Browse Arkansas Code titles and sections
33 U.S.C. § 1300 — Pilot program for alternative water
Federal law — U.S. Code and appendices · legal_authorities
Page 442
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 1299
any treatment works the Administrator shall
determine that the facilities plan of which such
treatment works are a part constitutes the most
economical and cost-effective combination of
treatment works over the life of the project to
meet the requirements of this chapter, includ-
ing, but not limited to, consideration of con-
struction costs, operation, maintenance, and re-
placement costs.
(c) Value engineering review
In furtherance of the policy set forth in sub-
section (a) of this section, the Administrator
shall require value engineering review in con-
nection with any treatment works, prior to ap-
proval of any grant for the erection, building,
acquisition, alteration, remodeling, improve-
ment, or extension of such treatment works, in
any case in which the cost of such erection,
building, acquisition, alteration, remodeling,
improvement, or extension is projected to be in
excess of $10,000,000. For purposes of this sub-
section, the term ‘‘value engineering review’’
means a specialized cost control technique
which uses a systematic and creative approach
to identify and to focus on unnecessarily high
cost in a project in order to arrive at a cost sav-
ing without sacrificing the reliability or effi-
ciency of the project.
(d) Projects affected
This section applies to projects for waste
treatment and management for which no treat-
ment works including a facilities plan for such
project have received Federal financial assist-
ance for the preparation of construction plans
and specifications under this chapter before De-
cember 29, 1981.
(June 30, 1948, ch. 758, title II, § 218, as added
Pub. L. 97–117, § 19, Dec. 29, 1981, 95 Stat. 1630.)
§ 1299. State certification of projects
Whenev
Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 1300
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: abceed81faddf4a659c070628e8e0dd007eaf552309c12b3e9f651a1ba28a7b2. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-c363de708b39a18352c951d9
Source file: Laws/federal/codes/united-states-code-2024/title-33/section-1300-pilot-program-for-alternative-water--cc9c351f42.md
Pages: Not recorded – Not recorded
Passage SHA-256: 1b2a6e590351a362a876845d6250a1f45845a1cc968b3c7755ffd0980e37edc9
Source location: USCODE-2024-title33-chap26-subchapII-sec1300.pdf
Stored source content
Page 442
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 1299
any treatment works the Administrator shall
determine that the facilities plan of which such
treatment works are a part constitutes the most
economical and cost-effective combination of
treatment works over the life of the project to
meet the requirements of this chapter, includ-
ing, but not limited to, consideration of con-
struction costs, operation, maintenance, and re-
placement costs.
(c) Value engineering review
In furtherance of the policy set forth in sub-
section (a) of this section, the Administrator
shall require value engineering review in con-
nection with any treatment works, prior to ap-
proval of any grant for the erection, building,
acquisition, alteration, remodeling, improve-
ment, or extension of such treatment works, in
any case in which the cost of such erection,
building, acquisition, alteration, remodeling,
improvement, or extension is projected to be in
excess of $10,000,000. For purposes of this sub-
section, the term ‘‘value engineering review’’
means a specialized cost control technique
which uses a systematic and creative approach
to identify and to focus on unnecessarily high
cost in a project in order to arrive at a cost sav-
ing without sacrificing the reliability or effi-
ciency of the project.
(d) Projects affected
This section applies to projects for waste
treatment and management for which no treat-
ment works including a facilities plan for such
project have received Federal financial assist-
ance for the preparation of construction plans
and specifications under this chapter before De-
cember 29, 1981.
(June 30, 1948, ch. 758, title II, § 218, as added
Pub. L. 97–117, § 19, Dec. 29, 1981, 95 Stat. 1630.)
§ 1299. State certification of projects
Whenever the Governor of a State which has
been delegated sufficient authority to admin-
ister the construction grant program under this
subchapter in that State certifies to the Admin-
istrator that a grant application meets applica-
ble requirements of Federal and State law for
assistance under this subchapter, the Adminis-
trator shall approve or disapprove such applica-
tion within 45 days of the date of receipt of such
application. If the Administrator does not ap-
prove or disapprove such application within 45
days of receipt, the application shall be deemed
approved. If the Administrator disapproves such
application the Administrator shall state in
writing the reasons for such disapproval. Any
grant approved or deemed approved under this
section shall be subject to amounts provided in
appropriation Acts.
(June 30, 1948, ch. 758, title II, § 219, as added
Pub. L. 97–117, § 20, Dec. 29, 1981, 95 Stat. 1631.)
§ 1300. Pilot program for alternative water
source projects
(a) Policy
Nothing in this section shall be construed to
affect the application of section 1251(g) of this
title and all of the provisions of this section
shall be carried out in accordance with the pro-
visions of section 1251(g) of this title.
(b) Definitions
In this section:
(1) Alternative water source project
The term ‘‘alternative water source project’’
means a project designed to provide munic-
ipal, industrial, and agricultural water sup-
plies in an environmentally sustainable man-
ner by conserving, managing, reclaiming, or
reusing water, wastewater, or stormwater or
by treating wastewater or stormwater for
groundwater recharge, potable reuse, or other
purposes. Such term does not include water
treatment or distribution facilities.
(2) Critical water supply needs
The term ‘‘critical water supply needs’’
means existing or reasonably anticipated fu-
ture water supply needs that cannot be met by
existing water supplies, as identified in a com-
prehensive statewide or regional water supply
plan or assessment projected over a planning
period of at least 20 years.
(c) Establishment
The Administrator may establish a pilot pro-
gram to make grants to State, interstate, and
intrastate water resource development agencies
(including water management districts and
water supply authorities), local government
agencies, private utilities, and nonprofit entities
for alternative water source projects to meet
critical water supply needs.
(d) Eligible entity
The Administrator may make grants under
this section to an entity only if the entity has
authority under State law to develop or provide
water for municipal, industrial, and agricultural
uses in an area of the State that is experiencing
critical water supply needs.
(e) Selection of projects
(1) Limitation
A project that has received construction
funds under the reclamation and reuse pro-
gram
conducted
under
the
Reclamation
Projects Authorization and Adjustment Act of
1992 (43 U.S.C. 390h et seq.) shall not be eligible
for grant assistance under this section.
(2) Geographical distribution
Alternative water source projects selected
by the Administrator under this section shall
reflect a variety of geographical and environ-
mental conditions.
(f) Uses of grants
Amounts from grants received under this sec-
tion may be used for engineering, design, con-
struction, and final testing of alternative water
source projects designed to meet critical water
supply needs. Such amounts may not be used for
planning, feasibility studies or for operation,
maintenance, replacement, repair, or rehabilita-
tion.
(g) Cost sharing
The Federal share of the eligible costs of an
alternative water source project carried out
using assistance made available under this sec-
tion shall not exceed 50 percent.
(h) Reports
On or before September 30, 2004, the Adminis-
trator shall transmit to Congress a report on the
Page 443
TITLE 33—NAVIGATION AND NAVIGABLE WATERS
§ 1301
results of the pilot program established under
this section, including progress made toward
meeting the critical water supply needs of the
participants in the pilot program.
(i) Authorization of appropriations
(1) In general
There is authorized to be appropriated to
carry out this section $25,000,000 for each of
fiscal years 2022 through 2026, to remain avail-
able until expended.
(2) Limitation on use of funds
Of the amounts made available for grants
under paragraph (1), not more than 2 percent
may be used to pay the administrative costs of
the Administrator.
(June 30, 1948, ch. 758, title II, § 220, as added
Pub. L. 106–457, title VI, § 602, Nov. 7, 2000, 114
Stat. 1975; amended Pub. L. 117–58, div. E, title
II, § 50203, Nov. 15, 2021, 135 Stat. 1159.)
Editorial Notes
REFERENCES IN TEXT
The Reclamation Projects Authorization and Adjust-
ment Act of 1992, referred to in subsec. (e)(1), is Pub. L.
102–575, Oct. 30, 1992, 106 Stat. 4600. Provisions relating
to the reclamation and reuse program are classified
generally to section 390h et seq. of Title 43, Public
Lands. For complete classification of this Act to the
Code, see Short Title of 1992 Amendment note set out
under section 371 of Title 43 and Tables.
AMENDMENTS
2021—Subsec. (b). Pub. L. 117–58, § 50203(6), redesig-
nated subsec. (i) as (b). Former subsec. (b) redesignated
(c).
Pub. L. 117–58, § 50203(1), substituted ‘‘Establishment’’
for ‘‘In general’’ in heading.
Subsec. (c). Pub. L. 117–58, § 50203(6), redesignated sub-
sec. (b) as (c). Former subsec. (c) redesignated (d).
Subsec. (d). Pub. L. 117–58, § 50203(6), redesignated sub-
sec. (c) as (d). Former subsec. (d) redesignated (e).
Subsec. (d)(1). Pub. L. 117–58, § 50203(2)(A), inserted
‘‘construction’’ before ‘‘funds’’.
Subsec. (d)(2), (3). Pub. L. 117–58, § 50203(2)(B), (C), re-
designated par. (3) as (2) and struck out former par. (2)
which related to additional consideration regarding the
location of a project.
Subsec. (e). Pub. L. 117–58, § 50203(6), redesignated sub-
sec. (d) as (e).
Pub. L. 117–58, § 50203(3), struck out subsec. (e) which
related to committee resolution procedure.
Subsec. (i). Pub. L. 117–58, § 50203(6), redesignated sub-
sec. (j) as (i). Former subsec. (i) redesignated (b).
Pub. L. 117–58, § 50203(4)(A), struck out ‘‘, the fol-
lowing definitions apply’’ before the semicolon in intro-
ductory provisions.
Subsec. (i)(1). Pub. L. 117–58, § 50203(4)(B), substituted
‘‘water, wastewater, or stormwater or by treating
wastewater or stormwater for groundwater recharge,
potable reuse, or other purposes’’ for ‘‘water or waste-
water or by treating wastewater’’.
Subsec. (j). Pub. L. 117–58, § 50203(6), redesignated sub-
sec. (j) as (i). Former subsec. (i) redesignated (b).
Pub. L. 117–58, § 50203(5), designated existing provi-
sions
as
par.
(1),
inserted
heading,
substituted
‘‘$25,000,000 for each of fiscal years 2022 through 2026,
to’’ for ‘‘a total of $75,000,000 for fiscal years 2002
through 2004. Such sums shall’’, and added par. (2).
§ 1301. Sewer overflow and stormwater reuse mu-
nicipal grants
(a) In general
(1) Grants to States
The Administrator may make grants to
States for the purpose of providing grants to a
municipality or municipal entity for planning,
design, and construction of—
(A) treatment works to intercept, trans-
port, control, treat, or reuse municipal com-
bined sewer overflows, sanitary sewer over-
flows, or stormwater;
(B) notification systems to inform the pub-
lic of combined sewer or sanitary overflows
that result in sewage being released into riv-
ers and other waters; and
(C) any other measures to manage, reduce,
treat, or recapture stormwater or subsurface
drainage water eligible for assistance under
section 1383(c) of this title.
(2) Direct municipal grants
Subject to subsection (g), the Administrator
may make a direct grant to a municipality or
municipal entity for the purposes described in
paragraph (1).
(b) Prioritization
In selecting from among municipalities apply-
ing for grants under subsection (a), a State or
the Administrator shall give priority to an ap-
plicant that—
(1) is a municipality that is a financially dis-
tressed community under subsection (c);
(2) has implemented or is complying with an
implementation schedule for the nine min-
imum controls specified in the CSO control
policy referred to in section 1342(q)(1) of this
title and has begun implementing a long-term
municipal combined sewer overflow control
plan or a separate sanitary sewer overflow
control plan;
(3) is requesting a grant for a project that is
on a State’s intended use plan pursuant to sec-
tion 1386(c) of this title; or
(4) is an Alaska Native Village.
(c) Financially distressed community
(1) Definition
In subsection (b), the term ‘‘financially dis-
tressed community’’ means a community that
meets affordability criteria established by the
State in which the community is located, if
such criteria are developed after public review
and comment.
(2) Consideration of impact on water and
sewer rates
In determining if a community is a dis-
tressed community for the purposes of sub-
section (b), the State shall consider, among
other factors, the extent to which the rate of
growth of a community’s tax base has been
historically slow such that implementing a
plan described in subsection (b)(2) would result
in a significant increase in any water or sewer
rate charged by the community’s publicly
owned wastewater treatment facility.
(3) Information to assist States
The Administrator may publish information
to assist States in establishing affordability
criteria under paragraph (1).
(d) Cost-sharing
(1) In general
The Federal share of the cost of activities
carried out using amounts from a grant made
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Policy** Nothing in this section shall be construed to affect the application of [section 1251(g) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1251/g&num=0&edition=prelim) and all of the provisions of this section shall be carried out in accordance with the provisions of [section 1251(g) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1251/g&num=0&edition=prelim).
**(b) Definitions** In this section:
(1) **Alternative water source project** — The term “alternative water source project” means a project designed to provide municipal, industrial, and agricultural water supplies in an environmentally sustainable manner by conserving, managing, reclaiming, or reusing water, wastewater, or stormwater or by treating wastewater or stormwater for groundwater recharge, potable reuse, or other purposes. Such term does not include water treatment or distribution facilities.
(2) **Critical water supply needs** — The term “critical water supply needs” means existing or reasonably anticipated future water supply needs that cannot be met by existing water supplies, as identified in a comprehensive statewide or regional water supply plan or assessment projected over a planning period of at least 20 years.
**(c) Establishment** The Administrator may establish a pilot program to make grants to State, interstate, and intrastate water resource development agencies (including water management districts and water supply authorities), local government agencies, private utilities, and nonprofit entities for alternative water source projects to meet critical water supply needs.
**(d) Eligible entity** The Administrator may make grants under this section to an entity only if the entity has authorit
Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 1300
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.
Federal law — U.S. Code and appendices · legal_authorities
**(a) Program established** The Secretary of the Interior (hereafter “Secretary”), acting pursuant to the Reclamation Act of 1902 (Act of June 17, 1902, 32 Stat. 388) and Acts amendatory thereof and supplementary thereto (hereafter “Federal reclamation laws”), is directed to undertake a program to investigate and identify opportunities for reclamation and reuse of municipal, industrial, domestic, and agricultural wastewater, and naturally impaired ground and surface waters, for the design and construction of demonstration and permanent facilities to reclaim and reuse wastewater, and to conduct research, including desalting, for the reclamation of wastewater and naturally impaired ground and surface waters.
**(b) States included** Such program shall be limited to the States and areas referred to in section 1 of the Reclamation Act of 1902 (Act of June 17, 1902, 32 Stat. 388) [[43 U.S.C. 391](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section391&num=0&edition=prelim)] as amended, and the State of Hawaii.
**(c) Agreements and regulations** The Secretary is authorized to enter into such agreements and promulgate such regulations as may be necessary to carry out the purposes and provisions of sections 390h to 390h–39 of this title.
**(d) San Luis Unit of Central Valley Project, California** The Secretary shall not investigate, promote or implement, pursuant to sections 390h to 390h–39 of this title, any project intended to reclaim and reuse agricultural wastewater generated in the service area of the San Luis Unit of the Central Valley Project, California, except those measures recommended for action by the San Joaquin Valley Drainage Program in the report entitled A Management Plan for Agricultural Subsurface Drainage and Related Problems on the
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 390h
Stored review status: release_metadata_unconfirmed. The source passage cites 43 U.S.C. § 390h. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 103
TITLE 43—PUBLIC LANDS
§ 390h
(B) Effect on existing contracts
Nothing in this subsection affects a con-
tract—
(i) in effect on December 27, 2020; and
(ii) under which the use of excess capac-
ity in a Bureau conveyance facility for
carriage of non-Reclamation project water
for aquifer recharge is allowed.
(2) Aquifer recharge on eligible land
(A) In general
Subject to subparagraphs (C) and (D), the
Secretary may contract with a holder of a
water service or repayment contract for a
Reclamation project to allow the contractor,
in accordance with applicable State laws and
policies—
(i) to directly use water available under
the contract for aquifer recharge on eligi-
ble land; or
(ii) to enter into an agreement with an
individual or entity to transfer water
available under the contract for aquifer re-
charge on eligible land.
(B) Authorized project use
The use of a Reclamation facility for aqui-
fer recharge under subparagraph (A) shall be
considered an authorized use for the Rec-
lamation project if requested by a holder of
a water service or repayment contract for
the Reclamation facility.
(C) Modifications to contracts
The Secretary may contract with a holder
of a water service or repayment contract for
a Reclamation project under subparagraph
(A) if the Secretary determines that a new
contract or contract amendment described
in that subparagraph is—
(i) necessary to allow for the use of
water available under the contract for aq-
uifer recharge under this subsection;
(ii) in the best interest of the Reclama-
tion project and the United States; and
(iii) approved by the contractor that is
responsible for repaying the cost of con-
struction, operations, and maintenance of
the facility that delivers the water under
the contract.
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 390h
Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 390h. This identifies an authority to review, not proof of applicability.