal.
(D) In making a decision under this paragraph, the President shall comply with applicable requirements of Federal law, including any requirements of—
(i) the National Forest Management Act of 1976 ([16 U.S.C. 472a](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section472a&num=0&edition=prelim) et seq.);
(ii) the Endangered Species Act of 1973 ([16 U.S.C. 1531](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section1531&num=0&edition=prelim) et seq.);
(iii) the Federal Water Pollution Control Act ([33 U.S.C. 1251](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1251&num=0&edition=prelim) et seq.);
(iv) the National Environmental Policy Act of 1969 ([42 U.S.C. 4321](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section4321&num=0&edition=prelim) et seq.); and
(v) the Federal Land Policy and Management Act of 1976 ([43 U.S.C. 1701](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1701&num=0&edition=prelim) et seq.).
(7)
(A) Not later than 18 months after August 8, 2005, the Secretary shall issue any regulations necessary to implement this subsection.
(B)
(i) Not later than 1 year after August 8, 2005, the Secretary and the heads of all Federal agencies with authority to issue Federal authorizations shall enter into a memorandum of understanding to ensure the timely and coordinated review and permitting of electricity transmission facilities.
(ii) Interested Indian tribes, multistate entities, and State agencies may enter the memorandum of understanding.
(C) The head of each Federal agency with authority to issue a Federal authorization shall designate a senior official responsible for, and dedicate sufficient other staff and resources to ensure, full implementation of the regulations and memorandum required under this paragraph.
(8)
(A) Each Federal land use authorization for an electricity transmission facility shall be issued—
(i) for a duration, as determined by the Secretary, commensurate with the anticipated use of the facility; and
(ii) with appropriate authority to manage the right-of-way for reliability and environmental protection.
(B) On the expiration of the authorization (including an authorization issued before August 8, 2005), the authorization shall be reviewed for renewal taking fully into account reliance on such electricity infrastructure, recognizing the importance of the authorization for public health, safety, and economic welfare and as a legitimate use of Federal land.
(9) In exercising the responsibilities under this section, the Secretary shall consult regularly with—
(A) the Federal Energy Regulatory Commission;
(B) electric reliability organizations (including related regional entities) approved by the Commission; and
(C) Transmission Organizations approved by the Commission.
**(i) Interstate compacts**
(1) The consent of Congress is given for three or more contiguous States to enter into an interstate compact, subject to approval by Congress, establishing regional transmission siting agencies to—
(A) facilitate siting of future electric energy transmission facilities within those States; and
(B) carry out the electric energy transmission siting responsibilities of those States.
(2) The Secretary shall provide technical assistance to regional transmission siting agencies established under this subsection.
(3) The regional transmission siting agencies shall have the authority to review, certify, and permit siting of transmission facilities, including facilities in national interest electric transmission corridors (other than facilities on property owned by the United States).
(4) The Commission shall have no authority to issue a permit for the construction or modification of an electric transmission facility within a State that is a party to a compact, unless the Secretary determines that the members of the compact are in disagreement after the later of—
(A) the date that is 1 year after the date on which the relevant application for the facility was filed; and
(B) the date that is 1 year after the date on which the relevant national interest electric transmission corridor was designated by the Secretary under subsection (a).
**(j) Relationship to other laws**
(1) Except as specifically provided, nothing in this section affects any requirement of an environmental law of the United States, including the National Environmental Policy Act of 1969 ([42 U.S.C. 4321](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section4321&num=0&edition=prelim) et seq.).
(2) Subsection (h)(6) shall not apply to any unit of the National Park System, the National Wildlife Refuge System, the National Wild and Scenic Rivers System, the National Trails System, the National Wilderness Preservation System, or a National Monument.
**(k) ERCOT** This section shall not apply within the area referred to in [section 824k(k)(2)(A) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section824k/k/2/A&num=0&edition=prelim).
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Findings** The Congress finds and declares that—
(1) various species of fish, wildlife, and plants in the United States have been rendered extinct as a consequence of economic growth and development untempered by adequate concern and conservation;
(2) other species of fish, wildlife, and plants have been so depleted in numbers that they are in danger of or threatened with extinction;
(3) these species of fish, wildlife, and plants are of esthetic, ecological, educational, historical, recreational, and scientific value to the Nation and its people;
(4) the United States has pledged itself as a sovereign state in the international community to conserve to the extent practicable the various species of fish or wildlife and plants facing extinction, pursuant to—
(A) migratory bird treaties with Canada and Mexico;
(B) the Migratory and Endangered Bird Treaty with Japan;
(C) the Convention on Nature Protection and Wildlife Preservation in the Western Hemisphere;
(D) the International Convention for the Northwest Atlantic Fisheries;
(E) the International Convention for the High Seas Fisheries of the North Pacific Ocean;
(F) the Convention on International Trade in Endangered Species of Wild Fauna and Flora; and
(G) other international agreements; and
(5) encouraging the States and other interested parties, through Federal financial assistance and a system of incentives, to develop and maintain conservation programs which meet national and international standards is a key to meeting the Nation’s international commitments and to better safeguarding, for the benefit of all citizens, the Nation’s heritage in fish, wildlife, and plants.
**(b) Purposes** The purposes of this chapter are to provide a means whereby the ecosystems upon which endangered
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 1531
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Restoration and maintenance of chemical, physical and biological integrity of Nation’s waters; national goals for achievement of objective** The objective of this chapter is to restore and maintain the chemical, physical, and biological integrity of the Nation’s waters. In order to achieve this objective it is hereby declared that, consistent with the provisions of this chapter—
(1) it is the national goal that the discharge of pollutants into the navigable waters be eliminated by 1985;
(2) it is the national goal that wherever attainable, an interim goal of water quality which provides for the protection and propagation of fish, shellfish, and wildlife and provides for recreation in and on the water be achieved by July 1, 1983;
(3) it is the national policy that the discharge of toxic pollutants in toxic amounts be prohibited;
(4) it is the national policy that Federal financial assistance be provided to construct publicly owned waste treatment works;
(5) it is the national policy that areawide waste treatment management planning processes be developed and implemented to assure adequate control of sources of pollutants in each State;
(6) it is the national policy that a major research and demonstration effort be made to develop technology necessary to eliminate the discharge of pollutants into the navigable waters, waters of the contiguous zone, and the oceans; and
(7) it is the national policy that programs for the control of nonpoint sources of pollution be developed and implemented in an expeditious manner so as to enable the goals of this chapter to be met through the control of both point and nonpoint sources of pollution.
**(b) Congressional recognition, preservation, and protection of primary responsibilities and rights of States** It is the policy
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 1251
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Authorization; rules and regulations; appraised value as minimum sale price** For the purpose of achieving the policies set forth in the Multiple-Use Sustained-Yield Act of 1960 (74 Stat. 215; [16 U.S.C. 528–531](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section528–531&num=0&edition=prelim)) and the Forest and Rangeland Renewable Resources Planning Act of 1974 (88 Stat. 476) [[16 U.S.C. 1600](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section1600&num=0&edition=prelim) et seq.], the Secretary of Agriculture, under such rules and regulations as he may prescribe, may sell, at not less than appraised value, trees, portions of trees, or forest products located on National Forest System lands.
**(b) Designation on map; prospectus** All advertised timber sales shall be designated on maps, and a prospectus shall be available to the public and interested potential bidders.
**(c) Terms and conditions of contract** The length and other terms of the contract shall be designed to promote orderly harvesting consistent with the principles set out in section 6 of the Forest and Rangeland Renewable Resources Planning Act of 1974, as amended [[16 U.S.C. 1604](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section1604&num=0&edition=prelim)]. Unless there is a finding by the Secretary of Agriculture that better utilization of the various forest resources (consistent with the provisions of the Multiple-Use Sustained-Yield Act of 1960 [[16 U.S.C. 528–531](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section528–531&num=0&edition=prelim)]) will result, sales contracts shall be for a period not to exceed ten years: Provided, That such period may be adjusted at the discretion of the Secreta
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 472a
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Definitions** In this section:
(1) **Additional services** — The term “additional services” means the provision of supplementary power, backup or standby power, maintenance power, or interruptible power to an electric consumer by an electric utility.
(2) **Waste heat to power system** — The term “waste heat to power system” means a system that generates electricity through the recovery of waste energy.
(3) **Other terms**
(A) *Purpa* — The terms “electric consumer”, “electric utility”, “interconnection service”, “nonregulated electric utility”, and “State regulatory authority” have the meanings given those terms in the Public Utility Regulatory Policies Act of 1978 ([16 U.S.C. 2601](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section2601&num=0&edition=prelim) et seq.), within the meaning of title I of that Act ([16 U.S.C. 2611](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section2611&num=0&edition=prelim) et seq.).
(B) *EPCA* — The terms “combined heat and power system” and “waste energy” have the meanings given those terms in [section 6341 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6341&num=0&edition=prelim).
**(b) Review**
(1) **In general** — Not later than 180 days after November 15, 2021, the Secretary, in consultation with the Federal Energy Regulatory Commission and other appropriate entities, shall review existing rules and procedures relating to interconnection service and additional services throughout the United States for electric generation with nameplate capacity up to 150 megawatts connecting at either distribution or transmission voltage levels to identify barriers to the deployment of combined heat and power systems and waste heat to power s
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 18851
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a)** The Congress declares that it is the policy of the United States that—
(1) the public lands be retained in Federal ownership, unless as a result of the land use planning procedure provided for in this Act, it is determined that disposal of a particular parcel will serve the national interest;
(2) the national interest will be best realized if the public lands and their resources are periodically and systematically inventoried and their present and future use is projected through a land use planning process coordinated with other Federal and State planning efforts;
(3) public lands not previously designated for any specific use and all existing classifications of public lands that were effected by executive action or statute before October 21, 1976, be reviewed in accordance with the provisions of this Act;
(4) the Congress exercise its constitutional authority to withdraw or otherwise designate or dedicate Federal lands for specified purposes and that Congress delineate the extent to which the Executive may withdraw lands without legislative action;
(5) in administering public land statutes and exercising discretionary authority granted by them, the Secretary be required to establish comprehensive rules and regulations after considering the views of the general public; and to structure adjudication procedures to assure adequate third party participation, objective administrative review of initial decisions, and expeditious decisionmaking;
(6) judicial review of public land adjudication decisions be provided by law;
(7) goals and objectives be established by law as guidelines for public land use planning, and that management be on the basis of multiple use and sustained yield unless otherwise specified by law;
(8) the public lands be managed in a manner t
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1701
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
### Statutory Notes
Section, Pub. L. 114–94, div. D, title XLI, § 41013, Dec. 4, 2015, 129 Stat. 1761, provided that this subchapter shall terminate 7 years after Dec. 4, 2015.
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 4321
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
In order to minimize adverse environmental impacts and the proliferation of separate rights-of-way, the utilization of rights-of-way in common shall be required to the extent practical, and each right-of-way or permit shall reserve to the Secretary concerned the right to grant additional rights-of-way or permits for compatible uses on or adjacent to rights-of-way granted pursuant to this Act. In designating right-of-way corridors and in determining whether to require that rights-of-way be confined to them, the Secretary concerned shall take into consideration national and State land use policies, environmental quality, economic efficiency, national security, safety, and good engineering and technological practices. The Secretary concerned shall issue regulations containing the criteria and procedures he will use in designating such corridors. Any existing transportation and utility corridors may be designated as transportation and utility corridors pursuant to this subsection without further review.
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1763
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
The Congress finds that—
(1) the management of the Nation’s renewable resources is highly complex and the uses, demand for, and supply of the various resources are subject to change over time;
(2) the public interest is served by the Forest Service, Department of Agriculture, in cooperation with other agencies, assessing the Nation’s renewable resources, and developing and preparing a national renewable resource program, which is periodically reviewed and updated;
(3) to serve the national interest, the renewable resource program must be based on a comprehensive assessment of present and anticipated uses, demand for, and supply of renewable resources from the Nation’s public and private forests and rangelands, through analysis of environmental and economic impacts, coordination of multiple use and sustained yield opportunities as provided in the Multiple-Use Sustained-Yield Act of 1960 (74 Stat. 215; [16 U.S.C. 528–531](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section528–531&num=0&edition=prelim)), and public participation in the development of the program;
(4) the new knowledge derived from coordinated public and private research programs will promote a sound technical and ecological base for effective management, use, and protection of the Nation’s renewable resources;
(5) inasmuch as the majority of the Nation’s forests and rangeland is under private, State, and local governmental management and the Nation’s major capacity to produce goods and services is based on these nonfederally managed renewable resources, the Federal Government should be a catalyst to encourage and assist these owners in the efficient long-term use and improvement of these lands and their renewable resources consistent with the principles of sustained yield and
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 1600
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Rulemaking requirement** Not later than 1 year after August 8, 2005, the Commission shall establish, by rule, incentive-based (including performance-based) rate treatments for the transmission of electric energy in interstate commerce by public utilities for the purpose of benefitting consumers by ensuring reliability and reducing the cost of delivered power by reducing transmission congestion.
**(b) Contents** The rule shall—
(1) promote reliable and economically efficient transmission and generation of electricity by promoting capital investment in the enlargement, improvement, maintenance, and operation of all facilities for the transmission of electric energy in interstate commerce, regardless of the ownership of the facilities;
(2) provide a return on equity that attracts new investment in transmission facilities (including related transmission technologies);
(3) encourage deployment of transmission technologies and other measures to increase the capacity and efficiency of existing transmission facilities and improve the operation of the facilities; and
(4) allow recovery of—
(A) all prudently incurred costs necessary to comply with mandatory reliability standards issued pursuant to section 824o of this title; and
(B) all prudently incurred costs related to transmission infrastructure development pursuant to [section 824p of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section824p&num=0&edition=prelim).
**(c) Incentives** In the rule issued under this section, the Commission shall, to the extent within its jurisdiction, provide for incentives to each transmitting utility or electric utility that joins a Transmission Organization. The Commission shall ensure that any costs recoverable pursuant to this subsection
Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 824s
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 1909
TITLE 16—CONSERVATION
§ 1531
maintenance of continuing and stable supply of agri-
cultural commodities and forest products.
Section 1502, Pub. L. 91–524, title X, § 1002, as added
Pub. L. 93–86, § 1(28), Aug. 10, 1973, 87 Stat. 242, required
eligible landowners and operators to furnish plan of
farming operations or land use to Secretary.
Section 1503, Pub. L. 91–524, title X, § 1003, as added
Pub. L. 93–86, § 1(28), Aug. 10, 1973, 87 Stat. 242; amended
Pub. L. 93–125, § 1(g)(i), Oct. 18, 1973, 87 Stat. 450, related
to approved conservation plans as basis for contracts,
duties under contracts, and termination or modifica-
tion of contracts.
Section 1504, Pub. L. 91–524, title X, § 1004, as added
Pub. L. 93–86, § 1(28), Aug. 10, 1973, 87 Stat. 243, author-
ized furnishing of conservation materials to eligible
owners and operators.
Section 1505, Pub. L. 91–524, title X, § 1005, as added
Pub. L. 93–86, § 1(28), Aug. 10, 1973, 87 Stat. 243; amended
Pub. L. 95–113, title XV, § 1509, Sept. 29, 1977, 91 Stat.
1022, authorized establishment of multiyear set-aside
contracts.
Section 1506, Pub. L. 91–524, title X, § 1006, as added
Pub. L. 93–86, § 1(28), Aug. 10, 1973, 87 Stat. 244, author-
ized issuance of rules and regulations as well as limita-
tions on total retired acreage.
Section 1507, Pub. L. 91–524, title X, § 1007, as added
Pub. L. 93–86, § 1(28), Aug. 10, 1973, 87 Stat. 244; amended
Pub. L. 93–125, § 1(g)(ii), Oct. 18, 1973, 87 Stat. 450, di-
rected appointment of advisory boards to assist in de-
velopment of programs under this chapter.
Section 1508, Pub. L. 91–524, title X, § 1008, as added
Pub. L. 93–86, § 1(28), Aug. 10, 1973, 87 Stat. 244, directed
coordination with and utilization of Federal, State, and
local services and facili
Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 1531
Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 1531. This identifies an authority to review, not proof of applicability.