Arkansas Legal Resource Navigator

43 U.S.C. § 422e — Contract requirements

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 422e — Contract requirements

Upon approval of any project proposal by the Secretary under the provisions of [section 422d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422d&num=0&edition=prelim), he may negotiate a contract which shall set out, among other things— **(a)** the maximum amount of any loan to be made to the organization and the time and method of making the same available to the organization. Said loan shall not exceed the lesser of (1) two-thirds of the maximum allowable estimated total project cost as determined by [section 422b(f) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422b/f&num=0&edition=prelim), or (2) the estimated total cost of the project minus the contribution of the local organization as provided in [section 422d(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422d/b&num=0&edition=prelim) and the amount of the grant approved; **(b)** the maximum amount of any grant to be accorded the organization. Said grant shall not exceed the sum of the following: (1) the costs of investigations, surveys, and engineering and other services necessary to the preparation of proposals and plans for the project allocable to fish and wildlife enhancement or public recreation; (2) one-half the costs of acquiring lands or interests therein to serve exclusively the purposes of fish and wildlife enhancement or public recreation, plus the costs of acquiring joint use lands and interests therein properly allocable to fish and wildlife enhancement and public recreation; (3) one-half the costs of basic public outdoor recreation facilities or facilities serving fish and wildlife enhancement purposes exclusively; (4) one-half the costs of construction of joint u

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 422e

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 6474bc443e5ba84a594c3a868cd3fab07cb99dcbedee33b6930c18b3626d8f59. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_3a7e1e73851d821fd7c4190d
Source file: Laws/federal/codes/united-states-code/title-43/section-422e-contract-requirements--79526ff869.md
Pages: Not recorded – Not recorded
Passage SHA-256: e8341abdf395ee59c1ec818e8f1f9ca94e7b71ad4e6389d3f8b059750f204409

Source location: Title 43, Chapter 12, § 422e; chapter-012-reclamation-and-irrigation-of-lands-by-federal-government.md

Stored source content

Upon approval of any project proposal by the Secretary under the provisions of [section 422d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422d&num=0&edition=prelim), he may negotiate a contract which shall set out, among other things— **(a)** the maximum amount of any loan to be made to the organization and the time and method of making the same available to the organization. Said loan shall not exceed the lesser of (1) two-thirds of the maximum allowable estimated total project cost as determined by [section 422b(f) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422b/f&num=0&edition=prelim), or (2) the estimated total cost of the project minus the contribution of the local organization as provided in [section 422d(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422d/b&num=0&edition=prelim) and the amount of the grant approved; **(b)** the maximum amount of any grant to be accorded the organization. Said grant shall not exceed the sum of the following: (1) the costs of investigations, surveys, and engineering and other services necessary to the preparation of proposals and plans for the project allocable to fish and wildlife enhancement or public recreation; (2) one-half the costs of acquiring lands or interests therein to serve exclusively the purposes of fish and wildlife enhancement or public recreation, plus the costs of acquiring joint use lands and interests therein properly allocable to fish and wildlife enhancement and public recreation; (3) one-half the costs of basic public outdoor recreation facilities or facilities serving fish and wildlife enhancement purposes exclusively; (4) one-half the costs of construction of joint use facilities properly allocable to fish and wildlife enhancement or public recreation; (5) that portion of the estimated cost of constructing the project which, if it were constructed as a Federal reclamation project, would be properly allocable to functions, other than recreation and fish and wildlife enhancement and flood control, which are nonreimbursable under general provisions of law applicable to such projects; and (6) that portion of the estimated cost of constructing the project which is allocable to flood control and which would be nonreimbursable under general provisions of law applicable to projects constructed by the Secretary of the Army.11 So in original. The period probably should be a semicolon. **(c)** a plan of repayment by the organization of (1) the sums lent to it in not more than forty years from the date when the principal benefits of the project first become available; (2) interest, as determined by the Secretary of the Treasury, as of the beginning of the fiscal year in which the contract is executed, on the basis of the average market yields on outstanding marketable obligations of the United States with remaining periods of maturity comparable to the applicable reimbursement period of the project, adjusted to the nearest one-eighth of 1 percent on the unamortized balance of any portion of the loan— (A) which is attributable to furnishing irrigation benefits in each particular year to land held in private ownership by a qualified recipient or by a limited recipient, as such terms are defined in [section 390bb of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section390bb&num=0&edition=prelim), in excess of three hundred and twenty irrigable acres; or, (B) which is allocated to domestic, industrial, or municipal water supply, commercial power, fish and wildlife enhancement, or public recreation except that portion of such allocation attributable to furnishing benefits to a facility operated by an agency of the United States, which portion shall bear no interest.1 **(d)** provision for operation of the project, if a grant predicated upon its performance of nonreimbursable functions is made, in accordance with regulations with respect thereto prescribed by the head of the Federal department or agency primarily concerned with those functions and, in the event of noncompliance with such regulations, for operation by the United States or for repayment to the United States of the amount of any such grant; **(e)** such provisions as the Secretary shall deem necessary or proper to provide assurance of and security for prompt repayment of the loan and interest as aforesaid. The liability of the United States under any contract entered into pursuant to this subchapter shall be contingent upon the availability of appropriations to carry out the same, and every such contract shall so recite; and **(f)** provisions conforming to the preference requirements contained in the proviso to [section 485h(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section485h/c&num=0&edition=prelim), if the project produces electric power for sale.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 422b — Definitions

As used in this subchapter— **(a)** The term “construction” shall include rehabilitation and betterment. **(b)** The term “Federal reclamation laws” shall mean the Act of June 17, 1902 (32 Stat. 388), and Acts amendatory thereof or supplementary thereto. **(c)** The term “organization” shall mean a State or a department, agency, or political subdivision thereof or a conservancy district, irrigation district, water users’ association, an agency created by interstate compact, or similar organization which has capacity to contract with the United States under the Federal reclamation laws. **(d)** The term “project” shall mean (i) any complete irrigation project, or (ii) any multiple-purpose water resource project that is authorized or is eligible for authorization under the Federal reclamation laws, or (iii) any distinct unit of a project described in clause (i) and (ii) or (iv) any project for the drainage of irrigated lands, without regard to whether such lands are irrigated with water supplies developed pursuant to the Federal reclamation laws, or (v) any project for the rehabilitation and betterment of a project or distinct unit described in clauses (i), (ii), (iii), and (iv): Provided, That the estimated total cost of the project described in clause (i), (ii), (iii), (iv), or (v) does not exceed the maximum allowable estimated total project cost as determined by subsection (f) hereof: Provided further, That a project described in clause (i), (ii), or (iii) may consist of existing facilities as distinct from newly constructed facilities, and funds made available pursuant to this subchapter may be utilized to acquire such facilities subject to a determination by the Secretary that such facilities meet standards of design and construction which he shall promulgate an

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 422b

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 422a — Declaration of purpose

The purpose of this subchapter is to encourage State and local participation in the development of projects under the Federal reclamation laws, with emphasis on rehabilitation and betterment of existing projects for purposes of significant conservation of water, energy and the environment and for purpose of water quality control, and to provide for Federal assistance in the development of similar projects in the seventeen western reclamation States by non-Federal organizations.

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 422a

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 390bb — Definitions

As used in this subchapter: (1) The term “contract” means any repayment or water service contract between the United States and a district providing for the payment of construction charges to the United States including normal operation, maintenance, and replacement costs pursuant to Federal reclamation law. (2) The term “district” means any individual or any legal entity established under State law which has entered into a contract or is eligible to contract with the Secretary for irrigation water. (3) (A) The term “full cost” means an annual rate as determined by the Secretary that shall amortize the expenditures for construction properly allocable to irrigation facilities in service, including all operation and maintenance deficits funded, less payments, over such periods as may be required under Federal reclamation law or applicable contract provisions, with interest on both accruing from October 12, 1982, on costs outstanding at that date, or from the date incurred in the case of costs arising subsequent to October 12, 1982: Provided, That operation, maintenance, and replacement charges required under Federal reclamation law, including this subchapter, shall be collected in addition to the full cost charge. (B) The interest rate used for expenditures made on or before October 12, 1982, shall be determined by the Secretary of the Treasury on the basis of the weighted average yield of all interest bearing, marketable issues sold by the Treasury during the fiscal year in which the expenditures by the United States were made, but shall not be less than 7½ per centum per annum. (C) The interest rate used for expenditures made after October 12, 1982, shall be determined by the Secretary of the Treasury on the basis of the arithmetic average of— (i) the r

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 390bb

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 422d — Contents of proposals

**(a) Plans and estimates; review by States; allocation of capital costs** Any proposal with respect to the construction of a project which has not theretofore been authorized for construction under the Federal reclamation laws shall set forth, among other things, a plan and estimated cost in detail comparable to those included in preauthorization reports required for a Federal reclamation project; shall have been submitted for review by the States of the drainage basin in which the project is located in like manner as provided in [section 701–1(c) of title 33](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section701–1/c&num=0&edition=prelim), except that the review may be limited to the State or States in which the project is located if the proposal is one solely for rehabilitation and betterment of an existing project; and shall include a proposed allocation of capital costs to functions such that costs for facilities used for a single purpose shall be allocated to that purpose and costs for facilities used for more than one purpose shall be so allocated among the purposes served that each purpose will share equitably in the costs of such joint facilities. The costs of means and measures to prevent loss of and damage to fish and wildlife resources shall be considered as project costs and allocated as may be appropriate among project functions. **(b) Lands and water rights; ownership; financing** (1) Every such proposal shall include a showing that the organization already holds or can acquire all lands and interests in land (except public and other lands and interests in land owned by the United States which are within the administrative jurisdiction of the Secretary and subject to disposition by him) and rights, pursuant to applicable State l

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 422d

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 422f — Proposals for projects previously authorized; waiver of requirements; approval; negotiation of contract

Any proposal with respect to the construction of a project which has theretofore been authorized for construction under the Federal reclamation laws shall be made in like manner as a proposal under [section 422d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422d&num=0&edition=prelim), but the Secretary may waive such requirements of subsections (a) and (b) of [section 422d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422d&num=0&edition=prelim) as he finds to be duplicative of, or rendered unnecessary or impossible by, action already taken by the United States. Upon approval of any such proposal by the Secretary he may negotiate and execute a contract which conforms, as nearly as may be, to the provisions of [section 422e of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422e&num=0&edition=prelim).

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 422f

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 422g — Information from Federal agencies; costs

Upon request of an organization which has made or intends to make a proposal under this subchapter, the head of any Federal department or agency may make available to the organization any existing engineering, economic, or hydrologic information and printed material that it may have and that will be useful in connection with the planning, design, construction, or operation and maintenance of the project concerned. The reasonable cost of any plans, specifications, and other unpublished material furnished by the Secretary pursuant to this section and the cost of making and administering any loan under this subchapter shall, to the extent that they would not be nonreimbursable in the case of a project constructed under the Federal reclamation laws, be treated as a loan and covered in the provisions of the contract entered into under [section 422e of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422e&num=0&edition=prelim) unless they are otherwise paid for by the organization.

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 422g

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 422e — Contract requirements

Page 143 TITLE 43—PUBLIC LANDS § 422e 1 So in original. The period probably should be a semicolon. Subsecs. (e), (f). Pub. L. 94–181, § 1(d), (e), redesignated former subsec. (d) as (e), substituted ‘‘(e)’’ for ‘‘(d)’’, and redesignated former subsec. (e) as (f). 1971—Subsec. (e). Pub. L. 92–167 substituted in first sentence ‘‘project’’ for ‘‘project, whether the proposal involves furnishing supplemental irrigation water for an existing irrigation project, whether the proposal in- volves rehabilitation of existing irrigation project works, and whether the proposed project is primarily for irrigation’’. 1966—Subsec. (a). Pub. L. 89–553, § 1(2), extended project costs to include the cost of means and measures to prevent loss of and damage to fish and wildlife re- sources and authorized allocation of such costs as may be appropriate among project functions. Subsec. (b). Pub. L. 89–553, § 1(3), substituted ‘‘cost of the project’’ for ‘‘cost of construction’’ in provision re- quiring that the organization be ready, able, and will- ing to finance by other than loan or grant whatever costs the Secretary advises, inserted reference to sec- tion 422e(b)(2) of this title as an exception to the costs which the organization must be able to finance other than by loan or grant, and struck out proviso that the contribution by the applicant organization shall not be required in excess of 25 per centum of the costs of the project which, if it were being constructed as a Federal reclamation project, would be properly allocable to re- imbursable functions under general provisions of law applicable to such projects. 1957—Subsec. (c). Pub. L. 85–47, § 1(a), changed lan- guage generally, and struck out provisions which au- thorized Secretary to negotiate a contract a

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 422e

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.