Arkansas Legal Resource Navigator

16 U.S.C. § 824a — Interconnection and coordination of facilities; emergencies; transmission to foreign countries

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 824a — Interconnection and coordination of facilities; emergencies; transmission to foreign countries

**(a) Regional districts; establishment; notice to State commissions** For the purpose of assuring an abundant supply of electric energy throughout the United States with the greatest possible economy and with regard to the proper utilization and conservation of natural resources, the Commission is empowered and directed to divide the country into regional districts for the voluntary interconnection and coordination of facilities for the generation, transmission, and sale of electric energy, and it may at any time thereafter, upon its own motion or upon application, make such modifications thereof as in its judgment will promote the public interest. Each such district shall embrace an area which, in the judgment of the Commission, can economically be served by such interconnection and coordinated electric facilities. It shall be the duty of the Commission to promote and encourage such interconnection and coordination within each such district and between such districts. Before establishing any such district and fixing or modifying the boundaries thereof the Commission shall give notice to the State commission of each State situated wholly or in part within such district, and shall afford each such State commission reasonable opportunity to present its views and recommendations, and shall receive and consider such views and recommendations. **(b) Sale or exchange of energy; establishing physical connections** Whenever the Commission, upon application of any State commission or of any person engaged in the transmission or sale of electric energy, and after notice to each State commission and public utility affected and after opportunity for hearing, finds such action necessary or appropriate in the public interest it may by order direct a public utility (if the Commissio

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 824a

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 3673aa162c052729e0f98d5603568a3864f7dac8028ca0eb7c5d8a0f943d6ba0. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_e373a9662ef7f255de3421b2
Source file: Laws/federal/codes/united-states-code/title-16/section-824a-interconnection-and-coordination-of-facilities-emergencies-transmission--c5582b4faa.md
Pages: Not recorded – Not recorded
Passage SHA-256: 92524b9eeb1e3dce3e8c7907e306cff6ee4b6d133226a23d4bbaf023aa34f2f4

Source location: Title 16, Chapter 12, § 824a; chapter-012-federal-regulation-and-development-of-power.md

Stored source content

**(a) Regional districts; establishment; notice to State commissions** For the purpose of assuring an abundant supply of electric energy throughout the United States with the greatest possible economy and with regard to the proper utilization and conservation of natural resources, the Commission is empowered and directed to divide the country into regional districts for the voluntary interconnection and coordination of facilities for the generation, transmission, and sale of electric energy, and it may at any time thereafter, upon its own motion or upon application, make such modifications thereof as in its judgment will promote the public interest. Each such district shall embrace an area which, in the judgment of the Commission, can economically be served by such interconnection and coordinated electric facilities. It shall be the duty of the Commission to promote and encourage such interconnection and coordination within each such district and between such districts. Before establishing any such district and fixing or modifying the boundaries thereof the Commission shall give notice to the State commission of each State situated wholly or in part within such district, and shall afford each such State commission reasonable opportunity to present its views and recommendations, and shall receive and consider such views and recommendations. **(b) Sale or exchange of energy; establishing physical connections** Whenever the Commission, upon application of any State commission or of any person engaged in the transmission or sale of electric energy, and after notice to each State commission and public utility affected and after opportunity for hearing, finds such action necessary or appropriate in the public interest it may by order direct a public utility (if the Commission finds that no undue burden will be placed upon such public utility thereby) to establish physical connection of its transmission facilities with the facilities of one or more other persons engaged in the transmission or sale of electric energy, to sell energy to or exchange energy with such persons: Provided, That the Commission shall have no authority to compel the enlargement of generating facilities for such purposes, nor to compel such public utility to sell or exchange energy when to do so would impair its ability to render adequate service to its customers. The Commission may prescribe the terms and conditions of the arrangement to be made between the persons affected by any such order, including the apportionment of cost between them and the compensation or reimbursement reasonably due to any of them. **(c) Temporary connection and exchange of facilities during emergency** (1) During the continuance of any war in which the United States is engaged, or whenever the Commission determines that an emergency exists by reason of a sudden increase in the demand for electric energy, or a shortage of electric energy or of facilities for the generation or transmission of electric energy, or of fuel or water for generating facilities, or other causes, the Commission shall have authority, either upon its own motion or upon complaint, with or without notice, hearing, or report, to require by order such temporary connections of facilities and such generation, delivery, interchange, or transmission of electric energy as in its judgment will best meet the emergency and serve the public interest. If the parties affected by such order fail to agree upon the terms of any arrangement between them in carrying out such order, the Commission, after hearing held either before or after such order takes effect, may prescribe by supplemental order such terms as it finds to be just and reasonable, including the compensation or reimbursement which should be paid to or by any such party. (2) With respect to an order issued under this subsection that may result in a conflict with a requirement of any Federal, State, or local environmental law or regulation, the Commission shall ensure that such order requires generation, delivery, interchange, or transmission of electric energy only during hours necessary to meet the emergency and serve the public interest, and, to the maximum extent practicable, is consistent with any applicable Federal, State, or local environmental law or regulation and minimizes any adverse environmental impacts. (3) To the extent any omission or action taken by a party, that is necessary to comply with an order issued under this subsection, including any omission or action taken to voluntarily comply with such order, results in noncompliance with, or causes such party to not comply with, any Federal, State, or local environmental law or regulation, such omission or action shall not be considered a violation of such environmental law or regulation, or subject such party to any requirement, civil or criminal liability, or a citizen suit under such environmental law or regulation. (4) (A) An order issued under this subsection that may result in a conflict with a requirement of any Federal, State, or local environmental law or regulation shall expire not later than 90 days after it is issued. The Commission may renew or reissue such order pursuant to paragraphs (1) and (2) for subsequent periods, not to exceed 90 days for each period, as the Commission determines necessary to meet the emergency and serve the public interest. (B) In renewing or reissuing an order under subparagraph (A), the Commission shall consult with the primary Federal agency with expertise in the environmental interest protected by such law or regulation, and shall include in any such renewed or reissued order such conditions as such Federal agency determines necessary to minimize any adverse environmental impacts to the extent practicable. The conditions, if any, submitted by such Federal agency shall be made available to the public. The Commission may exclude such a condition from the renewed or reissued order if it determines that such condition would prevent the order from adequately addressing the emergency necessitating such order and provides in the order, or otherwise makes publicly available, an explanation of such determination. (5) If an order issued under this subsection is subsequently stayed, modified, or set aside by a court pursuant to section 825l of this title or any other provision of law, any omission or action previously taken by a party that was necessary to comply with the order while the order was in effect, including any omission or action taken to voluntarily comply with the order, shall remain subject to paragraph (3). **(d) Temporary connection during emergency by persons without jurisdiction of Commission** During the continuance of any emergency requiring immediate action, any person or municipality engaged in the transmission or sale of electric energy and not otherwise subject to the jurisdiction of the Commission may make such temporary connections with any public utility subject to the jurisdiction of the Commission or may construct such temporary facilities for the transmission of electric energy in interstate commerce as may be necessary or appropriate to meet such emergency, and shall not become subject to the jurisdiction of the Commission by reason of such temporary connection or temporary construction: Provided, That such temporary connection shall be discontinued or such temporary construction removed or otherwise disposed of upon the termination of such emergency: Provided further, That upon approval of the Commission permanent connections for emergency use only may be made hereunder. **(e) Transmission of electric energy to foreign country** After six months from August 26, 1935, no person shall transmit any electric energy from the United States to a foreign country without first having secured an order of the Commission authorizing it to do so. The Commission shall issue such order upon application unless, after opportunity for hearing, it finds that the proposed transmission would impair the sufficiency of electric supply within the United States or would impede or tend to impede the coordination in the public interest of facilities subject to the jurisdiction of the Commission. The Commission may by its order grant such application in whole or in part, with such modifications and upon such terms and conditions as the Commission may find necessary or appropriate, and may from time to time, after opportunity for hearing and for good cause shown, make such supplemental orders in the premises as it may find necessary or appropriate. **(f) Transmission or sale at wholesale of electric energy; regulation** The ownership or operation of facilities for the transmission or sale at wholesale of electric energy which is (a) generated within a State and transmitted from the State across an international boundary and not thereafter transmitted into any other State, or (b) generated in a foreign country and transmitted across an international boundary into a State and not thereafter transmitted into any other State, shall not make a person a public utility subject to regulation as such under other provisions of this subchapter. The State within which any such facilities are located may regulate any such transaction insofar as such State regulation does not conflict with the exercise of the Commission’s powers under or relating to subsection (e). **(g) Continuance of service** In order to insure continuity of service to customers of public utilities, the Commission shall require, by rule, each public utility to— (1) report promptly to the Commission and any appropriate State regulatory authorities any anticipated shortage of electric energy or capacity which would affect such utility’s capability of serving its wholesale customers, (2) submit to the Commission, and to any appropriate State regulatory authority, and periodically revise, contingency plans respecting— (A) shortages of electric energy or capacity, and (B) circumstances which may result in such shortages, and (3) accommodate any such shortages or circumstances in a manner which shall— (A) give due consideration to the public health, safety, and welfare, and (B) provide that all persons served directly or indirectly by such public utility will be treated, without undue prejudice or disadvantage.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

15 U.S.C. § 717b — Exportation or importation of natural gas; LNG terminals

**(a) Mandatory authorization order** After six months from June 21, 1938, no person shall export any natural gas from the United States to a foreign country or import any natural gas from a foreign country without first having secured an order of the Commission authorizing it to do so. The Commission shall issue such order upon application, unless, after opportunity for hearing, it finds that the proposed exportation or importation will not be consistent with the public interest. The Commission may by its order grant such application, in whole or in part, with such modification and upon such terms and conditions as the Commission may find necessary or appropriate, and may from time to time, after opportunity for hearing, and for good cause shown, make such supplemental order in the premises as it may find necessary or appropriate. **(b) Free trade agreements** With respect to natural gas which is imported into the United States from a nation with which there is in effect a free trade agreement requiring national treatment for trade in natural gas, and with respect to liquefied natural gas— (1) the importation of such natural gas shall be treated as a “first sale” within the meaning of [section 3301(21) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section3301/21&num=0&edition=prelim); and (2) the Commission shall not, on the basis of national origin, treat any such imported natural gas on an unjust, unreasonable, unduly discriminatory, or preferential basis. **(c) Expedited application and approval process** For purposes of subsection (a), the importation of the natural gas referred to in subsection (b), or the exportation of natural gas to a nation with which there is in effect a free trade agreement requiring national treatme

Source: Supplied U.S. Code snapshot — release unconfirmed · 15 U.S.C. § 717b

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

3 U.S.C. § 301 — General authorization to delegate functions; publication of delegations

The President of the United States is authorized to designate and empower the head of any department or agency in the executive branch, or any official thereof who is required to be appointed by and with the advice and consent of the Senate, to perform without approval, ratification, or other action by the President (1) any function which is vested in the President by law, or (2) any function which such officer is required or authorized by law to perform only with or subject to the approval, ratification, or other action of the President: Provided, That nothing contained herein shall relieve the President of his responsibility in office for the acts of any such head or other official designated by him to perform such functions. Such designation and authorization shall be in writing, shall be published in the Federal Register, shall be subject to such terms, conditions, and limitations as the President may deem advisable, and shall be revocable at any time by the President in whole or in part.

Source: Supplied U.S. Code snapshot — release unconfirmed · 3 U.S.C. § 301

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 824a–1 — Pooling

**(a) State laws** The Commission may, on its own motion, and shall, on application of any person or governmental entity, after public notice and notice to the Governor of the affected State and after affording an opportunity for public hearing, exempt electric utilities, in whole or in part, from any provision of State law, or from any State rule or regulation, which prohibits or prevents the voluntary coordination of electric utilities, including any agreement for central dispatch, if the Commission determines that such voluntary coordination is designed to obtain economical utilization of facilities and resources in any area. No such exemption may be granted if the Commission finds that such provision of State law, or rule or regulation— (1) is required by any authority of Federal law, or (2) is designed to protect public health, safety, or welfare, or the environment or conserve energy or is designed to mitigate the effects of emergencies resulting from fuel shortages. **(b) Pooling study** (1) The Commission, in consultation with the reliability councils established under section 202(a) of the Federal Power Act [[16 U.S.C. 824a](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section824a&num=0&edition=prelim)], the Secretary, and the electric utility industry shall study the opportunities for— (A) conservation of energy, (B) optimization in the efficiency of use of facilities and resources, and (C) increased reliability, through pooling arrangements. Not later than 18 months after November 9, 1978, the Commission shall submit a report containing the results of such study to the President and the Congress. (2) The Commission may recommend to electric utilities that such utilities should voluntarily enter into negotiations where t

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 824a–1

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 824a — Interconnection and coordination of fa-

Page 1400 TITLE 16—CONSERVATION § 824a AMENDMENTS 2015—Subsec. (b)(2). Pub. L. 114–94, § 61003(b)(1), in- serted ‘‘824o–1,’’ after ‘‘824o,’’ in two places. Subsec. (e). Pub. L. 114–94, § 61003(b)(2), inserted ‘‘824o–1,’’ after ‘‘824o,’’. 2005—Subsec. (b)(2). Pub. L. 109–58, § 1295(a)(1), sub- stituted ‘‘Notwithstanding subsection (f), the provi- sions of sections 824b(a)(2), 824e(e), 824i, 824j, 824j–1, 824k, 824o, 824p, 824q, 824r, 824s, 824t, 824u, and 824v of this title’’ for ‘‘The provisions of sections 824i, 824j, and 824k of this title’’ and ‘‘Compliance with any order or rule of the Commission under the provisions of section 824b(a)(2), 824e(e), 824i, 824j, 824j–1, 824k, 824o, 824p, 824q, 824r, 824s, 824t, 824u, or 824v of this title’’ for ‘‘Compli- ance with any order of the Commission under the provi- sions of section 824i or 824j of this title’’. Subsec. (e). Pub. L. 109–58, § 1295(a)(2), substituted ‘‘section 824e(e), 824e(f), 824i, 824j, 824j–1, 824k, 824o, 824p, 824q, 824r, 824s, 824t, 824u, or 824v of this title’’ for ‘‘sec- tion 824i, 824j, or 824k of this title’’. Subsec. (f). Pub. L. 109–58, § 1291(c), which directed amendment of subsec. (f) by substituting ‘‘political subdivision of a State, an electric cooperative that re- ceives financing under the Rural Electrification Act of 1936 (7 U.S.C. 901 et seq.) or that sells less than 4,000,000 megawatt hours of electricity per year,’’ for ‘‘political subdivision of a state,’’, was executed by making the substitution for ‘‘political subdivision of a State,’’ to reflect the probable intent of Congress. Subsec. (g)(5). Pub. L. 109–58, § 1277(b)(1), substituted ‘‘2005’’ for ‘‘1935’’. 1992—Subsec. (g). Pub. L. 102–486 added subsec. (g). 1978—Subsec. (b). Pub. L. 95–617, § 204(b)(1), de

Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 824a

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.