Browse Arkansas Code titles and sections
43 U.S.C. § 620a — Priority to planning reports of certain additional participating projects; reports to States; San Juan-Chama project; Juniper project
Federal law — U.S. Code and appendices · legal_authorities
In carrying out further investigations of projects under the Federal reclamation laws in the Upper Colorado River Basin, the Secretary shall give priority to completion of planning reports on the Gooseberry, Eagle Divide, Bluestone, Battlement Mesa, Grand Mesa, Yellow Jacket, Basalt, Middle Park (including the Troublesome, Rabbit Ear, and Azure units), Upper Gunnison (including the East River, Ohio Creek, and Tomichi Creek units), Lower Yampa (including the Juniper and Great Northern units), Upper Yampa (including the Hayden Mesa, Wessels, and Toponas units) and Sublette (including a diversion of water from the Green River to the North Platte River Basin Wyoming), Ute Indian unit of the Central Utah Project, San Juan County (Utah), Price River, Grand County (Utah), Gray Canyon, and Juniper (Utah) participating projects: Provided, That the planning report for the Ute Indian unit of the Central Utah participating project shall be completed on or before December 31, 1974, to enable the United States of America to meet the commitments heretofore made to the Ute Indian Tribe of the Uintah and Ouray Indian Reservation under the agreement dated September 20, 1965 (Contract Numbered 14–06–W–194). Said reports shall be completed as expeditiously as funds are made available therefor and shall be submitted promptly to the affected States, which in the case of the San Juan-Chama project shall include the State of Texas, and thereafter to the President and the Congress: Provided, That with reference to the plans and specifications for the San Juan-Chama project, the storage for control and regulation of water imported from the San Juan River shall (1) be limited to a single offstream dam and reservoir on a tributary of the Chama River, (2) be used solely for control and regulation
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 620a
Stored review status: release_metadata_unconfirmed. A text match is a research starting point; applicability is not established.
Original supplied file — preserved unchanged
Download original Markdown file
File SHA-256: a15217cdae04c7b59338b08367c8965993ea9295e31c5c63c906a15968d42064. The original may include catalog metadata, neighboring provisions, or embedded records outside this collection's scope. Search shows only the selected federal record. Historical editions and unverified snapshots are not a statement of current law.
Authority boundary: historical or unconfirmed source not current law verified.
Open the recorded source website ↗
Record provenance
Stable record: federal_law:legal_authorities:record_usc_07bbb4775476542a81f0a711
Source file: Laws/federal/codes/united-states-code/title-43/section-620a-priority-to-planning-reports-of-certain-additional-participating-project--8d0c521ab6.md
Pages: Not recorded – Not recorded
Passage SHA-256: 2de689ba5e39786b7c0b8034fff9230c9b6b9b055022433d5af59f5518789ac4
Source location: Title 43, Chapter 12B, § 620a; chapter-12b-colorado-river-storage-project.md
Stored source content
In carrying out further investigations of projects under the Federal reclamation laws in the Upper Colorado River Basin, the Secretary shall give priority to completion of planning reports on the Gooseberry, Eagle Divide, Bluestone, Battlement Mesa, Grand Mesa, Yellow Jacket, Basalt, Middle Park (including the Troublesome, Rabbit Ear, and Azure units), Upper Gunnison (including the East River, Ohio Creek, and Tomichi Creek units), Lower Yampa (including the Juniper and Great Northern units), Upper Yampa (including the Hayden Mesa, Wessels, and Toponas units) and Sublette (including a diversion of water from the Green River to the North Platte River Basin Wyoming), Ute Indian unit of the Central Utah Project, San Juan County (Utah), Price River, Grand County (Utah), Gray Canyon, and Juniper (Utah) participating projects: Provided, That the planning report for the Ute Indian unit of the Central Utah participating project shall be completed on or before December 31, 1974, to enable the United States of America to meet the commitments heretofore made to the Ute Indian Tribe of the Uintah and Ouray Indian Reservation under the agreement dated September 20, 1965 (Contract Numbered 14–06–W–194). Said reports shall be completed as expeditiously as funds are made available therefor and shall be submitted promptly to the affected States, which in the case of the San Juan-Chama project shall include the State of Texas, and thereafter to the President and the Congress: Provided, That with reference to the plans and specifications for the San Juan-Chama project, the storage for control and regulation of water imported from the San Juan River shall (1) be limited to a single offstream dam and reservoir on a tributary of the Chama River, (2) be used solely for control and regulation and no power facilities shall be established, installed or operated thereat, and (3) be operated at all times by the Bureau of Reclamation of the Department of the Interior in strict compliance with the Rio Grande Compact as administered by the Rio Grande Compact Commission. The preparation of detailed designs and specifications for the works proposed to be constructed in connection with projects shall be carried as far forward as the investigations thereof indicate is reasonable in the circumstances.
Cross-references
Connections may be documented source relationships, shared citations or nearby passages. Each explains its basis; a connection alone does not establish applicability to your situation.
Federal law — U.S. Code and appendices · legal_authorities
In order to initiate the comprehensive development of the water resources of the Upper Colorado River Basin, for the purposes, among others, of regulating the flow of the Colorado River, storing water for beneficial consumptive use, making it possible for the States of the Upper Basin to utilize, consistently with the provisions of the Colorado River Compact, the apportionments made to and among them in the Colorado River Compact and the Upper Colorado River Basin Compact, respectively, providing for the reclamation of arid and semiarid land, for the control of floods, and for the generation of hydroelectric power, as an incident of the foregoing purposes, the Secretary of the Interior is authorized (1) to construct, operate, and maintain the following initial units of the Colorado River storage project, consisting of dams, reservoirs, powerplants, transmission facilities and appurtenant works: Wayne N. Aspinall, Flaming Gorge, Navajo (dam and reservoir only), and Glen Canyon: Provided, That the Wayne N. Aspinall Dam shall be constructed to a height which will impound not less than nine hundred and forty thousand acre-feet of water or will create a reservoir of such greater capacity as can be obtained by a high waterline located at seven thousand five hundred and twenty feet above mean sea level, and that construction thereof shall not be undertaken until the Secretary has, on the basis of further engineering and economic investigations, reexamined the economic justification of such unit and, accompanied by appropriate documentation in the form of a supplemental report, has certified to the Congress and to the President that, in his judgment, the benefits of such unit will exceed its costs; and (2) to construct, operate, and maintain the following additional reclamation
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 620
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Except as otherwise provided in this chapter, in constructing, operating, and maintaining the units of the Colorado River storage project and the participating projects listed in [section 620 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section620&num=0&edition=prelim), the Secretary shall be governed by the Federal reclamation laws (Act of June 17, 1902, 32 Stat. 388, and Acts amendatory thereof or supplementary thereto): Provided, That (a) irrigation repayment contracts shall be entered into which, except as otherwise provided for the Paonia and Eden projects, provide for repayment of the obligation assumed thereunder with respect to any project contract unit over a period of not more than fifty years exclusive of any development period authorized by law; (b) prior to construction of irrigation distribution facilities, repayment contracts shall be made with an “organization” as defined in [section 485a(g) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section485a/g&num=0&edition=prelim) which has the capacity to levy assessments upon all taxable real property located within its boundaries to assist in making repayments, except where a substantial proportion of the lands to be served are owned by the United States; (c) contracts relating to municipal water supply may be made without regard to the limitations of the last sentence of [section 485h(c) of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section485h/c&num=0&edition=prelim); and (d), as to Indian lands within, under or served by any participating project, payment of construction costs within the capability of the land to repay shall be subject to [section 386a of title 25](https://uscode.house.gov/view
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 620c
Stored review status: release_metadata_unconfirmed. Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
It is not the intention of Congress, in authorizing only those projects designated in [section 620 of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section620&num=0&edition=prelim), and in authorizing priority in planning only those additional projects designated in [section 620a of this title](https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title43-section620a&num=0&edition=prelim), to limit, restrict, or otherwise interfere with such comprehensive development as will provide for the consumptive use by States of the Upper Colorado River Basin of waters, the use of which is apportioned to the Upper Colorado River Basin by the Colorado River Compact and to each State thereof by the Upper Colorado River Basin Compact, nor to preclude consideration and authorization by the Congress of additional projects under the allocations in the compacts as additional needs are indicated. It is the intention of Congress that no dam or reservoir constructed under the authorization of this chapter shall be within any national park or monument.
Source: Supplied U.S. Code snapshot — release unconfirmed · 43 U.S.C. § 620b
Stored review status: release_metadata_unconfirmed. Incoming connection: Explicit cross-reference supplied in source Markdown; currentness and applicability require review.
Federal law — U.S. Code and appendices · legal_authorities
Page 231
TITLE 43—PUBLIC LANDS
§ 620a
‘‘(A) provides congressional authorization for the
lease, contracting, and transfer of any water right
described in paragraph (1)(A); and
‘‘(B) is deemed to fulfill any requirement that
may be imposed by the provisions of section 2116 of
the Revised Statutes (25 U.S.C. 177).
‘‘(5) FORFEITURE.—The nonuse of a water right of
the Nation by a lessee or contractor to the Nation
under this subsection shall not result in forfeiture,
abandonment, relinquishment, or other loss of any
part of a right decreed to the Nation under the Con-
tract or this section.
‘‘(e) NULLIFICATION.—
‘‘(1) DEADLINES.—
‘‘(A) IN GENERAL.—In carrying out this section,
the following deadlines apply with respect to imple-
mentation of the Agreement:
‘‘(i) AGREEMENT.—Not later than December 31,
2010, the Secretary shall execute the Agreement.
‘‘(ii) CONTRACT.—Not later than December 31,
2010, the Secretary and the Nation shall execute
the Contract.
‘‘(iii) PARTIAL
FINAL
DECREE.—Not later than
December 31, 2013, the court in the stream adju-
dication shall have entered the Partial Final De-
cree described in paragraph 3.0 of the Agreement.
‘‘(iv)
FRUITLAND-CAMBRIDGE
IRRIGATION
PROJECT.—Not later than December 31, 2016, the
rehabilitation construction of the Fruitland-Cam-
bridge Irrigation Project authorized under section
10607(a)(1) [123 Stat. 1394] shall be completed.
‘‘(v) SUPPLEMENTAL PARTIAL FINAL DECREE.—Not
later than December 31, 2016, the court in the
stream adjudication shall enter the Supplemental
Partial Final Decree described in subparagraph
4.0 of the Agreement.
‘‘(vi) HOGBACK-CUDEI IRRIGATION PROJECT.—Not
later than December 31, 2019, the rehabilitation
construction of the Hogback-Cudei Irrigation
Project authorized unde
Source: Supplied 2024 U.S. Code historical extraction · 43 U.S.C. § 620a
Stored review status: historical_2024_not_currentness_verified. Same stored citation; legal effect and authority still require review.