Browse Arkansas Code titles and sections
10 U.S.C. § 2917 — Development of geothermal energy on
Federal law — U.S. Code and appendices · legal_authorities
Page 2349
TITLE 10—ARMED FORCES
§ 2918
designated subsec. (b) of section 2911, relating to the de-
velopment of an energy performance master plan, as
(d), not (c).
AMENDMENTS
2019—Subsec. (b)(3)(B). Pub. L. 116–92 substituted
‘‘shall be provided directly to the commander of the
military installation in which the geothermal energy
resource is located to be used for—’’ for ‘‘shall be avail-
able, for military construction projects described in
paragraph (2) or for installation energy or water secu-
rity projects directly coordinated with local area en-
ergy or groundwater governing authorities, for the
military installation in which the geothermal energy
resource is located.’’ and added cls. (i) and (ii).
2018—Subsec. (b)(1). Pub. L. 115–232, § 313(1), sub-
stituted ‘‘Except as provided in paragraph (3), pro-
ceeds’’ for ‘‘Proceeds’’.
Subsec. (b)(3). Pub. L. 115–232, § 313(2), added par. (3).
2017—Subsec. (b)(2). Pub. L. 115–91, § 2831(c)(3), sub-
stituted ‘‘2911(c)’’ for ‘‘2911(b)’’.
Subsec. (c). Pub. L. 115–91, § 2801(e)(2), struck out ‘‘in
writing’’ after ‘‘notify Congress’’ and ‘‘or, if earlier, the
end of the 14-day period beginning on the date on which
a copy of the notification is provided’’ after ‘‘received
by Congress’’ and substituted ‘‘14-day period’’ for ‘‘21-
day period’’.
2006—Pub. L. 109–364, § 2851(b)(1), renumbered section
2867 of this title as this section.
Subsec. (b)(2). Pub. L. 109–364, § 2851(b)(3)(B), sub-
stituted ‘‘2911(b)’’ for ‘‘2865(a)’’.
2003—Subsec. (c). Pub. L. 108–136 inserted before pe-
riod at end ‘‘or, if earlier, the end of the 14-day period
beginning on the date on which a copy of the notifica-
tion is provided in an electronic medium pursuant to
section 480 of this title’’.
1997—Pub. L. 105–85 renumbered sectio
Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 2917
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 45d908229713fabb6a50508f1345dabaef962328202408b6c12c5a96bb68eb48. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-f5ec77edff93a5bbce830c59
Source file: Laws/federal/codes/united-states-code-2024/title-10/section-2917-development-of-geothermal-energy-on--2b642b6a58.md
Pages: Not recorded – Not recorded
Passage SHA-256: 8b362d35749aa3e6513c2e9c7334b765d1f5ba1cab06e384d973c35b3911c3d1
Source location: USCODE-2024-title10-subtitleA-partIV-chap173-subchapI-sec2917.pdf
Stored source content
Page 2349
TITLE 10—ARMED FORCES
§ 2918
designated subsec. (b) of section 2911, relating to the de-
velopment of an energy performance master plan, as
(d), not (c).
AMENDMENTS
2019—Subsec. (b)(3)(B). Pub. L. 116–92 substituted
‘‘shall be provided directly to the commander of the
military installation in which the geothermal energy
resource is located to be used for—’’ for ‘‘shall be avail-
able, for military construction projects described in
paragraph (2) or for installation energy or water secu-
rity projects directly coordinated with local area en-
ergy or groundwater governing authorities, for the
military installation in which the geothermal energy
resource is located.’’ and added cls. (i) and (ii).
2018—Subsec. (b)(1). Pub. L. 115–232, § 313(1), sub-
stituted ‘‘Except as provided in paragraph (3), pro-
ceeds’’ for ‘‘Proceeds’’.
Subsec. (b)(3). Pub. L. 115–232, § 313(2), added par. (3).
2017—Subsec. (b)(2). Pub. L. 115–91, § 2831(c)(3), sub-
stituted ‘‘2911(c)’’ for ‘‘2911(b)’’.
Subsec. (c). Pub. L. 115–91, § 2801(e)(2), struck out ‘‘in
writing’’ after ‘‘notify Congress’’ and ‘‘or, if earlier, the
end of the 14-day period beginning on the date on which
a copy of the notification is provided’’ after ‘‘received
by Congress’’ and substituted ‘‘14-day period’’ for ‘‘21-
day period’’.
2006—Pub. L. 109–364, § 2851(b)(1), renumbered section
2867 of this title as this section.
Subsec. (b)(2). Pub. L. 109–364, § 2851(b)(3)(B), sub-
stituted ‘‘2911(b)’’ for ‘‘2865(a)’’.
2003—Subsec. (c). Pub. L. 108–136 inserted before pe-
riod at end ‘‘or, if earlier, the end of the 14-day period
beginning on the date on which a copy of the notifica-
tion is provided in an electronic medium pursuant to
section 480 of this title’’.
1997—Pub. L. 105–85 renumbered section 2483 of this
title as this section.
1993—Subsec. (b). Pub. L. 103–160, § 2802(a), designated
existing provisions as par. (1) and added par. (2).
Subsec. (c). Pub. L. 103–160, § 2802(b), added subsec. (c).
§ 2917. Development of geothermal energy on
military lands
(a) DEVELOPMENT AUTHORIZED.—The Secretary
of a military department may develop, or au-
thorize the development of, any geothermal en-
ergy resource within lands under the Secretary’s
jurisdiction, including public lands, for the use
or benefit of the Department of Defense if that
development is in the public interest, as deter-
mined by the Secretary concerned, and will not
deter commercial development and use of other
portions of such resource if offered for leasing.
(b) CONSIDERATION OF ENERGY SECURITY.—The
development of a geothermal energy project
under subsection (a) should include consider-
ation of energy security in the design and devel-
opment of the project.
(Added Pub. L. 97–214, § 6(c)(1), July 12, 1982, 96
Stat. 172, § 2689; renumbered § 2917, Pub. L.
109–364, div. B, title XXVIII, § 2851(b)(1), Oct. 17,
2006, 120 Stat. 2494; amended Pub. L. 112–81, div.
B, title XXVIII, § 2822(c), Dec. 31, 2011, 125 Stat.
1692.)
Editorial Notes
AMENDMENTS
2011—Pub. L. 112–81 designated existing provisions as
subsec. (a), inserted heading, and added subsec. (b).
2006—Pub. L. 109–364 renumbered section 2689 of this
title as this section.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE
Section effective Oct. 1, 1982, and applicable to mili-
tary construction projects, and to construction and ac-
quisition of military family housing authorized before,
on, or after such date, see section 12(a) of Pub. L.
97–214, set out as a note under section 2801 of this title.
§ 2918. Fuel sources for heating systems; prohibi-
tion on converting certain heating facilities
(a)(1) The Secretary of the military depart-
ment concerned shall provide that the primary
fuel source to be used in any new heating system
constructed on lands under the jurisdiction of
the military department is the most cost effec-
tive fuel for that heating system over the life
cycle of the system.
(2) The Secretary of Defense shall prescribe
regulations for the determination of the life-
cycle cost effectiveness of a fuel for the purposes
of paragraph (1).
(b) The Secretary of a military department
may not convert a heating facility at a United
States military installation in Europe from a
coal-fired facility to an oil-fired facility, or to
any other energy source facility, unless the Sec-
retary determines that the conversion—
(1) is required by the government of the
country in which the facility is located; or
(2) is cost-effective over the life cycle of the
facility.
(Added Pub. L. 97–214, § 6(c)(1), July 12, 1982, 96
Stat. 173, § 2690; amended Pub. L. 99–661, div. A,
title XII, § 1205(a)(1), Nov. 14, 1986, 100 Stat. 3971;
Pub. L. 105–85, div. A, title X, § 1041(a), Nov. 18,
1997, 111 Stat. 1885; renumbered § 2918, Pub. L.
109–364, div. B, title XXVIII, § 2851(b)(1), Oct. 17,
2006, 120 Stat. 2494.)
Editorial Notes
AMENDMENTS
2006—Pub. L. 109–364 renumbered section 2690 of this
title as this section.
1997—Subsec. (b). Pub. L. 105–85 substituted ‘‘unless
the Secretary determines that the conversion—’’ for
‘‘unless the Secretary—’’ in introductory provisions,
added pars. (1) and (2), and struck out former pars. (1)
and (2) which read as follows:
‘‘(1) determines that the conversion (A) is required by
the government of the country in which the facility is
located, or (B) is cost effective over the life cycle of the
facility; and
‘‘(2) submits to Congress notification of the proposed
conversion and a period of 30 days has elapsed following
the date on which Congress receives the notice.’’
1986—Pub. L. 99–661 substituted ‘‘Fuel sources for
heating systems; prohibition on converting certain
heating facilities’’ for ‘‘Restriction on fuel sources for
new heating systems’’ in section catchline and amend-
ed text generally. Prior to amendment, text read as fol-
lows:
‘‘(a) Except as provided in subsection (b), a new heat-
ing system that requires a heat input rate of fifty mil-
lion British thermal units per hour or more and that
uses oil or gas (or a derivative of oil or gas) as fuel may
not be constructed on lands under the jurisdiction of a
military department.
‘‘(b) The Secretary of the military department con-
cerned may waive the provisions of subsection (a) in
rare and unusual cases, but such a waiver may not be-
come effective until after the Secretary has notified
the appropriate committees of Congress in writing of
the waiver.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Development Authorized.—** The Secretary of a military department may develop, or authorize the development of, any geothermal energy resource within lands under the Secretary’s jurisdiction, including public lands, for the use or benefit of the Department of Defense if that development is in the public interest, as determined by the Secretary concerned, and will not deter commercial development and use of other portions of such resource if offered for leasing.
**(b) Consideration of Energy Security.—** The development of a geothermal energy project under subsection (a) should include consideration of energy security in the design and development of the project.
Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 2917
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.