10 U.S.C. § 4231 — Major systems: determination of quantity
Federal law — U.S. Code and appendices · legal_authorities
Page 2714
TITLE 10—ARMED FORCES
§ 4231
document the basis for the contract type selected for a
program. The documentation shall include an expla-
nation of the level of program risk for the program and,
if the Milestone Decision Authority determines that
the level of program risk is high, the steps that have
been taken to reduce program risk and reasons for pro-
ceeding with Milestone B approval despite the high
level of program risk.
‘‘(f) CONDITIONS WITH RESPECT TO CERTAIN LOW-RATE
INITIAL PRODUCTION.—
‘‘(1) IN GENERAL.—The number of low-rate initial
production lots associated with a major defense ac-
quisition program may not be more than one if—
‘‘(A) the milestone decision authority authorizes
the use of a fixed-price type contract at the time of
a decision on Milestone B approval; and
‘‘(B) the scope of the work of the fixed-price type
contract includes both the development and low-
rate initial production of items for such major de-
fense acquisition program.
‘‘(2) WAIVER.—The limitation in paragraph (1) may
be waived by the applicable service acquisition execu-
tive or a designee of such executive if—
‘‘(A) such waiver authority is not delegated to the
level of the contracting officer; and
‘‘(B) written notification of a granted waiver, in-
cluding the associated rationale, is provided to the
congressional defense committees [Committees on
Armed Services and Appropriations of the Senate
and the House of Representatives] not later than 30
days after issuance of the waiver.
‘‘(3) DEFINITIONS.—In this subsection:
‘‘(A) The term ‘low-rate initial production’ has
the meaning given under section 4231 of title 10,
United States Code.
‘‘(B) The term ‘milestone decision authority’ has
the meaning given in section 4211 of title 10, United
States
Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 4231
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 5821fbcec7bef6dda6a0bdced3b5749c01f0722fed8e05c7ac79c1ed90c72819. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-e4bcc64e8d2489b383ef7d9c
Source file: Laws/federal/codes/united-states-code-2024/title-10/section-4231-major-systems-determination-of-quantity--a7b93fd658.md
Pages: Not recorded – Not recorded
Passage SHA-256: a57dcc939f306dfd382da507c617d7218481f74550876b99b0d4aff119a3c922
Source location: USCODE-2024-title10-subtitleA-partV-subpartF-chap322-subchapII-sec4231.pdf
Stored source content
Page 2714
TITLE 10—ARMED FORCES
§ 4231
document the basis for the contract type selected for a
program. The documentation shall include an expla-
nation of the level of program risk for the program and,
if the Milestone Decision Authority determines that
the level of program risk is high, the steps that have
been taken to reduce program risk and reasons for pro-
ceeding with Milestone B approval despite the high
level of program risk.
‘‘(f) CONDITIONS WITH RESPECT TO CERTAIN LOW-RATE
INITIAL PRODUCTION.—
‘‘(1) IN GENERAL.—The number of low-rate initial
production lots associated with a major defense ac-
quisition program may not be more than one if—
‘‘(A) the milestone decision authority authorizes
the use of a fixed-price type contract at the time of
a decision on Milestone B approval; and
‘‘(B) the scope of the work of the fixed-price type
contract includes both the development and low-
rate initial production of items for such major de-
fense acquisition program.
‘‘(2) WAIVER.—The limitation in paragraph (1) may
be waived by the applicable service acquisition execu-
tive or a designee of such executive if—
‘‘(A) such waiver authority is not delegated to the
level of the contracting officer; and
‘‘(B) written notification of a granted waiver, in-
cluding the associated rationale, is provided to the
congressional defense committees [Committees on
Armed Services and Appropriations of the Senate
and the House of Representatives] not later than 30
days after issuance of the waiver.
‘‘(3) DEFINITIONS.—In this subsection:
‘‘(A) The term ‘low-rate initial production’ has
the meaning given under section 4231 of title 10,
United States Code.
‘‘(B) The term ‘milestone decision authority’ has
the meaning given in section 4211 of title 10, United
States Code.
‘‘(C) The term ‘major defense acquisition pro-
gram’ has the meaning given in section 4201 of title
10, United States Code.
‘‘(D) The term ‘Milestone B approval’ has the
meaning given in section 4172(e) of title 10, United
States Code.
‘‘(g) CONDITIONS
WITH
RESPECT
TO
CERTAIN
SHIP-
BUILDING CONTRACTS.—
‘‘(1) LIMITATION.—With respect to a fixed-price type
contract for the procurement of shipbuilding associ-
ated with a major defense acquisition program, the
number of ships to be procured under such contract,
including all options, may not be more than two if
the scope of the work of such contract includes the
detail design and the construction of items for such
a major defense acquisition program.
‘‘(2) WAIVER.—The Secretary concerned may waive
the limitation in paragraph (1) if such Secretary sub-
mits to the congressional defense committees, not
later than 30 days after issuance of such waiver, a
written notification of such waiver that includes a
certification that the basic and functional design of
any ship to be procured under a contract described in
paragraph (1) are [sic] complete.
‘‘(3) DEFINITIONS.—In this subsection:
‘‘(A) The term ‘basic and functional design’ has
the meaning given in section 8669c of title 10,
United States Code.
‘‘(B) The term ‘construction’ means steel cutting
and module fabrication, assembly, and outfitting,
keel laying, and module erection supporting the
launch and eventual delivery of a completed ship.
‘‘(C) The term ‘detail design’ means design using
computer-aided modeling to enable the generation
of work instructions for construction of the ship,
where such work instructions show detailed system
information and support construction, including
guidance for subcontractors and suppliers, installa-
tion drawings, schedules, material lists, and lists of
prefabricated materials and parts.’’
[Pub. L. 117–263, div. A, title VIII, § 808(b), Dec. 23,
2022, 136 Stat. 2705, provided that: ‘‘Not later than 120
days after the date of the enactment of this Act [Dec.
23, 2022], the Secretary of Defense shall revise the De-
partment of Defense Supplement to the Federal Acqui-
sition Regulation and any applicable regulations re-
garding the use of fixed-price type contracts for a
major defense acquisition program (as defined in sec-
tion 4201 of title 10, United States Code) to carry out
this section [enacting section 818(f) of Pub. L. 109–364,
set out above] and the amendments made by this sec-
tion.’’]
§ 4231. Major systems: determination of quantity
for low-rate initial production
(a) DETERMINATION OF QUANTITIES TO BE PRO-
CURED FOR LOW-RATE INITIAL PRODUCTION.—(1) In
the course of the development of a major sys-
tem, the determination of what quantity of arti-
cles of that system should be procured for low-
rate initial production (including the quantity
to be procured for preproduction verification ar-
ticles) shall be made—
(A) when the milestone B decision with re-
spect to that system is made; and
(B) by the official of the Department of De-
fense who makes that decision.
(2) In this section, the term ‘‘milestone B deci-
sion’’ means the decision to approve the system
development and demonstration of a major sys-
tem by the official of the Department of Defense
designated to have the authority to make that
decision.
(3) Any increase from a quantity determined
under paragraph (1) may only be made with the
approval of the official making the determina-
tion.
(4) The quantity of articles of a major system
that may be procured for low-rate initial pro-
duction may not be less than one operationally
configured production unit unless another quan-
tity is established at the milestone B decision.
(5) The Secretary of Defense shall include a
statement of the quantity determined under
paragraph (1) in the first SAR submitted with
respect to the program concerned after that
quantity is determined. If the quantity exceeds
10 percent of the total number of articles to be
produced, as determined at the milestone B deci-
sion with respect to that system, the Secretary
shall include in the statement the reasons for
such quantity. For purposes of this paragraph,
the term ‘‘SAR’’ means a Selected Acquisition
Report submitted under section 4351 of this title.
(b) LOW-RATE INITIAL PRODUCTION OF WEAPON
SYSTEMS.—Except as provided in subsection (c),
low-rate initial production with respect to a new
system is production of the system in the min-
imum quantity necessary—
(1) to provide production-configured or rep-
resentative articles for operational tests pur-
suant to section 4171 of this title;
(2) to establish an initial production base for
the system; and
(3) to permit an orderly increase in the pro-
duction rate for the system sufficient to lead
to full-rate production upon the successful
completion of operational testing.
(c) LOW-RATE INITIAL PRODUCTION
OF NAVAL
VESSEL AND SATELLITE PROGRAMS.—With respect
to naval vessel programs and military satellite
programs, low-rate initial production is produc-
tion of items at the minimum quantity and rate
Page 2715
TITLE 10—ARMED FORCES
§ 4236
that (1) preserves the mobilization production
base for that system, and (2) is feasible, as deter-
mined pursuant to regulations prescribed by the
Secretary of Defense.
(Added Pub. L. 101–189, div. A, title VIII, § 803(a),
Nov. 29, 1989, 103 Stat. 1487, § 2400; amended Pub.
L. 103–355, title III, § 3015, Oct. 13, 1994, 108 Stat.
3332; Pub. L. 104–106, div. A, title X, § 1062(d), div.
D, title XLIII, § 4321(b)(13), Feb. 10, 1996, 110 Stat.
444, 673; Pub. L. 107–107, div. A, title VIII, § 821(c),
Dec. 28, 2001, 115 Stat. 1182; renumbered § 4231 and
amended Pub. L. 116–283, div. A, title XVIII,
§ 1847(c)(1), Jan. 1, 2021, 134 Stat. 4254; Pub. L.
117–81, div. A, title XVII, § 1701(o)(6)(C)(ii), Dec.
27, 2021, 135 Stat. 2147.)
Editorial Notes
AMENDMENTS
2021—Pub. L. 116–283, § 1847(c)(1)(B), amended section
catchline generally. Prior to amendment, section
catchline read as follows: ‘‘Low-rate initial production
of new systems’’.
Pub. L. 116–283, § 1847(c)(1)(A), renumbered section
2400 of this title as this section.
Subsec. (a)(5). Pub. L. 116–283, § 1847(c)(1)(A)(i), as
amended by Pub. L. 117–81, § 1701(o)(6)(C)(ii), substituted
‘‘section 4351’’ for ‘‘section 2432’’.
Subsec. (b)(1). Pub. L. 116–283, § 1847(c)(1)(A)(ii), sub-
stituted ‘‘section 4171’’ for ‘‘section 2399’’.
2001—Subsec. (a)(1)(A). Pub. L. 107–107, § 821(c)(1), sub-
stituted ‘‘milestone B’’ for ‘‘milestone II’’.
Subsec. (a)(2). Pub. L. 107–107 substituted ‘‘milestone
B’’ for ‘‘milestone II’’ and ‘‘system development and
demonstration’’ for ‘‘engineering and manufacturing
development’’.
Subsec. (a)(4), (5). Pub. L. 107–107, § 821(c)(1), sub-
stituted ‘‘milestone B’’ for ‘‘milestone II’’.
1996—Subsec. (a)(5). Pub. L. 104–106, § 4321(b)(13), sub-
stituted ‘‘this paragraph’’ for ‘‘the preceding sentence’’.
Subsec. (c). Pub. L. 104–106, § 1062(d), struck out ‘‘(1)’’
before ‘‘With respect to’’, redesignated subpars. (A) and
(B) of former par. (1) as pars. (1) and (2), respectively,
and struck out former par. (2) which read as follows:
‘‘For each naval vessel program and military satellite
program, the Secretary of Defense shall submit to Con-
gress a report providing—
‘‘(A) an explanation of the rate and quantity pre-
scribed for low-rate initial production and the consid-
erations in establishing that rate and quantity;
‘‘(B) a test and evaluation master plan for that pro-
gram; and
‘‘(C) an acquisition strategy for that program that
has been approved by the Secretary, to include the
procurement objectives in terms of total quantity of
articles to be procured and annual production rates.’’
1994—Subsec. (a)(2). Pub. L. 103–355, § 3015(1), sub-
stituted ‘‘this section’’ for ‘‘paragraph (1)’’ and ‘‘engi-
neering and manufacturing development’’ for ‘‘full-
scale engineering development’’.
Subsec. (a)(4). Pub. L. 103–355, § 3015(2), (3), added par.
(4) and redesignated former par. (4) as (5).
Subsec. (a)(5). Pub. L. 103–355, § 3015(2), redesignated
par. (4) as (5) and inserted after first sentence ‘‘If the
quantity exceeds 10 percent of the total number of arti-
cles to be produced, as determined at the milestone II
decision with respect to that system, the Secretary
shall include in the statement the reasons for such
quantity.’’
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 2021 AMENDMENT
Amendment by Pub. L. 117–81 applicable as if in-
cluded in the enactment of title XVIII of Pub. L. 116–283
as enacted, see section 1701(a)(2) of Pub. L. 117–81, set
out in a note preceding section 3001 of this title and
note below.
Amendment by Pub. L. 116–283 effective Jan. 1, 2022,
with additional provisions for delayed implementation
and applicability of existing law, see section 1801(d) of
Pub. L. 116–283, set out as a note preceding section 3001
of this title.
EFFECTIVE DATE OF 1996 AMENDMENT
For effective date and applicability of amendment by
section 4321(b)(13) of Pub. L. 104–106, see section 4401 of
Pub. L. 104–106, set out as a note under section 2220 of
this title.
§ 4232. Prohibition on use of lowest price tech-
nically acceptable source selection process
(a) IN GENERAL.—The Department of Defense
shall not use a lowest price technically accept-
able source selection process for the engineering
and manufacturing development contract of a
major defense acquisition program.
(b) DEFINITIONS.—In this section:
(1) LOWEST
PRICE
TECHNICALLY
ACCEPTABLE
SOURCE SELECTION PROCESS.—The term ‘‘lowest
price technically acceptable source selection
process’’ has the meaning given that term in
part 15 of the Federal Acquisition Regulation.
(2) ENGINEERING AND MANUFACTURING DEVEL-
OPMENT
CONTRACT.—The term ‘‘engineering
and manufacturing development contract’’
means a prime contract for the engineering
and manufacturing development of a major de-
fense acquisition program.
(Added Pub. L. 115–91, div. A, title VIII,
§ 832(a)(1), Dec. 12, 2017, 131 Stat. 1468, § 2442; re-
numbered § 4232 and amended Pub. L. 116–283,
div. A, title XVIII, § 1847(c)(2), Jan. 1, 2021, 134
Stat. 4254.)
Editorial Notes
AMENDMENTS
2021—Pub. L. 116–283 renumbered section 2442 of this
title as this section and, in subsec. (b), redesignated
par. (3) as (2) and struck out former par. (2) which de-
fined ‘‘major defense acquisition program’’.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE OF 2021 AMENDMENT
Amendment by Pub. L. 116–283 effective Jan. 1, 2022,
with additional provisions for delayed implementation
and applicability of existing law, see section 1801(d) of
Pub. L. 116–283, set out as a note preceding section 3001
of this title.
EFFECTIVE DATE
Pub. L. 115–91, div. A, title VIII, § 832(b), Dec. 12, 2017,
131 Stat. 1468, provided that: ‘‘The requirements of sec-
tion 2442 of title 10, United States Code [now 10 U.S.C.
4232], as added by subsection (a), shall apply to major
defense acquisition programs for which budgetary au-
thority is requested for fiscal year 2019 or a subsequent
fiscal year.’’
§ 4236. Negotiation of price for technical data be-
fore
development,
production,
or
sustainment of major weapon systems
The Secretary of Defense shall ensure, to the
maximum extent practicable, that the Depart-
ment of Defense, before selecting a contractor
for the engineering and manufacturing develop-
ment of a major weapon system, production of a
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Determination of Quantities To Be Procured for Low-Rate Initial Production.—**
(1) In the course of the development of a major system, the determination of what quantity of articles of that system should be procured for low-rate initial production (including the quantity to be procured for preproduction verification articles) shall be made—
(A) when the milestone B decision with respect to that system is made; and
(B) by the official of the Department of Defense who makes that decision.
(2) In this section, the term “milestone B decision” means the decision to approve the system development and demonstration of a major system by the official of the Department of Defense designated to have the authority to make that decision.
(3) Any increase from a quantity determined under paragraph (1) may only be made with the approval of the official making the determination.
(4) The quantity of articles of a major system that may be procured for low-rate initial production may not be less than one operationally configured production unit unless another quantity is established at the milestone B decision.
(5) The Secretary of Defense shall include a statement of the quantity determined under paragraph (1) in the first SAR submitted with respect to the program concerned after that quantity is determined. If the quantity exceeds 10 percent of the total number of articles to be produced, as determined at the milestone B decision with respect to that system, the Secretary shall include in the statement the reasons for such quantity. For purposes of this paragraph, the term “SAR” means a Selected Acquisition Report submitted under [section 4351 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section4351&num=0&edition=prelim).
**(b) Lo
Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 4231
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) In General.—** The Department of Defense shall not use a lowest price technically acceptable source selection process for the engineering and manufacturing development contract of a major defense acquisition program.
**(b) Definitions.—** In this section:
(1) **Lowest price technically acceptable source selection process.—** — The term “lowest price technically acceptable source selection process” has the meaning given that term in part 15 of the Federal Acquisition Regulation.
(2) **Engineering and manufacturing development contract.—** — The term “engineering and manufacturing development contract” means a prime contract for the engineering and manufacturing development of a major defense acquisition program.
Source: Supplied U.S. Code snapshot — release unconfirmed · 10 U.S.C. § 4232
Stored review status: release_metadata_unconfirmed. The source passage cites 10 U.S.C. § 4232. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 2715
TITLE 10—ARMED FORCES
§ 4236
that (1) preserves the mobilization production
base for that system, and (2) is feasible, as deter-
mined pursuant to regulations prescribed by the
Secretary of Defense.
(Added Pub. L. 101–189, div. A, title VIII, § 803(a),
Nov. 29, 1989, 103 Stat. 1487, § 2400; amended Pub.
L. 103–355, title III, § 3015, Oct. 13, 1994, 108 Stat.
3332; Pub. L. 104–106, div. A, title X, § 1062(d), div.
D, title XLIII, § 4321(b)(13), Feb. 10, 1996, 110 Stat.
444, 673; Pub. L. 107–107, div. A, title VIII, § 821(c),
Dec. 28, 2001, 115 Stat. 1182; renumbered § 4231 and
amended Pub. L. 116–283, div. A, title XVIII,
§ 1847(c)(1), Jan. 1, 2021, 134 Stat. 4254; Pub. L.
117–81, div. A, title XVII, § 1701(o)(6)(C)(ii), Dec.
27, 2021, 135 Stat. 2147.)
Editorial Notes
AMENDMENTS
2021—Pub. L. 116–283, § 1847(c)(1)(B), amended section
catchline generally. Prior to amendment, section
catchline read as follows: ‘‘Low-rate initial production
of new systems’’.
Pub. L. 116–283, § 1847(c)(1)(A), renumbered section
2400 of this title as this section.
Subsec. (a)(5). Pub. L. 116–283, § 1847(c)(1)(A)(i), as
amended by Pub. L. 117–81, § 1701(o)(6)(C)(ii), substituted
‘‘section 4351’’ for ‘‘section 2432’’.
Subsec. (b)(1). Pub. L. 116–283, § 1847(c)(1)(A)(ii), sub-
stituted ‘‘section 4171’’ for ‘‘section 2399’’.
2001—Subsec. (a)(1)(A). Pub. L. 107–107, § 821(c)(1), sub-
stituted ‘‘milestone B’’ for ‘‘milestone II’’.
Subsec. (a)(2). Pub. L. 107–107 substituted ‘‘milestone
B’’ for ‘‘milestone II’’ and ‘‘system development and
demonstration’’ for ‘‘engineering and manufacturing
development’’.
Subsec. (a)(4), (5). Pub. L. 107–107, § 821(c)(1), sub-
stituted ‘‘milestone B’’ for ‘‘milestone II’’.
1996—Subsec. (a)(5). Pub. L. 104–106, § 4321(b)(13), s
Source: Supplied 2024 U.S. Code historical extraction · 10 U.S.C. § 4232
Stored review status: historical_2024_not_currentness_verified. The source passage cites 10 U.S.C. § 4232. This identifies an authority to review, not proof of applicability.