Arkansas Legal Resource Navigator

10 U.S.C. § 2917 — Development of geothermal energy on military lands

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 2917 — Development of geothermal energy on military lands

**(a) Development Authorized.—** The Secretary of a military department may develop, or authorize the development of, any geothermal energy resource within lands under the Secretary’s jurisdiction, including public lands, for the use or benefit of the Department of Defense if that development is in the public interest, as determined by the Secretary concerned, and will not deter commercial development and use of other portions of such resource if offered for leasing. **(b) Consideration of Energy Security.—** The development of a geothermal energy project under subsection (a) should include consideration of energy security in the design and development of the project.

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 2917

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 0954bfd205ec7934d4f3b0ff0028463788cdb41cb6151256a857bf4ffe934ffe. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_42f5f6b7c0e2e7feb3c34cb5
Source file: Laws/federal/codes/united-states-code/title-10/section-2917-development-of-geothermal-energy-on-military-lands--48970e8eed.md
Pages: Not recorded – Not recorded
Passage SHA-256: bfbe4ed63a2106ac517ce3d2b476ed9d37c9f10523db9204f23bead2cc3e8c54

Source location: Title 10, Chapter 173, § 2917; chapter-173-energy-security.md

Stored source content

**(a) Development Authorized.—** The Secretary of a military department may develop, or authorize the development of, any geothermal energy resource within lands under the Secretary’s jurisdiction, including public lands, for the use or benefit of the Department of Defense if that development is in the public interest, as determined by the Secretary concerned, and will not deter commercial development and use of other portions of such resource if offered for leasing. **(b) Consideration of Energy Security.—** The development of a geothermal energy project under subsection (a) should include consideration of energy security in the design and development of the project.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 2801 — Scope of chapter; definitions

**(a)** The term “military construction” as used in this chapter or any other provision of law includes any construction, development, conversion, or extension of any kind carried out with respect to a military installation, whether to satisfy temporary or permanent requirements, or any acquisition of land or construction of a defense access road (as described in [section 210 of title 23](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title23-section210&num=0&edition=prelim)). **(b)** A military construction project includes all military construction work, or any contribution authorized by this chapter, necessary to produce a complete and usable facility or a complete and usable improvement to an existing facility (or to produce such portion of a complete and usable facility or improvement as is specifically authorized by law). **(c)** In this chapter and chapter 173 of this title: (1) The term “appropriate committees of Congress” means the congressional defense committees and, with respect to any project to be carried out by, or for the use of, an intelligence component of the Department of Defense, the Permanent Select Committee on Intelligence of the House of Representatives and the Select Committee on Intelligence of the Senate. (2) The term “facility” means a building, structure, or other improvement to real property. (3) The term “life-cycle cost-effective”, with respect to a project, product, or measure, means that the sum of the present values of investment costs, capital costs, installation costs, energy costs, operating costs, maintenance costs, and replacement costs, as estimated for the lifetime of the project, product, or measure, does not exceed the base case (current or standard) for the practice, product, or measure. (4) The term “mil

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 2801

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 2689 — Renumbered § 2917]

<a id="section-2690"></a>

Source: U.S. Code supplied Markdown snapshot · 10 U.S.C. § 2689

Stored review status: release_metadata_unconfirmed; partially_verified. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 2922a — Contracts for energy or fuel for military installations

**(a)** Subject to subsection (b), the Secretary of a military department may enter into contracts for periods of up to 30 years— (1) under [section 2917 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section2917&num=0&edition=prelim); and (2) for the provision and operation of energy production facilities on real property under the Secretary’s jurisdiction or on private property and the purchase of energy produced from such facilities. **(b)** A contract may be made under subsection (a) only after the approval of the proposed contract by the Secretary of Defense. **(c)** The costs of contracts under this section for any year may be paid from annual appropriations for that year. **(d)** The Secretary concerned shall ensure energy security and energy resilience are included as critical factors in the provision and operation of energy production facilities under this section.

Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 2922a

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

10 U.S.C. § 2917 — Development of geothermal energy on

Page 2349 TITLE 10—ARMED FORCES § 2918 designated subsec. (b) of section 2911, relating to the de- velopment of an energy performance master plan, as (d), not (c). AMENDMENTS 2019—Subsec. (b)(3)(B). Pub. L. 116–92 substituted ‘‘shall be provided directly to the commander of the military installation in which the geothermal energy resource is located to be used for—’’ for ‘‘shall be avail- able, for military construction projects described in paragraph (2) or for installation energy or water secu- rity projects directly coordinated with local area en- ergy or groundwater governing authorities, for the military installation in which the geothermal energy resource is located.’’ and added cls. (i) and (ii). 2018—Subsec. (b)(1). Pub. L. 115–232, § 313(1), sub- stituted ‘‘Except as provided in paragraph (3), pro- ceeds’’ for ‘‘Proceeds’’. Subsec. (b)(3). Pub. L. 115–232, § 313(2), added par. (3). 2017—Subsec. (b)(2). Pub. L. 115–91, § 2831(c)(3), sub- stituted ‘‘2911(c)’’ for ‘‘2911(b)’’. Subsec. (c). Pub. L. 115–91, § 2801(e)(2), struck out ‘‘in writing’’ after ‘‘notify Congress’’ and ‘‘or, if earlier, the end of the 14-day period beginning on the date on which a copy of the notification is provided’’ after ‘‘received by Congress’’ and substituted ‘‘14-day period’’ for ‘‘21- day period’’. 2006—Pub. L. 109–364, § 2851(b)(1), renumbered section 2867 of this title as this section. Subsec. (b)(2). Pub. L. 109–364, § 2851(b)(3)(B), sub- stituted ‘‘2911(b)’’ for ‘‘2865(a)’’. 2003—Subsec. (c). Pub. L. 108–136 inserted before pe- riod at end ‘‘or, if earlier, the end of the 14-day period beginning on the date on which a copy of the notifica- tion is provided in an electronic medium pursuant to section 480 of this title’’. 1997—Pub. L. 105–85 renumbered sectio

Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 2917

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.