43 U.S.C. § 2405 — Feasibility studies
Federal law — U.S. Code and appendices · legal_authorities
Page 635
TITLE 43—PUBLIC LANDS
§ 2405
(C) Form
The non-Federal share under subparagraph
(A) may be in the form of any in-kind serv-
ices that the Secretary determines would
contribute substantially toward the conduct
and completion of the appraisal investiga-
tion.
(h)
Consultation;
identification
of
funding
sources
In conducting an appraisal investigation under
subsection (a)(2), the Secretary shall—
(1) consult and cooperate with the non-Fed-
eral project entity and appropriate State, trib-
al, regional, and local authorities;
(2) consult with the heads of appropriate
Federal agencies to—
(A) ensure that the proposed rural water
supply project does not duplicate a project
carried out under the authority of the agen-
cy head; and
(B) if a duplicate project is being carried
out, identify the authority under which the
duplicate project is being carried out; and
(3) identify what funding sources are avail-
able for the proposed rural water supply
project.
(Pub. L. 109–451, title I, § 105, Dec. 22, 2006, 120
Stat. 3349.)
§ 2405. Feasibility studies
(a) In general
On completion of an appraisal report under
section 2404(c) of this title that recommends un-
dertaking a feasibility study and subject to the
availability of appropriations, the Secretary
shall—
(1) in cooperation with a non-Federal project
entity, carry out a study to determine the fea-
sibility of the proposed rural water supply
project;
(2) receive and review a feasibility study
that is—
(A) developed by the non-Federal project
entity, with or without support from the
Secretary; and
(B) submitted to the Secretary by the non-
Federal project entity; or
(3)(A) provide a grant to, or enter into a co-
operative
agreement
with,
a
non-Federal
project entity to conduct a feasibi
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 2405
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 228c20273a597b9b13594a6160cad777df13581ce8a305ff6e0b29780978ba15. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-1b33d933e1f3a9fdcdf6ba2f
Source file: Laws/federal/codes/united-states-code-2024/title-43/section-2405-feasibility-studies--13f6e33bb6.md
Pages: Not recorded – Not recorded
Passage SHA-256: 518994743c1561842b5eabde282206d23a4a1bcaf228c13959b09d47c69420be
Source location: USCODE-2024-title43-chap42-subchapI-sec2405.pdf
Stored source content
Page 635
TITLE 43—PUBLIC LANDS
§ 2405
(C) Form
The non-Federal share under subparagraph
(A) may be in the form of any in-kind serv-
ices that the Secretary determines would
contribute substantially toward the conduct
and completion of the appraisal investiga-
tion.
(h)
Consultation;
identification
of
funding
sources
In conducting an appraisal investigation under
subsection (a)(2), the Secretary shall—
(1) consult and cooperate with the non-Fed-
eral project entity and appropriate State, trib-
al, regional, and local authorities;
(2) consult with the heads of appropriate
Federal agencies to—
(A) ensure that the proposed rural water
supply project does not duplicate a project
carried out under the authority of the agen-
cy head; and
(B) if a duplicate project is being carried
out, identify the authority under which the
duplicate project is being carried out; and
(3) identify what funding sources are avail-
able for the proposed rural water supply
project.
(Pub. L. 109–451, title I, § 105, Dec. 22, 2006, 120
Stat. 3349.)
§ 2405. Feasibility studies
(a) In general
On completion of an appraisal report under
section 2404(c) of this title that recommends un-
dertaking a feasibility study and subject to the
availability of appropriations, the Secretary
shall—
(1) in cooperation with a non-Federal project
entity, carry out a study to determine the fea-
sibility of the proposed rural water supply
project;
(2) receive and review a feasibility study
that is—
(A) developed by the non-Federal project
entity, with or without support from the
Secretary; and
(B) submitted to the Secretary by the non-
Federal project entity; or
(3)(A) provide a grant to, or enter into a co-
operative
agreement
with,
a
non-Federal
project entity to conduct a feasibility study,
for submission to the Secretary, if the Sec-
retary determines that—
(i) the non-Federal entity is qualified to
complete the feasibility study in accordance
with the criteria promulgated under sub-
section (d); and
(ii) using the non-Federal project entity to
conduct the feasibility study is a cost-effec-
tive alternative for completing the appraisal
investigation; or
(B) if the Secretary determines not to pro-
vide a grant to, or enter into a cooperative
agreement with, a non-Federal project entity
under subparagraph (A), provide to the non-
Federal project entity notice of the deter-
mination, including an explanation of the rea-
son for the determination.
(b) Review of non-Federal feasibility studies
(1) In general
In conducting a review of a feasibility study
submitted under paragraph (2) or (3) of sub-
section (a), the Secretary shall—
(A) in accordance with the feasibility fac-
tors described in subsection (c) and the cri-
teria promulgated under subsection (d), as-
sess the completeness of the feasibility
study; and
(B) if the Secretary determines that a fea-
sibility study is not complete, notify the
non-Federal entity of the determination.
(2) Revisions
If the Secretary determines under paragraph
(1)(B) that a feasibility study is not complete,
the non-Federal entity shall pay any costs as-
sociated with revising the feasibility study.
(c) Feasibility factors
Feasibility studies authorized or reviewed
under this subchapter shall include an assess-
ment of—
(1) near- and long-term water demand in the
area to be served by the rural water supply
project;
(2) advancement of public health and safety
of any existing rural water supply project and
other benefits of the proposed rural water sup-
ply project;
(3) alternative new water supplies in the
study area, including any opportunities to
treat and use low-quality water, nonpotable
water, water reuse-based supplies, and brack-
ish and saline waters through innovative and
economically viable treatment technologies;
(4) environmental quality and source water
protection issues related to the rural water
supply project;
(5) innovative opportunities for water con-
servation in the study area to reduce water
use and water system costs, including—
(A) nonstructural approaches to reduce the
need for the project; and
(B) demonstration technologies;
(6) the extent to which the project and alter-
natives take advantage of economic incentives
and the use of market-based mechanisms;
(7)(A) the construction costs and projected
operations, maintenance, and replacement
costs of all alternatives; and
(B) the economic feasibility and lowest cost
method of obtaining the desired results of
each alternative, taking into account the Fed-
eral cost-share;
(8) the availability of guaranteed loans for a
proposed rural water supply project;
(9) the financial capability of the non-Fed-
eral project entity to pay the non-Federal
project entity’s proportionate share of the de-
sign and construction costs and 100 percent of
operations, maintenance, and replacement
costs, including the allocation of costs to each
non-Federal project entity in the case of mul-
tiple entities;
(10) whether the non-Federal project entity
has developed an operations, management, and
replacement plan to assist the non-Federal
project entity in establishing rates and fees
for beneficiaries of the rural water supply
Page 636
TITLE 43—PUBLIC LANDS
§ 2405
1 So in original. No par. (2) has been enacted.
project that includes a schedule identifying
the annual operations, maintenance, and re-
placement costs that should be allocated to
each non-Federal entity participating in the
project;
(11)(A) the non-Federal project entity ad-
ministrative organization that would imple-
ment construction, operations, maintenance,
and replacement activities; and
(B) the fiscal, administrative, and oper-
ational controls to be implemented to manage
the project;
(12) the extent to which assistance for rural
water supply is available under other Federal
authorities;
(13) the engineering, environmental, and eco-
nomic activities to be undertaken to carry out
the proposed rural water supply project;
(14) the extent to which the project involves
partnerships with other State, local, or tribal
governments or Federal entities; and
(15) in the case of a project intended for In-
dian tribes and tribal organizations, the ex-
tent to which the project addresses the goal of
economic self-sufficiency.
(d) Feasibility study criteria
(1) In general
Not later than 18 months after December 22,
2006, the Secretary shall promulgate criteria
(including the feasibility factors listed under
subsection (c)) under which the feasibility
studies shall be assessed for completeness and
appropriateness.
(2) Inclusions
The Secretary shall include in the criteria
promulgated under paragraph (1) methods to
scale the level of effort needed to complete the
feasibility assessment relative to the total
size and cost of the proposed rural water sup-
ply project and reduce total costs to non-Fed-
eral entities.
(e) Feasibility report
(1) 1 In general
After completion of appropriate feasibility
studies for rural water supply projects that ad-
dress the factors described in subsection (c)
and the criteria promulgated under subsection
(d), the Secretary shall—
(A) develop a feasibility report that in-
cludes—
(i) a recommendation of the Secretary
on—
(I) whether the rural water supply
project should be authorized for con-
struction; and
(II) the appropriate non-Federal share
of construction costs, which shall be—
(aa) at least 25 percent of the total
construction costs; and
(bb) determined based on an analysis
of the capability-to-pay information
considered under subsections (c)(9) and
(f); and
(ii) if the Secretary recommends that
the project should be authorized for con-
struction—
(I) what amount of grants, loan guar-
antees, or combination of grants and
loan guarantees should be used to pro-
vide the Federal cost share;
(II) a schedule that identifies the an-
nual operations, maintenance, and re-
placement costs that should be allocated
to each non-Federal entity participating
in the rural water supply project; and
(III) an assessment of the financial ca-
pability of each non-Federal entity par-
ticipating in the rural water supply
project to pay the allocated annual oper-
ation, maintenance, and replacement
costs for the rural water supply project;
(B) submit the report to the Committee on
Energy and Natural Resources of the Senate
and the Committee on Resources of the
House of Representatives;
(C) make the report publicly available,
along with associated study documents; and
(D) publish in the Federal Register a no-
tice of the availability of the results.
(f) Capability-to-pay
(1) In general
In evaluating a proposed rural water supply
project under this section, the Secretary
shall—
(A) consider the financial capability of any
non-Federal project entities participating in
the rural water supply project to pay 25 per-
cent or more of the capital construction
costs of the rural water supply project; and
(B) recommend an appropriate Federal
share and non-Federal share of the capital
construction costs, as determined by the
Secretary.
(2) Factors
In determining the financial capability of
non-Federal project entities to pay for a rural
water supply project under paragraph (1), the
Secretary shall evaluate factors for the
project area, relative to the State average, in-
cluding—
(A) per capita income;
(B) median household income;
(C) the poverty rate;
(D) the ability of the non-Federal project
entity to raise tax revenues or assess fees;
(E) the strength of the balance sheet of the
non-Federal project entity; and
(F) the existing cost of water in the region.
(3) Indian tribes
In determining the capability-to-pay of In-
dian tribe project beneficiaries, the Secretary
may consider deferring the collection of all or
part of the non-Federal construction costs ap-
portioned to Indian tribe project beneficiaries
unless or until the Secretary determines that
the Indian tribe project beneficiaries should
pay—
(A) the costs allocated to the beneficiaries;
or
(B) an appropriate portion of the costs.
(g) Cost-sharing requirement
(1) In general
Except as otherwise provided in this sub-
section, the Federal share of the cost of a fea-
Page 637
TITLE 43—PUBLIC LANDS
§ 2408
1 So in original. The comma probably should follow ‘‘to’’.
sibility study carried out under this section
shall not exceed 50 percent of the study costs.
(2) Form
The non-Federal share under paragraph (1)
may be in the form of any in-kind services
that the Secretary determines would con-
tribute substantially toward the conduct and
completion of the study.
(3) Financial hardship
The Secretary may increase the Federal
share of the costs of a feasibility study if the
Secretary determines, based on a demonstra-
tion of financial hardship, that the non-Fed-
eral participant is unable to contribute at
least 50 percent of the costs of the study.
(4) Larger communities
In conducting a feasibility study of a rural
water supply system that includes a commu-
nity with a population in excess of 50,000 in-
habitants, the Secretary may require the non-
Federal project entity to pay more than 50
percent of the costs of the study.
(h) Consultation and cooperation
In addition to the non-Federal project entity,
the Secretary shall consult and cooperate with
appropriate Federal, State, tribal, regional, and
local authorities during the conduct of each fea-
sibility assessment and development of the fea-
sibility report conducted under this subchapter.
(Pub. L. 109–451, title I, § 106, Dec. 22, 2006, 120
Stat. 3351.)
§ 2406. Miscellaneous
(a) Authority of Secretary
The Secretary may enter into contracts, fi-
nancial assistance agreements, and such other
agreements, and promulgate such regulations,
as are necessary to carry out this subchapter.
(b) Transfer of projects
Nothing in this subchapter authorizes the
transfer of pre-existing facilities or pre-existing
components of any water system from Federal
to private ownership or from private to Federal
ownership.
(c) Federal reclamation law
Nothing in this subchapter supersedes or
amends any Federal law associated with a
project, or portion of a project, constructed
under Federal reclamation law.
(d) Interagency coordination
The Secretary shall coordinate the Program
carried out under this subchapter with existing
Federal and State rural water and wastewater
programs to facilitate the most efficient and ef-
fective solution to meeting the water needs of
the non-Federal project sponsors.
(e) Multiple Indian tribes
In any case in which a contract is entered into
with, or a grant is made, to 1 an organization to
perform services benefitting more than 1 Indian
tribe under this subchapter, the approval of each
such Indian tribe shall be a prerequisite to en-
tering into the contract or making the grant.
(f) Ownership of facilities
Title to any facility planned, designed, and
recommended for construction under this sub-
chapter shall be held by the non-Federal project
entity.
(g) Expedited procedures
If the Secretary determines that a community
to be served by a proposed rural water supply
project has urgent and compelling water needs,
the Secretary shall, to the maximum extent
practicable, expedite appraisal investigations
and reports conducted under section 2404 of this
title and feasibility studies and reports con-
ducted under section 2405 of this title.
(h) Effect on State water law
(1) In general
Nothing in this subchapter preempts or af-
fects State water law or an interstate compact
governing water.
(2) Compliance required
The Secretary shall comply with State
water laws in carrying out this subchapter.
(i) No additional requirements
Nothing in this subchapter requires a feasi-
bility study for, or imposes any other additional
requirements with respect to, rural water supply
projects or programs that are authorized before
December 22, 2006.
(Pub. L. 109–451, title I, § 107, Dec. 22, 2006, 120
Stat. 3355.)
§ 2407. Reports
Beginning in fiscal year 2007, and each fiscal
year thereafter through fiscal year 2012, the Sec-
retary shall submit to the Committee on Energy
and Natural Resources of the Senate and the
Committee on Resources of the House of Rep-
resentatives an annual report that describes the
number and type of full-time equivalent posi-
tions in the Department of the Interior and the
amount of overhead costs of the Department of
the Interior that are allocated to carrying out
this subchapter for the applicable fiscal year.
(Pub. L. 109–451, title I, § 108, Dec. 22, 2006, 120
Stat. 3356.)
§ 2408. Authorization of appropriations
(a) In general
There is authorized to be appropriated to
carry out this subchapter $15,000,000 for each of
fiscal years 2007 through 2016, to remain avail-
able until expended.
(b) Rural water programs assessment
Of the amounts made available under sub-
section (a), not more than $1,000,000 may be
made available to carry out section 2403 of this
title for each of fiscal years 2007 and 2008.
(c) Construction costs
No amounts made available under this section
shall be used to pay construction costs associ-
ated with any rural water supply project.
(Pub. L. 109–451, title I, § 109, Dec. 22, 2006, 120
Stat. 3356.)
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) In general** On completion of an appraisal report under [section 2404(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section2404/c&num=0&edition=prelim) that recommends undertaking a feasibility study and subject to the availability of appropriations, the Secretary shall—
(1) in cooperation with a non-Federal project entity, carry out a study to determine the feasibility of the proposed rural water supply project;
(2) receive and review a feasibility study that is—
(A) developed by the non-Federal project entity, with or without support from the Secretary; and
(B) submitted to the Secretary by the non-Federal project entity; or
(3)
(A) provide a grant to, or enter into a cooperative agreement with, a non-Federal project entity to conduct a feasibility study, for submission to the Secretary, if the Secretary determines that—
(i) the non-Federal entity is qualified to complete the feasibility study in accordance with the criteria promulgated under subsection (d); and
(ii) using the non-Federal project entity to conduct the feasibility study is a cost-effective alternative for completing the appraisal investigation; or
(B) if the Secretary determines not to provide a grant to, or enter into a cooperative agreement with, a non-Federal project entity under subparagraph (A), provide to the non-Federal project entity notice of the determination, including an explanation of the reason for the determination.
**(b) Review of non-Federal feasibility studies**
(1) **In general** — In conducting a review of a feasibility study submitted under paragraph (2) or (3) of subsection (a), the Secretary shall—
(A) in accordance with the feasibility factors described in subsection (c) and the criteria promulgated und