Browse Arkansas Code titles and sections
43 U.S.C. § 620a — Priority to planning reports of certain ad-
Federal law — U.S. Code and appendices · legal_authorities
Page 231
TITLE 43—PUBLIC LANDS
§ 620a
‘‘(A) provides congressional authorization for the
lease, contracting, and transfer of any water right
described in paragraph (1)(A); and
‘‘(B) is deemed to fulfill any requirement that
may be imposed by the provisions of section 2116 of
the Revised Statutes (25 U.S.C. 177).
‘‘(5) FORFEITURE.—The nonuse of a water right of
the Nation by a lessee or contractor to the Nation
under this subsection shall not result in forfeiture,
abandonment, relinquishment, or other loss of any
part of a right decreed to the Nation under the Con-
tract or this section.
‘‘(e) NULLIFICATION.—
‘‘(1) DEADLINES.—
‘‘(A) IN GENERAL.—In carrying out this section,
the following deadlines apply with respect to imple-
mentation of the Agreement:
‘‘(i) AGREEMENT.—Not later than December 31,
2010, the Secretary shall execute the Agreement.
‘‘(ii) CONTRACT.—Not later than December 31,
2010, the Secretary and the Nation shall execute
the Contract.
‘‘(iii) PARTIAL
FINAL
DECREE.—Not later than
December 31, 2013, the court in the stream adju-
dication shall have entered the Partial Final De-
cree described in paragraph 3.0 of the Agreement.
‘‘(iv)
FRUITLAND-CAMBRIDGE
IRRIGATION
PROJECT.—Not later than December 31, 2016, the
rehabilitation construction of the Fruitland-Cam-
bridge Irrigation Project authorized under section
10607(a)(1) [123 Stat. 1394] shall be completed.
‘‘(v) SUPPLEMENTAL PARTIAL FINAL DECREE.—Not
later than December 31, 2016, the court in the
stream adjudication shall enter the Supplemental
Partial Final Decree described in subparagraph
4.0 of the Agreement.
‘‘(vi) HOGBACK-CUDEI IRRIGATION PROJECT.—Not
later than December 31, 2019, the rehabilitation
construction of the Hogback-Cudei Irrigation
Project authorized unde
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 620a
Stored review status: historical_2024_not_currentness_verified. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: 2e508283ee74e14d97a640cdba6714639363d12f86128582a3154b3219d1e9f2. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:usc2024-bad7c2f392831b559375b461
Source file: Laws/federal/codes/united-states-code-2024/title-43/section-620a-priority-to-planning-reports-of-certain-ad--0f0a08c993.md
Pages: Not recorded – Not recorded
Passage SHA-256: f8966bd752832b1d0bba8147b9c505e7c2625d3b8fdaab5027112c3c9428d604
Source location: USCODE-2024-title43-chap12B-sec620a.pdf
Stored source content
Page 231
TITLE 43—PUBLIC LANDS
§ 620a
‘‘(A) provides congressional authorization for the
lease, contracting, and transfer of any water right
described in paragraph (1)(A); and
‘‘(B) is deemed to fulfill any requirement that
may be imposed by the provisions of section 2116 of
the Revised Statutes (25 U.S.C. 177).
‘‘(5) FORFEITURE.—The nonuse of a water right of
the Nation by a lessee or contractor to the Nation
under this subsection shall not result in forfeiture,
abandonment, relinquishment, or other loss of any
part of a right decreed to the Nation under the Con-
tract or this section.
‘‘(e) NULLIFICATION.—
‘‘(1) DEADLINES.—
‘‘(A) IN GENERAL.—In carrying out this section,
the following deadlines apply with respect to imple-
mentation of the Agreement:
‘‘(i) AGREEMENT.—Not later than December 31,
2010, the Secretary shall execute the Agreement.
‘‘(ii) CONTRACT.—Not later than December 31,
2010, the Secretary and the Nation shall execute
the Contract.
‘‘(iii) PARTIAL
FINAL
DECREE.—Not later than
December 31, 2013, the court in the stream adju-
dication shall have entered the Partial Final De-
cree described in paragraph 3.0 of the Agreement.
‘‘(iv)
FRUITLAND-CAMBRIDGE
IRRIGATION
PROJECT.—Not later than December 31, 2016, the
rehabilitation construction of the Fruitland-Cam-
bridge Irrigation Project authorized under section
10607(a)(1) [123 Stat. 1394] shall be completed.
‘‘(v) SUPPLEMENTAL PARTIAL FINAL DECREE.—Not
later than December 31, 2016, the court in the
stream adjudication shall enter the Supplemental
Partial Final Decree described in subparagraph
4.0 of the Agreement.
‘‘(vi) HOGBACK-CUDEI IRRIGATION PROJECT.—Not
later than December 31, 2019, the rehabilitation
construction of the Hogback-Cudei Irrigation
Project authorized under section 10607(a)(2) [123
Stat. 1394] shall be completed.
‘‘(vii) TRUST
FUND.—Not later than December
31, 2019, the United States shall make all deposits
into the Trust Fund under section 10702 [123 Stat.
1402].
‘‘(viii) CONJUNCTIVE WELLS.—Not later than De-
cember 31, 2019, the funds authorized to be appro-
priated under section 10609(b)(1) [123 Stat. 1395]
for the conjunctive use wells authorized under
section 10606(b) [123 Stat. 1393] should be appro-
priated.
‘‘(ix) NAVAJO-GALLUP WATER SUPPLY PROJECT.—
Not later than December 31, 2024, the construc-
tion of all Project facilities shall be completed.
‘‘(B) EXTENSION.—A deadline described in sub-
paragraph (A) may be extended if the Nation, the
United States (acting through the Secretary), and
the State of New Mexico (acting through the New
Mexico Interstate Stream Commission) agree that
an extension is reasonably necessary.
‘‘(2) REVOCABILITY OF AGREEMENT, CONTRACT AND AU-
THORIZATIONS.—
‘‘(A) PETITION.—If the Nation determines that a
deadline described in paragraph (1)(A) is not sub-
stantially met, the Nation may submit to the court
in the stream adjudication a petition to enter an
order terminating the Agreement.
‘‘(B) TERMINATION.—On issuance of an order to
terminate the Agreement under subparagraph (A)—
‘‘(i) the Trust Fund shall be terminated;
‘‘(ii) the balance of the Trust Fund shall be de-
posited in the general fund of the Treasury;
‘‘(iii) the authorizations for construction and
rehabilitation of water projects under this sub-
title shall be revoked and any Federal activity re-
lated to that construction and rehabilitation
shall be suspended; and
‘‘(iv) this part and parts I and III [parts IV
(§§ 10701–10704),
I
(§§ 10401–10403),
and
III
(§§ 10601–10609) of subtitle B of title X of Pub. L.
111–11, enacting former section 615jj and section
620n–1 of this title, amending this section, former
section 615ss, and section 620o of this title, repeal-
ing former section 615jj of this title, and enacting
provisions set out as notes under this section]
shall be null and void.
‘‘(3) CONDITIONS NOT CAUSING NULLIFICATION OF SET-
TLEMENT.—
‘‘(A) IN GENERAL.—If a condition described in sub-
paragraph (B) occurs, the Agreement shall not be
nullified or terminated.
‘‘(B) CONDITIONS.—The conditions referred to in
subparagraph (A) are as follows:
‘‘(i) A lack of right to divert at the capacities
of conjunctive use wells constructed or rehabili-
tated under section 10606 [123 Stat. 1392].
‘‘(ii) A failure—
‘‘(I) to determine or resolve an accounting of
the use of water under this subtitle in the State
of Arizona;
‘‘(II) to obtain a necessary water right for the
consumptive use of water in Arizona;
‘‘(III) to contract for the delivery of water for
use in Arizona; or
‘‘(IV) to construct and operate a lateral facil-
ity to deliver water to a community of the Na-
tion in Arizona, under the Project.
‘‘(f) EFFECT ON RIGHTS OF INDIAN TRIBES.—
‘‘(1) IN GENERAL.—Except as provided in paragraph
(2), nothing in the Agreement, the Contract, or this
section quantifies or adversely affects the land and
water rights, or claims or entitlements to water, of
any Indian tribe or community other than the rights,
claims, or entitlements of the Nation in, to, and from
the San Juan River Basin in the State of New Mexico.
‘‘(2) EXCEPTION.—The right of the Nation to use
water under water rights the Nation has in other
river basins in the State of New Mexico shall be
forborne to the extent that the Nation supplies the
uses for which the water rights exist by diversions of
water from the San Juan River Basin under the
Project consistent with subparagraph 9.13 of the
Agreement.’’
[For definitions of terms used in section 10701 of Pub.
L. 111–11, set out above, see section 10302 of Pub. L.
111–11, set out as a note under section 407 of this title.]
§ 620a. Priority to planning reports of certain ad-
ditional participating projects; reports to
States; San Juan-Chama project; Juniper
project
In carrying out further investigations of proj-
ects under the Federal reclamation laws in the
Upper Colorado River Basin, the Secretary shall
give priority to completion of planning reports
on the Gooseberry, Eagle Divide, Bluestone,
Battlement Mesa, Grand Mesa, Yellow Jacket,
Basalt, Middle Park (including the Troublesome,
Rabbit Ear, and Azure units), Upper Gunnison
(including the East River, Ohio Creek, and
Tomichi Creek units), Lower Yampa (including
the Juniper and Great Northern units), Upper
Yampa (including the Hayden Mesa, Wessels,
and Toponas units) and Sublette (including a di-
version of water from the Green River to the
North Platte River Basin Wyoming), Ute Indian
unit of the Central Utah Project, San Juan
County (Utah), Price River, Grand County
(Utah), Gray Canyon, and Juniper (Utah) par-
ticipating projects: Provided, That the planning
report for the Ute Indian unit of the Central
Utah participating project shall be completed on
or before December 31, 1974, to enable the United
States of America to meet the commitments
heretofore made to the Ute Indian Tribe of the
Uintah and Ouray Indian Reservation under the
Page 232
TITLE 43—PUBLIC LANDS
§ 620a–1
agreement dated September 20, 1965 (Contract
Numbered 14–06–W–194). Said reports shall be
completed as expeditiously as funds are made
available
therefor
and
shall
be
submitted
promptly to the affected States, which in the
case of the San Juan-Chama project shall in-
clude the State of Texas, and thereafter to the
President and the Congress: Provided, That with
reference to the plans and specifications for the
San Juan-Chama project, the storage for control
and regulation of water imported from the San
Juan River shall (1) be limited to a single
offstream dam and reservoir on a tributary of
the Chama River, (2) be used solely for control
and regulation and no power facilities shall be
established, installed or operated thereat, and
(3) be operated at all times by the Bureau of
Reclamation of the Department of the Interior
in strict compliance with the Rio Grande Com-
pact as administered by the Rio Grande Com-
pact Commission. The preparation of detailed
designs and specifications for the works pro-
posed to be constructed in connection with
projects shall be carried as far forward as the in-
vestigations thereof indicate is reasonable in
the circumstances.
The Secretary, concurrently with the inves-
tigations directed by the preceding paragraph,
shall also give priority to completion of a plan-
ning report on the Juniper project.
(Apr. 11, 1956, ch. 203, § 2, 70 Stat. 106; Pub. L.
87–483, § 18, June 13, 1962, 76 Stat. 102; Pub. L.
88–568, § 1, Sept. 2, 1964, 78 Stat. 852; Pub. L.
90–537, title V, § 501(a), Sept. 30, 1968, 82 Stat.
897.)
Editorial Notes
REFERENCES IN TEXT
The Federal reclamation laws, referred to in text, are
identified in section 620c of this title.
CODIFICATION
The provisions of subsec. (a) of section 501 of Pub. L.
90–537 which amended this section are only a part of
said subsec. (a). The remainder of subsec. (a), amended
section 620 of this title and enacted provisions set out
as notes under sections 620 and 620k of this title.
AMENDMENTS
1968—Pub. L. 90–537 substituted Basalt, Middle Park
(including Troublesome, Rabbit Ear, and Azure units),
Upper Gunnison (including the East River, Ohio Creek,
and Tomichi Creek units), Lower Yampa (including Ju-
niper and Great Northern units), and Upper Yampa (in-
cluding Hayden Mesa, Wessels, and Toponas units)
projects for Parshall, Troublesome, Rabbit Ear, San
Miguel, West Divide, Tomichi Creek, East River, Ohio
Creek, Dallas Creek, Dolores, Fruit Growers Extension,
and Animas-La Plata projects, added Ute Indian unit of
the Central Utah Project, San Juan County (Utah),
Price River, Grand County (Utah), Gray Canyon, and
Juniper (Utah) projects, and that portion of the
Sublette projects consisting of a diversion of water
from the Green River to the North Platte River Basin
in Wyoming to the list of participating projects, and in-
serted proviso that planning report for Ute Indian unit
of Central Utah project be completed on or before De-
cember 31, 1974.
1964—Pub. L. 88–568 struck out ‘‘, Fruitland Mesa,
Bostwick Park’’ and ‘‘, Savery-Pot Hook’’ after ‘‘Ohio
Creek’’ and ‘‘Dallas Creek’’, respectively.
1962—Pub. L. 87–483 struck out ‘‘San Juan-Chama,
Navajo’’ after ‘‘Gooseberry,’’ in first sentence.
Statutory Notes and Related Subsidiaries
STORAGE OF WATER AT ABIQUIU DAM IN NEW MEXICO
Pub. L. 100–522, Oct. 24, 1988, 102 Stat. 2604, as amend-
ed by Pub. L. 116–260, div. AA, title III, § 337(b), Dec. 27,
2020, 134 Stat. 2712, provided that:
‘‘SECTION 1. WATER STORAGE.
‘‘Notwithstanding any other provision of law, the
Secretary of the Army, acting through the Chief of En-
gineers, is authorized to store Rio Grande system and
San Juan-Chama project water at Abiquiu Dam, New
Mexico. The Secretary is authorized further to acquire
lands adjacent to Abiquiu Dam on which the Secretary
holds easements as of the date of enactment of this Act
[Oct. 24, 1988] if such acquisition is necessary to assure
proper recreational access at Abiquiu Dam. The Sec-
retary is further directed to report to Congress as soon
as possible with recommendations on additional ease-
ments that may be required to assure implementation
of this Act.
‘‘SEC. 2. LIMITATION.
‘‘The authorization to store water and to acquire
lands under section 1 is subject to the provisions of the
Rio Grande Compact and the resolutions of the Rio
Grande Compact Commission.’’
STORAGE OF SAN JUAN-CHAMA PROJECT WATER IN
OTHER RESERVOIRS
Pub. L. 97–140, § 5, Dec. 29, 1981, 95 Stat. 1717, as
amended by Pub. L. 116–260, div. AA, title III, § 337(a),
Dec. 27, 2020, 134 Stat. 2712, provided that:
‘‘(a) The proviso of section 2 of Public Law 84–485
[this section] shall not be construed to prohibit the
storage of San Juan-Chama project water acquired by
contract with the Secretary of the Interior pursuant to
Public Law 87-483 [section 615ii et seq. of this title] in
any reservoir, including the storage of water for recre-
ation and other beneficial purposes by any party con-
tracting with the Secretary for project water.
‘‘(b) The Secretary of the Army, acting through the
Chief of Engineers, is authorized to enter into agree-
ments with entities which have contracted with the
Secretary of the Interior for water from the San Juan-
Chama project pursuant to Public Law 87-483 for stor-
age of such water in Abiquiu Reservoir. The Secretary
of the Interior is hereby authorized to release San
Juan-Chama project water to contracting entities for
such storage. The agreements to thus store San Juan-
Chama project water shall not interfere with the au-
thorized purposes of the Abiquiu Dam and Reservoir
project and shall include a requirement that each user
of storage space shall pay any increase in operation and
maintenance costs attributable to the storage of that
user’s water.
‘‘(c) The Secretary of the Interior is authorized to
enter into agreements with entities which have con-
tracted with the Secretary of the Interior for water
from the San Juan-Chama project pursuant to Public
Law 87-483 for storage of such water in Elephant Butte
Reservoir. The Secretary of the Interior is hereby au-
thorized to release San Juan-Chama project water to
contracting entities for such storage. Any increase in
operation and maintenance costs resulting from such
storage not offset by increased power revenues result-
ing from that storage shall be paid proportionately by
the entities for which the San Juan-Chama project
water is stored.
‘‘(d) The amount of evaporation loss and spill charge-
able to San Juan-Chama project water stored pursuant
to subsections (b) and (c) of this section shall be ac-
counted as required by the Rio Grande compact and the
procedures established by the Rio Grande Compact
Commission.’’
§ 620a–1. Construction of participating projects
to be concurrent with Central Arizona
Project
The Secretary is directed to proceed as nearly
as practicable with the construction of the
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
No purchase, grant, lease, or other conveyance of lands, or of any title or claim thereto, from any Indian nation or tribe of Indians, shall be of any validity in law or equity, unless the same be made by treaty or convention entered into pursuant to the Constitution. Every person who, not being employed under the authority of the United States, attempts to negotiate such treaty or convention, directly or indirectly, or to treat with any such nation or tribe of Indians for the title or purchase of any lands by them held or claimed, is liable to a penalty of $1,000. The agent of any State who may be present at any treaty held with Indians under the authority of the United States, in the presence and with the approbation of the commissioner of the United States appointed to hold the same, may, however, propose to, and adjust with, the Indians the compensation to be made for their claim to lands within such State, which shall be extinguished by treaty.
Source: Supplied U.S. Code snapshot — release unconfirmed · 25 U.S.C. § 177
Stored review status: release_metadata_unconfirmed. The source passage cites 25 U.S.C. § 177. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
Page 49
TITLE 25—INDIANS
§ 180
Statutory Notes and Related Subsidiaries
CHANGE OF NAME
‘‘United States attorney’’ substituted in text for
‘‘United States district attorney’’ on authority of act
June 25, 1948. See section 541 of Title 28, Judiciary and
Judicial Procedure.
§ 176. Survey of reservations
Whenever it becomes necessary to survey any
Indian or other reservations, or any lands, the
same shall be surveyed under the direction and
control of the Bureau of Land Management, and
as nearly as may be in conformity to the rules
and regulations under which other public lands
are surveyed.
(R.S. § 2115; 1946 Reorg. Plan No. 3, § 403, eff. July
16, 1946, 11 F.R. 7876, 60 Stat. 1100.)
Editorial Notes
CODIFICATION
R.S. § 2115 derived from act Apr. 8, 1864, ch. 48, § 6, 13
Stat. 41.
Executive Documents
TRANSFER OF FUNCTIONS
For transfer of functions of other officers, employees,
and agencies of Department of the Interior, with cer-
tain exceptions, to Secretary of the Interior, with
power to delegate, see Reorg. Plan No. 3 of 1950, §§ 1, 2,
eff. May 24, 1950, 15 F.R. 3174, 64 Stat. 1262, set out in
the Appendix to Title 5, Government Organization and
Employees.
‘‘Bureau of Land Management’’ substituted in text
for ‘‘General Land Office’’ pursuant to section 403 of
Reorg. Plan No. 3 of 1946, set out in the Appendix to
Title 5, which established the Bureau and transferred
thereto the powers and duties of the General Land Of-
fice.
§ 177. Purchases or grants of lands from Indians
No purchase, grant, lease, or other conveyance
of lands, or of any title or claim thereto, from
any Indian nation or tribe of Indians, shall be of
any validity in law or equity, unless the same be
made by treaty or convention entered into pur-
suant to the Constitutio
Source: Supplied 2024 U.S. Code historical extraction · 25 U.S.C. § 177
Stored review status: historical_2024_not_currentness_verified. The source passage cites 25 U.S.C. § 177. This identifies an authority to review, not proof of applicability.
Federal law — U.S. Code and appendices · legal_authorities
In carrying out further investigations of projects under the Federal reclamation laws in the Upper Colorado River Basin, the Secretary shall give priority to completion of planning reports on the Gooseberry, Eagle Divide, Bluestone, Battlement Mesa, Grand Mesa, Yellow Jacket, Basalt, Middle Park (including the Troublesome, Rabbit Ear, and Azure units), Upper Gunnison (including the East River, Ohio Creek, and Tomichi Creek units), Lower Yampa (including the Juniper and Great Northern units), Upper Yampa (including the Hayden Mesa, Wessels, and Toponas units) and Sublette (including a diversion of water from the Green River to the North Platte River Basin Wyoming), Ute Indian unit of the Central Utah Project, San Juan County (Utah), Price River, Grand County (Utah), Gray Canyon, and Juniper (Utah) participating projects: Provided, That the planning report for the Ute Indian unit of the Central Utah participating project shall be completed on or before December 31, 1974, to enable the United States of America to meet the commitments heretofore made to the Ute Indian Tribe of the Uintah and Ouray Indian Reservation under the agreement dated September 20, 1965 (Contract Numbered 14–06–W–194). Said reports shall be completed as expeditiously as funds are made available therefor and shall be submitted promptly to the affected States, which in the case of the San Juan-Chama project shall include the State of Texas, and thereafter to the President and the Congress: Provided, That with reference to the plans and specifications for the San Juan-Chama project, the storage for control and regulation of water imported from the San Juan River shall (1) be limited to a single offstream dam and reservoir on a tributary of the Chama River, (2) be used solely for control and regulation
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 620a
Stored review status: release_metadata_unconfirmed. Same stored citation; legal effect and authority still require review.