Browse Arkansas Code titles and sections
33 U.S.C. § 2321 — Operation and maintenance of navigation
Federal law — U.S. Code and appendices · legal_authorities
Page 808
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2320
‘‘(B) not later than 2 years after the date of enact-
ment of this Act, submit to Congress a report that—
‘‘(i) summarizes the results of the audit required
by subparagraph (A);
‘‘(ii) includes an assessment of whether existing
practices for managing and reviewing project oper-
ations could result in greater efficiencies that
would enable the Corps of Engineers to better pre-
pare for, contain, and respond to flood, storm, and
drought conditions; and
‘‘(iii) includes recommendations for improving
the review of project operations to improve the effi-
ciency and effectiveness of such operations and to
better achieve authorized purposes while enhancing
overall project benefits.
‘‘(4) INTERAGENCY
AND
COOPERATIVE
AGREEMENTS.—
The Secretary may enter into interagency agreements
with other Federal agencies and cooperative agree-
ments with non-Federal entities to carry out this sub-
section and reviews of project operations or activities
resulting from those reviews.
‘‘(5) FUNDING.—
‘‘(A) IN GENERAL.—The Secretary may use to carry
out this subsection, including any reviews of project
operations identified in the plan developed under
paragraph (2)(B)(ii)(I)(dd), amounts made available to
the Secretary.
‘‘(B) FUNDING FROM OTHER SOURCES.—The Secretary
may accept and expend amounts from non-Federal
entities and other Federal agencies to carry out this
subsection and reviews of project operations or ac-
tivities resulting from those reviews.
‘‘(6) EFFECT OF SUBSECTION.—
‘‘(A) IN
GENERAL.—Nothing in this subsection
changes the authorized purpose of any Corps of Engi-
neers dam or reservoir.
‘‘(B) ADMINISTRATION.—The Secretary may carry
out any recommendations and activities under this
subsection pursu
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 2321
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: dd3b7e1cdbc84c54aebea52e4dd80e0fb87dbbb3a6a721ab8f360a4a98c1f3d2. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-46566e01cee6de37d66ebbcc
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-2321-operation-and-maintenance-of-navigation--9d9d2cfa49.md
Pages: Not recorded – Not recorded
Passage SHA-256: d365e6bfe90a0aa0a77bd0892ddd4f5e4f21dd489ecc10281ae8ec93528222d9
Source location: USCODE-2024-title33-chap36-subchapV-sec2321.pdf
Stored source content
Page 808
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2320
‘‘(B) not later than 2 years after the date of enact-
ment of this Act, submit to Congress a report that—
‘‘(i) summarizes the results of the audit required
by subparagraph (A);
‘‘(ii) includes an assessment of whether existing
practices for managing and reviewing project oper-
ations could result in greater efficiencies that
would enable the Corps of Engineers to better pre-
pare for, contain, and respond to flood, storm, and
drought conditions; and
‘‘(iii) includes recommendations for improving
the review of project operations to improve the effi-
ciency and effectiveness of such operations and to
better achieve authorized purposes while enhancing
overall project benefits.
‘‘(4) INTERAGENCY
AND
COOPERATIVE
AGREEMENTS.—
The Secretary may enter into interagency agreements
with other Federal agencies and cooperative agree-
ments with non-Federal entities to carry out this sub-
section and reviews of project operations or activities
resulting from those reviews.
‘‘(5) FUNDING.—
‘‘(A) IN GENERAL.—The Secretary may use to carry
out this subsection, including any reviews of project
operations identified in the plan developed under
paragraph (2)(B)(ii)(I)(dd), amounts made available to
the Secretary.
‘‘(B) FUNDING FROM OTHER SOURCES.—The Secretary
may accept and expend amounts from non-Federal
entities and other Federal agencies to carry out this
subsection and reviews of project operations or ac-
tivities resulting from those reviews.
‘‘(6) EFFECT OF SUBSECTION.—
‘‘(A) IN
GENERAL.—Nothing in this subsection
changes the authorized purpose of any Corps of Engi-
neers dam or reservoir.
‘‘(B) ADMINISTRATION.—The Secretary may carry
out any recommendations and activities under this
subsection pursuant to existing law.’’
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of Pub. L. 101–640, set out as a note under section
2201 of this title.
§ 2320. Protection of recreational and commercial
uses
(a) General rule
In planning any water resources project, the
Secretary shall consider the impact of the
project on existing and future recreational and
commercial uses in the area surrounding the
project.
(b) Maintenance
Whenever the Secretary maintains, repairs,
rehabilitates, or reconstructs a water resources
project which will result in a change in the con-
figuration of a structure which is a part of such
project, the Secretary, to the maximum extent
practicable, shall carry out such maintenance,
repair, rehabilitation, or reconstruction in a
manner which will not adversely affect any rec-
reational use established with respect to such
project before the date of such maintenance, re-
pair, rehabilitation, or reconstruction.
(c) Mitigation
(1) In general
If maintenance, repair, rehabilitation, or re-
construction of a water resources project by
the Secretary results in a change in the con-
figuration of any structure which is a part of
such project and has an adverse effect on a
recreational use established with respect to
such project before the date of such mainte-
nance, repair, rehabilitation, or reconstruc-
tion, the Secretary, to the maximum extent
practicable, shall take such actions as may be
necessary to restore such recreational use or
provide alternative opportunities for com-
parable recreational use.
(2) Maximum amount
The Secretary may not expend more than
$2,000,000 in a fiscal year to carry out this sub-
section.
(3) Termination date
This subsection shall not be effective after
the last day of the 5-year period beginning on
November 28, 1990; except that the Secretary
may complete any restoration commenced
under this subsection on or before such last
day.
(d) Applicability
(1) General rule
Subsections (b) and (c) shall apply to main-
tenance, repair, rehabilitation, or reconstruc-
tion for which physical construction is initi-
ated after May 1, 1988.
(2) Limitation
Subsections (b) and (c) shall not apply to
any action of the Secretary which is necessary
to discontinue the operation of a water re-
sources project.
(e) Cost sharing
Costs incurred by the Secretary to carry out
the objectives of this section shall be allocated
to recreation and shall be payable by the bene-
ficiaries of the recreation.
(Pub. L. 101–640, title III, § 313, Nov. 28, 1990, 104
Stat. 4640.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 1990, and not as part of the Water
Resources Development Act of 1986 which comprises
this chapter.
Statutory Notes and Related Subsidiaries
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of Pub. L. 101–640, set out as a note under section
2201 of this title.
§ 2321. Operation and maintenance of navigation
and hydroelectric facilities
(a) In general
Activities currently performed by personnel
under the direction of the Secretary in connec-
tion with the operation and maintenance of
navigation or hydroelectric power generating fa-
cilities at Corps of Engineers water resources
projects are to be considered as inherently gov-
ernmental functions and not commercial activi-
ties.
(b) Major maintenance contracts allowed
This section does not prohibit contracting out
major maintenance or other functions which are
Page 809
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 2321a
currently contracted out or studying services
not directly connected with project mainte-
nance and operations.
(c) Exclusion
This section does not—
(1) apply to a navigation facility that was
under contract on or before October 23, 2018,
with a non-Federal interest to perform oper-
ations or maintenance; and
(2) prohibit the Secretary from contracting
out commercial activities after October 23,
2018, at a navigation facility.
(Pub. L. 101–640, title III, § 314, Nov. 28, 1990, 104
Stat. 4641; Pub. L. 115–270, title I, § 1151(a), Oct.
23, 2018, 132 Stat. 3787.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 1990, and not as part of the Water
Resources Development Act of 1986 which comprises
this chapter.
AMENDMENTS
2018—Pub. L. 115–270 inserted ‘‘navigation and’’ before
‘‘hydroelectric facilities’’ in section catchline, des-
ignated first sentence as subsec. (a), inserted heading,
and inserted ‘‘navigation or’’ before ‘‘hydroelectric’’,
designated second sentence as subsec. (b) and inserted
heading, and added subsec. (c).
Statutory Notes and Related Subsidiaries
REMOTE OPERATIONS AT CORPS DAMS
Pub. L. 118–272, div. A, title I, § 1149, Jan. 4, 2025, 138
Stat. 3039, provided that: ‘‘During the 6-year period be-
ginning on the date of enactment of this Act [Jan. 4,
2025], with respect to a water resources development
project owned, operated, or managed by the Corps of
Engineers, the Secretary [of the Army] is authorized to
use remote operation activities at a navigation or hy-
droelectric power generating facility at such project as
a replacement for activities performed, as of the date of
enactment of this Act, by personnel under the direction
of the Secretary at such project, only after the Sec-
retary provides written notice to the Committee on
Transportation and Infrastructure of the House of Rep-
resentatives and the Committee on Environment and
Public Works of the Senate that—
‘‘(1) use of the remote operation activities—
‘‘(A) does not affect activities described in section
314 of the Water Resources Development Act of 1990
(33 U.S.C. 2321);
‘‘(B) will address any cyber and physical security
risks to such project in accordance with applicable
Federal law and agency guidance; and
‘‘(C) is necessary to increase the availability and
capacity, as applicable, of such project, including a
project on a lower use waterway; and
‘‘(2) the remote operation activities were developed
under a public process that included engagement with
such personnel and other stakeholders who may be
affected by the use of such activities.’’
‘‘SECRETARY’’ DEFINED
Secretary means the Secretary of the Army, see sec-
tion 2 of Pub. L. 101–640, set out as a note under section
2201 of this title.
§ 2321a. Hydroelectric power project uprating
(a) In general
In carrying out the operation, maintenance,
rehabilitation, and modernization of a hydro-
electric power generating facility at a water re-
sources project under the jurisdiction of the De-
partment of the Army, the Secretary may, to
the extent funds are made available in appro-
priations Acts or in accordance with subsection
(c), take such actions as are necessary to opti-
mize the efficiency of energy production or in-
crease the capacity of the facility, or both, if,
after consulting with the heads of other appro-
priate Federal and State agencies, the Secretary
determines that such actions—
(1) are economically justified and financially
feasible;
(2) will not result in any significant adverse
effect on the other purposes for which the
project is authorized;
(3) will not result in significant adverse en-
vironmental impacts;
(4) will not involve major structural or oper-
ational changes in the project; and
(5) will not adversely affect the use, manage-
ment, or protection of existing Federal, State,
or tribal water rights.
(b) Consultation
Before proceeding with any proposed uprating
under subsection (a), the Secretary shall provide
affected State, tribal, and Federal agencies with
a copy of the proposed determinations under
subsection (a). If the agencies submit comments,
the Secretary shall accept those comments or
respond in writing to any objections those agen-
cies raise to the proposed determinations.
(c) Use of funds provided by preference cus-
tomers
In carrying out this section, the Secretary
may accept and expend funds provided by pref-
erence customers under Federal law relating to
the marketing of power.
(d) Application
This section does not apply to any facility of
the Department of the Army that is authorized
to be funded under section 839d–1 of title 16.
(e) Effect on other authority
This section shall not affect the authority of
the Secretary and the Administrator of the Bon-
neville Power Administration under section
839d–1 of title 16.
(Pub. L. 104–303, title II, § 216, Oct. 12, 1996, 110
Stat. 3694; Pub. L. 106–541, title II, § 212, Dec. 11,
2000, 114 Stat. 2593.)
Editorial Notes
CODIFICATION
Section was enacted as part of the Water Resources
Development Act of 1996, and not as part of the Water
Resources Development Act of 1986 which comprises
this chapter.
AMENDMENTS
2000—Subsec. (a). Pub. L. 106–541, § 212(1), inserted in-
troductory provisions and struck out former introduc-
tory provisions which read as follows: ‘‘In carrying out
the maintenance, rehabilitation, and modernization of
a hydroelectric power generating facility at a water re-
sources project under the jurisdiction of the Depart-
ment of the Army, the Secretary may take, to the ex-
tent funds are made available in appropriations Acts,
such actions as are necessary to increase the efficiency
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Exclusion of elements from benefit-cost analysis** The Secretary shall not include in the benefit base for justifying Federal flood damage reduction projects—
(1)
(A) any new or substantially improved structure (other than a structure necessary for conducting a water-dependent activity) built in the 100-year flood plain with a first floor elevation less than the 100-year flood elevation after July 1, 1991; or
(B) in the case of a county substantially located within the 100-year flood plain, any new or substantially improved structure (other than a structure necessary for conducting a water-dependent activity) built in the 10-year flood plain after July 1, 1991; and
(2) any structure which becomes located in the 100-year flood plain with a first floor elevation less than the 100-year flood elevation or in the 10-year flood plain, as the case may be, by virtue of constrictions placed in the flood plain after July 1, 1991.
**(b) Flood damage reduction benefits**
(1) **In general** — In calculating the benefits of a proposed project for nonstructural flood damage reduction, the Secretary shall calculate the benefits of the nonstructural project using methods similar to those used for calculating the benefits of structural projects, including similar treatment in calculating the benefits from losses avoided.
(2) **Avoidance of double counting** — In carrying out paragraph (1), the Secretary should avoid double counting of benefits.
**(c) Counties substantially located within 100-year flood plain** For the purposes of subsection (a), a county is substantially located within the 100-year flood plain—
(1) if the county is comprised of lands of which 50 percent or more are located in the 100-year flood plain; and
(2) if the Secretary determines that applicati
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 2321
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.