Arkansas Legal Resource Navigator

43 U.S.C. § 1596 — Biennial report to President, Congress,

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1596 — Biennial report to President, Congress,

Page 426 TITLE 43—PUBLIC LANDS § 1596 Section is comprised of section 205 of Pub. L. 93–320. Subsecs. (b)(2) and (d) of section 205 of Pub. L. 93–320 amended sections 1543 and 620d, respectively, of this title. AMENDMENTS 2024—Pub. L. 118–183, § 2(1), inserted section catchline. Subsec. (a). Pub. L. 118–183, § 2(1), inserted heading. Subsec. (a)(1). Pub. L. 118–183, § 2(2), added par. (1) and struck out former par. (1) which described various non- reimbursable and reimbursable costs. Subsec. (b). Pub. L. 118–183, § 2(3), inserted subsec. and par. (1) headings. Subsec. (c). Pub. L. 118–183, § 2(4), inserted heading. Subsec. (e). Pub. L. 118–183, § 2(5), inserted heading. 2008—Subsec. (f). Pub. L. 110–246, § 2806(b)(2), added subsec. (f) and struck out former subsec. (f). Prior to amendment, text read as follows: ‘‘The Secretary may expend funds available in the Basin Funds referred to in this section to carry out cost-share salinity meas- ures in a manner that is consistent with the cost allo- cations required under this section.’’ 1996—Subsec. (a). Pub. L. 104–127, § 336(c)(2)(A), struck out ‘‘pursuant to section 1592(c)(2)(C) of this title’’ after ‘‘non-Federal participants’’ in introductory provisions. Subsec. (f). Pub. L. 104–127, § 336(c)(2)(B), added subsec. (f). 1995—Subsec. (a)(1). Pub. L. 104–20, § 1(2)(A), sub- stituted ‘‘authorized by paragraphs (4) through (6) of section 1592(a)’’ for ‘‘authorized by section 1592(a)(4) and (5)’’. Subsec. (a)(4)(i). Pub. L. 104–20, § 1(2)(B), substituted ‘‘paragraphs (4) through (6) of section 1592’’ for ‘‘sec- tions 1592(a)(4) and (5)’’ in two places. 1984—Subsec. (a). Pub. L. 98–569, § 4(a), inserted ‘‘(a)’’ after ‘‘section 1592’’ and inserted ‘‘(excluding costs borne by non-Federal participants

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 1596

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 9e585d3315dd404275dd863fde4126e0eeba16389bfb5376a66ea97231852355. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-ef25cb10ccd251635a73e4da
Source file: Laws/federal/codes/united-states-code-2024/title-43/section-1596-biennial-report-to-president-congress--42141c03ee.md
Pages: Not recorded – Not recorded
Passage SHA-256: 571c701f8b330a1fd28b9564333f0d08a16fd12ca3ae69bc3083b40ccd5a12cb

Source location: USCODE-2024-title43-chap32A-subchapII-sec1596.pdf

Stored source content

Page 426 TITLE 43—PUBLIC LANDS § 1596 Section is comprised of section 205 of Pub. L. 93–320. Subsecs. (b)(2) and (d) of section 205 of Pub. L. 93–320 amended sections 1543 and 620d, respectively, of this title. AMENDMENTS 2024—Pub. L. 118–183, § 2(1), inserted section catchline. Subsec. (a). Pub. L. 118–183, § 2(1), inserted heading. Subsec. (a)(1). Pub. L. 118–183, § 2(2), added par. (1) and struck out former par. (1) which described various non- reimbursable and reimbursable costs. Subsec. (b). Pub. L. 118–183, § 2(3), inserted subsec. and par. (1) headings. Subsec. (c). Pub. L. 118–183, § 2(4), inserted heading. Subsec. (e). Pub. L. 118–183, § 2(5), inserted heading. 2008—Subsec. (f). Pub. L. 110–246, § 2806(b)(2), added subsec. (f) and struck out former subsec. (f). Prior to amendment, text read as follows: ‘‘The Secretary may expend funds available in the Basin Funds referred to in this section to carry out cost-share salinity meas- ures in a manner that is consistent with the cost allo- cations required under this section.’’ 1996—Subsec. (a). Pub. L. 104–127, § 336(c)(2)(A), struck out ‘‘pursuant to section 1592(c)(2)(C) of this title’’ after ‘‘non-Federal participants’’ in introductory provisions. Subsec. (f). Pub. L. 104–127, § 336(c)(2)(B), added subsec. (f). 1995—Subsec. (a)(1). Pub. L. 104–20, § 1(2)(A), sub- stituted ‘‘authorized by paragraphs (4) through (6) of section 1592(a)’’ for ‘‘authorized by section 1592(a)(4) and (5)’’. Subsec. (a)(4)(i). Pub. L. 104–20, § 1(2)(B), substituted ‘‘paragraphs (4) through (6) of section 1592’’ for ‘‘sec- tions 1592(a)(4) and (5)’’ in two places. 1984—Subsec. (a). Pub. L. 98–569, § 4(a), inserted ‘‘(a)’’ after ‘‘section 1592’’ and inserted ‘‘(excluding costs borne by non-Federal participants pursuant to section 1592(c)(2)(C) of this title) of the on-farm measures au- thorized by section 1592(c) of this title, of all measures to replace incidental fish and wildlife values foregone, and’’ after ‘‘total costs’’. Subsec. (a)(1). Pub. L. 98–569, § 4(b), inserted ‘‘author- ized by section 1592(a)(1), (2), and (3) of this title, in- cluding 75 per centum of the total costs of construc- tion, operation, and maintenance of the associated measures to replace incidental fish and wildlife values foregone, 70 per centum of the total costs of construc- tion, operation, maintenance, and replacement of each unit, or separable feature thereof authorized by section 1592(a)(4) and (5) of this title, including 70 per centum of the total costs of construction, operation, and main- tenance of the associated measures to replace inci- dental fish and wildlife values foregone, and 70 per cen- tum of the total costs of implementation of the on- farm measures authorized by section 1592(c) of this title, including 70 per centum of the total costs of the associated measures to replace incidental fish and wild- life values foregone,’’ after ‘‘shall be nonreimbursable’’ and further inserted ‘‘The total costs remaining after these allocations shall be reimbursable as provided for in paragraphs (2), (3), (4), and (5), of subsection (a)’’ at the end thereof. Subsec. (a)(3). Pub. L. 98–569, § 4(d), substituted ‘‘con- struction and replacement of each unit’’ for ‘‘construc- tion, operation, maintenance, and replacement of each unit’’ before ‘‘or separable features thereof’’, inserted ‘‘authorized by sections 1592(a)(1), (2), and (3) of this title and costs of construction of measures to replace incidental fish and wildlife values foregone, when such measures are a part of the units authorized by sections 1592(a)(1), (2), and (3) of this title’’ before ‘‘allocated’’, and inserted ‘‘or within a period equal to the estimated life of the unit, separable feature thereof, or replace- ment, whichever is less,’’ before ‘‘without interest’’. Subsec. (a)(4), (5). Pub. L. 98–569, § 4(e), added pars. (4) and (5). Subsec. (b). Pub. L. 98–569, § 4(f)(1), inserted ‘‘author- ized by section 1592(a) of this title, costs of construc- tion, operation, and maintenance of measures to re- place incidental fish and wildlife values foregone, and costs of implementation of the on-farm measures au- thorized by section 1592(c) of this title,’’ before ‘‘allo- cated for repayment’’. Subsec. (c). Pub. L. 98–569, § 4(g), inserted ‘‘authorized by section 1592(a) of this title, costs of construction, operation, and maintenance of measures to replace in- cidental fish and wildlife values foregone, and costs of implementation of the on-farm measures authorized by section 1592(c) of this title’’ before ‘‘allocated for’’. Subsec. (e). Pub. L. 98–569, § 4(i), struck out ‘‘of con- struction, operation, maintenance, and replacement of units’’ before ‘‘allocated under’’, inserted ‘‘to the Upper Colorado River Basin Fund’’ after ‘‘allocated’’, inserted ‘‘, subsection (a)(4) and subsection (a)(5)’’ after ‘‘sub- section (a)(3)’’, and inserted ‘‘, for the construction, op- eration and maintenance of measures to replace inci- dental fish and wildlife values foregone, and for the im- plementation of on-farm measures’’ after ‘‘salinity con- trol units’’. Statutory Notes and Related Subsidiaries EFFECTIVE DATE OF 2008 AMENDMENT Amendment of this section and repeal of Pub. L. 110–234 by Pub. L. 110–246 effective May 22, 2008, the date of enactment of Pub. L. 110–234, see section 4 of Pub. L. 110–246, set out as an Effective Date note under section 8701 of Title 7, Agriculture. EFFECTIVE DATE OF 1984 AMENDMENT Amendment by Pub. L. 98–569 effective Oct. 30, 1984, see section 6 of Pub. L. 98–569, set out as a note under section 1591 of this title. TERMINATION OF ADVISORY COUNCILS Advisory councils established after Jan. 5, 1973, to terminate not later than the expiration of the 2-year period beginning on the date of their establishment, unless, in the case of a council established by the Presi- dent or an officer of the Federal Government, such council is renewed by appropriate action prior to the expiration of such 2-year period, or in the case of a council established by the Congress, its duration is oth- erwise provided for by law. See sections 1001(2) and 1013 of Title 5, Government Organization and Employees. § 1596. Biennial report to President, Congress, and Advisory Council Commencing on January 1, 1975, and every two years thereafter, the Secretary shall submit, si- multaneously, to the President, the Congress, and the Advisory Council created in section 1594(a) of this title, a report on the Colorado River salinity control program authorized by this subchapter covering the progress of inves- tigations, planning, and construction of salinity control units for the previous fiscal year, the ef- fectiveness of such units, anticipated work need- ed to be accomplished in the future to meet the objectives of this subchapter, with emphasis on the needs during the five years immediately fol- lowing the date of each report, and any special problems that may be impeding progress in at- taining an effective salinity control program. Said report may be included in the biennial re- port on the quality of water of the Colorado River Basin prepared by the Secretary pursuant to section 620n of this title, section 615ww of this title, and section 616e of this title. (Pub. L. 93–320, title II, § 206, June 24, 1974, 88 Stat. 274.) Editorial Notes REFERENCES IN TEXT Sections 615ww and 616e of this title, referred to in text, were omitted from the Code. Page 427 TITLE 43—PUBLIC LANDS § 1598 Statutory Notes and Related Subsidiaries TERMINATION OF REPORTING REQUIREMENTS For termination, effective May 15, 2000, of provisions in this section relating to the requirement that the Secretary submit a biennial report to Congress, see sec- tion 3003 of Pub. L. 104–66, as amended, set out as a note under section 1113 of Title 31, Money and Finance, and the 4th item on page 113 of House Document No. 103–7. TERMINATION OF ADVISORY COUNCILS Advisory councils established after Jan. 5, 1973, to terminate not later than the expiration of the 2-year period beginning on the date of their establishment, unless, in the case of a council established by the Presi- dent or an officer of the Federal Government, such council is renewed by appropriate action prior to the expiration of such 2-year period, or in the case of a council established by the Congress, its duration is oth- erwise provided for by law. See sections 1001(2) and 1013 of Title 5, Government Organization and Employees. § 1597. Construction of provisions of subchapter Except as provided in sections 620d(d)(5), 1543(g)(2), and 1595(b) of this title, with respect to the Colorado River Basin Project Act [43 U.S.C. 1501 et seq.] and the Colorado River Stor- age Project Act [43 U.S.C. 620 et seq.], respec- tively, nothing in this subchapter shall be con- strued to alter, amend, repeal, modify, inter- pret, or be in conflict with the provisions of the Colorado River Compact (45 Stat. 1057), the Upper Colorado River Basin Compact (63 Stat. 31), the Water Treaty of 1944 with the United Mexican States (Treaty Series 994; 59 Stat. 1219), the decree entered by the Supreme Court of the United States in Arizona against California and others (376 U.S. 340), the Boulder Canyon Project Act (45 Stat. 1057) [43 U.S.C. 617 et seq.], Boulder Canyon Project Adjustment Act (54 Stat. 774; 43 U.S.C. 618a) [43 U.S.C. 618 et seq.], section 15 of the Colorado River Storage Project Act (70 Stat. 111; 43 U.S.C. 620n), the Colorado River Basin Project Act (82 Stat. 885), section 6 of the Fryingpan-Arkansas Project Act (76 Stat. 393) [43 U.S.C. 616e], section 15 of the Navajo Indian irrigation project and initial stage of the San Juan-Chama Project Act (76 Stat. 102) [43 U.S.C. 615ww], the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.], and the Federal Water Pollution Control Act, as amended [33 U.S.C. 1251 et seq.]. (Pub. L. 93–320, title I, § 207, June 24, 1974, 88 Stat. 274.) Editorial Notes REFERENCES IN TEXT Sections 620d(d)(5), 1543(g)(2), and 1595(b) of this title, referred to in text, was in the original a reference to ‘‘section 205(b) and 205(d) of this title’’, meaning section 205(b) and (d) of title II of Pub. L. 93–320. Section 205(b)(1) is classified to section 1595(b) of this title; sec- tion 205(b)(2) amended section 403(g) of the Colorado River Basin Project Act by inserting a new par. (2), which is classified to section 1543(g)(2) of this title; and section 205(d) amended section 5(d) of the Colorado River Storage Project Act by inserting a new par. (5), which is classified to section 620d(d)(5) of this title. This subchapter, referred to in text, was in the origi- nal ‘‘this title’’, meaning title II of Pub. L. 93–320, which enacted this subchapter and amended sections 1620d(d) and 1543(g) of this title. For complete classi- fication of title II to the Code, see Tables. The Colorado River Basin Project Act, referred to in text, is Pub. L. 90–537, Sept. 30, 1968, 82 Stat. 885, which is classified principally to chapter 32 (§ 1501 et seq.) of this title. For complete classification of this Act to the Code, see Short Title note set out under section 1501 of this title and Tables. The Colorado River Storage Project Act, referred to in text, is act Apr. 11, 1956, ch. 203, 70 Stat. 105, which is classified generally to chapter 12B (§ 620 et seq.) of this title. For complete classification of this Act to the Code, see Short Title note set out under section 620 of this title and Tables. The Colorado River Compact (45 Stat. 1057), the Upper Colorado River Basin Compact (63 Stat. 31), and the Water Treaty of 1944, referred to in text, are not classi- fied to the Code. The Boulder Canyon Project Act, referred to in text, is act Dec. 21, 1928, ch. 42, 45 Stat. 1057, as amended, which is classified generally to subchapter I (§ 617 et seq.) of chapter 12A of this title. For complete classi- fication of this Act to the Code, see section 617t of this title and Tables. The Boulder Canyon Project Adjustment Act, re- ferred to in text, is act July 19, 1940, ch. 643, 54 Stat. 774, which is classified generally to subchapter II (§ 618 et seq.) of chapter 12A of this title. For complete classi- fication of this Act to the Code, see section 618o of this title and Tables. Section 6 of the Fryingpan-Arkansas Project Act [43 U.S.C. 616e] and section 15 of the Navajo Indian irriga- tion project and initial stage of the San Juan-Chama Project Act [43 U.S.C. 615ww], referred to in text, were omitted from the Code. The National Environmental Policy Act of 1969, re- ferred to in text, is Pub. L. 91–190, Jan. 1, 1970, 83 Stat. 852, which is classified generally to chapter 55 (§ 4321 et seq.) of Title 42, The Public Health and Welfare. For complete classification of this Act to the Code, see Short Title note set out under section 4321 of Title 42 and Tables. The Federal Water Pollution Control Act, as amend- ed, referred to in text, is act June 30, 1948, ch. 758, as amended generally by Pub. L. 92–500, § 2, Oct. 18, 1972, 86 Stat. 816, which is classified generally to chapter 26 (§ 1251 et seq.) of Title 33, Navigation and Navigable Wa- ters. For complete classification of this Act to the Code, see Short Title note set out under section 1251 of Title 33 and Tables. § 1598. Achieving project objectives (a) Modification of projects The Secretary is authorized to provide for modifications of the projects authorized by this subchapter as determined to be appropriate for purposes of meeting the objective of this sub- chapter. No funds for any such modification shall be expended until the expiration of sixty days after the proposed modification has been submitted to appropriate committees of the Congress, except that funds may be expended prior to the expiration of such sixty days in any case in which the Congress approves an earlier date by concurrent resolution. The Governors of the Colorado River Basin States shall be noti- fied of these changes. (b) Contract authority; authorization of appro- priations The Secretary is hereby authorized to enter into contracts that he deems necessary to carry out the provisions of this subchapter, in advance of the appropriation of funds therefor. There is hereby authorized to be appropriated the sum of $125,100,000 for the construction of the works and for other purposes authorized in section 1592(a) or (b) of this title, based on April 1973 prices,

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1501 — Congressional declaration of purpose and policy

**(a)** It is the object of this chapter to provide a program for the further comprehensive development of the water resources of the Colorado River Basin and for the provision of additional and adequate water supplies for use in the upper as well as in the lower Colorado River Basin. This program is declared to be for the purposes, among others, of regulating the flow of the Colorado River; controlling floods; improving navigation; providing for the storage and delivery of the waters of the Colorado River for reclamation of lands, including supplemental water supplies, and for municipal, industrial, and other beneficial purposes; improving water quality; providing for basic public outdoor recreation facilities; improving conditions for fish and wildlife, and the generation and sale of electrical power as an incident of the foregoing purposes. **(b)** It is the policy of the Congress that the Secretary of the Interior (hereinafter referred to the “Secretary”) shall continue to develop, after consultation with affected States and appropriate Federal agencies, a regional water plan, consistent with the provisions of this chapter and with future authorizations, to serve as the framework under which projects in the Colorado River Basin may be coordinated and constructed with proper timing to the end that an adequate supply of water may be made available for such projects, whether heretofore, herein, or hereafter authorized.

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1501

Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 1501. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1501 — Congressional declaration of purpose and

Page 398 TITLE 43—PUBLIC LANDS § 1501 documents, handbooks, standard operating pro- cedures, and statements of policy specific to the scoping, contracting, and review of appraisals performed for the Department by Federal or non-Federal covered appraisers, shall be made publicly available online and provided upon re- quest. (f) Definitions In this section: (1) Covered appraiser The term ‘‘covered appraiser’’ means a State-licensed or -certified real property ap- praiser. (2) Department The term ‘‘Department’’ means the Depart- ment of the Interior. (3) Reporting period The term ‘‘reporting period’’ means the 1- year period before the date on which a report is submitted under subsection (c). (4) Secretary The term ‘‘Secretary’’ means the Secretary of the Interior. (5) State The term ‘‘State’’ means each of the several States, the District of Columbia, and each ter- ritory and possession of the United States. (Pub. L. 118–230, § 2, Jan. 4, 2025, 138 Stat. 2826.) CHAPTER 32—COLORADO RIVER BASIN PROJECT SUBCHAPTER I—OBJECTIVES Sec. 1501. Congressional declaration of purpose and pol- icy. SUBCHAPTER II—INVESTIGATIONS AND PLANNING 1511. Reconnaissance investigations by Secretary of the Interior; reports; 10-year moratorium on water importation studies. 1511a. Cooperation and participation by Secretary of the Army with Federal, State, and local agencies. 1512. Mexican Water Treaty. 1513. Importation of water; protection of exporting areas. 1514. Authorization of appropriations. SUBCHAPTER III—AUTHORIZED UNITS; PROTECTION OF EXISTING USES 1521. Central Arizona Project. 1522. Orme Dam and Reservoir. 1523. Power requirements of Central Arizona Project and augmentation of Lower Colo- rado River Basin Development Fund. 1524.

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 1501

Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 1501. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 1596 — Biennial report to President, Congress, and Advisory Council

Commencing on January 1, 1975, and every two years thereafter, the Secretary shall submit, simultaneously, to the President, the Congress, and the Advisory Council created in [section 1594(a) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1594/a&num=0&edition=prelim), a report on the Colorado River salinity control program authorized by this subchapter covering the progress of investigations, planning, and construction of salinity control units for the previous fiscal year, the effectiveness of such units, anticipated work needed to be accomplished in the future to meet the objectives of this subchapter, with emphasis on the needs during the five years immediately following the date of each report, and any special problems that may be impeding progress in attaining an effective salinity control program. Said report may be included in the biennial report on the quality of water of the Colorado River Basin prepared by the Secretary pursuant to [section 620n of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section620n&num=0&edition=prelim), [section 615ww of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section615ww&num=0&edition=prelim), and [section 616e of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section616e&num=0&edition=prelim).

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 1596

Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 617 — Colorado River Basin; protection and development; dam, reservoir, and incidental works; water, water power, and electrical energy; eminent domain

For the purpose of controlling the floods, improving navigation, and regulating the flow of the Colorado River, providing for storage and for the delivery of the stored waters thereof for reclamation of public lands and other beneficial uses exclusively within the United States, and for the generation of electrical energy as a means of making the project herein authorized a self-supporting and financially solvent undertaking, the Secretary of the Interior subject to the terms of the Colorado River compact hereinafter mentioned in this chapter, is authorized to construct, operate, and maintain a dam and incidental works in the main stream of the Colorado River at Black Canyon or Boulder Canyon adequate to create a storage reservoir of a capacity of not less than twenty million acre-feet of water and a main canal and appurtenant structures located entirely within the United States connecting the Laguna Dam, or other suitable diversion dam, which the Secretary of the Interior is authorized to construct if deemed necessary or advisable by him upon engineering or economic considerations, with the Imperial and Coachella Valleys in California, the expenditures for said main canal and appurtenant structures to be reimbursable, as provided in the reclamation law, and shall not be paid out of revenues derived from the sale or disposal of water power or electric energy at the dam authorized to be constructed at said Black Canyon or Boulder Canyon, or for water for potable purposes outside of the Imperial and Coachella Valleys: Provided, however, That no charge shall be made for water for the use, storage, or delivery of water for irrigation or water for potable purposes in the Imperial or Coachella Valleys; also to construct and equip, operate, and maintain at or near said dam, or

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 617

Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 617. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 617 — Colorado River Basin; protection and de-

Page 209 TITLE 43—PUBLIC LANDS § 617 Sec. 618i. Effective date. 618j. Effect of refusal to modify existing contracts. 618k. Definitions. 618l. Repealed. 618m. Effect on existing laws and States’ rights. 618n. Wages of employees. 618o. Short title. 618p. Omitted. SUBCHAPTER III—HOOVER DAM CONTRACTS AND FACILITIES 619. Increase in capacity of existing generating equipment at Hoover Powerplant; construc- tion of Colorado River bridge crossing. 619a. Renewal contracts for power. 619b. Reimbursement of funds advanced by non- Federal purchasers; uprating program; re- payment requirement; visitor facilities pro- gram. Statutory Notes and Related Subsidiaries CONSOLIDATION OF CERTAIN PROJECTS; EFFECT ON THIS CHAPTER Act May 28, 1954, ch. 241, 68 Stat. 143, provided that: ‘‘For the purposes of effecting economies and in- creased efficiency in the construction, operation, and maintenance thereof and of accounting for the return of reimbursable costs, the Secretary of the Interior is authorized and directed to consolidate and administer as a single project to be known as the Parker-Davis project, Arizona-California-Nevada, the projects known as the Parker Dam power project, Arizona-California, and the Davis Dam project, Arizona-Nevada: Provided, That nothing in this Act shall be construed to alter or affect in any way the Boulder Canyon Project Act (45 Stat. 1057) [subchapter I of this chapter], the Boulder Canyon Project Adjustment Act (54 Stat. 774) [sub- chapter II of this chapter], or the treaty between the United States of America and the United Mexican States, signed at Washington on February 3, 1944, relat- ing to the utilization of the waters of the Colorado and Tijuana Rivers and of the Rio Grande from Fort Quitman, Texas, to th

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 617

Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 617. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 618 — Promulgation of charges for electrical energy

The Secretary of the Interior is authorized and directed to, and he shall, promulgate charges, or the basis of computation thereof, for electrical energy generated at Hoover Dam beginning June 1, 1937, computed to be sufficient, together with other net revenues from the project, to accomplish the following purposes: **(a)** To meet the cost of operation and maintenance, and to provide for replacements, of the project beginning June 1, 1937; **(b)** To repay to the Treasury, with interest, the advances to the Colorado River Dam Fund for the project made prior to June 1, 1937, within fifty years from that date (excluding advances allocated to flood control by [section 617a(b) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section617a/b&num=0&edition=prelim), which shall be repayable as provided in [section 618f of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618f&num=0&edition=prelim)), and such advances made on and after June 1, 1937, over fifty-year periods; **(c)** To provide $600,000 for each of the years and for the purposes specified in [section 618a(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618a/c&num=0&edition=prelim); **(d)** To provide $500,000 for each of the years and for the purposes specified in [section 618a(d) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618a/d&num=0&edition=prelim); and **(e)** To provide, by application of the increments to rates specified in section 403(c)(2) of the Colorado River Basin Project Act of 1968, as amended and supplemented [[43 U.S.C. 1543(c)(2)](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section1543/c/2&num=0&edition=p

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 618

Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 618. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 618 — Promulgation of charges for electrical en-

Page 217 TITLE 43—PUBLIC LANDS § 618 islature of each of such States and by the Con- gress of the United States. (Dec. 21, 1928, ch. 42, § 19, 45 Stat. 1065.) § 617s. Recognition of rights of Mexico to Colo- rado River waters Nothing in this subchapter shall be construed as a denial or recognition of any rights, if any, in Mexico to the use of the waters of the Colo- rado River system. (Dec. 21, 1928, ch. 42, § 20, 45 Stat. 1066.) § 617t. Short title The short title of this subchapter shall be ‘‘Boulder Canyon Project Act.’’ (Dec. 21, 1928, ch. 42, § 21, 45 Stat. 1066.) § 617u. Lease of reserved lands in Boulder City, Nevada; disposition of revenues The Secretary of the Interior is authorized and empowered, under such rules and regulations as he may prescribe, to establish rental rates for the lease of reserved lands of the United States situate within the exterior boundaries of Boul- der City, Nevada, and, without prior advertising, to enter into leases therefor at not less than rates so established and for periods not exceed- ing fifty-three years from the date of such leases: Provided, That all revenues which may accrue to the United States under the provisions of such leases shall be deposited in the Treasury and credited to the Colorado River Dam fund es- tablished by section 617a of this title. (June 18, 1940, ch. 395, 54 Stat. 437.) Editorial Notes CODIFICATION Section was not enacted as part of the Boulder Can- yon Project Act which comprises this subchapter. Statutory Notes and Related Subsidiaries BOULDER CITY ACT OF 1958 Public Law 85–900, Sept. 2, 1958, 72 Stat. 1726, provided for disposal of certain Federal property in Boulder City for purposes of establishment of a municipal corpora- tion incorporated under laws of Nevada. § 61

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 618

Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 618. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 618a — Receipts from project; disposition

All receipts from the project shall be paid into the Colorado River Dam Fund and shall be available, without further appropriation, for: **(a) Defraying operating expenses** Defraying the costs of operation (including purchase of supplemental energy to meet temporary deficiencies in firm energy which the Secretary of Energy is obligated by contract to supply), maintenance and replacements of, and emergency expenditures for, all facilities of the project, within such separate limitations as may be included in annual appropriations Acts; **(b) Repayment of cost of construction** Repayment to the Treasury, with interest (after making provision for the payments and transfers provided in subdivisions (c) and (d) hereof), of advances to the Colorado River Dam Fund for the construction of the project (excluding the amount allocated to flood control by section 2(b) of the Project Act [[43 U.S.C. 617a(b)](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section617a/b&num=0&edition=prelim)]), and any readvances made to said fund under [section 618d of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618d&num=0&edition=prelim); and **(c) Commutation payments to Arizona and Nevada** Payment subject to the provisions of [section 618b of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section618b&num=0&edition=prelim), in commutation of the payments now provided for the States of Arizona and Nevada in section 4(b) of the Project Act [[43 U.S.C. 617c(b)](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section617c/b&num=0&edition=prelim)] to each of said States of the sum of $300,000 for each year of operation, beginning with the year of operation ending May 31, 1938, and

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 618a

Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 618a. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 618a — Receipts from project; disposition

Page 218 TITLE 43—PUBLIC LANDS § 618a title], the Boulder Canyon Project Adjustment Act of 1940 (54 Stat. 774, as amended, 43 U.S.C. 618), as amended and supplemented [this subchapter], shall remain in full force and effect.’’ § 618a. Receipts from project; disposition All receipts from the project shall be paid into the Colorado River Dam Fund and shall be avail- able, without further appropriation, for: (a) Defraying operating expenses Defraying the costs of operation (including purchase of supplemental energy to meet tem- porary deficiencies in firm energy which the Secretary of Energy is obligated by contract to supply), maintenance and replacements of, and emergency expenditures for, all facilities of the project, within such separate limitations as may be included in annual appropriations Acts; (b) Repayment of cost of construction Repayment to the Treasury, with interest (after making provision for the payments and transfers provided in subdivisions (c) and (d) hereof), of advances to the Colorado River Dam Fund for the construction of the project (exclud- ing the amount allocated to flood control by section 2(b) of the Project Act [43 U.S.C. 617a(b)]), and any readvances made to said fund under section 618d of this title; and (c) Commutation payments to Arizona and Ne- vada Payment subject to the provisions of section 618b of this title, in commutation of the pay- ments now provided for the States of Arizona and Nevada in section 4(b) of the Project Act [43 U.S.C. 617c(b)] to each of said States of the sum of $300,000 for each year of operation, beginning with the year of operation ending May 31, 1938, and continuing annually thereafter until and in- cluding the year of operation ending May 31, 1987, and such payments for any year

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 618a

Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 618a. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 620 — Upper Colorado River Basin; purpose of development of water resources; initial units; construction of Wayne N. Aspinall unit contingent upon certification; participating projects; Rainbow Bridge National Monument

In order to initiate the comprehensive development of the water resources of the Upper Colorado River Basin, for the purposes, among others, of regulating the flow of the Colorado River, storing water for beneficial consumptive use, making it possible for the States of the Upper Basin to utilize, consistently with the provisions of the Colorado River Compact, the apportionments made to and among them in the Colorado River Compact and the Upper Colorado River Basin Compact, respectively, providing for the reclamation of arid and semiarid land, for the control of floods, and for the generation of hydroelectric power, as an incident of the foregoing purposes, the Secretary of the Interior is authorized (1) to construct, operate, and maintain the following initial units of the Colorado River storage project, consisting of dams, reservoirs, powerplants, transmission facilities and appurtenant works: Wayne N. Aspinall, Flaming Gorge, Navajo (dam and reservoir only), and Glen Canyon: Provided, That the Wayne N. Aspinall Dam shall be constructed to a height which will impound not less than nine hundred and forty thousand acre-feet of water or will create a reservoir of such greater capacity as can be obtained by a high waterline located at seven thousand five hundred and twenty feet above mean sea level, and that construction thereof shall not be undertaken until the Secretary has, on the basis of further engineering and economic investigations, reexamined the economic justification of such unit and, accompanied by appropriate documentation in the form of a supplemental report, has certified to the Congress and to the President that, in his judgment, the benefits of such unit will exceed its costs; and (2) to construct, operate, and maintain the following additional reclamation

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 620

Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 620. This identifies an authority to review, not proof of applicability.