Browse Arkansas Code titles and sections
43 U.S.C. § 2402 — Rural water supply program
Federal law — U.S. Code and appendices · legal_authorities
**(a) In general** The Secretary, in cooperation with non-Federal project entities and consistent with this subchapter, may carry out a rural water supply program in Reclamation States to—
(1) investigate and identify opportunities to ensure safe and adequate rural water supply projects for domestic, municipal, and industrial use in small communities and rural areas of the Reclamation States;
(2) plan the design and construction, through the conduct of appraisal investigations and feasibility studies, of rural water supply projects in Reclamation States; and
(3) oversee, as appropriate, the construction of rural water supply projects in Reclamation States that are recommended by the Secretary in a feasibility report developed pursuant to [section 2405 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section2405&num=0&edition=prelim) and subsequently authorized by Congress.
**(b) Non-Federal project entity** Any activity carried out under this subchapter shall be carried out in cooperation with a qualifying non-Federal project entity, consistent with this subchapter.
**(c) Eligibility criteria** Not later than 1 year after December 22, 2006, the Secretary shall, consistent with this subchapter, develop and publish in the Federal Register criteria for—
(1) determining the eligibility of a rural community for assistance under the Program; and
(2) prioritizing requests for assistance under the Program.
**(d) Factors** The criteria developed under subsection (c) shall take into account such factors as whether—
(1) a rural water supply project—
(A) serves—
(i) rural areas and small communities; or
(ii) Indian tribes; or
(B) promotes and applies a regional or watershed perspective to water resources management;
(2) t
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 2402
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 22840afd8c1578766647aadb6d82817abbca67adea48873160cc55659b533d95. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_159716add0c547b1c9eee459
Source file: Laws/federal/codes/united-states-code/title-43/section-2402-rural-water-supply-program--63cd822d77.md
Pages: Not recorded – Not recorded
Passage SHA-256: d5112441f74ea85b3ecdec473680331d2f81a890243c5667b348699cbbee73ca
Source location: Title 43, Chapter 42, § 2402; chapter-042-rural-water-supply.md
Stored source content
**(a) In general** The Secretary, in cooperation with non-Federal project entities and consistent with this subchapter, may carry out a rural water supply program in Reclamation States to—
(1) investigate and identify opportunities to ensure safe and adequate rural water supply projects for domestic, municipal, and industrial use in small communities and rural areas of the Reclamation States;
(2) plan the design and construction, through the conduct of appraisal investigations and feasibility studies, of rural water supply projects in Reclamation States; and
(3) oversee, as appropriate, the construction of rural water supply projects in Reclamation States that are recommended by the Secretary in a feasibility report developed pursuant to [section 2405 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section2405&num=0&edition=prelim) and subsequently authorized by Congress.
**(b) Non-Federal project entity** Any activity carried out under this subchapter shall be carried out in cooperation with a qualifying non-Federal project entity, consistent with this subchapter.
**(c) Eligibility criteria** Not later than 1 year after December 22, 2006, the Secretary shall, consistent with this subchapter, develop and publish in the Federal Register criteria for—
(1) determining the eligibility of a rural community for assistance under the Program; and
(2) prioritizing requests for assistance under the Program.
**(d) Factors** The criteria developed under subsection (c) shall take into account such factors as whether—
(1) a rural water supply project—
(A) serves—
(i) rural areas and small communities; or
(ii) Indian tribes; or
(B) promotes and applies a regional or watershed perspective to water resources management;
(2) there is an urgent and compelling need for a rural water supply project that would—
(A) improve the health or aesthetic quality of water;
(B) result in continuous, measurable, and significant water quality benefits; or
(C) address current or future water supply needs;
(3) a rural water supply project helps meet applicable requirements established by law; and
(4) a rural water supply project is cost effective.
**(e) Inclusions** The Secretary may include—
(1) to the extent that connection provides a reliable water supply, a connection to pre-existing infrastructure (including impoundments and conveyance channels) as part of a rural water supply project; and
(2) notwithstanding the limitation on population under [section 2401(9)(A) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section2401/9/A&num=0&edition=prelim), a town or community with a population in excess of 50,000 inhabitants in an area served by a rural water supply project if, at the discretion of the Secretary, the town or community is considered to be a critical partner in the rural supply project.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) In general** On completion of an appraisal report under [section 2404(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section2404/c&num=0&edition=prelim) that recommends undertaking a feasibility study and subject to the availability of appropriations, the Secretary shall—
(1) in cooperation with a non-Federal project entity, carry out a study to determine the feasibility of the proposed rural water supply project;
(2) receive and review a feasibility study that is—
(A) developed by the non-Federal project entity, with or without support from the Secretary; and
(B) submitted to the Secretary by the non-Federal project entity; or
(3)
(A) provide a grant to, or enter into a cooperative agreement with, a non-Federal project entity to conduct a feasibility study, for submission to the Secretary, if the Secretary determines that—
(i) the non-Federal entity is qualified to complete the feasibility study in accordance with the criteria promulgated under subsection (d); and
(ii) using the non-Federal project entity to conduct the feasibility study is a cost-effective alternative for completing the appraisal investigation; or
(B) if the Secretary determines not to provide a grant to, or enter into a cooperative agreement with, a non-Federal project entity under subparagraph (A), provide to the non-Federal project entity notice of the determination, including an explanation of the reason for the determination.
**(b) Review of non-Federal feasibility studies**
(1) **In general** — In conducting a review of a feasibility study submitted under paragraph (2) or (3) of subsection (a), the Secretary shall—
(A) in accordance with the feasibility factors described in subsection (c) and the criteria promulgated und
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 2405
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
In this subchapter:
(1) **Construction** — The term “construction” means the installation of infrastructure and the upgrading of existing facilities in locations in which the infrastructure or facilities are associated with the new infrastructure of a rural water project recommended by the Secretary pursuant to this subchapter.
(2) **Federal reclamation law** — The term “Federal reclamation law” means the Act of June 17, 1902 (32 Stat. 388, chapter 1093), and Acts supplemental to and amendatory of that Act ([43 U.S.C. 371](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section371&num=0&edition=prelim) et seq.).
(3) **Indian** — The term “Indian” means an individual who is a member of an Indian tribe.
(4) **Indian tribe** — The term “Indian tribe” has the meaning given the term in [section 5304 of title 25](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title25-section5304&num=0&edition=prelim).
(5) **Non-Federal project entity** — The term “non-Federal project entity” means a State, regional, or local authority, Indian tribe or tribal organization, or other qualifying entity, such as a water conservation district, water conservancy district, or rural water district or association.
(6) **Operations, maintenance, and replacement costs**
(A) *In general* — The term “operations, maintenance, and replacement costs” means all costs for the operation of a rural water supply project that are necessary for the safe, efficient, and continued functioning of the project to produce the benefits described in a feasibility study.
(B) *Inclusions* — The term “operations, maintenance, and replacement costs” includes—
(i) repairs of a routine nature that maintain a rural water supply project in a well kept condition;
(ii) replacem
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 2401
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 632
TITLE 43—PUBLIC LANDS
§ 2402
tion district, water conservancy district, or
rural water district or association.
(6) Operations, maintenance, and replacement
costs
(A) In general
The term ‘‘operations, maintenance, and
replacement costs’’ means all costs for the
operation of a rural water supply project
that are necessary for the safe, efficient, and
continued functioning of the project to
produce the benefits described in a feasi-
bility study.
(B) Inclusions
The term ‘‘operations, maintenance, and
replacement costs’’ includes—
(i) repairs of a routine nature that main-
tain a rural water supply project in a well
kept condition;
(ii) replacement of worn-out project ele-
ments; and
(iii) rehabilitation activities necessary
to bring a deteriorated project back to the
original condition of the project.
(C) Exclusion
The term ‘‘operations, maintenance, and
replacement costs’’ does not include con-
struction costs.
(7) Program
The term ‘‘Program’’ means the rural water
supply program carried out under section 2402
of this title.
(8) Reclamation States
The term ‘‘Reclamation States’’ means the
States and areas referred to in the first sec-
tion of the Act of June 17, 1902 (43 U.S.C. 391).
(9) Rural water supply project
(A) In general
The term ‘‘rural water supply project’’
means a project that is designed to serve a
community or group of communities, each of
which has a population of not more than
50,000 inhabitants, which may include Indian
tribes and tribal organizations, dispersed
homesites, or rural areas with domestic, in-
dustrial, municipal, and residential water.
(B) Inclusion
The term ‘‘rural water supply project’’ in-
cludes—
(i) incidental noncommercial livestock
watering and noncommercial irrigation of
vegetation a
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 2402
Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.