Arkansas Legal Resource Navigator

42 U.S.C. § 7172 — Jurisdiction of Commission

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 7172 — Jurisdiction of Commission

Page 7073 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 7172 thermal, wind, geothermal, and biomass energy produc- tion technologies. ‘‘(b) RATE INCENTIVES STUDY.—Within 18 months after enactment [Nov. 15, 1990], the Federal Energy Regu- latory Commission, in consultation with the Environ- mental Protection Agency, shall complete a study which calculates the net environmental benefits of re- newable energy, compared to nonrenewable energy, and assigns numerical values to them. The study shall in- clude, but not be limited to, environmental impacts on air, water, land use, water use, human health, and waste disposal. ‘‘(c) MODEL REGULATIONS.—In conjunction with the study in subsection (b), the Commission shall propose one or more models for incorporating the net environ- mental benefits into the regulatory treatment of re- newable energy in order to provide economic compensa- tion for those benefits. ‘‘(d) REPORT.—The Commission shall transmit the study and the model regulations to Congress, along with any recommendations on the best ways to reward renewable energy technologies for their environmental benefits, in a report no later than 24 months after en- actment [Nov. 15, 1990].’’ RETENTION AND USE OF REVENUES FROM LICENSING FEES, INSPECTION SERVICES, AND OTHER SERVICES AND COLLECTIONS; REDUCTION TO ACHIEVE FINAL FISCAL YEAR APPROPRIATION Pub. L. 99–500, § 101(e) [title III], Oct. 18, 1986, 100 Stat. 1783–194, 1783–208, and Pub. L. 99–591, § 101(e) [title III], Oct. 30, 1986, 100 Stat. 3341–194, 3341–208, provided in part: ‘‘That hereafter and notwithstanding any other provision of law revenues from licensing fees, inspec- tion services, and other services and collections, esti- mated at $78,754,000 in fiscal year 1987, may be retained and used for ne

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 7172

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 7430ce79ba9ee4c19a67f7233bffce415bbd0875a0de3f449ce9969a0b36d441. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-fb48f903f14704cfc7335fad
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-7172-jurisdiction-of-commission--0fb5e3f551.md
Pages: Not recorded – Not recorded
Passage SHA-256: 052086b282952b275e8ac5d38a54cc53f0905a175c85d9562d70b6aad08124fd

Source location: USCODE-2024-title42-chap84-subchapIV-sec7172.pdf

Stored source content

Page 7073 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 7172 thermal, wind, geothermal, and biomass energy produc- tion technologies. ‘‘(b) RATE INCENTIVES STUDY.—Within 18 months after enactment [Nov. 15, 1990], the Federal Energy Regu- latory Commission, in consultation with the Environ- mental Protection Agency, shall complete a study which calculates the net environmental benefits of re- newable energy, compared to nonrenewable energy, and assigns numerical values to them. The study shall in- clude, but not be limited to, environmental impacts on air, water, land use, water use, human health, and waste disposal. ‘‘(c) MODEL REGULATIONS.—In conjunction with the study in subsection (b), the Commission shall propose one or more models for incorporating the net environ- mental benefits into the regulatory treatment of re- newable energy in order to provide economic compensa- tion for those benefits. ‘‘(d) REPORT.—The Commission shall transmit the study and the model regulations to Congress, along with any recommendations on the best ways to reward renewable energy technologies for their environmental benefits, in a report no later than 24 months after en- actment [Nov. 15, 1990].’’ RETENTION AND USE OF REVENUES FROM LICENSING FEES, INSPECTION SERVICES, AND OTHER SERVICES AND COLLECTIONS; REDUCTION TO ACHIEVE FINAL FISCAL YEAR APPROPRIATION Pub. L. 99–500, § 101(e) [title III], Oct. 18, 1986, 100 Stat. 1783–194, 1783–208, and Pub. L. 99–591, § 101(e) [title III], Oct. 30, 1986, 100 Stat. 3341–194, 3341–208, provided in part: ‘‘That hereafter and notwithstanding any other provision of law revenues from licensing fees, inspec- tion services, and other services and collections, esti- mated at $78,754,000 in fiscal year 1987, may be retained and used for necessary expenses in this account [Fed- eral Energy Regulatory Commission, Salaries and Ex- penses], and may remain available until expended: Pro- vided further, That the sum herein appropriated shall be reduced as revenues are received during fiscal year 1987, so as to result in a final fiscal year 1987 appropriation estimated at not more than $20,325,000.’’ Similar provisions were contained in the following appropriation acts: Pub. L. 118–42, div. D, title III, Mar. 9, 2024, 138 Stat. 205. Pub. L. 117–328, div. D, title III, Dec. 29, 2022, 136 Stat. 4642. Pub. L. 117–103, div. D, title III, Mar. 15, 2022, 136 Stat. 231. Pub. L. 116–260, div. D, title III, Dec. 27, 2020, 134 Stat. 1372. Pub. L. 116–94, div. C, title III, Dec. 20, 2019, 133 Stat. 2678. Pub. L. 115–244, div. A, title III, Sept. 21, 2018, 132 Stat. 2915. Pub. L. 115–141, div. D, title III, Mar. 23, 2018, 132 Stat. 527. Pub. L. 115–31, div. D, title III, May 5, 2017, 131 Stat. 319. Pub. L. 114–113, div. D, title III, Dec. 18, 2015, 129 Stat. 2415. Pub. L. 113–235, div. D, title III, Dec. 16, 2014, 128 Stat. 2322. Pub. L. 113–76, div. D, title III, Jan. 17, 2014, 128 Stat. 172. Pub. L. 112–74, div. B, title III, Dec. 23, 2011, 125 Stat. 875. Pub. L. 111–85, title III, Oct. 28, 2009, 123 Stat. 2871. Pub. L. 111–8, div. C, title III, Mar. 11, 2009, 123 Stat. 625. Pub. L. 110–161, div. C, title III, Dec. 26, 2007, 121 Stat. 1966. Pub. L. 109–103, title III, Nov. 19, 2005, 119 Stat. 2277. Pub. L. 108–447, div. C, title III, Dec. 8, 2004, 118 Stat. 2957. Pub. L. 108–137, title III, Dec. 1, 2003, 117 Stat. 1859. Pub. L. 108–7, div. D, title III, Feb. 20, 2003, 117 Stat. 153. Pub. L. 107–66, title III, Nov. 12, 2001, 115 Stat. 508. Pub. L. 106–377, § 1(a)(2) [title III], Oct. 27, 2000, 114 Stat. 1441, 1441A–78. Pub. L. 106–60, title III, Sept. 29, 1999, 113 Stat. 494. Pub. L. 105–245, title III, Oct. 7, 1998, 112 Stat. 1851. Pub. L. 105–62, title III, Oct. 13, 1997, 111 Stat. 1334. Pub. L. 104–206, title III, Sept. 30, 1996, 110 Stat. 2998. Pub. L. 104–46, title III, Nov. 13, 1995, 109 Stat. 416. Pub. L. 103–316, title III, Aug. 26, 1994, 108 Stat. 1719. Pub. L. 103–126, title III, Oct. 28, 1993, 107 Stat. 1330. Pub. L. 102–377, title III, Oct. 2, 1992, 106 Stat. 1338. Pub. L. 102–104, title III, Aug. 17, 1991, 105 Stat. 531. Pub. L. 101–514, title III, Nov. 5, 1990, 104 Stat. 2093. Pub. L. 101–101, title III, Sept. 29, 1989, 103 Stat. 661. Pub. L. 100–371, title III, July 19, 1988, 102 Stat. 870. Pub. L. 100–202, § 101(d) [title III], Dec. 22, 1987, 101 Stat. 1329–104, 1329–124. § 7172. Jurisdiction of Commission (a) Transfer of functions from Federal Power Commission (1) There are transferred to, and vested in, the Commission the following functions of the Fed- eral Power Commission or of any member of the Commission or any officer or component of the Commission: (A) the investigation, issuance, transfer, re- newal, revocation, and enforcement of licenses and permits for the construction, operation, and maintenance of dams, water conduits, res- ervoirs, powerhouses, transmission lines, or other works for the development and improve- ment of navigation and for the development and utilization of power across, along, from, or in navigable waters under part I of the Federal Power Act [16 U.S.C. 791a et seq.]; (B) the establishment, review, and enforce- ment of rates and charges for the transmission or sale of electric energy, including deter- minations on construction work in progress, under part II of the Federal Power Act [16 U.S.C. 824 et seq.], and the interconnection, under section 202(b), of such Act [16 U.S.C. 824a(b)], of facilities for the generation, trans- mission, and sale of electric energy (other than emergency interconnection); (C) the establishment, review, and enforce- ment of rates and charges for the transpor- tation and sale of natural gas by a producer or gatherer or by a natural gas pipeline or nat- ural gas company under sections 1, 4, 5, and 6 of the Natural Gas Act [15 U.S.C. 717, 717c to 717e]; (D) the issuance of a certificate of public convenience and necessity, including abandon- ment of facilities or services, and the estab- lishment of physical connections under sec- tion 7 of the Natural Gas Act [15 U.S.C. 717f]; (E) the establishment, review, and enforce- ment of curtailments, other than the estab- lishment and review of priorities for such cur- tailments, under the Natural Gas Act [15 U.S.C. 717 et seq.]; and (F) the regulation of mergers and securities acquisition under the Federal Power Act [16 U.S.C. 791a et seq.] and Natural Gas Act [15 U.S.C. 717 et seq.]. (2) The Commission may exercise any power under the following sections to the extent the Commission determines such power to be nec- essary to the exercise of any function within the jurisdiction of the Commission: Page 7074 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 7172 1 See References in Text note below. (A) sections 4, 301, 302, 306 through 309, and 312 through 316 of the Federal Power Act [16 U.S.C. 797, 825, 825a, 825e to 825h, 825k to 825o]; and (B) sections 8, 9, 13 through 17, 20, and 21 of the Natural Gas Act [15 U.S.C. 717g, 717h, 717l to 717p, 717s, 717t]. (b) Repealed. Pub. L. 103–272, § 7(b), July 5, 1994, 108 Stat. 1379 (c) Consideration of proposals made by Sec- retary to amend regulations issued under section 753 of title 15; exception (1) Pursuant to the procedures specified in sec- tion 7174 of this title and except as provided in paragraph (2), the Commission shall have juris- diction to consider any proposal by the Sec- retary to amend the regulation required to be issued under section 753(a) 1 of title 15 which is required by section 757 or 760a 1 of title 15 to be transmitted by the President to, and reviewed by, each House of Congress, under section 6421 of this title. (2) In the event that the President determines that an emergency situation of overriding na- tional importance exists and requires the expe- ditious promulgation of a rule described in para- graph (1), the President may direct the Sec- retary to assume sole jurisdiction over the pro- mulgation of such rule, and such rule shall be transmitted by the President to, and reviewed by, each House of Congress under section 757 or 760a 1 of title 15, and section 6421 of this title. (d) Matters involving agency determinations to be made on record after agency hearing The Commission shall have jurisdiction to hear and determine any other matter arising under any other function of the Secretary— (1) involving any agency determination re- quired by law to be made on the record after an opportunity for an agency hearing; or (2) involving any other agency determina- tion which the Secretary determines shall be made on the record after an opportunity for an agency hearing, except that nothing in this subsection shall re- quire that functions under sections 6213 and 6214 1 of this title shall be within the jurisdiction of the Commission unless the Secretary assigns such a function to the Commission. (e) Matters assigned by Secretary after public notice and matters referred under section 7174 of this title In addition to the other provisions of this sec- tion, the Commission shall have jurisdiction over any other matter which the Secretary may assign to the Commission after public notice, or which are required to be referred to the Commis- sion pursuant to section 7174 of this title. (f) Limitation No function described in this section which regulates the exports or imports of natural gas or electricity shall be within the jurisdiction of the Commission unless the Secretary assigns such a function to the Commission. (g) Final agency action The decision of the Commission involving any function within its jurisdiction, other than ac- tion by it on a matter referred to it pursuant to section 7174 of this title, shall be final agency action within the meaning of section 704 of title 5 and shall not be subject to further review by the Secretary or any officer or employee of the Department. (h) Rules, regulations, and statements of policy The Commission is authorized to prescribe rules, regulations, and statements of policy of general applicability with respect to any func- tion under the jurisdiction of the Commission pursuant to this section. (Pub. L. 95–91, title IV, § 402, Aug. 4, 1977, 91 Stat. 583; Pub. L. 103–272, § 7(b), July 5, 1994, 108 Stat. 1379.) Editorial Notes REFERENCES IN TEXT The Federal Power Act, referred to in subsec. (a)(1)(A), (B), (F), is act June 10, 1920, ch. 285, 41 Stat. 1063, which is classified generally to chapter 12 (§ 791a et seq.) of Title 16, Conservation. Parts I and II of the Fed- eral Power Act are classified generally to subchapters I (§ 791a et seq.) and II (§ 824 et seq.), respectively, of chapter 12 of Title 16. For complete classification of this Act to the Code, see section 791a of Title 16 and Ta- bles. The Natural Gas Act, referred to in subsec. (a)(1)(E), (F), is act June 21, 1938, ch. 556, 52 Stat. 821, which is classified generally to chapter 15B (§ 717 et seq.) of Title 15, Commerce and Trade. For complete classification of this Act to the Code, see section 717w of Title 15 and Tables. Sections 753, 757, and 760a of title 15, referred to in subsec. (c), were omitted from the Code pursuant to section 760g of Title 15, which provided for the expira- tion of the President’s authority under those sections on Sept. 30, 1981. Section 6214 of this title, referred to in subsec. (d), was repealed by Pub. L. 106–469, title I, § 103(3), Nov. 9, 2000, 114 Stat. 2029. AMENDMENTS 1994—Subsec. (b). Pub. L. 103–272 struck out subsec. (b) which read as follows: ‘‘There are transferred to, and vested in, the Commission all functions and au- thority of the Interstate Commerce Commission or any officer or component of such Commission where the regulatory function establishes rates or charges for the transportation of oil by pipeline or establishes the valuation of any such pipeline.’’ See section 60502 of Title 49, Transportation. Statutory Notes and Related Subsidiaries OIL PIPELINE REGULATORY REFORM Pub. L. 102–486, title XVIII, Oct. 24, 1992, 106 Stat. 3010, provided that: ‘‘SEC. 1801. OIL PIPELINE RATEMAKING METHOD- OLOGY. ‘‘(a) ESTABLISHMENT.—Not later than 1 year after the date of the enactment of this Act [Oct. 24, 1992], the Federal Energy Regulatory Commission shall issue a final rule which establishes a simplified and generally applicable ratemaking methodology for oil pipelines in accordance with section 1(5) of part I of the Interstate Commerce Act [former 49 U.S.C. 1(5)]. ‘‘(b) EFFECTIVE DATE.—The final rule to be issued under subsection (a) may not take effect before the 365th day following the date of the issuance of the rule. ‘‘SEC. 1802. STREAMLINING OF COMMISSION PRO- CEDURES. ‘‘(a) RULEMAKING.—Not later than 18 months after the date of the enactment of this Act [Oct. 24, 1992], the Page 7075 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 7173 Commission shall issue a final rule to streamline proce- dures of the Commission relating to oil pipeline rates in order to avoid unnecessary regulatory costs and delays. ‘‘(b) SCOPE OF RULEMAKING.—Issues to be considered in the rulemaking proceeding to be conducted under subsection (a) shall include the following: ‘‘(1) Identification of information to be filed with an oil pipeline tariff and the availability to the pub- lic of any analysis of such tariff filing performed by the Commission or its staff. ‘‘(2) Qualification for standing (including defini- tions of economic interest) of parties who protest oil pipeline tariff filings or file complaints thereto. ‘‘(3) The level of specificity required for a protest or complaint and guidelines for Commission action on the portion of the tariff or rate filing subject to pro- test or complaint. ‘‘(4) An opportunity for the oil pipeline to file a re- sponse for the record to an initial protest or com- plaint. ‘‘(5) Identification of specific circumstances under which Commission staff may initiate a protest. ‘‘(c) ADDITIONAL PROCEDURAL CHANGES.—In con- ducting the rulemaking proceeding to carry out sub- section (a), the Commission shall identify and transmit to Congress any other procedural changes relating to oil pipeline rates which the Commission determines are necessary to avoid unnecessary regulatory costs and delays and for which additional legislative authority may be necessary. ‘‘(d) WITHDRAWAL OF TARIFFS AND COMPLAINTS.— ‘‘(1) WITHDRAWAL OF TARIFFS.—If an oil pipeline tar- iff which is filed under part I of the Interstate Com- merce Act [former 49 U.S.C. 1 et seq.] and which is subject to investigation is withdrawn— ‘‘(A) any proceeding with respect to such tariff shall be terminated; ‘‘(B) the previous tariff rate shall be reinstated; and ‘‘(C) any amounts collected under the withdrawn tariff rate which are in excess of the previous tariff rate shall be refunded. ‘‘(2) WITHDRAWAL OF COMPLAINTS.—If a complaint which is filed under section 13 of the Interstate Com- merce Act [former 49 U.S.C. 13] with respect to an oil pipeline tariff is withdrawn, any proceeding with re- spect to such complaint shall be terminated. ‘‘(e) ALTERNATIVE DISPUTE RESOLUTION.—To the max- imum extent practicable, the Commission shall estab- lish appropriate alternative dispute resolution proce- dures, including required negotiations and voluntary arbitration, early in an oil pipeline rate proceeding as a method preferable to adjudication in resolving dis- putes relating to the rate. Any proposed rates derived from implementation of such procedures shall be con- sidered by the Commission on an expedited basis for ap- proval. ‘‘SEC. 1803. PROTECTION OF CERTAIN EXISTING RATES. ‘‘(a) RATES DEEMED JUST AND REASONABLE.—Except as provided in subsection (b)— ‘‘(1) any rate in effect for the 365-day period ending on the date of the enactment of this Act [Oct. 24, 1992] shall be deemed to be just and reasonable (within the meaning of section 1(5) of the Interstate Commerce Act [former 49 U.S.C. 1(5)]); and ‘‘(2) any rate in effect on the 365th day preceding the date of such enactment shall be deemed to be just and reasonable (within the meaning of such section 1(5)) regardless of whether or not, with respect to such rate, a new rate has been filed with the Commis- sion during such 365-day period; if the rate in effect, as described in paragraph (1) or (2), has not been subject to protest, investigation, or com- plaint during such 365-day period. ‘‘(b) CHANGED CIRCUMSTANCES.—No person may file a complaint under section 13 of the Interstate Commerce Act [former 49 U.S.C. 13] against a rate deemed to be just and reasonable under subsection (a) unless— ‘‘(1) evidence is presented to the Commission which establishes that a substantial change has occurred after the date of the enactment of this Act [Oct. 24, 1992]— ‘‘(A) in the economic circumstances of the oil pipeline which were a basis for the rate; or ‘‘(B) in the nature of the services provided which were a basis for the rate; or ‘‘(2) the person filing the complaint was under a contractual prohibition against the filing of a com- plaint which was in effect on the date of enactment of this Act and had been in effect prior to January 1, 1991, provided that a complaint by a party bound by such prohibition is brought within 30 days after the expiration of such prohibition. If the Commission determines pursuant to a proceeding instituted as a result of a complaint under section 13 of the Interstate Commerce Act that the rate is not just and reasonable, the rate shall not be deemed to be just and reasonable. Any tariff reduction or refunds that may result as an outcome of such a complaint shall be prospective from the date of the filing of the com- plaint. ‘‘(c) LIMITATION REGARDING UNDULY DISCRIMINATORY OR PREFERENTIAL TARIFFS.—Nothing in this section shall prohibit any aggrieved person from filing a com- plaint under section 13 or section 15(l) of the Interstate Commerce Act [former 49 U.S.C. 13, 15(1)] challenging any tariff provision as unduly discriminatory or unduly preferential. ‘‘SEC. 1804. DEFINITIONS. ‘‘For the purposes of this title, the following defini- tions apply: ‘‘(1) COMMISSION.—The term ‘Commission’ means the Federal Energy Regulatory Commission and, un- less the context requires otherwise, includes the Oil Pipeline Board and any other office or component of the Commission to which the functions and authority vested in the Commission under section 402(b) of the Department of Energy Organization Act (42 U.S.C. 7172(b)) are delegated. ‘‘(2) OIL PIPELINE.— ‘‘(A) IN GENERAL.—Except as provided in subpara- graph (B), the term ‘oil pipeline’ means any com- mon carrier (within the meaning of the Interstate Commerce Act [former 49 U.S.C. 1 et seq.]) which transports oil by pipeline subject to the functions and authority vested in the Commission under sec- tion 402(b) of the Department of Energy Organiza- tion Act (42 U.S.C. 7172(b)). ‘‘(B) EXCEPTION.—The term ‘oil pipeline’ does not include the Trans-Alaska Pipeline authorized by the Trans-Alaska Pipeline Authorization Act (43 U.S.C. 1651 et seq.) or any pipeline delivering oil di- rectly or indirectly to the Trans-Alaska Pipeline. ‘‘(3) OIL.—The term ‘oil’ has the same meaning as is given such term for purposes of the transfer of func- tions from the Interstate Commerce Commission to the Federal Energy Regulatory Commission under section 402(b) of the Department of Energy Organiza- tion Act (42 U.S.C. 7172(b)). ‘‘(4) RATE.—The term ‘rate’ means all charges that an oil pipeline requires shippers to pay for transpor- tation services.’’ § 7173. Initiation of rulemaking procedures be- fore Commission (a) Proposal of rules, regulations, and statements of policy of general applicability by Sec- retary and Commission The Secretary and the Commission are au- thorized to propose rules, regulations, and state- ments of policy of general applicability with re- spect to any function within the jurisdiction of the Commission under section 7172 of this title. (b) Consideration and final action on proposals of Secretary The Commission shall have exclusive jurisdic- tion with respect to any proposal made under

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

15 U.S.C. § 717 — Regulation of natural gas companies

**(a) Necessity of regulation in public interest** As disclosed in reports of the Federal Trade Commission made pursuant to S. Res. 83 (Seventieth Congress, first session) and other reports made pursuant to the authority of Congress, it is declared that the business of transporting and selling natural gas for ultimate distribution to the public is affected with a public interest, and that Federal regulation in matters relating to the transportation of natural gas and the sale thereof in interstate and foreign commerce is necessary in the public interest. **(b) Transactions to which provisions of chapter applicable** The provisions of this chapter shall apply to the transportation of natural gas in interstate commerce, to the sale in interstate commerce of natural gas for resale for ultimate public consumption for domestic, commercial, industrial, or any other use, and to natural-gas companies engaged in such transportation or sale, and to the importation or exportation of natural gas in foreign commerce and to persons engaged in such importation or exportation, but shall not apply to any other transportation or sale of natural gas or to the local distribution of natural gas or to the facilities used for such distribution or to the production or gathering of natural gas. **(c) Intrastate transactions exempt from provisions of chapter; certification from State commission as conclusive evidence** The provisions of this chapter shall not apply to any person engaged in or legally authorized to engage in the transportation in interstate commerce or the sale in interstate commerce for resale, of natural gas received by such person from another person within or at the boundary of a State if all the natural gas so received is ultimately consumed within such State, or to any fa

Source: Supplied U.S. Code snapshot — release unconfirmed · 15 U.S.C. § 717

Stored review status: release_metadata_unconfirmed. The source passage cites 15 U.S.C. § 717. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

15 U.S.C. § 717 — Regulation of natural gas companies

Page 1186 TITLE 15—COMMERCE AND TRADE § 715l § 715l. Repealed. June 22, 1942, ch. 436, 56 Stat. 381 Section, acts Feb. 22, 1935, ch. 18, § 13, 49 Stat. 33; June 14, 1937, ch. 335, 50 Stat. 257; June 29, 1939, ch. 250, 53 Stat. 927, provided for expiration of this chapter on June 30, 1942. § 715m. Cooperation between Secretary of the In- terior and Federal and State authorities The Secretary of the Interior, in carrying out the Act of February 22, 1935, as amended (15 U.S.C., ch. 15A), is authorized to cooperate with Federal and State authorities. (June 25, 1946, ch. 472, § 3, 60 Stat. 307.) Editorial Notes REFERENCES IN TEXT Act of February 22, 1935, referred to in text, is act Feb. 22, 1935, ch. 18, 49 Stat. 30, popularly known as the ‘‘Hot Oil Act’’ and also as the ‘‘Connally Hot Oil Act’’, which is classified generally to this chapter. For com- plete classification of this Act to the Code, see Short Title note set out under section 715 of this title and Ta- bles. CODIFICATION Section was not enacted as a part of act Feb. 22, 1935, which comprises this chapter. Executive Documents DELEGATION OF FUNCTIONS Delegation of President’s authority to Secretary of the Interior, see note set out under section 715j of this title. CHAPTER 15B—NATURAL GAS Sec. 717. Regulation of natural gas companies. 717a. Definitions. 717b. Exportation or importation of natural gas; LNG terminals. 717b–1. State and local safety considerations. 717c. Rates and charges. 717c–1. Prohibition on market manipulation. 717d. Fixing rates and charges; determination of cost of production or transportation. 717e. Ascertainment of cost of property. 717f. Construction, extension, or abandonment of facilities. 717g. Accounts; records; memoranda. 717h. Rates of

Source: Supplied 2024 U.S. Code historical extraction · 15 U.S.C. § 717

Stored review status: historical_2024_not_currentness_verified. The source passage cites 15 U.S.C. § 717. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

15 U.S.C. § 717f — Construction, extension, or abandonment of facilities

**(a) Extension or improvement of facilities on order of court; notice and hearing** Whenever the Commission, after notice and opportunity for hearing, finds such action necessary or desirable in the public interest, it may by order direct a natural-gas company to extend or improve its transportation facilities, to establish physical connection of its transportation facilities with the facilities of, and sell natural gas to, any person or municipality engaged or legally authorized to engage in the local distribution of natural or artificial gas to the public, and for such purpose to extend its transportation facilities to communities immediately adjacent to such facilities or to territory served by such natural-gas company, if the Commission finds that no undue burden will be placed upon such natural-gas company thereby: Provided, That the Commission shall have no authority to compel the enlargement of transportation facilities for such purposes, or to compel such natural-gas company to establish physical connection or sell natural gas when to do so would impair its ability to render adequate service to its customers. **(b) Abandonment of facilities or services; approval of Commission** No natural-gas company shall abandon all or any portion of its facilities subject to the jurisdiction of the Commission, or any service rendered by means of such facilities, without the permission and approval of the Commission first had and obtained, after due hearing, and a finding by the Commission that the available supply of natural gas is depleted to the extent that the continuance of service is unwarranted, or that the present or future public convenience or necessity permit such abandonment. **(c) Certificate of public convenience and necessity** (1) (A) No natural-gas comp

Source: Supplied U.S. Code snapshot — release unconfirmed · 15 U.S.C. § 717f

Stored review status: release_metadata_unconfirmed. The source passage cites 15 U.S.C. § 717f. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

15 U.S.C. § 717f — Construction, extension, or abandonment

Page 1192 TITLE 15—COMMERCE AND TRADE § 717d those terms are used in section 78j(b) of this title) in contravention of such rules and regula- tions as the Commission may prescribe as nec- essary in the public interest or for the protec- tion of natural gas ratepayers. Nothing in this section shall be construed to create a private right of action. (June 21, 1938, ch. 556, § 4A, as added Pub. L. 109–58, title III, § 315, Aug. 8, 2005, 119 Stat. 691.) § 717d. Fixing rates and charges; determination of cost of production or transportation (a) Decreases in rates Whenever the Commission, after a hearing had upon its own motion or upon complaint of any State, municipality, State commission, or gas distributing company, shall find that any rate, charge, or classification demanded, observed, charged, or collected by any natural-gas com- pany in connection with any transportation or sale of natural gas, subject to the jurisdiction of the Commission, or that any rule, regulation, practice, or contract affecting such rate, charge, or classification is unjust, unreasonable, unduly discriminatory, or preferential, the Commission shall determine the just and reasonable rate, charge, classification, rule, regulation, practice, or contract to be thereafter observed and in force, and shall fix the same by order: Provided, however, That the Commission shall have no power to order any increase in any rate con- tained in the currently effective schedule of such natural gas company on file with the Com- mission, unless such increase is in accordance with a new schedule filed by such natural gas company; but the Commission may order a de- crease where existing rates are unjust, unduly discriminatory, preferential, otherwise unlaw- ful, or are not the lowest reaso

Source: Supplied 2024 U.S. Code historical extraction · 15 U.S.C. § 717f

Stored review status: historical_2024_not_currentness_verified. The source passage cites 15 U.S.C. § 717f. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 791a — Short title

This chapter may be cited as the “Federal Power Act”.

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 791a

Stored review status: release_metadata_unconfirmed. The source passage cites 16 U.S.C. § 791a. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 791a — Short title

Page 1364 TITLE 16—CONSERVATION § 791 Sec. Statutory Notes and Related Subsidiaries FINDINGS Pub. L. 113–23, § 2, Aug. 9, 2013, 127 Stat. 493, provided that: ‘‘Congress finds that— ‘‘(1) the hydropower industry currently employs ap- proximately 300,000 workers across the United States; ‘‘(2) hydropower is the largest source of clean, re- newable electricity in the United States; ‘‘(3) as of the date of enactment of this Act [Aug. 9, 2013], hydropower resources, including pumped stor- age facilities, provide— ‘‘(A) nearly 7 percent of the electricity generated in the United States; and ‘‘(B) approximately 100,000 megawatts of electric capacity in the United States; ‘‘(4) only 3 percent of the 80,000 dams in the United States generate electricity, so there is substantial potential for adding hydropower generation to non- powered dams; and ‘‘(5) according to one study, by utilizing currently untapped resources, the United States could add ap- proximately 60,000 megawatts of new hydropower ca- pacity by 2025, which could create 700,000 new jobs over the next 13 years.’’ SUBCHAPTER I—REGULATION OF THE DE- VELOPMENT OF WATER POWER AND RE- SOURCES Statutory Notes and Related Subsidiaries CODIFICATION; CONSTRUCTION Act Aug. 26, 1935, ch. 687, title II, § 212, 49 Stat. 847, provided that sections 1 to 29 of the Federal Water Power Act, as amended (sections 792, 793, 794 to 797, 798 to 818, 819, and 820 to 823 of this title) shall constitute part I of the act. Said section 212 also repealed sections 25 and 30 of the act (sections 819, 791 of this title). It also contained a proviso as follows: ‘‘That nothing in that Act, as amended, shall be construed to repeal or amend the provisions of the amendment to the Federal Water Power Act approved March 3, 192

Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 791a

Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 791a. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 824 — Declaration of policy; application of subchapter

**(a) Federal regulation of transmission and sale of electric energy** It is declared that the business of transmitting and selling electric energy for ultimate distribution to the public is affected with a public interest, and that Federal regulation of matters relating to generation to the extent provided in this subchapter and subchapter III of this chapter and of that part of such business which consists of the transmission of electric energy in interstate commerce and the sale of such energy at wholesale in interstate commerce is necessary in the public interest, such Federal regulation, however, to extend only to those matters which are not subject to regulation by the States. **(b) Use or sale of electric energy in interstate commerce** (1) The provisions of this subchapter shall apply to the transmission of electric energy in interstate commerce and to the sale of electric energy at wholesale in interstate commerce, but except as provided in paragraph (2) shall not apply to any other sale of electric energy or deprive a State or State commission of its lawful authority now exercised over the exportation of hydroelectric energy which is transmitted across a State line. The Commission shall have jurisdiction over all facilities for such transmission or sale of electric energy, but shall not have jurisdiction, except as specifically provided in this subchapter and subchapter III of this chapter, over facilities used for the generation of electric energy or over facilities used in local distribution or only for the transmission of electric energy in intrastate commerce, or over facilities for the transmission of electric energy consumed wholly by the transmitter. (2) Notwithstanding subsection (f), the provisions of sections 824b(a)(2), 824e(e), 824i, 824j, 824j–

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 824

Stored review status: release_metadata_unconfirmed. The source passage cites 16 U.S.C. § 824. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 824 — Declaration of policy; application of sub-

Page 1398 TITLE 16—CONSERVATION § 823g (g) Qualifying criteria for closed-loop pumped storage projects (1) In general The Commission shall establish criteria that a pumped storage project shall meet in order to qualify as a closed-loop pumped storage project eligible for the expedited process es- tablished under this section. (2) Inclusions In establishing the criteria under paragraph (1), the Commission shall include criteria re- quiring that the pumped storage project— (A) cause little to no change to existing surface and ground water flows and uses; and (B) is unlikely to adversely affect species listed as a threatened species or endangered species under the Endangered Species Act of 1973 [16 U.S.C. 1531 et seq.]. (h) Savings clause Nothing in this section affects any authority of the Commission to license a closed-loop pumped storage project under this subchapter. (June 10, 1920, ch. 285, pt. I, § 35, as added Pub. L. 115–270, title III, § 3004, Oct. 23, 2018, 132 Stat. 3865.) Editorial Notes REFERENCES IN TEXT The Fish and Wildlife Coordination Act, referred to in subsec. (c)(2), (3)(A), is act Mar. 10, 1934, ch. 55, 48 Stat. 401, which is classified generally to sections 661 to 666c–1 of this title. For complete classification of this Act to the Code, see section 661(a) of this title, Short Title note set out under section 661 of this title, and Tables. The National Environmental Policy Act of 1969, re- ferred to in subsec. (e), is Pub. L. 91–190, Jan. 1, 1970, 83 Stat. 852, which is classified generally to chapter 55 (§ 4321 et seq.) of Title 42, The Public Health and Wel- fare. For complete classification of this Act to the Code, see Short Title note set out under section 4321 of Title 42 and Tables. The Endangered Species Act

Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 824

Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 824. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 824a — Interconnection and coordination of facilities; emergencies; transmission to foreign countries

**(a) Regional districts; establishment; notice to State commissions** For the purpose of assuring an abundant supply of electric energy throughout the United States with the greatest possible economy and with regard to the proper utilization and conservation of natural resources, the Commission is empowered and directed to divide the country into regional districts for the voluntary interconnection and coordination of facilities for the generation, transmission, and sale of electric energy, and it may at any time thereafter, upon its own motion or upon application, make such modifications thereof as in its judgment will promote the public interest. Each such district shall embrace an area which, in the judgment of the Commission, can economically be served by such interconnection and coordinated electric facilities. It shall be the duty of the Commission to promote and encourage such interconnection and coordination within each such district and between such districts. Before establishing any such district and fixing or modifying the boundaries thereof the Commission shall give notice to the State commission of each State situated wholly or in part within such district, and shall afford each such State commission reasonable opportunity to present its views and recommendations, and shall receive and consider such views and recommendations. **(b) Sale or exchange of energy; establishing physical connections** Whenever the Commission, upon application of any State commission or of any person engaged in the transmission or sale of electric energy, and after notice to each State commission and public utility affected and after opportunity for hearing, finds such action necessary or appropriate in the public interest it may by order direct a public utility (if the Commissio

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 824a

Stored review status: release_metadata_unconfirmed. The source passage cites 16 U.S.C. § 824a. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 824a — Interconnection and coordination of fa-

Page 1400 TITLE 16—CONSERVATION § 824a AMENDMENTS 2015—Subsec. (b)(2). Pub. L. 114–94, § 61003(b)(1), in- serted ‘‘824o–1,’’ after ‘‘824o,’’ in two places. Subsec. (e). Pub. L. 114–94, § 61003(b)(2), inserted ‘‘824o–1,’’ after ‘‘824o,’’. 2005—Subsec. (b)(2). Pub. L. 109–58, § 1295(a)(1), sub- stituted ‘‘Notwithstanding subsection (f), the provi- sions of sections 824b(a)(2), 824e(e), 824i, 824j, 824j–1, 824k, 824o, 824p, 824q, 824r, 824s, 824t, 824u, and 824v of this title’’ for ‘‘The provisions of sections 824i, 824j, and 824k of this title’’ and ‘‘Compliance with any order or rule of the Commission under the provisions of section 824b(a)(2), 824e(e), 824i, 824j, 824j–1, 824k, 824o, 824p, 824q, 824r, 824s, 824t, 824u, or 824v of this title’’ for ‘‘Compli- ance with any order of the Commission under the provi- sions of section 824i or 824j of this title’’. Subsec. (e). Pub. L. 109–58, § 1295(a)(2), substituted ‘‘section 824e(e), 824e(f), 824i, 824j, 824j–1, 824k, 824o, 824p, 824q, 824r, 824s, 824t, 824u, or 824v of this title’’ for ‘‘sec- tion 824i, 824j, or 824k of this title’’. Subsec. (f). Pub. L. 109–58, § 1291(c), which directed amendment of subsec. (f) by substituting ‘‘political subdivision of a State, an electric cooperative that re- ceives financing under the Rural Electrification Act of 1936 (7 U.S.C. 901 et seq.) or that sells less than 4,000,000 megawatt hours of electricity per year,’’ for ‘‘political subdivision of a state,’’, was executed by making the substitution for ‘‘political subdivision of a State,’’ to reflect the probable intent of Congress. Subsec. (g)(5). Pub. L. 109–58, § 1277(b)(1), substituted ‘‘2005’’ for ‘‘1935’’. 1992—Subsec. (g). Pub. L. 102–486 added subsec. (g). 1978—Subsec. (b). Pub. L. 95–617, § 204(b)(1), de

Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 824a

Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 824a. This identifies an authority to review, not proof of applicability.