Arkansas Legal Resource Navigator

33 U.S.C. § 1300 — Pilot program for alternative water source projects

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 1300 — Pilot program for alternative water source projects

**(a) Policy** Nothing in this section shall be construed to affect the application of [section 1251(g) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1251/g&num=0&edition=prelim) and all of the provisions of this section shall be carried out in accordance with the provisions of [section 1251(g) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1251/g&num=0&edition=prelim). **(b) Definitions** In this section: (1) **Alternative water source project** — The term “alternative water source project” means a project designed to provide municipal, industrial, and agricultural water supplies in an environmentally sustainable manner by conserving, managing, reclaiming, or reusing water, wastewater, or stormwater or by treating wastewater or stormwater for groundwater recharge, potable reuse, or other purposes. Such term does not include water treatment or distribution facilities. (2) **Critical water supply needs** — The term “critical water supply needs” means existing or reasonably anticipated future water supply needs that cannot be met by existing water supplies, as identified in a comprehensive statewide or regional water supply plan or assessment projected over a planning period of at least 20 years. **(c) Establishment** The Administrator may establish a pilot program to make grants to State, interstate, and intrastate water resource development agencies (including water management districts and water supply authorities), local government agencies, private utilities, and nonprofit entities for alternative water source projects to meet critical water supply needs. **(d) Eligible entity** The Administrator may make grants under this section to an entity only if the entity has authorit

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 1300

Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.

Original supplied file — preserved unchanged

Download original Markdown file

File SHA-256: 3b373014acf15b95cb63690add4ae22a582476434a07d6a7761a29f55e8b4525. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.

Authority boundary: historical or unconfirmed source not current law verified.

Open the recorded source website ↗

Record provenance

Stable record: federal_law:legal_authorities:record_usc_e6b6671ff469136c9f1b4efd
Source file: Laws/federal/codes/united-states-code/title-33/section-1300-pilot-program-for-alternative-water-source-projects--d2f27c46fa.md
Pages: Not recorded – Not recorded
Passage SHA-256: ee6b179df1d166a63ef40fa3e3ca7267e5d5a5db105dc3d8bcd11a04c3250fd3

Source location: Title 33, Chapter 26, § 1300; chapter-026-water-pollution-prevention-and-control.md

Stored source content

**(a) Policy** Nothing in this section shall be construed to affect the application of [section 1251(g) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1251/g&num=0&edition=prelim) and all of the provisions of this section shall be carried out in accordance with the provisions of [section 1251(g) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title33-section1251/g&num=0&edition=prelim). **(b) Definitions** In this section: (1) **Alternative water source project** — The term “alternative water source project” means a project designed to provide municipal, industrial, and agricultural water supplies in an environmentally sustainable manner by conserving, managing, reclaiming, or reusing water, wastewater, or stormwater or by treating wastewater or stormwater for groundwater recharge, potable reuse, or other purposes. Such term does not include water treatment or distribution facilities. (2) **Critical water supply needs** — The term “critical water supply needs” means existing or reasonably anticipated future water supply needs that cannot be met by existing water supplies, as identified in a comprehensive statewide or regional water supply plan or assessment projected over a planning period of at least 20 years. **(c) Establishment** The Administrator may establish a pilot program to make grants to State, interstate, and intrastate water resource development agencies (including water management districts and water supply authorities), local government agencies, private utilities, and nonprofit entities for alternative water source projects to meet critical water supply needs. **(d) Eligible entity** The Administrator may make grants under this section to an entity only if the entity has authority under State law to develop or provide water for municipal, industrial, and agricultural uses in an area of the State that is experiencing critical water supply needs. **(e) Selection of projects** (1) **Limitation** — A project that has received construction funds under the reclamation and reuse program conducted under the Reclamation Projects Authorization and Adjustment Act of 1992 ([43 U.S.C. 390h](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section390h&num=0&edition=prelim) et seq.) shall not be eligible for grant assistance under this section. (2) **Geographical distribution** — Alternative water source projects selected by the Administrator under this section shall reflect a variety of geographical and environmental conditions. **(f) Uses of grants** Amounts from grants received under this section may be used for engineering, design, construction, and final testing of alternative water source projects designed to meet critical water supply needs. Such amounts may not be used for planning, feasibility studies or for operation, maintenance, replacement, repair, or rehabilitation. **(g) Cost sharing** The Federal share of the eligible costs of an alternative water source project carried out using assistance made available under this section shall not exceed 50 percent. **(h) Reports** On or before September 30, 2004, the Administrator shall transmit to Congress a report on the results of the pilot program established under this section, including progress made toward meeting the critical water supply needs of the participants in the pilot program. **(i) Authorization of appropriations** (1) **In general** — There is authorized to be appropriated to carry out this section $25,000,000 for each of fiscal years 2022 through 2026, to remain available until expended. (2) **Limitation on use of funds** — Of the amounts made available for grants under paragraph (1), not more than 2 percent may be used to pay the administrative costs of the Administrator.

Cross-references

Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 390h — Program to investigate reclamation and reuse of wastewater and groundwater; general authority

**(a) Program established** The Secretary of the Interior (hereafter “Secretary”), acting pursuant to the Reclamation Act of 1902 (Act of June 17, 1902, 32 Stat. 388) and Acts amendatory thereof and supplementary thereto (hereafter “Federal reclamation laws”), is directed to undertake a program to investigate and identify opportunities for reclamation and reuse of municipal, industrial, domestic, and agricultural wastewater, and naturally impaired ground and surface waters, for the design and construction of demonstration and permanent facilities to reclaim and reuse wastewater, and to conduct research, including desalting, for the reclamation of wastewater and naturally impaired ground and surface waters. **(b) States included** Such program shall be limited to the States and areas referred to in section 1 of the Reclamation Act of 1902 (Act of June 17, 1902, 32 Stat. 388) [[43 U.S.C. 391](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section391&num=0&edition=prelim)] as amended, and the State of Hawaii. **(c) Agreements and regulations** The Secretary is authorized to enter into such agreements and promulgate such regulations as may be necessary to carry out the purposes and provisions of sections 390h to 390h–39 of this title. **(d) San Luis Unit of Central Valley Project, California** The Secretary shall not investigate, promote or implement, pursuant to sections 390h to 390h–39 of this title, any project intended to reclaim and reuse agricultural wastewater generated in the service area of the San Luis Unit of the Central Valley Project, California, except those measures recommended for action by the San Joaquin Valley Drainage Program in the report entitled A Management Plan for Agricultural Subsurface Drainage and Related Problems on the

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 390h

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 371 — Definitions

When used in sections 371, 376, 377, 412, 417, 433, 462, 466, 478, 493, 494, 500, 501, and 526 of this title— **(a)** The word “Secretary” means the Secretary of the Interior. **(b)** The words “reclamation law” mean the Act of June 17, 1902 (32 Stat. 388), and all Acts amendatory thereof or supplementary thereto. **(c)** The words “reclamation fund” mean the fund provided by the reclamation law. **(d)** The word “project” means a Federal irrigation project authorized by the reclamation law. **(e)** The words “division of a project” mean a substantial irrigable area of a project designated as a division by order of the Secretary.

Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 371

Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 1251 — Congressional declaration of goals and policy

**(a) Restoration and maintenance of chemical, physical and biological integrity of Nation’s waters; national goals for achievement of objective** The objective of this chapter is to restore and maintain the chemical, physical, and biological integrity of the Nation’s waters. In order to achieve this objective it is hereby declared that, consistent with the provisions of this chapter— (1) it is the national goal that the discharge of pollutants into the navigable waters be eliminated by 1985; (2) it is the national goal that wherever attainable, an interim goal of water quality which provides for the protection and propagation of fish, shellfish, and wildlife and provides for recreation in and on the water be achieved by July 1, 1983; (3) it is the national policy that the discharge of toxic pollutants in toxic amounts be prohibited; (4) it is the national policy that Federal financial assistance be provided to construct publicly owned waste treatment works; (5) it is the national policy that areawide waste treatment management planning processes be developed and implemented to assure adequate control of sources of pollutants in each State; (6) it is the national policy that a major research and demonstration effort be made to develop technology necessary to eliminate the discharge of pollutants into the navigable waters, waters of the contiguous zone, and the oceans; and (7) it is the national policy that programs for the control of nonpoint sources of pollution be developed and implemented in an expeditious manner so as to enable the goals of this chapter to be met through the control of both point and nonpoint sources of pollution. **(b) Congressional recognition, preservation, and protection of primary responsibilities and rights of States** It is the policy

Source: Supplied U.S. Code snapshot — release unconfirmed · 33 U.S.C. § 1251

Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.

Federal law — U.S. Code and appendices · legal_authorities

33 U.S.C. § 1300 — Pilot program for alternative water

Page 442 TITLE 33—NAVIGATION AND NAVIGABLE WATERS § 1299 any treatment works the Administrator shall determine that the facilities plan of which such treatment works are a part constitutes the most economical and cost-effective combination of treatment works over the life of the project to meet the requirements of this chapter, includ- ing, but not limited to, consideration of con- struction costs, operation, maintenance, and re- placement costs. (c) Value engineering review In furtherance of the policy set forth in sub- section (a) of this section, the Administrator shall require value engineering review in con- nection with any treatment works, prior to ap- proval of any grant for the erection, building, acquisition, alteration, remodeling, improve- ment, or extension of such treatment works, in any case in which the cost of such erection, building, acquisition, alteration, remodeling, improvement, or extension is projected to be in excess of $10,000,000. For purposes of this sub- section, the term ‘‘value engineering review’’ means a specialized cost control technique which uses a systematic and creative approach to identify and to focus on unnecessarily high cost in a project in order to arrive at a cost sav- ing without sacrificing the reliability or effi- ciency of the project. (d) Projects affected This section applies to projects for waste treatment and management for which no treat- ment works including a facilities plan for such project have received Federal financial assist- ance for the preparation of construction plans and specifications under this chapter before De- cember 29, 1981. (June 30, 1948, ch. 758, title II, § 218, as added Pub. L. 97–117, § 19, Dec. 29, 1981, 95 Stat. 1630.) § 1299. State certification of projects Whenev

Source: Supplied 2024 U.S. Code historical extraction · 33 U.S.C. § 1300

Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.

Federal law — U.S. Code and appendices · legal_authorities

43 U.S.C. § 390h — Program to investigate reclamation and

Page 103 TITLE 43—PUBLIC LANDS § 390h (B) Effect on existing contracts Nothing in this subsection affects a con- tract— (i) in effect on December 27, 2020; and (ii) under which the use of excess capac- ity in a Bureau conveyance facility for carriage of non-Reclamation project water for aquifer recharge is allowed. (2) Aquifer recharge on eligible land (A) In general Subject to subparagraphs (C) and (D), the Secretary may contract with a holder of a water service or repayment contract for a Reclamation project to allow the contractor, in accordance with applicable State laws and policies— (i) to directly use water available under the contract for aquifer recharge on eligi- ble land; or (ii) to enter into an agreement with an individual or entity to transfer water available under the contract for aquifer re- charge on eligible land. (B) Authorized project use The use of a Reclamation facility for aqui- fer recharge under subparagraph (A) shall be considered an authorized use for the Rec- lamation project if requested by a holder of a water service or repayment contract for the Reclamation facility. (C) Modifications to contracts The Secretary may contract with a holder of a water service or repayment contract for a Reclamation project under subparagraph (A) if the Secretary determines that a new contract or contract amendment described in that subparagraph is— (i) necessary to allow for the use of water available under the contract for aq- uifer recharge under this subsection; (ii) in the best interest of the Reclama- tion project and the United States; and (iii) approved by the contractor that is responsible for repaying the cost of con- struction, operations, and maintenance of the facility that delivers the water under the contract.

Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 390h

Stored review status: historical_2024_not_currentness_verified. The source passage cites 43 U.S.C. § 390h. This identifies an authority to review, not proof of applicability.