Browse Arkansas Code titles and sections
42 U.S.C. § 6343 — Waste energy recovery incentive grant
Federal law — U.S. Code and appendices · legal_authorities
Page 6790
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 6343
ance Partnership Program. See section 6345 of this
title.
PRIOR PROVISIONS
A prior section 6342, Pub. L. 94–163, title III, § 372, Dec.
22, 1975, 89 Stat. 936; Pub. L. 95–91, title III, § 301(a), title
VII, §§ 703, 707, Aug. 4, 1977, 91 Stat. 577, 606, 607; Pub. L.
95–619, title VI, § 691(b)(2), Nov. 9, 1978, 92 Stat. 3288, re-
lated to establishment and maintenance of an energy
efficiency program, prior to repeal by Pub. L. 99–509,
title III, § 3101(b), Oct. 21, 1986, 100 Stat. 1888.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE
Section effective on the date that is 1 day after Dec.
19, 2007, see section 1601 of Pub. L. 110–140, set out as a
note under section 1824 of Title 2, The Congress.
§ 6343. Waste energy recovery incentive grant
program
(a) Establishment
The Secretary shall establish in the Depart-
ment of Energy a waste energy recovery incen-
tive grant program to provide incentive grants
to—
(1) owners and operators of projects that suc-
cessfully produce electricity or incremental
useful thermal energy from waste energy re-
covery;
(2) utilities purchasing or distributing the
electricity; and
(3) States that have achieved 80 percent or
more of recoverable waste heat recovery op-
portunities.
(b) Grants to projects and utilities
(1) In general
The Secretary shall make grants under this
section—
(A) to the owners or operators of waste en-
ergy recovery projects; and
(B) in the case of excess power purchased
or transmitted by a electric utility, to the
utility.
(2) Proof
Grants may only be made under this section
on receipt of proof of waste energy recovery or
excess electricity generation, or both, from
the project in a form prescribed by the Sec-
retary.
(3) Ex
Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 6343
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: f954920ad388f5aa3e8b77eb81549a2a0f37b2061913992994061669b1804a7a. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-dc027ad4d9c49fc385f77f9b
Source file: Laws/federal/codes/united-states-code-2024/title-42/section-6343-waste-energy-recovery-incentive-grant--5188ed6f3c.md
Pages: Not recorded – Not recorded
Passage SHA-256: 800b3ec9926c4cb61b83dff7c928726b163fc0ace81d21479b48004791056b8e
Source location: USCODE-2024-title42-chap77-subchapIII-partC-sec6343.pdf
Stored source content
Page 6790
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 6343
ance Partnership Program. See section 6345 of this
title.
PRIOR PROVISIONS
A prior section 6342, Pub. L. 94–163, title III, § 372, Dec.
22, 1975, 89 Stat. 936; Pub. L. 95–91, title III, § 301(a), title
VII, §§ 703, 707, Aug. 4, 1977, 91 Stat. 577, 606, 607; Pub. L.
95–619, title VI, § 691(b)(2), Nov. 9, 1978, 92 Stat. 3288, re-
lated to establishment and maintenance of an energy
efficiency program, prior to repeal by Pub. L. 99–509,
title III, § 3101(b), Oct. 21, 1986, 100 Stat. 1888.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE
Section effective on the date that is 1 day after Dec.
19, 2007, see section 1601 of Pub. L. 110–140, set out as a
note under section 1824 of Title 2, The Congress.
§ 6343. Waste energy recovery incentive grant
program
(a) Establishment
The Secretary shall establish in the Depart-
ment of Energy a waste energy recovery incen-
tive grant program to provide incentive grants
to—
(1) owners and operators of projects that suc-
cessfully produce electricity or incremental
useful thermal energy from waste energy re-
covery;
(2) utilities purchasing or distributing the
electricity; and
(3) States that have achieved 80 percent or
more of recoverable waste heat recovery op-
portunities.
(b) Grants to projects and utilities
(1) In general
The Secretary shall make grants under this
section—
(A) to the owners or operators of waste en-
ergy recovery projects; and
(B) in the case of excess power purchased
or transmitted by a electric utility, to the
utility.
(2) Proof
Grants may only be made under this section
on receipt of proof of waste energy recovery or
excess electricity generation, or both, from
the project in a form prescribed by the Sec-
retary.
(3) Excess electric energy
(A) In general
In the case of waste energy recovery, a
grant under this section shall be made at the
rate of $10 per megawatt hour of documented
electricity produced from recoverable waste
energy (or by prevention of waste energy in
the case of a new facility) by the project
during the first 3 calendar years of produc-
tion, beginning on or after December 19, 2007.
(B) Utilities
If the project produces net excess power
and an electric utility purchases or trans-
mits the excess power, 50 percent of so much
of the grant as is attributable to the net ex-
cess power shall be paid to the electric util-
ity purchasing or transporting the net ex-
cess power.
(4) Useful thermal energy
In the case of waste energy recovery that
produces useful thermal energy that is used
for a purpose different from that for which the
project is principally designed, a grant under
this section shall be made to the owner or op-
erator of the waste energy recovery project at
the rate of $10 for each 3,412,000 Btus of the ex-
cess thermal energy used for the different pur-
pose.
(c) Grants to States
In the case of any State that has achieved 80
percent or more of waste heat recovery opportu-
nities identified by the Secretary under this
part, the Administrator shall make a 1-time
grant to the State in an amount of not more
than $1,000 per megawatt of waste-heat capacity
recovered (or a thermal equivalent) to support
State-level programs to identify and achieve ad-
ditional energy efficiency.
(d) Eligibility
The Secretary shall—
(1) establish rules and guidelines to establish
eligibility for grants under subsection (b);
(2) publicize the availability of the grant
program known to owners or operators of re-
coverable waste energy sources and sites listed
on the Registry; and
(3) award grants under the program on the
basis of the merits of each project in recov-
ering or preventing waste energy throughout
the United States on an impartial, objective,
and not unduly discriminatory basis.
(e) Limitation
The Secretary shall not award grants to any
person for a combined heat and power project or
a waste heat recovery project that qualifies for
specific Federal tax incentives for combined
heat and power or for waste heat recovery.
(f) Authorization of appropriations
There are authorized to be appropriated to the
Secretary—
(1) to make grants to projects and utilities
under subsection (b)—
(A) $100,000,000 for fiscal year 2008 and
$200,000,000 for each of fiscal years 2009
through 2012; and
(B) such additional amounts for fiscal year
2008 and each fiscal year thereafter as may
be necessary for administration of the waste
energy recovery incentive grant program;
and
(2) to make grants to States under sub-
section (b), $10,000,000 for each of fiscal years
2008 through 2012, to remain available until ex-
pended.
(Pub. L. 94–163, title III, § 373, as added Pub. L.
110–140, title IV, § 451(a), Dec. 19, 2007, 121 Stat.
1627.)
Editorial Notes
PRIOR PROVISIONS
A prior section 6343, Pub. L. 94–163, title III, § 373, Dec.
22, 1975, 89 Stat. 936; Pub. L. 95–619, title VI, §§ 601(a),
691(b)(2), Nov. 9, 1978, 92 Stat. 3282, 3288, related to iden-
tification of major energy-consuming industries and
corporations in the United States, prior to repeal by
Page 6791
TITLE 42—THE PUBLIC HEALTH AND WELFARE
§ 6344
Pub. L. 99–509, title III, § 3101(b), Oct. 21, 1986, 100 Stat.
1888.
Statutory Notes and Related Subsidiaries
EFFECTIVE DATE
Section effective on the date that is 1 day after Dec.
19, 2007, see section 1601 of Pub. L. 110–140, set out as a
note under section 1824 of Title 2, The Congress.
§ 6344. Additional incentives for recovery, use,
and prevention of industrial waste energy
(a) Consideration of standard
(1) In general
Not later than 180 days after the receipt by
a State regulatory authority (with respect to
each electric utility for which the authority
has ratemaking authority), or nonregulated
electric utility, of a request from a project
sponsor or owner or operator, the State regu-
latory authority or nonregulated electric util-
ity shall—
(A) provide public notice and conduct a
hearing respecting the standard established
by subsection (b); and
(B) on the basis of the hearing, consider
and make a determination whether or not it
is appropriate to implement the standard to
carry out the purposes of this part.
(2) Relationship to State law
For purposes of any determination under
paragraph (1) and any review of the determina-
tion in any court, the purposes of this section
supplement otherwise applicable State law.
(3) Nonadoption of standard
Nothing in this part prohibits any State reg-
ulatory authority or nonregulated electric
utility from making any determination that it
is not appropriate to adopt any standard de-
scribed in paragraph (1), pursuant to authority
under otherwise applicable State law.
(b) Standard for sales of excess power
For purposes of this section, the standard re-
ferred to in subsection (a) shall provide that an
owner or operator of a waste energy recovery
project identified on the Registry that generates
net excess power shall be eligible to benefit from
at least 1 of the options described in subsection
(c) for disposal of the net excess power in ac-
cordance with the rate conditions and limita-
tions described in subsection (d).
(c) Options
The options referred to in subsection (b) are as
follows:
(1) Sale of net excess power to utility
The electric utility shall purchase the net
excess power from the owner or operator of the
eligible waste energy recovery project during
the operation of the project under a contract
entered into for that purpose.
(2) Transport by utility for direct sale to third
party
The electric utility shall transmit the net
excess power on behalf of the project owner or
operator to up to 3 separate locations on the
system of the utility for direct sale by the
owner or operator to third parties at those lo-
cations.
(3) Transport over private transmission lines
The State and the electric utility shall per-
mit, and shall waive or modify such laws as
would otherwise prohibit, the construction
and operation of private electric wires con-
structed, owned, and operated by the project
owner or operator, to transport the power to
up to 3 purchasers within a 3-mile radius of
the project, allowing the wires to use or cross
public rights-of-way, without subjecting the
project to regulation as a public utility, and
according the wires the same treatment for
safety, zoning, land use, and other legal privi-
leges as apply or would apply to the wires of
the utility, except that—
(A) there shall be no grant of any power of
eminent domain to take or cross private
property for the wires; and
(B) the wires shall be physically seg-
regated and not interconnected with any
portion of the system of the utility, except
on the customer side of the revenue meter of
the utility and in a manner that precludes
any possible export of the electricity onto
the utility system, or disruption of the sys-
tem.
(4) Agreed on alternatives
The utility and the owner or operator of the
project may reach agreement on any alternate
arrangement and payments or rates associated
with the arrangement that is mutually satis-
factory and in accord with State law.
(d) Rate conditions and criteria
(1) Definitions
In this subsection:
(A) Per unit distribution costs
The term ‘‘per unit distribution costs’’
means (in kilowatt hours) the quotient ob-
tained by dividing—
(i) the depreciated book-value distribu-
tion system costs of a utility; by
(ii) the volume of utility electricity sales
or transmission during the previous year
at the distribution level.
(B) Per unit distribution margin
The term ‘‘per unit distribution margin’’
means—
(i) in the case of a State-regulated elec-
tric utility, a per-unit gross pretax profit
equal to the product obtained by multi-
plying—
(I) the State-approved percentage rate
of return for the utility for distribution
system assets; by
(II) the per unit distribution costs; and
(ii) in the case of a nonregulated utility,
a per unit contribution to net revenues de-
termined multiplying—
(I) the percentage (but not less than 10
percent) obtained by dividing—
(aa) the amount of any net revenue
payment or contribution to the owners
or subscribers of the nonregulated util-
ity during the prior year; by
(bb) the gross revenues of the utility
during the prior year to obtain a per-
centage; by
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
In this part:
(1) **Administrator** — The term “Administrator” means the Administrator of the Environmental Protection Agency.
(2) **Combined heat and power** — The term “combined heat and power system” means a facility that—
(A) simultaneously and efficiently produces useful thermal energy and electricity; and
(B) recovers not less than 60 percent of the energy value in the fuel (on a higher-heating-value basis) in the form of useful thermal energy and electricity.
(3) **Net excess power** — The term “net excess power” means, for any facility, recoverable waste energy recovered in the form of electricity in quantities exceeding the total consumption of electricity at the specific time of generation on the site at which the facility is located.
(4) **Project** — The term “project” means a recoverable waste energy project or a combined heat and power system project.
(5) **Recoverable waste energy** — The term “recoverable waste energy” means waste energy from which electricity or useful thermal energy may be recovered through modification of an existing facility or addition of a new facility.
(6) **Registry** — The term “Registry” means the Registry of Recoverable Waste Energy Sources established under [section 6342(d) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6342/d&num=0&edition=prelim).
(7) **Useful thermal energy** — The term “useful thermal energy” means energy—
(A) in the form of direct heat, steam, hot water, or other thermal form that is used in production and beneficial measures for heating, cooling, humidity control, process use, or other valid thermal end-use energy requirements; and
(B) for which fuel or electricity would otherwise be consumed.
(8) **Waste energy** — The term “waste energy”
Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 6343
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.