Arkansas Legal Resource Navigator

42 U.S.C. § 6343 — Definitions

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 6343 — Definitions

In this part: (1) **Administrator** — The term “Administrator” means the Administrator of the Environmental Protection Agency. (2) **Combined heat and power** — The term “combined heat and power system” means a facility that— (A) simultaneously and efficiently produces useful thermal energy and electricity; and (B) recovers not less than 60 percent of the energy value in the fuel (on a higher-heating-value basis) in the form of useful thermal energy and electricity. (3) **Net excess power** — The term “net excess power” means, for any facility, recoverable waste energy recovered in the form of electricity in quantities exceeding the total consumption of electricity at the specific time of generation on the site at which the facility is located. (4) **Project** — The term “project” means a recoverable waste energy project or a combined heat and power system project. (5) **Recoverable waste energy** — The term “recoverable waste energy” means waste energy from which electricity or useful thermal energy may be recovered through modification of an existing facility or addition of a new facility. (6) **Registry** — The term “Registry” means the Registry of Recoverable Waste Energy Sources established under [section 6342(d) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6342/d&num=0&edition=prelim). (7) **Useful thermal energy** — The term “useful thermal energy” means energy— (A) in the form of direct heat, steam, hot water, or other thermal form that is used in production and beneficial measures for heating, cooling, humidity control, process use, or other valid thermal end-use energy requirements; and (B) for which fuel or electricity would otherwise be consumed. (8) **Waste energy** — The term “waste energy”

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 6343

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 4088994804960c915f21eba85ed62d2cc314876df8a614663ebd19310dfc48f5. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_ce1258fa1abc3081e3059a62
Source file: Laws/federal/codes/united-states-code/title-42/section-6343-definitions--7c3e2ce590.md
Pages: Not recorded – Not recorded
Passage SHA-256: 3debe42ddbf201f0a7c849170072457d15d3c6cb0e6843805a7b24453a26cd4d

Source location: Title 42, Chapter 77, § 6343; chapter-077-energy-conservation.md

Stored source content

In this part: (1) **Administrator** — The term “Administrator” means the Administrator of the Environmental Protection Agency. (2) **Combined heat and power** — The term “combined heat and power system” means a facility that— (A) simultaneously and efficiently produces useful thermal energy and electricity; and (B) recovers not less than 60 percent of the energy value in the fuel (on a higher-heating-value basis) in the form of useful thermal energy and electricity. (3) **Net excess power** — The term “net excess power” means, for any facility, recoverable waste energy recovered in the form of electricity in quantities exceeding the total consumption of electricity at the specific time of generation on the site at which the facility is located. (4) **Project** — The term “project” means a recoverable waste energy project or a combined heat and power system project. (5) **Recoverable waste energy** — The term “recoverable waste energy” means waste energy from which electricity or useful thermal energy may be recovered through modification of an existing facility or addition of a new facility. (6) **Registry** — The term “Registry” means the Registry of Recoverable Waste Energy Sources established under [section 6342(d) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6342/d&num=0&edition=prelim). (7) **Useful thermal energy** — The term “useful thermal energy” means energy— (A) in the form of direct heat, steam, hot water, or other thermal form that is used in production and beneficial measures for heating, cooling, humidity control, process use, or other valid thermal end-use energy requirements; and (B) for which fuel or electricity would otherwise be consumed. (8) **Waste energy** — The term “waste energy” means— (A) exhaust heat or flared gas from any industrial process; (B) waste gas or industrial tail gas that would otherwise be flared, incinerated, or vented; (C) a pressure drop in any gas, excluding any pressure drop to a condenser that subsequently vents the resulting heat; and (D) such other forms of waste energy as the Administrator may determine. (9) **Other terms** — The terms “electric utility”, “nonregulated electric utility”, “State regulated electric utility”, and other terms have the meanings given those terms in title I of the Public Utility Regulatory Policies Act of 1978 ([16 U.S.C. 2611](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section2611&num=0&edition=prelim) et seq.).

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 2601 — Gathering information on costs of service

**(a) Information required to be gathered** Each electric utility shall periodically gather information under such rules (promulgated by the Commission) as the Commission determines necessary to allow determination of the costs associated with providing electric service. For purposes of this section, and for purposes of any consideration and determination respecting the standard established by [section 2621(d)(2) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title16-section2621/d/2&num=0&edition=prelim), such costs shall be separated, to the maximum extent practicable, into the following components: customer cost component, demand cost component, and energy cost component. Rules under this subsection shall include requirements for the gathering of the following information with respect to each electric utility— (1) the costs of serving each electric consumer class, including costs of serving different consumption patterns within such class, based on voltage level, time of use, and other appropriate factors; (2) daily kilowatt demand load curves for all electric consumer classes combined representative of daily and seasonal differences in demand, and daily kilowatt demand load curves for each electric consumer class for which there is a separate rate, representative of daily and seasonal differences in demand; (3) annual capital, operating, and maintenance costs— (A) for transmission and distribution services, and (B) for each type of generating unit; and (4) costs of purchased power, including representative daily and seasonal differences in the amount of such costs. Such rules shall provide that information required to be gathered under this section shall be presented in such categories and such detail as may be necessary to carr

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 2601

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

2 U.S.C. § 1824 — Energy and environmental measures in Capitol Complex Master Plan

**(a) In general** To the maximum extent practicable, the Architect of the Capitol shall include energy efficiency and conservation measures, greenhouse gas emission reduction measures, and other appropriate environmental measures in the Capitol Complex Master Plan. **(b) Report** Not later than 6 months after December 19, 2007, the Architect of the Capitol shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Rules and Administration of the Senate, a report on the energy efficiency and conservation measures, greenhouse gas emission reduction measures, and other appropriate environmental measures included in the Capitol Complex Master Plan pursuant to subsection (a).

Source: Supplied U.S. Code snapshot — release unconfirmed · 2 U.S.C. § 1824

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 6808 — Authorization of appropriations

There are authorized to be appropriated— (1) not to exceed $40,000,000 for each of the fiscal years 1979 and 1980 to carry out [section 6807 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6807&num=0&edition=prelim) (relating to State utility regulatory assistance); (2) not to exceed $10,000,000 for each of the fiscal years 1979 and 1980 to carry out [section 6805 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6805&num=0&edition=prelim) (relating to State offices of consumer services); and (3) not to exceed $8,000,000 for the fiscal year 1979, and $10,000,000 for the fiscal year 1980 to carry out [section 6804(1)(B) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6804/1/B&num=0&edition=prelim) (relating to innovative rate structures).

Source: Supplied U.S. Code snapshot — release unconfirmed · 42 U.S.C. § 6808

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 2611 — Findings

The Congress finds that the protection of the public health, safety, and welfare, the preservation of national security, and the proper exercise of congressional authority under the Constitution to regulate interstate commerce require— (1) a program providing for increased conservation of electric energy, increased efficiency in the use of facilities and resources by electric utilities, and equitable retail rates for electric consumers, (2) a program to improve the wholesale distribution of electric energy, the reliability of electric service, the procedures concerning consideration of wholesale rate applications before the Federal Energy Regulatory Commission, the participation of the public in matters before the Commission, and to provide other measures with respect to the regulation of the wholesale sale of electric energy, (3) a program to provide for the expeditious development of hydroelectric potential at existing small dams to provide needed hydroelectric power, (4) a program for the conservation of natural gas while insuring that rates to natural gas consumers are equitable, (5) a program to encourage the development of crude oil transportation systems, and (6) the establishment of certain other authorities as provided in title VI of this Act.

Source: Supplied U.S. Code snapshot — release unconfirmed · 16 U.S.C. § 2611

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

16 U.S.C. § 2611 — Purposes

Page 2197 TITLE 16—CONSERVATION § 2621 CODIFICATION This section was not enacted as part of title I of Pub. L. 95–617 which comprises this chapter. AMENDMENTS 1992—Pars. (19) to (21). Pub. L. 102–486 added pars. (19) to (21). § 2603. Relationship to antitrust laws Nothing in this Act or in any amendment made by this Act affects— (1) the applicability of the antitrust laws to any electric utility or gas utility (as defined in section 3202 of title 15), or (2) any authority of the Secretary or of the Commission under any other provision of law (including the Federal Power Act [16 U.S.C. 791a et seq.] and the Natural Gas Act [15 U.S.C. 717 et seq.]) respecting unfair methods of com- petition or anticompetitive acts or practices. (Pub. L. 95–617, § 4, Nov. 9, 1978, 92 Stat. 3120.) Editorial Notes REFERENCES IN TEXT This Act, referred to in text, is act Pub. L. 95–617, Nov. 9, 1978, 92 Stat. 3117, known as the Public Utility Regulatory Policies Act of 1978. For complete classi- fication of this Act to the Code, see Short Title note set out under section 2601 of this title and Tables. The Federal Power Act, referred to in par. (2), is act June 10, 1920, ch. 285, 41 Stat. 1063, which is classified generally to chapter 12 (§ 791a et seq.) of this title. For complete classification of this Act to the Code, see sec- tion 791a of this title and Tables. The Natural Gas Act, referred to in par. (2), is act June 21, 1938, ch. 556, 52 Stat. 821, which is classified generally to chapter 15B (§ 717 et seq.) of Title 15, Com- merce and Trade. For complete classification of this Act to the Code, see section 717w of Title 15 and Tables. CODIFICATION This section was not enacted as part of title I of Pub. L. 95–617 which comprises this chapter. SUBCHAPTER I—R

Source: Supplied 2024 U.S. Code historical extraction · 16 U.S.C. § 2611

Stored review status: historical_2024_not_currentness_verified. The source passage cites 16 U.S.C. § 2611. This identifies an authority to review, not proof of applicability.

Federal law — U.S. Code and appendices · legal_authorities

42 U.S.C. § 6343 — Waste energy recovery incentive grant

Page 6790 TITLE 42—THE PUBLIC HEALTH AND WELFARE § 6343 ance Partnership Program. See section 6345 of this title. PRIOR PROVISIONS A prior section 6342, Pub. L. 94–163, title III, § 372, Dec. 22, 1975, 89 Stat. 936; Pub. L. 95–91, title III, § 301(a), title VII, §§ 703, 707, Aug. 4, 1977, 91 Stat. 577, 606, 607; Pub. L. 95–619, title VI, § 691(b)(2), Nov. 9, 1978, 92 Stat. 3288, re- lated to establishment and maintenance of an energy efficiency program, prior to repeal by Pub. L. 99–509, title III, § 3101(b), Oct. 21, 1986, 100 Stat. 1888. Statutory Notes and Related Subsidiaries EFFECTIVE DATE Section effective on the date that is 1 day after Dec. 19, 2007, see section 1601 of Pub. L. 110–140, set out as a note under section 1824 of Title 2, The Congress. § 6343. Waste energy recovery incentive grant program (a) Establishment The Secretary shall establish in the Depart- ment of Energy a waste energy recovery incen- tive grant program to provide incentive grants to— (1) owners and operators of projects that suc- cessfully produce electricity or incremental useful thermal energy from waste energy re- covery; (2) utilities purchasing or distributing the electricity; and (3) States that have achieved 80 percent or more of recoverable waste heat recovery op- portunities. (b) Grants to projects and utilities (1) In general The Secretary shall make grants under this section— (A) to the owners or operators of waste en- ergy recovery projects; and (B) in the case of excess power purchased or transmitted by a electric utility, to the utility. (2) Proof Grants may only be made under this section on receipt of proof of waste energy recovery or excess electricity generation, or both, from the project in a form prescribed by the Sec- retary. (3) Ex

Source: Supplied 2024 U.S. Code historical extraction · 42 U.S.C. § 6343

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.