43 U.S.C. § 2405 — Feasibility studies
Federal law — U.S. Code and appendices · legal_authorities
**(a) In general** On completion of an appraisal report under [section 2404(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section2404/c&num=0&edition=prelim) that recommends undertaking a feasibility study and subject to the availability of appropriations, the Secretary shall—
(1) in cooperation with a non-Federal project entity, carry out a study to determine the feasibility of the proposed rural water supply project;
(2) receive and review a feasibility study that is—
(A) developed by the non-Federal project entity, with or without support from the Secretary; and
(B) submitted to the Secretary by the non-Federal project entity; or
(3)
(A) provide a grant to, or enter into a cooperative agreement with, a non-Federal project entity to conduct a feasibility study, for submission to the Secretary, if the Secretary determines that—
(i) the non-Federal entity is qualified to complete the feasibility study in accordance with the criteria promulgated under subsection (d); and
(ii) using the non-Federal project entity to conduct the feasibility study is a cost-effective alternative for completing the appraisal investigation; or
(B) if the Secretary determines not to provide a grant to, or enter into a cooperative agreement with, a non-Federal project entity under subparagraph (A), provide to the non-Federal project entity notice of the determination, including an explanation of the reason for the determination.
**(b) Review of non-Federal feasibility studies**
(1) **In general** — In conducting a review of a feasibility study submitted under paragraph (2) or (3) of subsection (a), the Secretary shall—
(A) in accordance with the feasibility factors described in subsection (c) and the criteria promulgated und
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 2405
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: f3be265cc90061b0421439a4a8a7cd876dfc3aacf0493d3dc0752b76d4d927a6. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_2f1b5f852403fa0b0d4f6bf8
Source file: Laws/federal/codes/united-states-code/title-43/section-2405-feasibility-studies--5a42e07471.md
Pages: Not recorded – Not recorded
Passage SHA-256: 6bcca91d56fb47b2ee988c07be51ccbe24e4dba4daea37c6c2030124c26708de
Source location: Title 43, Chapter 42, § 2405; chapter-042-rural-water-supply.md
Stored source content
**(a) In general** On completion of an appraisal report under [section 2404(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section2404/c&num=0&edition=prelim) that recommends undertaking a feasibility study and subject to the availability of appropriations, the Secretary shall—
(1) in cooperation with a non-Federal project entity, carry out a study to determine the feasibility of the proposed rural water supply project;
(2) receive and review a feasibility study that is—
(A) developed by the non-Federal project entity, with or without support from the Secretary; and
(B) submitted to the Secretary by the non-Federal project entity; or
(3)
(A) provide a grant to, or enter into a cooperative agreement with, a non-Federal project entity to conduct a feasibility study, for submission to the Secretary, if the Secretary determines that—
(i) the non-Federal entity is qualified to complete the feasibility study in accordance with the criteria promulgated under subsection (d); and
(ii) using the non-Federal project entity to conduct the feasibility study is a cost-effective alternative for completing the appraisal investigation; or
(B) if the Secretary determines not to provide a grant to, or enter into a cooperative agreement with, a non-Federal project entity under subparagraph (A), provide to the non-Federal project entity notice of the determination, including an explanation of the reason for the determination.
**(b) Review of non-Federal feasibility studies**
(1) **In general** — In conducting a review of a feasibility study submitted under paragraph (2) or (3) of subsection (a), the Secretary shall—
(A) in accordance with the feasibility factors described in subsection (c) and the criteria promulgated under subsection (d), assess the completeness of the feasibility study; and
(B) if the Secretary determines that a feasibility study is not complete, notify the non-Federal entity of the determination.
(2) **Revisions** — If the Secretary determines under paragraph (1)(B) that a feasibility study is not complete, the non-Federal entity shall pay any costs associated with revising the feasibility study.
**(c) Feasibility factors** Feasibility studies authorized or reviewed under this subchapter shall include an assessment of—
(1) near- and long-term water demand in the area to be served by the rural water supply project;
(2) advancement of public health and safety of any existing rural water supply project and other benefits of the proposed rural water supply project;
(3) alternative new water supplies in the study area, including any opportunities to treat and use low-quality water, nonpotable water, water reuse-based supplies, and brackish and saline waters through innovative and economically viable treatment technologies;
(4) environmental quality and source water protection issues related to the rural water supply project;
(5) innovative opportunities for water conservation in the study area to reduce water use and water system costs, including—
(A) nonstructural approaches to reduce the need for the project; and
(B) demonstration technologies;
(6) the extent to which the project and alternatives take advantage of economic incentives and the use of market-based mechanisms;
(7)
(A) the construction costs and projected operations, maintenance, and replacement costs of all alternatives; and
(B) the economic feasibility and lowest cost method of obtaining the desired results of each alternative, taking into account the Federal cost-share;
(8) the availability of guaranteed loans for a proposed rural water supply project;
(9) the financial capability of the non-Federal project entity to pay the non-Federal project entity’s proportionate share of the design and construction costs and 100 percent of operations, maintenance, and replacement costs, including the allocation of costs to each non-Federal project entity in the case of multiple entities;
(10) whether the non-Federal project entity has developed an operations, management, and replacement plan to assist the non-Federal project entity in establishing rates and fees for beneficiaries of the rural water supply project that includes a schedule identifying the annual operations, maintenance, and replacement costs that should be allocated to each non-Federal entity participating in the project;
(11)
(A) the non-Federal project entity administrative organization that would implement construction, operations, maintenance, and replacement activities; and
(B) the fiscal, administrative, and operational controls to be implemented to manage the project;
(12) the extent to which assistance for rural water supply is available under other Federal authorities;
(13) the engineering, environmental, and economic activities to be undertaken to carry out the proposed rural water supply project;
(14) the extent to which the project involves partnerships with other State, local, or tribal governments or Federal entities; and
(15) in the case of a project intended for Indian tribes and tribal organizations, the extent to which the project addresses the goal of economic self-sufficiency.
**(d) Feasibility study criteria**
(1) **In general** — Not later than 18 months after December 22, 2006, the Secretary shall promulgate criteria (including the feasibility factors listed under subsection (c)) under which the feasibility studies shall be assessed for completeness and appropriateness.
(2) **Inclusions** — The Secretary shall include in the criteria promulgated under paragraph (1) methods to scale the level of effort needed to complete the feasibility assessment relative to the total size and cost of the proposed rural water supply project and reduce total costs to non-Federal entities.
**(e) Feasibility report**
(1) **11 So in original. No par. (2) has been enacted. In general** — After completion of appropriate feasibility studies for rural water supply projects that address the factors described in subsection (c) and the criteria promulgated under subsection (d), the Secretary shall—
(A) develop a feasibility report that includes—
(i) a recommendation of the Secretary on—
(I) whether the rural water supply project should be authorized for construction; and
(II) the appropriate non-Federal share of construction costs, which shall be—
(aa) at least 25 percent of the total construction costs; and
(bb) determined based on an analysis of the capability-to-pay information considered under subsections (c)(9) and (f); and
(ii) if the Secretary recommends that the project should be authorized for construction—
(I) what amount of grants, loan guarantees, or combination of grants and loan guarantees should be used to provide the Federal cost share;
(II) a schedule that identifies the annual operations, maintenance, and replacement costs that should be allocated to each non-Federal entity participating in the rural water supply project; and
(III) an assessment of the financial capability of each non-Federal entity participating in the rural water supply project to pay the allocated annual operation, maintenance, and replacement costs for the rural water supply project;
(B) submit the report to the Committee on Energy and Natural Resources of the Senate and the Committee on Resources of the House of Representatives;
(C) make the report publicly available, along with associated study documents; and
(D) publish in the Federal Register a notice of the availability of the results.
**(f) Capability-to-pay**
(1) **In general** — In evaluating a proposed rural water supply project under this section, the Secretary shall—
(A) consider the financial capability of any non-Federal project entities participating in the rural water supply project to pay 25 percent or more of the capital construction costs of the rural water supply project; and
(B) recommend an appropriate Federal share and non-Federal share of the capital construction costs, as determined by the Secretary.
(2) **Factors** — In determining the financial capability of non-Federal project entities to pay for a rural water supply project under paragraph (1), the Secretary shall evaluate factors for the project area, relative to the State average, including—
(A) per capita income;
(B) median household income;
(C) the poverty rate;
(D) the ability of the non-Federal project entity to raise tax revenues or assess fees;
(E) the strength of the balance sheet of the non-Federal project entity; and
(F) the existing cost of water in the region.
(3) **Indian tribes** — In determining the capability-to-pay of Indian tribe project beneficiaries, the Secretary may consider deferring the collection of all or part of the non-Federal construction costs apportioned to Indian tribe project beneficiaries unless or until the Secretary determines that the Indian tribe project beneficiaries should pay—
(A) the costs allocated to the beneficiaries; or
(B) an appropriate portion of the costs.
**(g) Cost-sharing requirement**
(1) **In general** — Except as otherwise provided in this subsection, the Federal share of the cost of a feasibility study carried out under this section shall not exceed 50 percent of the study costs.
(2) **Form** — The non-Federal share under paragraph (1) may be in the form of any in-kind services that the Secretary determines would contribute substantially toward the conduct and completion of the study.
(3) **Financial hardship** — The Secretary may increase the Federal share of the costs of a feasibility study if the Secretary determines, based on a demonstration of financial hardship, that the non-Federal participant is unable to contribute at least 50 percent of the costs of the study.
(4) **Larger communities** — In conducting a feasibility study of a rural water supply system that includes a community with a population in excess of 50,000 inhabitants, the Secretary may require the non-Federal project entity to pay more than 50 percent of the costs of the study.
**(h) Consultation and cooperation** In addition to the non-Federal project entity, the Secretary shall consult and cooperate with appropriate Federal, State, tribal, regional, and local authorities during the conduct of each feasibility assessment and development of the feasibility report conducted under this subchapter.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) In general** The Secretary, in cooperation with non-Federal project entities and consistent with this subchapter, may carry out a rural water supply program in Reclamation States to—
(1) investigate and identify opportunities to ensure safe and adequate rural water supply projects for domestic, municipal, and industrial use in small communities and rural areas of the Reclamation States;
(2) plan the design and construction, through the conduct of appraisal investigations and feasibility studies, of rural water supply projects in Reclamation States; and
(3) oversee, as appropriate, the construction of rural water supply projects in Reclamation States that are recommended by the Secretary in a feasibility report developed pursuant to [section 2405 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section2405&num=0&edition=prelim) and subsequently authorized by Congress.
**(b) Non-Federal project entity** Any activity carried out under this subchapter shall be carried out in cooperation with a qualifying non-Federal project entity, consistent with this subchapter.
**(c) Eligibility criteria** Not later than 1 year after December 22, 2006, the Secretary shall, consistent with this subchapter, develop and publish in the Federal Register criteria for—
(1) determining the eligibility of a rural community for assistance under the Program; and
(2) prioritizing requests for assistance under the Program.
**(d) Factors** The criteria developed under subsection (c) shall take into account such factors as whether—
(1) a rural water supply project—
(A) serves—
(i) rural areas and small communities; or
(ii) Indian tribes; or
(B) promotes and applies a regional or watershed perspective to water resources management;
(2) t
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 2402
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Authority of Secretary** The Secretary may enter into contracts, financial assistance agreements, and such other agreements, and promulgate such regulations, as are necessary to carry out this subchapter.
**(b) Transfer of projects** Nothing in this subchapter authorizes the transfer of pre-existing facilities or pre-existing components of any water system from Federal to private ownership or from private to Federal ownership.
**(c) Federal reclamation law** Nothing in this subchapter supersedes or amends any Federal law associated with a project, or portion of a project, constructed under Federal reclamation law.
**(d) Interagency coordination** The Secretary shall coordinate the Program carried out under this subchapter with existing Federal and State rural water and wastewater programs to facilitate the most efficient and effective solution to meeting the water needs of the non-Federal project sponsors.
**(e) Multiple Indian tribes** In any case in which a contract is entered into with, or a grant is made, to 11 So in original. The comma probably should follow “to”. an organization to perform services benefitting more than 1 Indian tribe under this subchapter, the approval of each such Indian tribe shall be a prerequisite to entering into the contract or making the grant.
**(f) Ownership of facilities** Title to any facility planned, designed, and recommended for construction under this subchapter shall be held by the non-Federal project entity.
**(g) Expedited procedures** If the Secretary determines that a community to be served by a proposed rural water supply project has urgent and compelling water needs, the Secretary shall, to the maximum extent practicable, expedite appraisal investigations and reports conducted under [section 2404 of this title](h
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 2406
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Eligibility criteria**
(1) **In general** — The Secretary shall develop and publish in the Federal Register criteria for determining the eligibility of a project for financial assistance under [section 2423 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section2423&num=0&edition=prelim).
(2) **Inclusions** — Eligibility criteria shall include—
(A) submission of an application by the lender to the Secretary;
(B) demonstration of the creditworthiness of the project, including a determination by the Secretary that any financing for the project has appropriate security features to ensure repayment;
(C) demonstration by the non-Federal borrower, to the satisfaction of the Secretary, of the ability of the non-Federal borrower to repay the project financing from user fees or other dedicated revenue sources;
(D) demonstration by the non-Federal borrower, to the satisfaction of the Secretary, of the ability of the non-Federal borrower to pay all operations, maintenance, and replacement costs of the project facilities; and
(E) such other criteria as the Secretary determines to be appropriate.
**(b) Waiver** The Secretary may waive any of the criteria in subsection (a)(2) that the Secretary determines to be duplicative or rendered unnecessary because of an action already taken by the United States.
**(c) Projects previously authorized** A project that was authorized for construction under Federal reclamation laws prior to December 22, 2006, shall be eligible for assistance under this subchapter, subject to the criteria established by the Secretary under subsection (a).
**(d) Criteria for rural water supply projects** A rural water supply project that is determined to be feasible under [section 2405 of this title](https
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 2422
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 635
TITLE 43—PUBLIC LANDS
§ 2405
(C) Form
The non-Federal share under subparagraph
(A) may be in the form of any in-kind serv-
ices that the Secretary determines would
contribute substantially toward the conduct
and completion of the appraisal investiga-
tion.
(h)
Consultation;
identification
of
funding
sources
In conducting an appraisal investigation under
subsection (a)(2), the Secretary shall—
(1) consult and cooperate with the non-Fed-
eral project entity and appropriate State, trib-
al, regional, and local authorities;
(2) consult with the heads of appropriate
Federal agencies to—
(A) ensure that the proposed rural water
supply project does not duplicate a project
carried out under the authority of the agen-
cy head; and
(B) if a duplicate project is being carried
out, identify the authority under which the
duplicate project is being carried out; and
(3) identify what funding sources are avail-
able for the proposed rural water supply
project.
(Pub. L. 109–451, title I, § 105, Dec. 22, 2006, 120
Stat. 3349.)
§ 2405. Feasibility studies
(a) In general
On completion of an appraisal report under
section 2404(c) of this title that recommends un-
dertaking a feasibility study and subject to the
availability of appropriations, the Secretary
shall—
(1) in cooperation with a non-Federal project
entity, carry out a study to determine the fea-
sibility of the proposed rural water supply
project;
(2) receive and review a feasibility study
that is—
(A) developed by the non-Federal project
entity, with or without support from the
Secretary; and
(B) submitted to the Secretary by the non-
Federal project entity; or
(3)(A) provide a grant to, or enter into a co-
operative
agreement
with,
a
non-Federal
project entity to conduct a feasibi