Arkansas Legal Resource Navigator

43 U.S.C. § 422g — Information from Federal agencies; costs

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 422g — Information from Federal agencies; costs

Upon request of an organization which has made or intends to make a proposal under this subchapter, the head of any Federal department or agency may make available to the organization any existing engineering, economic, or hydrologic information and printed material that it may have and that will be useful in connection with the planning, design, construction, or operation and maintenance of the project concerned. The reasonable cost of any plans, specifications, and other unpublished material furnished by the Secretary pursuant to this section and the cost of making and administering any loan under this subchapter shall, to the extent that they would not be nonreimbursable in the case of a project constructed under the Federal reclamation laws, be treated as a loan and covered in the provisions of the contract entered into under [section 422e of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422e&num=0&edition=prelim) unless they are otherwise paid for by the organization.

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 422g

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 35e29010b633d2b2643dd3ab55a4e61a7a941f79fe523e62278069e8413b131c. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_4c0001f377273631224f228d
Source file: Laws/federal/codes/united-states-code/title-43/section-422g-information-from-federal-agencies-costs--4e23738be5.md
Pages: Not recorded – Not recorded
Passage SHA-256: 97877e416251967890ecd6e1ab2dc53d00f930c9a1a7bde643e3b424d8ccc3d9

Source location: Title 43, Chapter 12, § 422g; chapter-012-reclamation-and-irrigation-of-lands-by-federal-government.md

Stored source content

Upon request of an organization which has made or intends to make a proposal under this subchapter, the head of any Federal department or agency may make available to the organization any existing engineering, economic, or hydrologic information and printed material that it may have and that will be useful in connection with the planning, design, construction, or operation and maintenance of the project concerned. The reasonable cost of any plans, specifications, and other unpublished material furnished by the Secretary pursuant to this section and the cost of making and administering any loan under this subchapter shall, to the extent that they would not be nonreimbursable in the case of a project constructed under the Federal reclamation laws, be treated as a loan and covered in the provisions of the contract entered into under [section 422e of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422e&num=0&edition=prelim) unless they are otherwise paid for by the organization.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 422b — Definitions

As used in this subchapter— **(a)** The term “construction” shall include rehabilitation and betterment. **(b)** The term “Federal reclamation laws” shall mean the Act of June 17, 1902 (32 Stat. 388), and Acts amendatory thereof or supplementary thereto. **(c)** The term “organization” shall mean a State or a department, agency, or political subdivision thereof or a conservancy district, irrigation district, water users’ association, an agency created by interstate compact, or similar organization which has capacity to contract with the United States under the Federal reclamation laws. **(d)** The term “project” shall mean (i) any complete irrigation project, or (ii) any multiple-purpose water resource project that is authorized or is eligible for authorization under the Federal reclamation laws, or (iii) any distinct unit of a project described in clause (i) and (ii) or (iv) any project for the drainage of irrigated lands, without regard to whether such lands are irrigated with water supplies developed pursuant to the Federal reclamation laws, or (v) any project for the rehabilitation and betterment of a project or distinct unit described in clauses (i), (ii), (iii), and (iv): Provided, That the estimated total cost of the project described in clause (i), (ii), (iii), (iv), or (v) does not exceed the maximum allowable estimated total project cost as determined by subsection (f) hereof: Provided further, That a project described in clause (i), (ii), or (iii) may consist of existing facilities as distinct from newly constructed facilities, and funds made available pursuant to this subchapter may be utilized to acquire such facilities subject to a determination by the Secretary that such facilities meet standards of design and construction which he shall promulgate an

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 422b

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 422e — Contract requirements

Upon approval of any project proposal by the Secretary under the provisions of [section 422d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422d&num=0&edition=prelim), he may negotiate a contract which shall set out, among other things— **(a)** the maximum amount of any loan to be made to the organization and the time and method of making the same available to the organization. Said loan shall not exceed the lesser of (1) two-thirds of the maximum allowable estimated total project cost as determined by [section 422b(f) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422b/f&num=0&edition=prelim), or (2) the estimated total cost of the project minus the contribution of the local organization as provided in [section 422d(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section422d/b&num=0&edition=prelim) and the amount of the grant approved; **(b)** the maximum amount of any grant to be accorded the organization. Said grant shall not exceed the sum of the following: (1) the costs of investigations, surveys, and engineering and other services necessary to the preparation of proposals and plans for the project allocable to fish and wildlife enhancement or public recreation; (2) one-half the costs of acquiring lands or interests therein to serve exclusively the purposes of fish and wildlife enhancement or public recreation, plus the costs of acquiring joint use lands and interests therein properly allocable to fish and wildlife enhancement and public recreation; (3) one-half the costs of basic public outdoor recreation facilities or facilities serving fish and wildlife enhancement purposes exclusively; (4) one-half the costs of construction of joint u

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 422e

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 422g — Information from Federal agencies; costs

Page 145 TITLE 43—PUBLIC LANDS § 422j grant was made prior to the effective date of Pub. L. 89–553, Sept. 2, 1966, see section 2 of Pub. L. 89–553, set out as a note under section 422b of this title. § 422f. Proposals for projects previously author- ized; waiver of requirements; approval; nego- tiation of contract Any proposal with respect to the construction of a project which has theretofore been author- ized for construction under the Federal reclama- tion laws shall be made in like manner as a pro- posal under section 422d of this title, but the Secretary may waive such requirements of sub- sections (a) and (b) of section 422d of this title as he finds to be duplicative of, or rendered unnec- essary or impossible by, action already taken by the United States. Upon approval of any such proposal by the Secretary he may negotiate and execute a contract which conforms, as nearly as may be, to the provisions of section 422e of this title. (Aug. 6, 1956, ch. 972, § 6, 70 Stat. 1046.) Editorial Notes REFERENCES IN TEXT The Federal reclamation laws, referred to in text, are defined in section 422b of this title. § 422g. Information from Federal agencies; costs Upon request of an organization which has made or intends to make a proposal under this subchapter, the head of any Federal department or agency may make available to the organiza- tion any existing engineering, economic, or hy- drologic information and printed material that it may have and that will be useful in connec- tion with the planning, design, construction, or operation and maintenance of the project con- cerned. The reasonable cost of any plans, speci- fications, and other unpublished material fur- nished by the Secretary pursuant to this section and the cost of making and administer

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 422g

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.