42 U.S.C. § 7651c — Phase I sulfur dioxide requirements
Federal law — U.S. Code and appendices · legal_authorities
Page 7418
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7651c
2 See References in Text note below.
(h) Competitive bidding for power supply
Nothing in this subchapter shall be construed
to interfere with or impair any program for
competitive bidding for power supply in a State
in which such program is established.
(i) Applicability of antitrust laws
(1) Nothing in this section affects—
(A) the applicability of the antitrust laws to
the transfer, use, or sale of allowances, or
(B) the authority of the Federal Energy Reg-
ulatory Commission under any provision of
law respecting unfair methods of competition
or anticompetitive acts or practices.
(2) As used in this section, ‘‘antitrust laws’’
means those Acts set forth in section 12 of title
15.
(j) Public Utility Holding Company Act
The acquisition or disposition of allowances
pursuant to this subchapter including the
issuance of securities or the undertaking of any
other financing transaction in connection with
such allowances shall not be subject to the pro-
visions of the Public Utility Holding Company
Act of 1935.2
(July 14, 1955, ch. 360, title IV, § 403, as added
Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104
Stat. 2589.)
Editorial Notes
REFERENCES IN TEXT
The Federal Power Act, referred to in subsec. (f), is
act June 10, 1920, ch. 285, 41 Stat. 1063, which is classi-
fied generally to chapter 12 (§ 791a et seq.) of Title 16,
Conservation. For complete classification of this Act to
the Code, see section 791a of Title 16 and Tables.
The Public Utility Holding Company Act of 1935, re-
ferred to in subsec. (j), is title I of act Aug. 26, 1935, ch.
687, 49 Stat. 803, which was classified generally to chap-
ter 2C (§ 79 et seq.) of Title 15, Commerce and Trade,
prior to repeal by Pub. L.
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 7651c
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: b34c2f62f4291c805e699badea24f10dc5f56d04f84eac5b404a9e91f8555349. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-f6bb8e2fb3073456e0e2edf9
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-7651c-phase-i-sulfur-dioxide-requirements--d8318fa42f.md
Pages: Not recorded – Not recorded
Passage SHA-256: 8ff6701df66d3a4df91a268e0f625e8562f03bb3a75e77a5cc741ac37f22ff28
Source location: USCODE-2024-title42-chap85-subchapIV-A-sec7651c.pdf
Stored source content
Page 7418
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7651c
2 See References in Text note below.
(h) Competitive bidding for power supply
Nothing in this subchapter shall be construed
to interfere with or impair any program for
competitive bidding for power supply in a State
in which such program is established.
(i) Applicability of antitrust laws
(1) Nothing in this section affects—
(A) the applicability of the antitrust laws to
the transfer, use, or sale of allowances, or
(B) the authority of the Federal Energy Reg-
ulatory Commission under any provision of
law respecting unfair methods of competition
or anticompetitive acts or practices.
(2) As used in this section, ‘‘antitrust laws’’
means those Acts set forth in section 12 of title
15.
(j) Public Utility Holding Company Act
The acquisition or disposition of allowances
pursuant to this subchapter including the
issuance of securities or the undertaking of any
other financing transaction in connection with
such allowances shall not be subject to the pro-
visions of the Public Utility Holding Company
Act of 1935.2
(July 14, 1955, ch. 360, title IV, § 403, as added
Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104
Stat. 2589.)
Editorial Notes
REFERENCES IN TEXT
The Federal Power Act, referred to in subsec. (f), is
act June 10, 1920, ch. 285, 41 Stat. 1063, which is classi-
fied generally to chapter 12 (§ 791a et seq.) of Title 16,
Conservation. For complete classification of this Act to
the Code, see section 791a of Title 16 and Tables.
The Public Utility Holding Company Act of 1935, re-
ferred to in subsec. (j), is title I of act Aug. 26, 1935, ch.
687, 49 Stat. 803, which was classified generally to chap-
ter 2C (§ 79 et seq.) of Title 15, Commerce and Trade,
prior to repeal by Pub. L. 109–58, title XII, § 1263, Aug.
8, 2005, 119 Stat. 974. For complete classification of this
Act to the Code, see Tables.
CODIFICATION
Another section 403 of act July 14, 1955, as added by
Pub. L. 91–604, § 14, Dec. 31, 1970, 84 Stat. 1710, is classi-
fied to section 7642 of this title.
Statutory Notes and Related Subsidiaries
FOSSIL FUEL USE
Pub. L. 101–549, title IV, § 402, Nov. 15, 1990, 104 Stat.
2631, provided that:
‘‘(a) CONTRACTS
FOR HYDROELECTRIC ENERGY.—Any
person who, after the date of the enactment of the
Clean Air Act Amendments of 1990 [Nov. 15, 1990], en-
ters into a contract under which such person receives
hydroelectric energy in return for the provision of elec-
tric energy by such person shall use allowances held by
such person as necessary to satisfy such person’s obli-
gations under such contract.
‘‘(b) FEDERAL POWER MARKETING ADMINISTRATION.—A
Federal Power Marketing Administration shall not be
subject to the provisions and requirements of this title
[enacting this subchapter, amending sections 7410, 7411,
and 7479 of this title, and enacting provisions set out as
notes under sections 7403, 7411, and 7651 of this title]
with respect to electric energy generated by hydro-
electric facilities and marketed by such Power Mar-
keting Administration. Any person who sells or pro-
vides electric energy to a Federal Power Marketing Ad-
ministration shall comply with the provisions and re-
quirements of this title.’’
§ 7651c. Phase I sulfur dioxide requirements
(a) Emission limitations
(1) After January 1, 1995, each source that in-
cludes one or more affected units listed in table
A is an affected source under this section. After
January 1, 1995, it shall be unlawful for any af-
fected unit (other than an eligible phase I unit
under subsection (d)(2)) to emit sulfur dioxide in
excess of the tonnage limitation stated as a
total number of allowances in table A for phase
I, unless (A) the emissions reduction require-
ments applicable to such unit have been
achieved pursuant to subsection (b) or (d), or (B)
the owner or operator of such unit holds allow-
ances to emit not less than the unit’s total an-
nual emissions, except that, after January 1,
2000, the emissions limitations established in
this section shall be superseded by those estab-
lished in section 7651d of this title. The owner or
operator of any unit in violation of this section
shall be fully liable for such violation including,
but not limited to, liability for fulfilling the ob-
ligations specified in section 7651j of this title.
(2) Not later than December 31, 1991, the Ad-
ministrator shall determine the total tonnage of
reductions in the emissions of sulfur dioxide
from all utility units in calendar year 1995 that
will occur as a result of compliance with the
emissions limitation requirements of this sec-
tion, and shall establish a reserve of allowances
equal in amount to the number of tons deter-
mined thereby not to exceed a total of 3.50 mil-
lion tons. In making such a determination, the
Administrator shall compute for each unit sub-
ject to the emissions limitation requirements of
this section the difference between:
(A) the product of its baseline multiplied by
the lesser of each unit’s allowable 1985 emis-
sions rate and its actual 1985 emissions rate,
divided by 2,000, and
(B) the product of each unit’s baseline multi-
plied by 2.50 lbs/mmBtu divided by 2,000,
and sum the computations. The Administrator
shall adjust the foregoing calculation to reflect
projected calendar year 1995 utilization of the
units subject to the emissions limitations of
this subchapter that the Administrator finds
would have occurred in the absence of the impo-
sition of such requirements. Pursuant to sub-
section (d), the Administrator shall allocate al-
lowances
from
the
reserve
established
hereinunder until the earlier of such time as all
such allowances in the reserve are allocated or
December 31, 1999.
(3) In addition to allowances allocated pursu-
ant to paragraph (1), in each calendar year be-
ginning in 1995 and ending in 1999, inclusive, the
Administrator shall allocate for each unit on
Table A that is located in the States of Illinois,
Indiana, or Ohio (other than units at Kyger
Creek, Clifty Creek and Joppa Steam), allow-
ances in an amount equal to 200,000 multiplied
by the unit’s pro rata share of the total number
of allowances allocated for all units on Table A
in the 3 States (other than units at Kyger Creek,
Page 7419
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7651c
1 So in original. Probably should be section ‘‘7651a(4)’’.
2 So in original. Probably should be ‘‘unit’s’’.
Clifty Creek, and Joppa Steam) pursuant to
paragraph (1). Such allowances shall be excluded
from the calculation of the reserve under para-
graph (2).
(b) Substitutions
The owner or operator of an affected unit
under subsection (a) may include in its section
7651g of this title permit application and pro-
posed compliance plan a proposal to reassign, in
whole or in part, the affected unit’s sulfur diox-
ide reduction requirements to any other unit(s)
under the control of such owner or operator.
Such proposal shall specify—
(1) the designation of the substitute unit or
units to which any part of the reduction obli-
gations of subsection (a) shall be required, in
addition to, or in lieu of, any original affected
units designated under such subsection;
(2) the original affected unit’s baseline, the
actual and allowable 1985 emissions rate for
sulfur dioxide, and the authorized annual al-
lowance allocation stated in table A;
(3) calculation of the annual average ton-
nage for calendar years 1985, 1986, and 1987,
emitted by the substitute unit or units, based
on the baseline for each unit, as defined in sec-
tion 7651a(d) 1 of this title, multiplied by the
lesser of the unit’s actual or allowable 1985
emissions rate;
(4) the emissions rates and tonnage limita-
tions that would be applicable to the original
and substitute affected units under the substi-
tution proposal;
(5) documentation, to the satisfaction of the
Administrator, that the reassigned tonnage
limits will, in total, achieve the same or
greater emissions reduction than would have
been achieved by the original affected unit and
the substitute unit or units without such sub-
stitution; and
(6) such other information as the Adminis-
trator may require.
(c) Administrator’s action on substitution pro-
posals
(1) The Administrator shall take final action
on such substitution proposal in accordance
with section 7651g(c) of this title if the substi-
tution proposal fulfills the requirements of this
subsection. The Administrator may approve a
substitution proposal in whole or in part and
with such modifications or conditions as may be
consistent with the orderly functioning of the
allowance system and which will ensure the
emissions reductions contemplated by this sub-
chapter. If a proposal does not meet the require-
ments of subsection (b), the Administrator shall
disapprove it. The owner or operator of a unit
listed in table A shall not substitute another
unit or units without the prior approval of the
Administrator.
(2) Upon approval of a substitution proposal,
each substitute unit, and each source with such
unit, shall be deemed affected under this sub-
chapter, and the Administrator shall issue a per-
mit to the original and substitute affected
source and unit in accordance with the approved
substitution plan and section 7651g of this title.
The Administrator shall allocate allowances for
the original and substitute affected units in ac-
cordance with the approved substitution pro-
posal pursuant to section 7651b of this title. It
shall be unlawful for any source or unit that is
allocated allowances pursuant to this section to
emit sulfur dioxide in excess of the emissions
limitation provided for in the approved substi-
tution permit and plan unless the owner or oper-
ator of each unit governed by the permit and ap-
proved substitution plan holds allowances to
emit not less than the units 2 total annual emis-
sions. The owner or operator of any original or
substitute affected unit operated in violation of
this subsection shall be fully liable for such vio-
lation, including liability for fulfilling the obli-
gations specified in section 7651j of this title. If
a substitution proposal is disapproved, the Ad-
ministrator shall allocate allowances to the
original affected unit or units in accordance
with subsection (a).
(d) Eligible phase I extension units
(1) The owner or operator of any affected unit
subject to an emissions limitation requirement
under this section may petition the Adminis-
trator in its permit application under section
7651g of this title for an extension of 2 years of
the deadline for meeting such requirement, pro-
vided that the owner or operator of any such
unit holds allowances to emit not less than the
unit’s total annual emissions for each of the 2
years of the period of extension. To qualify for
such an extension, the affected unit must either
employ a qualifying phase I technology, or
transfer its phase I emissions reduction obliga-
tion to a unit employing a qualifying phase I
technology. Such transfer shall be accomplished
in accordance with a compliance plan, sub-
mitted and approved under section 7651g of this
title, that shall govern operations at all units
included in the transfer, and that specifies the
emissions reduction requirements imposed pur-
suant to this subchapter.
(2) Such extension proposal shall—
(A) specify the unit or units proposed for
designation as an eligible phase I extension
unit;
(B) provide a copy of an executed contract,
which may be contingent upon the Adminis-
trator approving the proposal, for the design
engineering, and construction of the quali-
fying phase I technology for the extension
unit, or for the unit or units to which the ex-
tension unit’s emission reduction obligation is
to be transferred;
(C) specify the unit’s or units’ baseline, ac-
tual 1985 emissions rate, allowable 1985 emis-
sions rate, and projected utilization for cal-
endar years 1995 through 1999;
(D) require CEMS on both the eligible phase
I extension unit or units and the transfer unit
or units beginning no later than January 1,
1995; and
(E) specify the emission limitation and num-
ber of allowances expected to be necessary for
annual operation after the qualifying phase I
technology has been installed.
(3) The Administrator shall review and take
final action on each extension proposal in order
Page 7420
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7651c
3 So in original. Probably should be ‘‘this’’.
4 So in original. Probably should be ‘‘paragraph (1)’’.
of receipt, consistent with section 7651g of this
title, and for an approved proposal shall des-
ignate the unit or units as an eligible phase I ex-
tension unit. The Administrator may approve an
extension proposal in whole or in part, and with
such modifications or conditions as may be nec-
essary, consistent with the orderly functioning
of the allowance system, and to ensure the emis-
sions reductions contemplated by the 3
sub-
chapter.
(4) In order to determine the number of pro-
posals eligible for allocations from the reserve
under subsection (a)(2) and the number of allow-
ances remaining available after each proposal is
acted upon, the Administrator shall reduce the
total number of allowances remaining available
in the reserve by the number of allowances cal-
culated according to subparagraphs (A), (B) and
(C) until either no allowances remain available
in the reserve for further allocation or all ap-
proved proposals have been acted upon. If no al-
lowances remain available in the reserve for fur-
ther allocation before all proposals have been
acted upon by the Administrator, any pending
proposals shall be disapproved. The Adminis-
trator shall calculate allowances equal to—
(A) the difference between the lesser of the
average annual emissions in calendar years
1988 and 1989 or the projected emissions ton-
nage for calendar year 1995 of each eligible
phase I extension unit, as designated under
paragraph (3), and the product of the unit’s
baseline multiplied by an emission rate of 2.50
lbs/mmBtu, divided by 2,000;
(B) the difference between the lesser of the
average annual emissions in calendar years
1988 and 1989 or the projected emissions ton-
nage for calendar year 1996 of each eligible
phase I extension unit, as designated under
paragraph (3), and the product of the unit’s
baseline multiplied by an emission rate of 2.50
lbs/mmBtu, divided by 2,000; and
(C) the amount by which (i) the product of
each unit’s baseline multiplied by an emission
rate of 1.20 lbs/mmBtu, divided by 2,000, ex-
ceeds (ii) the tonnage level specified under
subparagraph (E) of paragraph (2) of this sub-
section multiplied by a factor of 3.
(5) Each eligible Phase I extension unit shall
receive allowances determined under subsection
(a)(1) or (c) of this section. In addition, for cal-
endar year 1995, the Administrator shall allocate
to each eligible Phase I extension unit, from the
allowance reserve created pursuant to sub-
section (a)(2), allowances equal to the difference
between the lesser of the average annual emis-
sions in calendar years 1988 and 1989 or its pro-
jected emissions tonnage for calendar year 1995
and the product of the unit’s baseline multiplied
by an emission rate of 2.50 lbs/mmBtu, divided
by 2,000. In calendar year 1996, the Adminis-
trator shall allocate for each eligible unit, from
the allowance reserve created pursuant to sub-
section (a)(2) of this section, allowances equal to
the difference between the lesser of the average
annual emissions in calendar years 1988 and 1989
or its projected emissions tonnage for calendar
year 1996 and the product of the unit’s baseline
multiplied by an emission rate of 2.50 lbs/
mmBtu, divided by 2,000. It shall be unlawful for
any source or unit subject to an approved exten-
sion plan under this subsection to emit sulfur
dioxide in excess of the emissions limitations
provided for in the permit and approved exten-
sion plan, unless the owner or operator of each
unit governed by the permit and approved plan
holds allowances to emit not less than the unit’s
total annual emissions.
(6) In addition to allowances specified in para-
graph (5), the Administrator shall allocate for
each eligible Phase I extension unit employing
qualifying Phase I technology, for calendar
years 1997, 1998, and 1999, additional allowances,
from any remaining allowances in the reserve
created pursuant to subsection (a)(2), following
the reduction in the reserve provided for in
paragraph (4), not to exceed the amount by
which (A) the product of each eligible unit’s
baseline times an emission rate of 1.20 lbs/
mmBtu, divided by 2,000, exceeds (B) the ton-
nage level specified under subparagraph (E) of
paragraph (2) of this subsection.
(7) After January 1, 1997, in addition to any li-
ability under this chapter, including under sec-
tion 7651j of this title, if any eligible phase I ex-
tension unit employing qualifying phase I tech-
nology or any transfer unit under this sub-
section emits sulfur dioxide in excess of the an-
nual tonnage limitation specified in the exten-
sion plan, as approved in paragraph (3) of this
subsection, the Administrator shall, in the cal-
endar year following such excess, deduct allow-
ances equal to the amount of such excess from
such unit’s annual allowance allocation.
(e) Allocation of allowances
(1) In the case of a unit that receives author-
ization from the Governor of the State in which
such unit is located to make reductions in the
emissions of sulfur dioxide prior to calendar
year 1995 and that is part of a utility system
that meets the following requirements: (A) the
total coal-fired generation within the utility
system as a percentage of total system genera-
tion decreased by more than 20 percent between
January 1, 1980, and December 31, 1985; and (B)
the weighted capacity factor of all coal-fired
units within the utility system averaged over
the period from January 1, 1985, through Decem-
ber 31, 1987, was below 50 percent, the Adminis-
trator shall allocate allowances under this para-
graph for the unit pursuant to this subsection.
The Administrator shall allocate allowances for
a unit that is an affected unit pursuant to sec-
tion 7651d of this title (but is not also an af-
fected unit under this section) and part of a util-
ity system that includes 1 or more affected units
under section 7651d of this title for reductions in
the emissions of sulfur dioxide made during the
period 1995–1999 if the unit meets the require-
ments of this subsection and the requirements
of the preceding sentence, except that for the
purposes of applying this subsection to any such
unit, the prior year concerned as specified
below, shall be any year after January 1, 1995
but prior to January 1, 2000.
(2) In the case of an affected unit under this
section described in subparagraph (A),4 the al-
Page 7421
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7651c
5 So in original. Probably should be ‘‘subsection’’.
6 So in original. Probably should be ‘‘majeure’’.
7 So in original. Probably should be ‘‘impracticability’’.
lowances allocated under this subsection for
early reductions in any prior year may not ex-
ceed the amount which (A) the product of the
unit’s baseline multiplied by the unit’s 1985 ac-
tual sulfur dioxide emission rate (in lbs. per
mmBtu), divided by 2,000, exceeds (B) the allow-
ances specified for such unit in Table A. In the
case of an affected unit under section 7651d of
this title described in subparagraph (A),4 the al-
lowances awarded under this subsection for
early reductions in any prior year may not ex-
ceed the amount by which (i) the product of the
quantity of fossil fuel consumed by the unit (in
mmBtu) in the prior year multiplied by the less-
er of 2.50 or the most stringent emission rate (in
lbs. per mmBtu) applicable to the unit under the
applicable implementation plan, divided by
2,000, exceeds (ii) the unit’s actual tonnage of
sulfur dioxide emission for the prior year con-
cerned. Allowances allocated under this sub-
section for units referred to in subparagraph
(A) 4 may be allocated only for emission reduc-
tions achieved as a result of physical changes or
changes in the method of operation made after
November 15, 1990, including changes in the type
or quality of fossil fuel consumed.
(3) In no event shall the provisions of this
paragraph 5 be interpreted as an event of force
majeur 6 or a commercial impractibility 7 or in
any other way as a basis for excused non-
performance by a utility system under a coal
sales contract in effect before November 15, 1990.
TABLE A.—AFFECTED SOURCES AND UNITS IN PHASE I
AND THEIR SULFUR DIOXIDE ALLOWANCES (TONS)
State
Plant Name
Gener-
ator
Phase I
Allow-
ances
Alabama ..........
Colbert ................
1
2
3
4
5
13,570
15,310
15,400
15,410
37,180
E.C. Gaston .........
1
2
3
4
5
18,100
18,540
18,310
19,280
59,840
Florida ............
Big Bend .............
1
2
3
28,410
27,100
26,740
Crist ....................
6
7
19,200
31,680
Georgia ............
Bowen .................
1
2
3
4
56,320
54,770
71,750
71,740
Hammond ............
1
2
3
4
8,780
9,220
8,910
37,640
J. McDonough .....
1
2
19,910
20,600
Wansley ..............
1
2
70,770
65,430
TABLE A.—AFFECTED SOURCES
AND UNITS
IN PHASE I
AND THEIR SULFUR DIOXIDE ALLOWANCES (TONS)—CON-
TINUED
State
Plant Name
Gener-
ator
Phase I
Allow-
ances
Yates ...................
1
2
3
4
5
6
7
7,210
7,040
6,950
8,910
9,410
24,760
21,480
Illinois .............
Baldwin ...............
1
2
3
42,010
44,420
42,550
Coffeen ................
1
2
11,790
35,670
Grand Tower .......
4
5,910
Hennepin .............
2
18,410
Joppa Steam .......
1
2
3
4
5
6
12,590
10,770
12,270
11,360
11,420
10,620
Kincaid ...............
1
2
31,530
33,810
Meredosia ...........
3
13,890
Vermilion ...........
2
8,880
Indiana ............
Bailly ..................
7
8
11,180
15,630
Breed ...................
1
18,500
Cayuga ................
1
2
33,370
34,130
Clifty Creek ........
1
2
3
4
5
6
20,150
19,810
20,410
20,080
19,360
20,380
E. W. Stout .........
5
6
7
3,880
4,770
23,610
F. B. Culley .........
2
3
4,290
16,970
F. E. Ratts ..........
1
2
8,330
8,480
Gibson .................
1
2
3
4
40,400
41,010
41,080
40,320
H. T. Pritchard ...
6
5,770
Michigan City .....
12
23,310
Petersburg ..........
1
2
16,430
32,380
R. Gallagher ........
1
2
3
4
6,490
7,280
6,530
7,650
Tanners Creek ....
4
24,820
Wabash River ......
1
2
3
5
6
4,000
2,860
3,750
3,670
12,280
Warrick ...............
4
26,980
Iowa .................
Burlington ..........
1
10,710
Des Moines ..........
7
2,320
George Neal ........
1
1,290
M.L. Kapp ...........
2
13,800
Prairie Creek ......
4
8,180
Riverside .............
5
3,990
Kansas .............
Quindaro .............
2
4,220
Kentucky .........
Coleman ..............
1
2
3
11,250
12,840
12,340
Page 7422
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7651c
TABLE A.—AFFECTED SOURCES
AND UNITS
IN PHASE I
AND THEIR SULFUR DIOXIDE ALLOWANCES (TONS)—CON-
TINUED
State
Plant Name
Gener-
ator
Phase I
Allow-
ances
Cooper .................
1
2
7,450
15,320
E.W. Brown .........
1
2
3
7,110
10,910
26,100
Elmer Smith .......
1
2
6,520
14,410
Ghent ..................
1
28,410
Green River .........
4
7,820
H.L. Spurlock .....
1
22,780
Henderson II .......
1
2
13,340
12,310
Paradise ..............
3
59,170
Shawnee ..............
10
10,170
Maryland .........
Chalk Point ........
1
2
21,910
24,330
C. P. Crane ..........
1
2
10,330
9,230
Morgantown ........
1
2
35,260
38,480
Michigan .........
J. H. Campbell ....
1
2
19,280
23,060
Minnesota ........
High Bridge .........
6
4,270
Mississippi .......
Jack Watson .......
4
5
17,910
36,700
Missouri ..........
Asbury ................
1
16,190
James River ........
5
4,850
Labadie ...............
1
2
3
4
40,110
37,710
40,310
35,940
Montrose .............
1
2
3
7,390
8,200
10,090
New Madrid .........
1
2
28,240
32,480
Sibley ..................
3
15,580
Sioux ...................
1
2
22,570
23,690
Thomas Hill ........
1
2
10,250
19,390
New Hampshire
Merrimack ..........
1
2
10,190
22,000
New Jersey ......
B.L. England .......
1
2
9,060
11,720
New York .........
Dunkirk ..............
3
4
12,600
14,060
Greenidge ............
4
7,540
Milliken ..............
1
2
11,170
12,410
Northport ............
1
2
3
19,810
24,110
26,480
Port Jefferson .....
3
4
10,470
12,330
Ohio .................
Ashtabula ...........
5
16,740
Avon Lake ..........
8
9
11,650
30,480
Cardinal ..............
1
2
34,270
38,320
Conesville ...........
1
2
3
4
4,210
4,890
5,500
48,770
Eastlake ..............
1
2
3
4
5
7,800
8,640
10,020
14,510
34,070
Edgewater ...........
4
5,050
Gen. J.M. Gavin ..
1
2
79,080
80,560
TABLE A.—AFFECTED SOURCES
AND UNITS
IN PHASE I
AND THEIR SULFUR DIOXIDE ALLOWANCES (TONS)—CON-
TINUED
State
Plant Name
Gener-
ator
Phase I
Allow-
ances
Kyger Creek ........
1
2
3
4
5
19,280
18,560
17,910
18,710
18,740
Miami Fort .........
5
6
7
760
11,380
38,510
Muskingum River
1
2
3
4
5
14,880
14,170
13,950
11,780
40,470
Niles ....................
1
2
6,940
9,100
Picway ................
5
4,930
R.E. Burger .........
3
4
5
6,150
10,780
12,430
W.H. Sammis ......
5
6
7
24,170
39,930
43,220
W.C. Beckjord .....
5
6
8,950
23,020
Pennsylvania ...
Armstrong ..........
1
2
14,410
15,430
Brunner Island ....
1
2
3
27,760
31,100
53,820
Cheswick .............
1
39,170
Conemaugh .........
1
2
59,790
66,450
Hatfield’s Ferry ..
1
2
3
37,830
37,320
40,270
Martins Creek .....
1
2
12,660
12,820
Portland ..............
1
2
5,940
10,230
Shawville ............
1
2
3
4
10,320
10,320
14,220
14,070
Sunbury ..............
3
4
8,760
11,450
Tennessee ........
Allen ...................
1
2
3
15,320
16,770
15,670
Cumberland ........
1
2
86,700
94,840
Gallatin ..............
1
2
3
4
17,870
17,310
20,020
21,260
Johnsonville .......
1
2
3
4
5
6
7
8
9
10
7,790
8,040
8,410
7,990
8,240
7,890
8,980
8,700
7,080
7,550
West Virginia ..
Albright ..............
3
12,000
Fort Martin ........
1
2
41,590
41,200
Harrison ..............
1
2
3
48,620
46,150
41,500
Page 7423
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7651c
TABLE A.—AFFECTED SOURCES
AND UNITS
IN PHASE I
AND THEIR SULFUR DIOXIDE ALLOWANCES (TONS)—CON-
TINUED
State
Plant Name
Gener-
ator
Phase I
Allow-
ances
Kammer ..............
1
2
3
18,740
19,460
17,390
Mitchell ..............
1
2
43,980
45,510
Mount Storm ......
1
2
3
43,720
35,580
42,430
Wisconsin ........
Edgewater ...........
4
24,750
La Crosse/Genoa ..
3
22,700
Nelson Dewey ......
1
2
6,010
6,680
N. Oak Creek ......
1
2
3
4
5,220
5,140
5,370
6,320
Pulliam ...............
8
7,510
S. Oak Creek .......
5
6
7
8
9,670
12,040
16,180
15,790
(f) Energy conservation and renewable energy
(1) Definitions
As used in this subsection:
(A) Qualified energy conservation measure
The term ‘‘qualified energy conservation
measure’’ means a cost effective measure, as
identified by the Administrator in consulta-
tion with the Secretary of Energy, that in-
creases the efficiency of the use of elec-
tricity provided by an electric utility to its
customers.
(B) Qualified renewable energy
The term ‘‘qualified renewable energy’’
means energy derived from biomass, solar,
geothermal, or wind as identified by the Ad-
ministrator in consultation with the Sec-
retary of Energy.
(C) Electric utility
The term ‘‘electric utility’’ means any per-
son, State agency, or Federal agency, which
sells electric energy.
(2) Allowances for emissions avoided through
energy conservation and renewable energy
(A) In general
The regulations under paragraph (4) of this
subsection shall provide that for each ton of
sulfur dioxide emissions avoided by an elec-
tric utility, during the applicable period,
through the use of qualified energy con-
servation measures or qualified renewable
energy, the Administrator shall allocate a
single allowance to such electric utility, on
a first-come-first-served basis from the Con-
servation and Renewable Energy Reserve es-
tablished under subsection (g), up to a total
of 300,000 allowances for allocation from
such Reserve.
(B) Requirements for issuance
The Administrator shall allocate allow-
ances to an electric utility under this sub-
section only if all of the following require-
ments are met:
(i) Such electric utility is paying for the
qualified energy conservation measures or
qualified renewable energy directly or
through purchase from another person.
(ii) The emissions of sulfur dioxide
avoided through the use of qualified en-
ergy conservation measures or qualified
renewable energy are quantified in accord-
ance with regulations promulgated by the
Administrator under this subsection.
(iii)(I) Such electric utility has adopted
and is implementing a least cost energy
conservation
and
electric
power
plan
which evaluates a range of resources, in-
cluding new power supplies, energy con-
servation, and renewable energy resources,
in order to meet expected future demand
at the lowest system cost.
(II) The qualified energy conservation
measures or qualified renewable energy, or
both, are consistent with that plan.
(III) Electric utilities subject to the ju-
risdiction of a State regulatory authority
must have such plan approved by such au-
thority. For electric utilities not subject
to the jurisdiction of a State regulatory
authority such plan shall be approved by
the entity with rate-making authority for
such utility.
(iv) In the case of qualified energy con-
servation measures undertaken by a State
regulated electric utility, the Secretary of
Energy certifies that the State regulatory
authority with jurisdiction over the elec-
tric rates of such electric utility has es-
tablished rates and charges which ensure
that the net income of such electric utility
after implementation of specific cost effec-
tive energy conservation measures is at
least as high as such net income would
have been if the energy conservation meas-
ures had not been implemented. Upon the
date of any such certification by the Sec-
retary of Energy, all allowances which, but
for this paragraph, would have been allo-
cated under subparagraph (A) before such
date, shall be allocated to the electric util-
ity. This clause is not a requirement for
qualified renewable energy.
(v) Such utility or any subsidiary of the
utility’s holding company owns or oper-
ates at least one affected unit.
(C) Period of applicability
Allowances under this subsection shall be
allocated only with respect to kilowatt
hours of electric energy saved by qualified
energy conservation measures or generated
by qualified renewable energy after January
1, 1992 and before the earlier of (i) December
31, 2000, or (ii) the date on which any electric
utility steam generating unit owned or oper-
ated by the electric utility to which the al-
lowances are allocated becomes subject to
this subchapter (including those sources
that elect to become affected by this sub-
chapter, pursuant to section 7651i of this
title).
Page 7424
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7651c
8 So in original. There is no cl. (ii).
9 So in original. The comma probably should be a semicolon.
(D) Determination of avoided emissions
(i) 8 Application
In order to receive allowances under this
subsection, an electric utility shall make
an application which—
(I) designates the qualified energy con-
servation measures implemented and the
qualified renewable energy sources used
for purposes of avoiding emissions,9
(II) calculates, in accordance with sub-
paragraphs (F) and (G), the number of
tons of emissions avoided by reason of
the implementation of such measures or
the
use
of
such
renewable
energy
sources; and
(III) demonstrates that the require-
ments of subparagraph (B) have been
met.
Such application for allowances by a
State-regulated electric utility shall re-
quire approval by the State regulatory au-
thority with jurisdiction over such electric
utility. The authority shall review the ap-
plication for accuracy and compliance
with this subsection and the rules under
this subsection. Electric utilities whose re-
tail rates are not subject to the jurisdic-
tion of a State regulatory authority shall
apply directly to the Administrator for
such approval.
(E) Avoided emissions from qualified energy
conservation measures
For the purposes of this subsection, the
emission tonnage deemed avoided by reason
of the implementation of qualified energy
conservation measures for any calendar year
shall be a tonnage equal to the product of
multiplying—
(i) the kilowatt hours that would other-
wise have been supplied by the utility dur-
ing such year in the absence of such quali-
fied energy conservation measures, by
(ii) 0.004,
and dividing by 2,000.
(F) Avoided emissions from the use of quali-
fied renewable energy
The emissions tonnage deemed avoided by
reason of the use of qualified renewable en-
ergy by an electric utility for any calendar
year shall be a tonnage equal to the product
of multiplying—
(i) the actual kilowatt hours generated
by, or purchased from, qualified renewable
energy, by
(ii) 0.004,
and dividing by 2,000.
(G) Prohibitions
(i) No allowances shall be allocated under
this subsection for the implementation of
programs that are exclusively informational
or educational in nature.
(ii) No allowances shall be allocated for en-
ergy conservation measures or renewable en-
ergy that were operational before January 1,
1992.
(3) Savings provision
Nothing in this subsection precludes a State
or State regulatory authority from providing
additional incentives to utilities to encourage
investment in demand-side resources.
(4) Regulations
Not later than 18 months after November 15,
1990, and in conjunction with the regulations
required to be promulgated under subsections
(b) and (c), the Administrator shall, in con-
sultation with the Secretary of Energy, pro-
mulgate regulations under this subsection.
Such regulations shall list energy conserva-
tion measures and renewable energy sources
which may be treated as qualified energy con-
servation measures and qualified renewable
energy for purposes of this subsection. Allow-
ances shall only be allocated if all require-
ments of this subsection and the rules promul-
gated to implement this subsection are com-
plied with. The Administrator shall review the
determinations of each State regulatory au-
thority under this subsection to encourage
consistency from electric utility to electric
utility and from State to State in accordance
with the Administrator’s rules. The Adminis-
trator shall publish the findings of this review
no less than annually.
(g) Conservation and Renewable Energy Reserve
The Administrator shall establish a Conserva-
tion and Renewable Energy Reserve under this
subsection. Beginning on January 1, 1995, the
Administrator may allocate from the Conserva-
tion and Renewable Energy Reserve an amount
equal to a total of 300,000 allowances for emis-
sions of sulfur dioxide pursuant to section 7651b
of this title. In order to provide 300,000 allow-
ances for such reserve, in each year beginning in
calendar year 2000 and until calendar year 2009,
inclusive, the Administrator shall reduce each
unit’s basic Phase II allowance allocation on the
basis of its pro rata share of 30,000 allowances. If
allowances remain in the reserve after January
2, 2010, the Administrator shall allocate such al-
lowances for affected units under section 7651d
of this title on a pro rata basis. For purposes of
this subsection, for any unit subject to the emis-
sions limitation requirements of section 7651d of
this title, the term ‘‘pro rata basis’’ refers to the
ratio which the reductions made in such unit’s
allowances in order to establish the reserve
under this subsection bears to the total of such
reductions for all such units.
(h) Alternative allowance allocation for units in
certain utility systems with optional baseline
(1) Optional baseline for units in certain sys-
tems
In the case of a unit subject to the emissions
limitation requirements of this section which
(as of November 15, 1990)—
(A) has an emission rate below 1.0 lbs/
mmBtu,
(B) has decreased its sulfur dioxide emis-
sions rate by 60 percent or greater since 1980,
and
(C) is part of a utility system which has a
weighted average sulfur dioxide emissions
rate for all fossil fueled-fired units below 1.0
lbs/mmBtu,
Page 7425
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 7651d
at the election of the owner or operator of
such unit, the unit’s baseline may be cal-
culated (i) as provided under section 7651a(d) 1
of this title, or (ii) by utilizing the unit’s aver-
age annual fuel consumption at a 60 percent
capacity factor. Such election shall be made
no later than March 1, 1991.
(2) Allowance allocation
Whenever a unit referred to in paragraph (1)
elects to calculate its baseline as provided in
clause (ii) of paragraph (1), the Administrator
shall allocate allowances for the unit pursuant
to section 7651b(a)(1) of this title, this section,
and section 7651d of this title (as basic Phase
II allowance allocations) in an amount equal
to the baseline selected multiplied by the
lower of the average annual emission rate for
such unit in 1989, or 1.0 lbs./mmBtu. Such al-
lowance allocation shall be in lieu of any allo-
cation of allowances under this section and
section 7651d of this title.
(July 14, 1955, ch. 360, title IV, § 404, as added
Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104
Stat. 2592.)
§ 7651d. Phase II sulfur dioxide requirements
(a) Applicability
(1) After January 1, 2000, each existing utility
unit as provided below is subject to the limita-
tions or requirements of this section. Each util-
ity unit subject to an annual sulfur dioxide ton-
nage emission limitation under this section is
an affected unit under this subchapter. Each
source that includes one or more affected units
is an affected source. In the case of an existing
unit that was not in operation during calendar
year 1985, the emission rate for a calendar year
after 1985, as determined by the Administrator,
shall be used in lieu of the 1985 rate. The owner
or operator of any unit operated in violation of
this section shall be fully liable under this chap-
ter for fulfilling the obligations specified in sec-
tion 7651j of this title.
(2) In addition to basic Phase II allowance al-
locations, in each year beginning in calendar
year 2000 and ending in calendar year 2009, inclu-
sive, the Administrator shall allocate up to
530,000 Phase II bonus allowances pursuant to
subsections (b)(2), (c)(4), (d)(3)(A) and (B), and
(h)(2) of this section and section 7651e of this
title. Not later than June 1, 1998, the Adminis-
trator shall calculate, for each unit granted an
extension pursuant to section 7651h of this title
the difference between (A) the number of allow-
ances allocated for the unit in calendar year
2000, and (B) the product of the unit’s baseline
multiplied by 1.20 lbs/mmBtu, divided by 2000,
and sum the computations. In each year, begin-
ning in calendar year 2000 and ending in cal-
endar year 2009, inclusive, the Administrator
shall deduct from each unit’s basic Phase II al-
lowance allocation its pro rata share of 10 per-
cent of the sum calculated pursuant to the pre-
ceding sentence.
(3) In addition to basic Phase II allowance al-
locations and Phase II bonus allowance alloca-
tions, beginning January 1, 2000, the Adminis-
trator shall allocate for each unit listed on
Table A in section 7651c of this title (other than
units at Kyger Creek, Clifty Creek, and Joppa
Steam) and located in the States of Illinois, In-
diana, Ohio, Georgia, Alabama, Missouri, Penn-
sylvania, West Virginia, Kentucky, or Tennessee
allowances in an amount equal to 50,000 multi-
plied by the unit’s pro rata share of the total
number of basic allowances allocated for all
units listed on Table A (other than units at
Kyger Creek, Clifty Creek, and Joppa Steam).
Allowances allocated pursuant to this paragraph
shall not be subject to the 8,900,000 ton limita-
tion in section 7651b(a) of this title.
(b) Units equal to, or above, 75 MWe and 1.20 lbs/
mmBtu
(1) Except as otherwise provided in paragraph
(3), after January 1, 2000, it shall be unlawful for
any existing utility unit that serves a generator
with nameplate capacity equal to, or greater,
than 75 MWe and an actual 1985 emission rate
equal to or greater than 1.20 lbs/mmBtu to ex-
ceed an annual sulfur dioxide tonnage emission
limitation equal to the product of the unit’s
baseline multiplied by an emission rate equal to
1.20 lbs/mmBtu, divided by 2,000, unless the
owner or operator of such unit holds allowances
to emit not less than the unit’s total annual
emissions.
(2) In addition to allowances allocated pursu-
ant to paragraph (1) and section 7651b(a)(1) of
this title as basic Phase II allowance alloca-
tions, beginning January 1, 2000, and for each
calendar year thereafter until and including
2009, the Administrator shall allocate annually
for each unit subject to the emissions limitation
requirements of paragraph (1) with an actual
1985 emissions rate greater than 1.20 lbs/mmBtu
and less than 2.50 lbs/mmBtu and a baseline ca-
pacity factor of less than 60 percent, allowances
from the reserve created pursuant to subsection
(a)(2) in an amount equal to 1.20 lbs/mmBtu mul-
tiplied by 50 percent of the difference, on a Btu
basis, between the unit’s baseline and the unit’s
fuel consumption at a 60 percent capacity fac-
tor.
(3) After January 1, 2000, it shall be unlawful
for any existing utility unit with an actual 1985
emissions rate equal to or greater than 1.20 lbs/
mmBtu whose annual average fuel consumption
during 1985, 1986, and 1987 on a Btu basis exceed-
ed 90 percent in the form of lignite coal which is
located in a State in which, as of July 1, 1989, no
county or portion of a county was designated
nonattainment under section 7407 of this title
for any pollutant subject to the requirements of
section 7409 of this title to exceed an annual sul-
fur dioxide tonnage limitation equal to the prod-
uct of the unit’s baseline multiplied by the less-
er of the unit’s actual 1985 emissions rate or its
allowable 1985 emissions rate, divided by 2,000,
unless the owner or operator of such unit holds
allowances to emit not less than the unit’s total
annual emissions.
(4) After January 1, 2000, the Administrator
shall allocate annually for each unit, subject to
the emissions limitation requirements of para-
graph (1), which is located in a State with an in-
stalled electrical generating capacity of more
than 30,000,000 kw in 1988 and for which was
issued a prohibition order or a proposed prohibi-
tion order (from burning oil), which unit subse-
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Emission limitations**
(1) After January 1, 1995, each source that includes one or more affected units listed in table A is an affected source under this section. After January 1, 1995, it shall be unlawful for any affected unit (other than an eligible phase I unit under subsection (d)(2)) to emit sulfur dioxide in excess of the tonnage limitation stated as a total number of allowances in table A for phase I, unless (A) the emissions reduction requirements applicable to such unit have been achieved pursuant to subsection (b) or (d), or (B) the owner or operator of such unit holds allowances to emit not less than the unit’s total annual emissions, except that, after January 1, 2000, the emissions limitations established in this section shall be superseded by those established in [section 7651d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651d&num=0&edition=prelim). The owner or operator of any unit in violation of this section shall be fully liable for such violation including, but not limited to, liability for fulfilling the obligations specified in [section 7651j of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7651j&num=0&edition=prelim).
(2) Not later than December 31, 1991, the Administrator shall determine the total tonnage of reductions in the emissions of sulfur dioxide from all utility units in calendar year 1995 that will occur as a result of compliance with the emissions limitation requirements of this section, and shall establish a reserve of allowances equal in amount to the number of tons determined thereby not to exceed a total of 3.50 million tons. In making such a determination, the Administrator shall compute for each unit subject to the emissions limitation