Arkansas Legal Resource Navigator

43 U.S.C. § 422d — Contents of proposals

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 422d — Contents of proposals

**(a) Plans and estimates; review by States; allocation of capital costs** Any proposal with respect to the construction of a project which has not theretofore been authorized for construction under the Federal reclamation laws shall set forth, among other things, a plan and estimated cost in detail comparable to those included in preauthorization reports required for a Federal reclamation project; shall have been submitted for review by the States of the drainage basin in which the project is located in like manner as provided in [section 701–1(c) of title 33](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section701–1/c&num=0&edition=prelim), except that the review may be limited to the State or States in which the project is located if the proposal is one solely for rehabilitation and betterment of an existing project; and shall include a proposed allocation of capital costs to functions such that costs for facilities used for a single purpose shall be allocated to that purpose and costs for facilities used for more than one purpose shall be so allocated among the purposes served that each purpose will share equitably in the costs of such joint facilities. The costs of means and measures to prevent loss of and damage to fish and wildlife resources shall be considered as project costs and allocated as may be appropriate among project functions. **(b) Lands and water rights; ownership; financing** (1) Every such proposal shall include a showing that the organization already holds or can acquire all lands and interests in land (except public and other lands and interests in land owned by the United States which are within the administrative jurisdiction of the Secretary and subject to disposition by him) and rights, pursuant to applicable State l

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 422d

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 149d41e8601dc29f5b15b23012faac1b2a85873f65d3a08ed70872bdc26272c5. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_d706e929e25d500aad18eb3b
Source file: Laws/federal/codes/united-states-code/title-43/section-422d-contents-of-proposals--c75c4ebc53.md
Pages: Not recorded – Not recorded
Passage SHA-256: 7abebdd9474a33441c438313b05312d9948d4e2d34c4c77e46eb8fc9681f734c

Source location: Title 43, Chapter 12, § 422d; chapter-012-reclamation-and-irrigation-of-lands-by-federal-government.md

Stored source content

**(a) Plans and estimates; review by States; allocation of capital costs** Any proposal with respect to the construction of a project which has not theretofore been authorized for construction under the Federal reclamation laws shall set forth, among other things, a plan and estimated cost in detail comparable to those included in preauthorization reports required for a Federal reclamation project; shall have been submitted for review by the States of the drainage basin in which the project is located in like manner as provided in [section 701–1(c) of title 33](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section701–1/c&num=0&edition=prelim), except that the review may be limited to the State or States in which the project is located if the proposal is one solely for rehabilitation and betterment of an existing project; and shall include a proposed allocation of capital costs to functions such that costs for facilities used for a single purpose shall be allocated to that purpose and costs for facilities used for more than one purpose shall be so allocated among the purposes served that each purpose will share equitably in the costs of such joint facilities. The costs of means and measures to prevent loss of and damage to fish and wildlife resources shall be considered as project costs and allocated as may be appropriate among project functions. **(b) Lands and water rights; ownership; financing** (1) Every such proposal shall include a showing that the organization already holds or can acquire all lands and interests in land (except public and other lands and interests in land owned by the United States which are within the administrative jurisdiction of the Secretary and subject to disposition by him) and rights, pursuant to applicable State law, to the use of water necessary for the successful construction, operation, and maintenance of the project and that it is ready, able, and willing to finance otherwise than by loan and grant of Federal funds such portion of the cost of the project (which portion shall include all costs of acquiring lands, interests in land, and rights to the use of water), except as provided in [section 422e(b)(2) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422e/b/2&num=0&edition=prelim) as the Secretary shall have advised is proper in the circumstances. (2) The Secretary shall require each organization to contribute toward the cost of the project (other than by loan and/or grant of Federal funds) an amount equal to 25 percent or more of the allowable estimated cost of the project: Provided, That the Secretary, at his discretion, may reduce the amount of such contribution to the extent that he determines that the organization is unable to secure financing from other sources under reasonable terms and conditions, and shall include letters from lenders or other written evidence in support of any funding of an applicant’s inability to secure such financing in any project proposal transmitted to the Congress: Provided further, That under no circumstances shall the Secretary reduce the amount of such contribution to less than 10 percent of the allowable estimated total project costs. In determining the amount of the contribution as required by this paragraph, the Secretary shall credit toward that amount the cost of investigations, surveys, engineering, and other services necessary to the preparation of proposals and plans for the project as required by the Secretary, and the costs of lands and rights-of-way required for the project, and the $5,000 fee described in [section 422c of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422c&num=0&edition=prelim). In determining the allowable estimated cost of the project, the Secretary shall not include the amount of grants accorded to the organization under [section 422e(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422e/b&num=0&edition=prelim). **(c) Transmittal of findings and approval to Congress; certification of soil survey; reservation of land** At such time as a project is found by the Secretary and the Governor of the State in which it is located (or an appropriate State agency designated by him) to be financially feasible, is determined by the Secretary to constitute a reasonable risk under the provisions of this subchapter, and is approved by the Secretary, such findings and approval shall be transmitted to the Congress. Each project proposal transmitted by the Secretary to the Congress shall include a certification by the Secretary that an adequate soil survey and land classification has been made, or that the successful irrigability of those lands and their susceptibility to sustained production of agricultural crops by means of irrigation has been demonstrated in practice. Such proposal shall also include an investigation of soil characteristics which might result in toxic or hazardous irrigation return flows. The Secretary, at the time of submitting the project proposal to Congress or at the time of his determination that the requested project constitutes a reasonable risk under the provisions of this subchapter, may reserve from use or disposition inimical to the project any lands and interests in land owned by the United States which are within his administrative jurisdiction and subject to disposition by him and which are required for use by the project. Any such reservation shall expire at the end of two years unless the contract provided for in [section 422e of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422e&num=0&edition=prelim) shall have been executed. **(d) Amount of loan and/or grant; increase by Secretary** At the time of his submitting the project proposal to the Congress, or at any subsequent time prior to completion of construction of the project, including projects heretofore approved, the Secretary may increase the amount of the requested loan and/or grant to an amount within the maximum allowed by [section 422e(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422e/a&num=0&edition=prelim), as amended by Pub. L. 94–181, to compensate for increases in construction costs due to price escalation. **(e) Appropriation; nonapplicability** No appropriation shall be made for financial participation in any such project prior to sixty calendar days (which sixty days, however, shall not include days on which either the House of Representatives or the Senate is not in session because of an adjournment of more than three calendar days to a day certain) from the date on which the Secretary’s findings and approval are submitted to the Congress and then only if, within said sixty days, neither the Committee on Natural Resources of the House of Representatives nor the Committee on Energy and Natural Resources of the Senate disapproves the project proposal by committee resolution. The provisions of this subsection (e) shall not be applicable to proposals made under [section 422f of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422f&num=0&edition=prelim). **(f) Consideration of financial feasibility, emergency, or urgent need; jurisdiction and control of project works and facilities** The Secretary shall give due consideration to financial feasibility, emergency, or urgent need for the project. All project works and facilities constructed under this subchapter shall remain under the jurisdiction and control of the local contracting organization subject to the terms of the repayment contract.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 422b — Definitions

As used in this subchapter— **(a)** The term “construction” shall include rehabilitation and betterment. **(b)** The term “Federal reclamation laws” shall mean the Act of June 17, 1902 (32 Stat. 388), and Acts amendatory thereof or supplementary thereto. **(c)** The term “organization” shall mean a State or a department, agency, or political subdivision thereof or a conservancy district, irrigation district, water users’ association, an agency created by interstate compact, or similar organization which has capacity to contract with the United States under the Federal reclamation laws. **(d)** The term “project” shall mean (i) any complete irrigation project, or (ii) any multiple-purpose water resource project that is authorized or is eligible for authorization under the Federal reclamation laws, or (iii) any distinct unit of a project described in clause (i) and (ii) or (iv) any project for the drainage of irrigated lands, without regard to whether such lands are irrigated with water supplies developed pursuant to the Federal reclamation laws, or (v) any project for the rehabilitation and betterment of a project or distinct unit described in clauses (i), (ii), (iii), and (iv): Provided, That the estimated total cost of the project described in clause (i), (ii), (iii), (iv), or (v) does not exceed the maximum allowable estimated total project cost as determined by subsection (f) hereof: Provided further, That a project described in clause (i), (ii), or (iii) may consist of existing facilities as distinct from newly constructed facilities, and funds made available pursuant to this subchapter may be utilized to acquire such facilities subject to a determination by the Secretary that such facilities meet standards of design and construction which he shall promulgate an

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 422b

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 422a — Declaration of purpose

The purpose of this subchapter is to encourage State and local participation in the development of projects under the Federal reclamation laws, with emphasis on rehabilitation and betterment of existing projects for purposes of significant conservation of water, energy and the environment and for purpose of water quality control, and to provide for Federal assistance in the development of similar projects in the seventeen western reclamation States by non-Federal organizations.

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 422a

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 422e — Contract requirements

Upon approval of any project proposal by the Secretary under the provisions of [section 422d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422d&num=0&edition=prelim), he may negotiate a contract which shall set out, among other things— **(a)** the maximum amount of any loan to be made to the organization and the time and method of making the same available to the organization. Said loan shall not exceed the lesser of (1) two-thirds of the maximum allowable estimated total project cost as determined by [section 422b(f) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422b/f&num=0&edition=prelim), or (2) the estimated total cost of the project minus the contribution of the local organization as provided in [section 422d(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422d/b&num=0&edition=prelim) and the amount of the grant approved; **(b)** the maximum amount of any grant to be accorded the organization. Said grant shall not exceed the sum of the following: (1) the costs of investigations, surveys, and engineering and other services necessary to the preparation of proposals and plans for the project allocable to fish and wildlife enhancement or public recreation; (2) one-half the costs of acquiring lands or interests therein to serve exclusively the purposes of fish and wildlife enhancement or public recreation, plus the costs of acquiring joint use lands and interests therein properly allocable to fish and wildlife enhancement and public recreation; (3) one-half the costs of basic public outdoor recreation facilities or facilities serving fish and wildlife enhancement purposes exclusively; (4) one-half the costs of construction of joint u

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 422e

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 422f — Proposals for projects previously authorized; waiver of requirements; approval; negotiation of contract

Any proposal with respect to the construction of a project which has theretofore been authorized for construction under the Federal reclamation laws shall be made in like manner as a proposal under [section 422d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422d&num=0&edition=prelim), but the Secretary may waive such requirements of subsections (a) and (b) of [section 422d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422d&num=0&edition=prelim) as he finds to be duplicative of, or rendered unnecessary or impossible by, action already taken by the United States. Upon approval of any such proposal by the Secretary he may negotiate and execute a contract which conforms, as nearly as may be, to the provisions of [section 422e of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422e&num=0&edition=prelim).

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 422f

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 422c — Proposals; submission; payment for cost of examination

Any organization desiring to avail itself of the benefits provided in this subchapter shall submit a proposal therefor to the Secretary in such form and manner as he shall prescribe. Each such proposal shall be accompanied by a payment of $5,000 to defray, in part, the cost of examining the proposal.

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 422c

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 422d — Contents of proposals

Page 141 TITLE 43—PUBLIC LANDS § 422d Federal reclamation laws, or (v) any project for the rehabilitation and betterment of a project or distinct unit described in clauses (i), (ii), (iii), and (iv): Provided, That the estimated total cost of the project described in clause (i), (ii), (iii), (iv), or (v) does not exceed the maximum allow- able estimated total project cost as determined by subsection (f) hereof: Provided further, That a project described in clause (i), (ii), or (iii) may consist of existing facilities as distinct from newly constructed facilities, and funds made available pursuant to this subchapter may be utilized to acquire such facilities subject to a determination by the Secretary that such facili- ties meet standards of design and construction which he shall promulgate and that the cost of such existing facilities represent less than fifty per centum of the cost of the project. Nothing contained in this subchapter shall preclude the making of more than one loan or grant, or com- bined loan and grant, to an organization so long as no two such loans or grants, or combinations thereof, are for the same project, as herein de- fined. (e) The term ‘‘Secretary’’ shall mean the Sec- retary of the Interior. (f) The maximum allowable estimated total project cost of a proposal submitted during any given calendar year shall be determined by the Secretary using the Bureau of Reclamation composite construction cost index for January of that year with $15,000,000 as the January 1971 base. (Aug. 6, 1956, ch. 972, § 2, 70 Stat. 1044; Pub. L. 89–553, § 1(1), Sept. 2, 1966, 80 Stat. 376; Pub. L. 92–167, § 1(1), Nov. 24, 1971, 85 Stat. 488; Pub. L. 94–181, § 1(a), (b), Dec. 27, 1975, 89 Stat. 1049.) Editorial Notes REFERENCES IN TEXT A

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 422d

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.