Arkansas Legal Resource Navigator

33 U.S.C. § 2321a — Hydroelectric power project uprating

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2321a — Hydroelectric power project uprating

Page 809 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2321a currently contracted out or studying services not directly connected with project mainte- nance and operations. (c) Exclusion This section does not— (1) apply to a navigation facility that was under contract on or before October 23, 2018, with a non-Federal interest to perform oper- ations or maintenance; and (2) prohibit the Secretary from contracting out commercial activities after October 23, 2018, at a navigation facility. (Pub. L. 101–640, title III, § 314, Nov. 28, 1990, 104 Stat. 4641; Pub. L. 115–270, title I, § 1151(a), Oct. 23, 2018, 132 Stat. 3787.) Editorial Notes CODIFICATION Section was enacted as part of the Water Resources Development Act of 1990, and not as part of the Water Resources Development Act of 1986 which comprises this chapter. AMENDMENTS 2018—Pub. L. 115–270 inserted ‘‘navigation and’’ before ‘‘hydroelectric facilities’’ in section catchline, des- ignated first sentence as subsec. (a), inserted heading, and inserted ‘‘navigation or’’ before ‘‘hydroelectric’’, designated second sentence as subsec. (b) and inserted heading, and added subsec. (c). Statutory Notes and Related Subsidiaries REMOTE OPERATIONS AT CORPS DAMS Pub. L. 118–272, div. A, title I, § 1149, Jan. 4, 2025, 138 Stat. 3039, provided that: ‘‘During the 6-year period be- ginning on the date of enactment of this Act [Jan. 4, 2025], with respect to a water resources development project owned, operated, or managed by the Corps of Engineers, the Secretary [of the Army] is authorized to use remote operation activities at a navigation or hy- droelectric power generating facility at such project as a replacement for activities performed, as of the date of enactment of this Act, by personnel under the

Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2321a

Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: e5de5e726d35fb2c0ac774a3adf88a2220560a90972ebe0f33a0beb4842364d8. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:usc2024-edf515bfa18e36edd8652420
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-2321a-hydroelectric-power-project-uprating--17de607305.md
Pages: Not recorded – Not recorded
Passage SHA-256: 037787d41ffc501df86e367f4c4281ed89b03212384fea9d4bc878b06ac5ae93

Source location: USCODE-2024-title33-chap36-subchapV-sec2321a.pdf

Stored source content

Page 809 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2321a currently contracted out or studying services not directly connected with project mainte- nance and operations. (c) Exclusion This section does not— (1) apply to a navigation facility that was under contract on or before October 23, 2018, with a non-Federal interest to perform oper- ations or maintenance; and (2) prohibit the Secretary from contracting out commercial activities after October 23, 2018, at a navigation facility. (Pub. L. 101–640, title III, § 314, Nov. 28, 1990, 104 Stat. 4641; Pub. L. 115–270, title I, § 1151(a), Oct. 23, 2018, 132 Stat. 3787.) Editorial Notes CODIFICATION Section was enacted as part of the Water Resources Development Act of 1990, and not as part of the Water Resources Development Act of 1986 which comprises this chapter. AMENDMENTS 2018—Pub. L. 115–270 inserted ‘‘navigation and’’ before ‘‘hydroelectric facilities’’ in section catchline, des- ignated first sentence as subsec. (a), inserted heading, and inserted ‘‘navigation or’’ before ‘‘hydroelectric’’, designated second sentence as subsec. (b) and inserted heading, and added subsec. (c). Statutory Notes and Related Subsidiaries REMOTE OPERATIONS AT CORPS DAMS Pub. L. 118–272, div. A, title I, § 1149, Jan. 4, 2025, 138 Stat. 3039, provided that: ‘‘During the 6-year period be- ginning on the date of enactment of this Act [Jan. 4, 2025], with respect to a water resources development project owned, operated, or managed by the Corps of Engineers, the Secretary [of the Army] is authorized to use remote operation activities at a navigation or hy- droelectric power generating facility at such project as a replacement for activities performed, as of the date of enactment of this Act, by personnel under the direction of the Secretary at such project, only after the Sec- retary provides written notice to the Committee on Transportation and Infrastructure of the House of Rep- resentatives and the Committee on Environment and Public Works of the Senate that— ‘‘(1) use of the remote operation activities— ‘‘(A) does not affect activities described in section 314 of the Water Resources Development Act of 1990 (33 U.S.C. 2321); ‘‘(B) will address any cyber and physical security risks to such project in accordance with applicable Federal law and agency guidance; and ‘‘(C) is necessary to increase the availability and capacity, as applicable, of such project, including a project on a lower use waterway; and ‘‘(2) the remote operation activities were developed under a public process that included engagement with such personnel and other stakeholders who may be affected by the use of such activities.’’ ‘‘SECRETARY’’ DEFINED Secretary means the Secretary of the Army, see sec- tion 2 of Pub. L. 101–640, set out as a note under section 2201 of this title. § 2321a. Hydroelectric power project uprating (a) In general In carrying out the operation, maintenance, rehabilitation, and modernization of a hydro- electric power generating facility at a water re- sources project under the jurisdiction of the De- partment of the Army, the Secretary may, to the extent funds are made available in appro- priations Acts or in accordance with subsection (c), take such actions as are necessary to opti- mize the efficiency of energy production or in- crease the capacity of the facility, or both, if, after consulting with the heads of other appro- priate Federal and State agencies, the Secretary determines that such actions— (1) are economically justified and financially feasible; (2) will not result in any significant adverse effect on the other purposes for which the project is authorized; (3) will not result in significant adverse en- vironmental impacts; (4) will not involve major structural or oper- ational changes in the project; and (5) will not adversely affect the use, manage- ment, or protection of existing Federal, State, or tribal water rights. (b) Consultation Before proceeding with any proposed uprating under subsection (a), the Secretary shall provide affected State, tribal, and Federal agencies with a copy of the proposed determinations under subsection (a). If the agencies submit comments, the Secretary shall accept those comments or respond in writing to any objections those agen- cies raise to the proposed determinations. (c) Use of funds provided by preference cus- tomers In carrying out this section, the Secretary may accept and expend funds provided by pref- erence customers under Federal law relating to the marketing of power. (d) Application This section does not apply to any facility of the Department of the Army that is authorized to be funded under section 839d–1 of title 16. (e) Effect on other authority This section shall not affect the authority of the Secretary and the Administrator of the Bon- neville Power Administration under section 839d–1 of title 16. (Pub. L. 104–303, title II, § 216, Oct. 12, 1996, 110 Stat. 3694; Pub. L. 106–541, title II, § 212, Dec. 11, 2000, 114 Stat. 2593.) Editorial Notes CODIFICATION Section was enacted as part of the Water Resources Development Act of 1996, and not as part of the Water Resources Development Act of 1986 which comprises this chapter. AMENDMENTS 2000—Subsec. (a). Pub. L. 106–541, § 212(1), inserted in- troductory provisions and struck out former introduc- tory provisions which read as follows: ‘‘In carrying out the maintenance, rehabilitation, and modernization of a hydroelectric power generating facility at a water re- sources project under the jurisdiction of the Depart- ment of the Army, the Secretary may take, to the ex- tent funds are made available in appropriations Acts, such actions as are necessary to increase the efficiency Page 810 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2321b of energy production or the capacity of the facility, or both, if, after consulting with the heads of other appro- priate Federal and State agencies, the Secretary deter- mines that the increase—’’. Subsec. (a)(1). Pub. L. 106–541, § 212(1), substituted ‘‘are’’ for ‘‘is’’ before ‘‘economically justified’’. Subsec. (b). Pub. L. 106–541, § 212(2), substituted ‘‘any proposed uprating’’ for ‘‘the proposed uprating’’ in first sentence. Subsecs. (c) to (e). Pub. L. 106–541, § 212(3), (4), added subsecs. (c) and (d) and redesignated former subsec. (c) as (e). Statutory Notes and Related Subsidiaries ‘‘SECRETARY’’ DEFINED Secretary means the Secretary of the Army, see sec- tion 2 of Pub. L. 104–303, set out as a note under section 2201 of this title. § 2321b. Expediting hydropower at Corps of Engi- neers facilities (a) Policy Congress declares that it is the policy of the United States that— (1) the development of non-Federal hydro- electric power at Corps of Engineers water re- sources development projects, including locks and dams, shall be given priority; (2) Corps of Engineers approval of non-Fed- eral hydroelectric power at Corps of Engineers water resources development projects, includ- ing permitting required under section 408 of this title, shall be completed by the Corps of Engineers in a timely and consistent manner; and (3) approval of hydropower at Corps of Engi- neers water resources development projects shall in no way diminish the other priorities and missions of the Corps of Engineers, includ- ing authorized project purposes and habitat and environmental protection. (b) Implementation of policy The Secretary shall— (1) ensure that the policy described in sub- section (a) is implemented nationwide in an ef- ficient, consistent, and coordinated manner; and (2) assess opportunities— (A) to increase the development of hydro- electric power at existing water resources development projects of the Corps of Engi- neers with hydroelectric facilities; and (B) to develop new hydroelectric power at existing nonpowered water resources devel- opment projects of the Corps of Engineers. (c) Report Not later than 2 years after June 10, 2014, and biennially thereafter, the Secretary shall sub- mit to the Committee on Environment and Pub- lic Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives and make publicly available a report that, at a minimum, shall include— (1) a description of initiatives carried out by the Secretary to encourage the development of hydroelectric power by non-Federal entities at Corps of Engineers water resources develop- ment projects and to meet the requirements of subsection (b); (2) a list of all new hydroelectric power ac- tivities by non-Federal entities approved at Corps of Engineers water resources develop- ment projects in that fiscal year, including the length of time the Secretary needed to ap- prove those activities; (3) a description of the status of each pend- ing application from non-Federal entities for approval to develop hydroelectric power at Corps of Engineers water resources develop- ment projects; (4) a description of any benefits or impacts to the environment, recreation, or other uses associated with Corps of Engineers water re- sources development projects at which non- Federal entities have developed hydroelectric power in the previous fiscal year; and (5) the total annual amount of payments or other services provided to the Corps of Engi- neers, the Treasury, and any other Federal agency as a result of approved non-Federal hy- dropower projects at Corps of Engineers water resources development projects. (d) Reviewing hydropower at Corps of Engineers facilities (1) Definition of eligible non-Federal interest In this subsection, the term ‘‘eligible non- Federal interest’’ means a non-Federal inter- est that owns or operates an existing non-Fed- eral hydropower facility at a Corps of Engi- neers water resources development project. (2) Evaluation (A) In general On the written request of an eligible non- Federal interest, the Secretary shall con- duct an evaluation to consider operational changes at the applicable project to facili- tate production of non-Federal hydropower, consistent with authorized project purposes. The Secretary shall solicit input from inter- ested stakeholders as part of the evaluation. (B) Deadline Not later than 180 days after the date on which the Secretary receives a written re- quest under subparagraph (A), the Secretary shall provide to the non-Federal interest a written response to inform the non-Federal interest— (i) that the Secretary has approved the request to conduct an evaluation; or (ii) of any additional information nec- essary for the Secretary to approve the re- quest to conduct an evaluation. (3) Operational changes An operational change referred to in para- graph (2)(A) may include— (A) changes to seasonal pool levels; (B) modifying releases from the project; and (C) other changes included in the written request submitted under that paragraph that enhance the usage of the project to facilitate production of non-Federal hydropower, con- sistent with authorized project purposes. (4) Cost share The eligible non-Federal interest shall pay 100 percent of the costs associated with an evaluation under this subsection, including the costs to prepare the report under para- graph (6).

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2321 — Flood plain management

**(a) Exclusion of elements from benefit-cost analysis** The Secretary shall not include in the benefit base for justifying Federal flood damage reduction projects— (1) (A) any new or substantially improved structure (other than a structure necessary for conducting a water-dependent activity) built in the 100-year flood plain with a first floor elevation less than the 100-year flood elevation after July 1, 1991; or (B) in the case of a county substantially located within the 100-year flood plain, any new or substantially improved structure (other than a structure necessary for conducting a water-dependent activity) built in the 10-year flood plain after July 1, 1991; and (2) any structure which becomes located in the 100-year flood plain with a first floor elevation less than the 100-year flood elevation or in the 10-year flood plain, as the case may be, by virtue of constrictions placed in the flood plain after July 1, 1991. **(b) Flood damage reduction benefits** (1) **In general** — In calculating the benefits of a proposed project for nonstructural flood damage reduction, the Secretary shall calculate the benefits of the nonstructural project using methods similar to those used for calculating the benefits of structural projects, including similar treatment in calculating the benefits from losses avoided. (2) **Avoidance of double counting** — In carrying out paragraph (1), the Secretary should avoid double counting of benefits. **(c) Counties substantially located within 100-year flood plain** For the purposes of subsection (a), a county is substantially located within the 100-year flood plain— (1) if the county is comprised of lands of which 50 percent or more are located in the 100-year flood plain; and (2) if the Secretary determines that applicati

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2321

Stored review status: release_metadata_unconfirmed. The source passage cites 33 U.S.C. § 2321. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2321 — Operation and maintenance of navigation

Page 808 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 2320 ‘‘(B) not later than 2 years after the date of enact- ment of this Act, submit to Congress a report that— ‘‘(i) summarizes the results of the audit required by subparagraph (A); ‘‘(ii) includes an assessment of whether existing practices for managing and reviewing project oper- ations could result in greater efficiencies that would enable the Corps of Engineers to better pre- pare for, contain, and respond to flood, storm, and drought conditions; and ‘‘(iii) includes recommendations for improving the review of project operations to improve the effi- ciency and effectiveness of such operations and to better achieve authorized purposes while enhancing overall project benefits. ‘‘(4) INTERAGENCY AND COOPERATIVE AGREEMENTS.— The Secretary may enter into interagency agreements with other Federal agencies and cooperative agree- ments with non-Federal entities to carry out this sub- section and reviews of project operations or activities resulting from those reviews. ‘‘(5) FUNDING.— ‘‘(A) IN GENERAL.—The Secretary may use to carry out this subsection, including any reviews of project operations identified in the plan developed under paragraph (2)(B)(ii)(I)(dd), amounts made available to the Secretary. ‘‘(B) FUNDING FROM OTHER SOURCES.—The Secretary may accept and expend amounts from non-Federal entities and other Federal agencies to carry out this subsection and reviews of project operations or ac- tivities resulting from those reviews. ‘‘(6) EFFECT OF SUBSECTION.— ‘‘(A) IN GENERAL.—Nothing in this subsection changes the authorized purpose of any Corps of Engi- neers dam or reservoir. ‘‘(B) ADMINISTRATION.—The Secretary may carry out any recommendations and activities under this subsection pursu

Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2321

Stored review status: historical_2024_not_currentness_verified. The source passage cites 33 U.S.C. § 2321. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 2321a — Reservoir management

The Secretary shall ensure that, in developing or revising reservoir operating manuals of the Corps of Engineers, the Corps shall provide significant opportunities for public participation, including opportunities for public hearings. The Secretary shall issue regulations to implement this section, including a requirement that all appropriate informational materials relating to proposed management decisions of the Corps be made available to the public sufficiently in advance of public hearings. Not later than January 1, 1992, the Secretary shall transmit to Congress a report on measures taken pursuant to this section.

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2321a

Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.